Good afternoon residents. Below is a continuation of ongoing communication with the residents on Biltmore Drive and a broader update on the entire Cherokee Scotland Storm Drainage Improvement Project. For the past four weeks updates have been coming from Jennifer Smith, the Division Manager of Charlotte-Mecklenburg Storm Water Services. I will continue with this charge moving forward. This email distribution list includes members of Eastover Residents’ Association, who will then forward to Block Captains. Each Friday, I will be sending an update of scheduled construction activity projecting two weeks out. Our goal is to provide useful information as it relates to locations of anticipated construction activity. Progress is weather dependent and as with all construction, site conditions may necessitate the need to deviate from what was anticipated. These updates will also include answers to general questions asked by individual residents throughout the week. City offices are closed November 26 and 27 for the Thanksgiving holiday, so the next update will be sent on Friday, December 4. Feel free to contact me if you have any questions about this update. Joel Hardison, Construction Inspector, will continue to be your main point of contact for construction related questions. You can reach him at 704-299-1994 or jdhardison@charlottenc.gov. Thanks, Jackie Bray Charlotte-Mecklenburg Storm Water Services Project Manager, City of Charlotte Lot at Providence and Scotland • Mecklenburg County is terminating the lease with Onsite for the use of 1727 Scotland Avenue today (11/20/2015). • Onsite will have 10 days to remove their materials and equipment. • Onsite will work with the County to restore the property. This may be completed after the 10 days. Upcoming Colville Road Closure • The 900 block of Colville Road between Scotland Avenue and Twiford Place is scheduled to close on Monday, November 23, 2015 at 7 a.m. and reopen Friday, December 11, 2015, at 5 p.m. The road in this area will be closed to all through traffic as the contractor will be installing the box culvert crossing. Detour signs will be posted, directing motorists around the closure using Scotland Avenue, Cherokee Road and Lockley Drive. Current Construction Conditions • Contractor will continue to work along the channel behind the homes of several properties on Scotland and Twifford Ave and reseeding areas. Sanitary Sewer Lines • As of Monday, November 16, Charlotte Water has identified the scope of the sanitary sewer line repairs needed and requested a cost estimate from the contractor. The repairs are extensive and time is needed to negotiate the cost and determine the construction schedule. We anticipate an agreement will be in place soon after the Thanksgiving holiday. • The sanitary sewer line repair work will require a temporary road closure on sections of Biltmore. The Colville Road closure is scheduled for November 23 through December 11 and we cannot close both at the same time. Due to this restriction along with the upcoming holidays, we anticipate the sanitary sewer line repair work will start after the New Year. Streets after Construction • Paving on Biltmore will take place after all the sewer repair and curb replacement is complete. • Paving on Scotland near Colville is planned for the week of November 30 and after channel work in the area is completed. • The contractor has been advised to be mindful of speed limits in the area. The contractor will keep heavy construction equipment and material deliveries off of newly paved streets as much as possible. Work Schedule • The contractor will not be working Thursday, November 26, through Sunday, November 29.