Parkwood storm drainage improvement project June 2011 YOUR STORM WATER FEES AT WORK Dear Resident or Property Owner, Charlotte-Mecklenburg Storm Water Services and consulting engineers RS&H are completing the evaluation of the existing conditions within the project area. When analysis is complete a public meeting will be scheduled to present the findings and solicit input from project area residents and property owners. Meeting details will be mailed to you approximately two weeks in advance. extension and work will begin once Phase 1 is complete. The project is being split into two phases: Phase 1 is downstream of the proposed light rail extension. Work is being accelerated on Phase 1 to prepare for the light rail extension. Phase 2 is upstream of the light rail If you have any questions, please contact Project Manager David Perry at dperry@charlottenc.gov or 704-336-4202. For more information, please visit our website at: http://stormwater.charmeck.org Click on Storm Water Projects dropdown menu in the green bar, then Active Projects and Parkwood Phase 1 or Parkwood Phase 2. Be a Water Watcher Report Pollution of our Lakes and Creeks Call 311 if you see: • Discolored or foul-smelling creeks or lakes • Improper dumping of used oil, paint and other pollutants • Mud coming from construction sites • Poor business practices that cause pollution • Sewage coming out of manholes or pipes For more information visit http://stormwater.charmeck.org or visit Water Watchers on Facebook. Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202