Enclosure 3A - Project Summary Form 166 NATIONAL FIRE PLAN COMMUNITY ASSISTANCE AND WILDLAND URBAN INTERFACE PROJECTS Application for Fuels Treatment Projects Applicant Applicant/Organization: Central Oregon Intergovernmental Council (COIC) Phone: Type of Applicant: (enter appropriate letter in box) F 541-548-9525 FAX: A. State B. County C. Municipal D. Township E. Interstate F. Intermunicipal G. Special District 541-548-9549 Email: scotta@coic.org H. Independent School District I. State-Controlled Institution of Higher Learning J. Private University K. Indian Tribe L. Nonprofit Organization M. Other (Specify) _______________________ Address (Street or P. O. Box, City, State, Zip): 2363 SW Glacier Place, Redmond, OR 97756 Project Coordinator Project Coordinator (Name and Title): Scott Aycock, Program Administrator Organization/Jurisdiction: Central Oregon Intergovernmental Council Phone: FAX: Email: 541-548-9525 541-548-9549 scotta@coic.org Project Information Project Title: South Deschutes County Communities Fuels Treatment and Mitigation Project Proposed Project Start Date: Proposed Project End Date: April, 2005 December, 2007 Federal Funding Request: Total Project Cost: $1,782,726 (for three years) $2,408,440 (for three years) Are you submitting multiple projects? If so, please prioritize, and explain if the projects are stand alone, sequential or other: 1 of 3 grants being submitted by COIC, this project is associated with the South Deschutes County Community Fire Action Plan project, and is the highest-priority project. The COPWRR Phase III proposal is an entirely separate project. Brief Project Summary: Who, What, Where, Desired Outcomes in relation to NFP Goals and Community Risk Assessment and Mitigation Plans (This should summarize page 2). Funding is requested to assist the 25 neighborhoods in the South Deschutes County Community Fire Action Plan area to implement high-priority fuels treatment and other needs identified in the 2004 South Deschutes County Community Fire Protection Plan being developed through the “Upper Deschutes Basin Community Fire Plans” project. This will include 70/30 cost-share funding to reduce concentrations of flammable fuels on private property to at least SB 360 standards, and 90/10 cost-share funding to address other community wildfire preparedness infrastructure needs (e.g. widening driveways, developing water sources, purchasing equipment etc.). COIC is providing overall project coordination services for this project. Project Location: County: Federal Congressional District: South Deschutes County, Oregon Deschutes Oregon 2nd Name of Federal, State or Tribal contact with whom you coordinated this proposal: Telephone number of Contact: FEDERAL: Sue Stewart, Central Oregon Fire Management Services STATE: Stuart Otto, Oregon Department of Forestry 541-416-6745 541-447-5658 Enclosure 3A (Page 1 of 3) - Project Narrative Description Applications for funding must include a narrative response that describes the proposal. Please do not submit responses longer than one page, single space, 12-pitch font. Describe project including, but not limited to: project location (e.g., Watershed, Address neighboring community) these items as applicable: anticipated outcomes project relationship to the community risk assessment and mitigation plan amount or extent of actions (acres, number of homes, etc.) community partners and their project timeline and matching or contributed funds role(s) proponent’s ability to complete project For this project, explain the level of cooperation, coordination or strategic planning, through a “Local Coordination Group.” If you haven’t worked with a local coordination group, why not? Overview and Location: Funding is requested to assist the 25 neighborhoods in the South Deschutes County Community Fire Action Plan area to implement high-priority fuels treatment and other needs identified in the 2004 South Deschutes County Community Fire Protection Plan being developed through the “Upper Deschutes Basin Community Fire Plans” project. This will include 70/30 cost-share funding to reduce concentrations of flammable fuels in common areas and undeveloped lots to at least SB 360 standards, and 90/10 cost-share funding to address other community wildfire preparedness infrastructure needs (e.g. widening driveways, developing water sources, purchasing equipment etc.). The region has been organized into 2 sub-regions: 1) the 11 communities of the Upper River Coalition along the main stem of the Deschutes, and 2) the 14 communities of the LaPine Coalition along the Little Deschutes. The entire area includes over 55,000 acres of private land interspersed in the WUI of the Prineville BLM and the Deschutes National Forest (primarily lodgepole and ponderosa pine forests), and corresponds to the boundaries