OGSA-DAI
Open Grid Services Architecture – Data Access and Integration
NeSC Review
18 March 2004
Description and Aims
OGSA–DAI
Provide a uniform access framework for heterogeneous
data resources on the Grid
Data resources:



Relational databases
XML collections
Can widen scope, e.g. files, any data source/sink
Middleware which:
Reduces development cost of data centric Grid
applications
Facilitates Grid data centric application development
Facilitates data integration
Increased collaboration
Status
Functional Scope defined goals
Had a 66 point functional scope for Phase II
All MUSTs/SHOULDs achieved except:

Statement Metadata (partially complete)
– We do not list all SQL operations a GDS supports
MAYs completed:





Transforming application data (compression, XSLT)
Caching of data
Block transfer of data
Scripting (though we no longer call it that)
Persistent components
Workplan
All workpackages and
deliverables completed
The project lasted 92
(78 + 14) weeks.
Over the 92 weeks
(4/2/02 to 31/10/03):
138 SM of effort at EPCC
were planned
140.2 SM were expended
1% overrun
Workpackage (WP)
Status
1. Programme Management
1.1 End of Phase 2 review
D1.1 End of Phase 2 Report
FINISHED
Oracle
Complete
2. Architecture
2.1 High Level Design
D2.1 High level system architecture
Due M3, 31/12/2002, delivered 25/11/2002
2.2 Architectural definition
D2.2 Architecture framework definition
Due M3, 31/12/2002, delivered 7/11/2002
FINISHED
EPCC/IBM
Complete
EPCC/IBM/NeSC/UoM
Complete
3. Development
3.1 Detailed Component design
D3.1.1 Release design documentation (Release 1)
D3.1.2 Release design documentation (Release 2)
D3.1.3 Release design documentation (Release 3)
3.2 Component implementation
D3.2.1 Release implementation code (Release 1)
D3.2.2 Release implementation code (Release 2)
D3.2.3 Release implementation code (Release 3)
3.3 Write documentation
D3.3.1 Release system and user documentation (Release 1)
D3.3.2 Release system and user documentation (Release 2)
D3.3.3 Release system and user documentation (Release 3)
3.4 Develop test strategy and test suites
D3.4 Release test strategy and test suites
3.5 Perform tests
D3.5.1 Documented test results (Release 1)
D3.5.2 Documented test results (Release 2)
D3.5.3 Documented test results (Release 3)
FINISHED
EPCC/IBM
Complete
Complete
Complete
EPCC/IBM
Complete
Complete
Complete
EPCC/IBM
Complete
Complete
Complete
EPCC/IBM
Complete
EPCC/IBM
Complete
Complete
Complete
4. Distributed Query Processing
4.1 Revise DQP model
D4.1 Revised DQP model
4.2 Develop prototype
D4.2 Distributed query prototype
FINISHED
UoM/UoN
Complete
UoM/UoN
Complete
5. Release Management
Complete (Phase 2)
Releases
Releases added functionality
in staged deliveries
Kept on target
Max slippage was 2 weeks
due to GGF
Made available through
project website and GTR
http://www.ogsadai.org.uk
http://gtr.globus.org
Early adopters had early
access to release candidates
1199 downloads at 31st Oct
2003
50% from UK
Release
Release
Date
Release 3.0.2 26/09/03
Release 3
31/07/03
Release 2
interim
11/06/03
Release 2
15/04/03
Release 1
interim
28/02/03
Release 1
15/01/03
The Basics
Container
DAISGR
Client
GDSF
Data Resource
GDS
Technical Achievements
Grid Data Service
Perform documents allow for powerful “scripting”

Composition of requests (encapsulation of activities)
Activity Framework easily extended by developers
Variety of delivery/upload mechanisms

SOAP/HTTP, GridFTP, GDT
Can achieve complex composition patterns

e.g. distributed queries using temporary tables
Grid Data Service Factory
Simple to configure
Supported databases:

MySQL, DB2, Oracle, XIndice
Other “working” databases:

