Building Consistency Meeting
Commercial
Date: 8/04/2010 Recorder and minutes prepared by: Danny Wooten/Jeff Vernon
Staff present: On file
Public present: Greg Seaton (Seaton Builders);Dave Reynolds (BFS)
Topics/Subject
Decisions/Conclusions/Actions
Old
Business
Section 3409
New
Business
Section
1108.2.8.1
Manufactured
Buildings
SI Not
Required
Spray
Fireproofing
Section
1008.1.8.3 Item
2
Insulation
Between
Condos
Section
1405.12.2
Energy Star
In renovation of an existing space 20% of the total cost of construction
must be used to upgrade the accessible path including restrooms and
water fountains.
Dining surfaces are provided, 5% but not less than 1 of seating or
standing spaces must be accessible and distributed throughout the
facility.
The interpretation was covered in the residential meeting.
If SI is marked on the appendix B but is not required then the plans
should be stamped SI NOT REQUIRED by the signature stamp.
SI is not required on spray fireproofing < 1000 sq ft in area. Patch and
repair.
A space can have more than one main entrance and this item may be
used on more than one main entrance as long as all 3 items listed under
2 are met. For A,B,M and S
In a condo building only the exterior walls are required to be insulated
to meet the Energy Code. The walls between the units are insulated for
sound.
Windows opening are restricted to 4” if more than 72” above finished
grade. Exception if windows or exterior guards meet ASTM 2006 or
ASTM 2090
Will need to develop a new task code for insulation inspections done at
the framing stage.
Approved By ___Lon Mcswain_________ Date _______08/30/2010_______________