of the LaPine Rural Fire District. The area has been classified by the Oregon Department of Forestry as highly susceptible to catastrophic wildfire, and has had few prior efforts at wildfire fuels reduction or collaboration. Anticipated Outcomes: This project will implement Phases I, II, and III (Years 1, 2, and 3) of fuels treatment and wildfire preparedness infrastructure improvements. Specific actions will accrue from the 2004 Community Fire Plan process and the early-2005 neighborhood Action Plan process. Project funding will enable the treatment of over 3,500 lots (at an average of $600/lot) to at least SB 360 standards and the improvement of wildfire preparedness infrastructure in the amount of $180,000. Community Partner and their Roles: Primary Collaborators include: COIC (treatment coordination, fiscal administration, reporting); Upper River Coalition and LaPine Community Action Team (sub-region organizing and coordination); Watershed Research & Training Center (planning and coordination); LaPine Fire District (local coordination and ID of infrastructure needs); Oregon Department of Forestry (planning); Central Oregon Fire Management Services (planning), & several other partners in sub-section 3A (3). Project Relationship to the Community Risk Assessment and Mitigation Plan: This project will implement the 2004 South Deschutes Community Fire Protection Plan (currently under way), and the neighborhood Action Plans and coordination to be performed in early 2005. Amount and Extent of Actions: The funding requested will enable the treatment of over 3,500 lots and the improvement of wildfire preparedness infrastructure in the amount of $180,000. Project Timeline: This project will be carried out over three Phases from April 2005 through December 2007, with each Phase corresponding to just under one year. Activity sequencing will flow from the prioritization process described in sub-section 3A (1). Matching Funds: Funding will be used to directly mobilize community group and landowner resources in the amount of $625,000. NFP and local funds will be used as match for the development of other funding sources (e.g. RAC; Title III funds; Foundation grants) to meet unmet needs identified in the planning process. Ability to Complete the Project: COIC has ample fiscal, administrative, and professional expertise to carry out this project, and partners have considerable wildfire risk reduction planning and implementation experience. Personnel funds requested in this application will provide the necessary staffing budget to administer and coordinate project activities. There is no Local Coordination Group, yet, for Central Oregon. Enclosure 3A (Page 2 of 3) - Project Evaluation Criteria Applications for funding must include narrative responses that address the following three criteria. Be sure you address every one briefly, yet thoroughly. Limit your responses to the area provided. 1. Reducing Hazardous Fuels (50 points) A. Describe the community infrastructure that will be protected. B. Explain how the proposal reduces fire behavior in high hazard areas by describing the fuels to be disposed or removed, and the techniques and timing of the treatments. C. How will the proposed treatments be maintained in future years? D. How will you use multi-party monitoring to improve this and future projects? Response: A. Community Infrastructure: The unincorporated South Deschutes County area includes 13,615 lots on over 55,000 acres of private land at “serious” risk of wildfire. 7,657 of these lots have houses, businesses, or other structures collectively valued at over $690 million. The area also includes the LaPine and Wickiup Junction commercial areas; the LaPine Industrial Park; several schools, and other community facilities. B. Fire Behavior Modification in High Hazard Areas: The 2004 Community Fire Protection Plan will identify priority hazard areas using the following criteria: 1) lot, neighborhood, and area fire hazard (including biophysical conditions and structural vulnerability); 2) neighborhood and landowner readiness to proceed (including neighborhood leadership and organizational capacity). Areas with the highest level of fire hazard and local capacity to proceed will be treated in Phase 1 (Year 1), with subsequent phasing of priority areas as local capacity is enhanced. Local capacity to implement will be most limited in the first year of operation, with subsequent neighborhoods/communities reaching full capacity in years 2 and 3, therefore the treatment budget increases over this period. Fuels treatment will reduce ladder fuels and stand densities to prevent catastrophic wildfire, with specific prescriptions designed according to biophysical conditions (vegetation, slope, wind patterns, etc.) and local management values. Residential lots will