SQL Server, Postgres, Access (via JDBC/ODBC)
DAI Service Group Registry
Framework for service discovery
Dissemination (1)
Selected Presentations (EPCC during Phase II only)
10th Anniversary of Poznan Supercomputing Centre, October 24, 2003
Designing and Building Grid Services Workshop, Chicago, October 8,
2003
Glasgow Kelvin Hub opening, September 17, 2003
All Hands presentations and demonstrations, Nottingham, September
2-4, 2003
DAIS F2F, NeSC, August 21 – 22, 2003
ASTAR Visit, NeSC, July 14, 2003
Virtual Observatory as a Data Grid, NeSC, June 30 – July 2, 2003
Geoffrey Fox visit, EPCC, April 4, 2003
NeSC Review, NeSC, March 28, 2003
OGSA-DAI / Informatics meeting, NeSC, March 27, 2003
OGSA Experiences Panel, GGF7 Tokyo, March 4-7, 2003
NeSC Open Day, NeSC, January 17, 2003
Dissemination (2)
Posters
NeSC Review, NeSC, September 30, 2003
UK e-Science All Hands, Nottingham, September 2-4, 2003
GlobusWorld January 13 – 17, 2003
Publications through GGF
DAIS – File Access, September 19, 2003
DAIS – Grid Data Service Specification, September 19, 2003
DAIS – Relational Specialisation, September 19, 2003
DAIS – XML Specialisation, September 19, 2003
DFDL – Basic Structures Ontology, August 5, 2003
DFDL – Primitive Type Ontology, August 5, 2003
DFDL – Structural Description, August 5, 2003
DFDL – XML Representation, August 5, 2003
DFDL – Primer, June 4, 2003
Other notable publications
“Grid Security for Dummies”, available from OGSA-DAI
website, October 29, 2003
Training
Course and tutorials by EPCC staff were run at:
eScience Summer School, NeSC, September 29 –
October 3rd, 2003
International Summer School on Grid Computing,
Naples, July 13 – 25, 2003
OGSA-DAI Training Course, NeSC, April 22, 2003
OGSA-DAI Tutorial, GGF7 Tokyo, March 4, 2003
Creating Grid Services using GT3 and Java course,
NeSC, February 24, 2003
OGSA-DAI Training Course, NeSC, February 11, 2003
OGSA-DAI Training Course, NeSC, January 8, 2003
“Show and tell” method of increasing exposure
Support
Support for OGSA-DAI through Grid
Support Centre from Release 2
Very useful to encourage user take-up
Query desk
Regular stream of queries
Active user list
“Power Users” submitted answers to other
users questions
Discussed innovative ways of extending OGSADAI
Exploitation
Projects started at both EPCC/NeSC and IBM
using OGSA-DAI:
eDiaMoND
FirstDIG
INWA
BRIDGES
EdSkyQueryG
Many more projects using OGSA-DAI
Presentations,
Visits and
Training
have been vital to uptake of OGSA-DAI
Future plans
Work continues under the DAIT project
Research and develop OGSA-DAI software
Improve performance and scalability
Liase with technology adopters

Make sure OGSA-DAI works for them
Liase with Globus


Globus Alliance
OGSA-DAI also distributed through Globus Toolkit
Continue standardisation process through
DAIS
We’ve done Data Access
… now it’s time for Data Integration!
Project Participants
EPCC
Ali Anjomshoaa, Mario Antonioletti, Rob Baxter, Neil Chue
Hong, Ally Hume, Mike Jackson, Amy Krause, Jeremy Nowell,
Charaka Palansuriya, Tom Sugden, Martin Westhead
IBM UK
Brian Collins, Simon Laws, Andrew Borley, James Magowan,
Neil Hardman, George Hicken, Manfred Oevers, Alan Knox
IBM US
Susan Malaika, Inderpal Narang
NeSC
Malcolm Atkinson
Oracle UK
Dave Pearson
University of Manchester
Norman Paton, Nedim Alpdemir
University of Newcastle
Paul Watson, Arijit Mukherjee
Download