Current Construction Conditions
o On Friday, October 23, the contractor washed, swept and picked up loose roadway
material.
o Asphalt will be placed in areas where the roadway is raveling and will taper around exposed
manholes. Contractor hopes to complete the work today.
o Contractor swept entrance area at contractor’s leased lot at corner of Providence and
Scotland.
o Staff will continue to work on dust control throughout the project with contractor.
Street after Construction
o Contractor is tentatively scheduled to pave Scotland next week.
o Staff is evaluating curb and gutter replacement and milling/resurfacing limits (both width
and length) on Biltmore.
o The timing of paving Biltmore is dependent on outcome of Charlotte Water’s evaluation and
potential of additional sewer repair work.
Condition of Water & Sewer Lines (Charlotte Water)
o Origin of sewer back up at 1631 Biltmore (Mr. Hardwick) was located and repaired.
o Video inspection of sewer along Biltmore Drive is schedule to begin Monday, October 26, to
determine if additional work is needed.
o Extensive rehab to the water system was completed within the past 10-15 years. Water
quality testing will be completed at a few locations as an initial screening. If problems are
found additional testing will be completed.
Safety for Halloween
o Staff is evaluating what can be done in preparation for Halloween night visitors on Biltmore.
Communication
o Storm Water Services is working to identify specific actions to improve communication with
Biltmore Drive residents. We’re working to determine the most effective communication
approach for the construction inspector to share construction schedule updates.
I will provide email updates on how we are addressing these concerns and feel free to contact me if you
have any questions. Joel Hardison, Construction Inspector, will continue to be your main point of
contact for construction related questions. You can reach him at 704-299-1994 or
jdhardison@charlottenc.gov.