be treated to a minimum of SB 360 standards. Treatments will involve minimal ground disturbance and will avoid impacts to wetlands, identified T&E habitat, cultural resources, and other sensitive areas, and will be coordinated with agency and adjoining private land partners. C. Maintenance: Treatments in many areas will likely be required at least once every 5 years. An associated proposal, the South Deschutes County Action Plan, will provide an incentive for maintenance treatments by incorporating SB 360 standards into neighborhood CC&Rs. Furthermore, as local organizational capacity is increased, funding will be raised by the local neighborhood coalitions through material sales and future grants. D. Monitoring: Treatment effectiveness in achieving ecological, fuels reduction, and economic goals will be monitored by the project manager, with the oversight of the Steering Committee and the COPWRR multistakeholder Advisory Council, with annual reporting to local, state, and national parties. Enclosure 3A (Page 3 of 3) - Project Evaluation Criteria 2. Increasing Local Capacity (25 points) A. How would the proposal improve or lead to the improvement of the local economy in terms of jobs and sustainable economic activity? B. How many jobs are expected to be created or retained and for how long? (Please distinguish between essentially year-round and seasonal jobs). C. What tools and skills will be gained or utilized as a result of this project? D. Will biomass be utilized; if so, in what manner and how much? Local Economy, Jobs, and Sustainable Economic Activity: All of the funds requested for this project will be injected into the local economy, with no activities contracted to outside employers. Wildfire risk reduction efforts will improve business recruitment efforts to the area (e.g. LaPine Industrial Park). This project will create direct year-round employment for one fuels reduction manager over three years, and if the chipper option is funded, two chipper/forwarder operators for three years. It is expected that this will provide intermittent employment for at least 10 local contractors (estimated total of 3-4 full time jobs for 3 years). As appropriate to the job, local youth crews will also be seasonally employed. Tools and Skills: Local contractors, neighborhood groups, and individual lot owners will gain valuable experience in performing fuels treatment on private lands. COIC will develop a certified contractor list, which will increase the professionalism and capacity of the local contracting pool. Furthermore, local citizens will gain experience working with each other and with local public agencies, culminating in the development of improved local capacity for collaboration and productive working relationships with agencies and surrounding communities. Biomass Utilization: This project will provide a stable resource base for small diameter timber and biomass, which will be used by (existing) local composting, post & poles, fire wood and pellets, and (proposed) biobased power businesses. The 2004 South Deschutes County Community Fire Protection Plan will include estimates of tonnage and board feet per year for utilization planning purposes. Response: 3. Demonstrating Community and Intergovernmental Collaboration (25 Points) A. How will this project implement a community risk assessment and mitigation plan? Include name of plan, date it was prepared, and local contact to get a copy of the plan if requested. B. How has this treatment been coordinated with adjacent landowners and local/State/Tribal/Federal agencies? C. Identify the cooperators/partners involved in implementation of this project. D. Describe the extent of current local support for the project, including any cost-sharing agreements. Community Fire Plan and Coordination with adjacent landowners and agencies: This project will implement high-priority needs identified in the 2004 South Deschutes Community Fire Protection Plan and the neighborhood Action Plans to be performed in early 2005 (identified in a separate application). The Watershed Research and Training Center is responsible for preparing the plan, and Marcus Kaufman (541346-0661) is the project coordinator. COIC, ODF, COFMS, and the neighborhood sub-regions each have representation on the Community Fire Plan Steering Committee to ensure coordination and synergy between planning and implementation. Furthermore, Sunriver Environmental, to the north, and Walker Range, to the south, will be consulted during the planning and implementation process. Cooperators/Partners: Primary Collaborators include COIC; Upper River Coalition and LaPine Community Action Team; Watershed Research & Training Center; LaPine Fire District; Oregon Department of Forestry; and Central Oregon Fire Management Services. Deschutes County Project