FOREST RESPONSIBILITY FOR TRAIL BRIDGE INFO CHECKLIST REQUIRED INFORMATION:

advertisement
Appendix A—Example of a Site Survey Map and Checklist
FOREST RESPONSIBILITY FOR TRAIL BRIDGE INFO
CHECKLIST
REQUIRED INFORMATION:
SITE PLAN (1:1) - ELECTRONIC DWG OR DXF FILE
NORTH ARROW
SCALE
STATIONING
CONTOURS (MAJOR & MINOR & LABELS)
TEMPORARY BENCH MARK & CONTROL POINTS (LABELED)
HIGH-WATER MARK (LABELED)
CL TRAIL
CL STREAM
TOP OF BANK
BOTTOM OF BANK
SHOTS & GROUND SHOTS
BREAKLINES
ON SEPARATE LAYERS
TINS
}
PROFILE (10:1) - ELECTRONIC DWG OR DXF FILE
PROJECT PROFILE
STATIONS
ELEVATIONS
HIGH-WATER MARK
FILES SHALL BE CLEAN AND EDITABLE WITH NO REFERENCE FILES
* ALL
BMPS FOR THE FOREST, IF REQUIRED
* SEE TYPICAL SITE SURVEY FOR SURVEY REQUIREMENTS.
APPROVAL INFORMATION EXAMPLE:
AREA ENGINEER
SUBMITTED
DISTRICT RANGER
REVIEWED
PROGRAM OFFICER
RECOMMENDED
FOREST SUPERVISOR
APPROVED
USER INFORMATION: (CHECK ALL THAT APPLY)
PEDESTRIAN
MOTORCYCLE
BIKE
HORSE
ATV
SNOWMOBILE
PRINT NAME
"
"
"
GROOMER
OTHER
NOTES: OTHER INFORMATION OR DESIGN CONSIDERATION (i.e ACCESSIBILITY)
BMPS FOR THE FOREST, IF REQUIRED
OTHER
SHEET 2 OF 2