Appendix A—Example of a Site Survey Map and Checklist FOREST RESPONSIBILITY FOR TRAIL BRIDGE INFO CHECKLIST REQUIRED INFORMATION: SITE PLAN (1:1) - ELECTRONIC DWG OR DXF FILE NORTH ARROW SCALE STATIONING CONTOURS (MAJOR & MINOR & LABELS) TEMPORARY BENCH MARK & CONTROL POINTS (LABELED) HIGH-WATER MARK (LABELED) CL TRAIL CL STREAM TOP OF BANK BOTTOM OF BANK SHOTS & GROUND SHOTS BREAKLINES ON SEPARATE LAYERS TINS } PROFILE (10:1) - ELECTRONIC DWG OR DXF FILE PROJECT PROFILE STATIONS ELEVATIONS HIGH-WATER MARK FILES SHALL BE CLEAN AND EDITABLE WITH NO REFERENCE FILES * ALL BMPS FOR THE FOREST, IF REQUIRED * SEE TYPICAL SITE SURVEY FOR SURVEY REQUIREMENTS. APPROVAL INFORMATION EXAMPLE: AREA ENGINEER SUBMITTED DISTRICT RANGER REVIEWED PROGRAM OFFICER RECOMMENDED FOREST SUPERVISOR APPROVED USER INFORMATION: (CHECK ALL THAT APPLY) PEDESTRIAN MOTORCYCLE BIKE HORSE ATV SNOWMOBILE PRINT NAME " " " GROOMER OTHER NOTES: OTHER INFORMATION OR DESIGN CONSIDERATION (i.e ACCESSIBILITY) BMPS FOR THE FOREST, IF REQUIRED OTHER SHEET 2 OF 2 22