Wildfire; Deschutes County Soil and Water Conservation District; COIC’s COPWRR project; Sunriver Environmental; Walker Range; Upper Deschutes Watershed Council, and other organizations will be represented on the project Steering Committee. Local Support and Match: Local support for this project has been demonstrated by the inordinate amount of time and energy already expended to date – community groups and agency representatives have been meeting for 6 months so far, and this in-kind commitment will continue. Private landowners will provide an average 30% match on treatment costs (using a sliding scale based on family income), and community partners will provide a 10% match on high-priority community infrastructure improvements. Response: Enclosure 3A - Project Work Form Tasks Time Frame Responsible Party Develop the South Deschutes County Community Fire Protection Plan through the “Upper Deschutes Basin Community Fire Plans” project; including neighborhood meetings, data analysis, etc. Pre-grant period: February, 2004 – February, 2005 Watershed Research & Training Ctr. Neighborhood Coalitions & Coordinators COFMS, ODF, LaPine RFD COIC Research models of neighborhood-level fire protection responsibilities and standards (documents and governance models). Pre-grant period: February, 2004 – June, 2004 Neighborhood Coalitions and Coordinators Develop neighborhood-level Action Plans for the South Deschutes County Community Fire Protection Plan, including individual lot assessments, and determine utilization opportunities. Pre-grant period: February, 2005 – April, 2005 Neighborhood Coalitions & Coordinators COIC Watershed Research and Training Ctr. LaPine RFD Convene Steering Committee; Select Phase I activities; establish monitoring protocols; establish fund administration process; and create certified contractor list. April – May, 2005 COIC Neighborhood Coalitions & Coordinators Steering Committee Watershed Research & Training Ctr. Coordinate and Implement Phase I treatments April – November, 2005 COIC Neighborhood Coalitions & Coordinators Steering Committee Contractors and Landowners Select Phase II Activities; incorporate monitoring results December, 2005 – March, 2006 COIC Neighborhood Coalitions & Coordinators Steering Committee Coordinate and Implement Phase II treatments April – November, 2006 COIC Neighborhood Coalitions & Coordinators Steering Committee Contractors and Landowners Select Phase III Activities; incorporate monitoring results December, 2006 – March, 2007 COIC Neighborhood Coalitions & Coordinators Steering Committee Coordinate and Implement Phase III treatments March, 2007 - November, 2007 COIC Neighborhood Coalitions & Coordinators Steering Committee Contractors and Landowners Create comprehensive annual report (Phase I, II, and III) for dissemination to other communities, agencies, and interested parties. December, 2005 – December, 2007 COIC (annually – also described in the Planning Neighborhood Coalitions & Grant). Coordinators Steering Committee Enclosure 3D Project Budget Cost Category Description Federal Agency COIC/ Landowners Personnel (33 month total) Implementation Coordinator 1FTE Program Assistant .1FTE Subtotal Applicant $126,816 $12,224 $139,040 Partner 1 Partner 2 Neigh. Coalit./ LaPine RFD $24,000 Steering Committee $24,000 $24,000 $24,000 Total $174,816 $12,224 $187,040 Fringe Benefits (33 mo. total) Implementation Coordinator Program Assistant Subtotal $61,789 $6,061 $67,850 $61,789 $6,061 $67,850 $6,000 $6,000 $12,000 $6,000 $6,000 $12,000 $100,025 $100,025 $100,025 $100,025 $6,000 $27,811 $33,811 $6,000 $27,811 $33,811 Travel (33 month total) Site visits Post-work site inspections Subtotal Equipment Optional Chipper/forwarder/loader Subtotal Supplies (33 month total) Outreach to landowners General Office Supplies Subtotal Contractual FUELS TREATED: $250K Year 1; $500,000 Year 2; $500,000 Year 3 Subtotal $250,000 $107,143 $357,143 $1,000,000 $1,250,000 $428,571 $535,714 $1,428,571 $1,785,714 Other Monitoring (33 month total) Infrast. Improvements @ 50K/year Subtotal Total Costs $30,000 $150,000 $180,000 $1,782,726 $535,714 $6,000 $30,000 $36,000 $6,000 $6,000 $42,000 $180,000 $222,000 $60,000 $30,000 $2,408,440 Project (Program) Income1 (using deductive alternative) 1 Program income is the gross revenue generated by a grant or cooperative agreement supported activity during the life of the grant. Program income can be made by recipients from fees charged for conference or workshop attendance, from rental fees earned from renting out real property or equipment acquired with grant or cooperative agreement funds, or from the sale of commodities or items developed under the grant or cooperative agreement. The use of Program Income during the project period may require prior approval by the granting agency.