Agenda • Introduction • Project Development • Service Development Plans • Next Steps • Discussion and Comments Project Development The NNEIRI study area includes 470 route miles on 3 segments SPG-MTL: 309 miles Partnership between MassDOT, VTrans, and FRA with Support and Coordination from other Agencies and Stakeholders BOS-SPG: 99 miles SPG-NH: 62 miles Project Development NNEIRI is two Corridors: BM HSR Boston-Montreal High Speed Rail (BMHSR) Inland Route Inland Route Project Development Purpose • Providing additional regional travel options through quality passenger rail • Connecting major cities in the Northeast and Quebec with smaller cities and rural areas • Creating a competitive rail transportation alternative to automobile, bus, and air options Project Development • 18 preliminary options with variations of Speed, Equipment, Track Engineering • Stakeholder, Public, and Agency Coordination for Alternatives Evaluation • 3 Build Alternatives and a No Build Alternative • Recommended Alternative Project Development Alt NB Alt 2 Project Development Alt NB No Build No Additional Capital Costs No Additional Operating Support 71,000 Annual Riders Corridor Service $615-785 Million Capital Costs Alt 2 $24 Million Operating Support 597,000 Annual Riders Corridor Service with Speed Improvements $1,065–1,350 Million Capital Costs $39 Million Operating Support 1,052,500 Annual Riders Corridor Service with Speed and Equipment Improvements $1,255-1,590 Million Capital Costs $48 Million Operating Support 1,170,700 Annual Riders Project Development Alternative 1 Alternative 3 Alternative 2 Recommended Alternative Inland Route BM HSR Project Development Recommended Alternative • Existing Services • Inland Route Corridor Service • Added 8 Daily Boston-New Haven Roundtrips • Boston-Montreal HSR Corridor Service • Added 1 Daily Boston-Montreal Roundtrip • Added 1 Daily New HavenMontreal Roundtrip Inland Route BM HSR Project Development Recommended Alternative • Sample Run Times • BOS-SPG: 2 Hours • BOS-NHV: 3 Hours 38 Minutes • SPG – MTL: 6 Hours 55 Minutes Inland Route BM HSR Project Development Recommended Alternative • Infrastructure Improvements • Worcester to Springfield Second Mainline Restoration • Added Worcester Union Station Platform • Vermont Siding Extensions • Signal and Track Improvements • Provision for a Potential Palmer Station Inland Route BM HSR Service Development Plans Service Development Plans Overview • Process • Independent but coordinated plans developed for each Corridor. • The plans provide the blueprint for the development of service in each Corridor. • The SDPs establish a policy for the implementation of service on the NNEIRI Corridor. • The SDPs include: • Methodology and Plan Development • Operations Modeling • Demand and Revenue Forecasts • Conceptual Engineering • Operating and Maintenance Costs • Investment Options Inland Route BM HSR Service Development Plans Service Development Plans Overview • NNEIRI (Full Project) $1.263 – 1.350 Billion Capital Costs $39 Million Operating Support 875,700 Annual Riders • Inland Route Corridor $612 – 648 Million Capital Costs $29 Million Operating Support 428,600 Annual Riders • Boston to Montreal HSR Corridor $900-984 Million Capital Costs $10 Million Operating Support 447,100 Annual Riders Inland Route BM HSR Service Development Plans Demand and Revenue Forecasts • Demand Forecasts • An intercity passenger rail ridership forecasting model was utilized to provide details on ridership. • The model consists of regional travel market data, historical rail ridership data and trends, and demographic data. • Revenue Forecasts • Related to ridership and service frequency • Average fares, which reflect current average fare values for intercity rail service in the Northeast and extrapolated for new markets based on mileage, were used as the basis for revenue estimation. Total NNEIRI Ridership 875,700 Total NNEIRI Revenue $33.3 Million Inland Route Service Development Plans Demand and Revenue Forecasts Ridership by Segment Daily Added Roundtrips Annual Ridership Within BOS-SPG Segment 8 44,610 Between BOS/SPG – SPG/NHV Segments 8 384,032 Total Ridership - 428,642 Total Revenue - $17.6 Million BM HSR Service Development Plans Demand and Revenue Forecasts Ridership by Segment Daily Added Roundtrips Annual Ridership Within BOS-SPG Segment 1 5,576 Between BOS/SPG – SPG/MTL Segments 1 23,782 Within SPG-MTL Segment 2 149,139 Between NHV/SPG – SPG/MTL Segments 1 268,561 Total Ridership - 447,058 Total Revenue - $15.8 Million Inland Route BM HSR Service Development Plans Conceptual Engineering Methodology for Conceptual Engineering Needs • Assessment of Infrastructure Needs • Testing of Infrastructure Needs with Operation Scenarios 1. 2015 Base Case 2. 2035 Baseline Infrastructure with existing passenger and 2.2% freight growth 3. 2035 Baseline Infrastructure with proposed passenger operations and 2.2% freight growth 4. 2035 Proposed Infrastructure with proposed passenger operations and 2.2% freight growth 5. Randomization of 2035 Scenario - Dwell Extension, Initial Departure Times, Train Operating Handling, and Information Gathering Inland Route BM HSR Service Development Plans NNEIRI (Full Build) Conceptual Engineering Improvement Cost Worcester to Springfield Second Mainline Restoration $120-139 Million Worcester Union Station Second Platform $17 – 19 Million Vermont Siding Extensions $102-117 Million Signal and Track Improvements $485-533 Million Provision for Palmer Station $12 – 14 Million Total NNEIRI Infrastructure Cost $736-821 Million Inland Route BM HSR Service Development Plans Worcester to Springfield Second Mainline Restoration • 37.2 miles Restored Second Mainline • 25 Undergrade bridge second track restorations • 3 grade crossings • Estimated Cost: $120.2-138.8 million Inland Route BM HSR Service Development Plans Worcester Union Station Platform • New Platform – Connects to Union Station via vertical access to existing tunnel. Retains Existing Platform. – Serves 9 Car Train Sets • New switches Installed • New platform will service two mainline tracks • Designed to avoid conflicts with Worcester Intermodal Terminal freight operations • Estimated Cost: $17-19 million Inland Route BM HSR Service Development Plans Vermont Siding Extensions • 29.5 miles of Extended Sidings • 28 Grade Crossing Improvements • Estimated Cost: $102-117 Million Inland Route BM HSR Service Development Plans Signal and Track Improvements • Proposed train control signal system as needed on the Corridor • All grade crossings will be brought into a state of good repair. • Grade crossings that have reached end of useful life will be replaced Section Signals Intermediate Signal Improved Grade Crossing Warning Devices CSX 8 - 13 NECR 20 57 161 Inland Route BM HSR Service Development Plans Provision for Potential Palmer Station • Three feasible sites identified in Palmer for a potential station • Final station design and location to be determined by Commonwealth and local partners. • Concepts for a station site include: • New Platform to Support 9 Car Trains • 100 Space Parking Lot and Bus/Taxi Stand • Dedicated Station Track • Estimated Cost: $12-14 million Inland Route BM HSR Service Development Plans Rolling Stock • Rolling stock refers to the number of train sets, inclusive of a locomotive and five coach cars. • Capital cost for each trainset is based on the recent purchase price for PRIIA Fleet design train sets plus 30% contingency. • Anticipated capital cost $35.1 Million per Trainset Train Sets Cost BMHSR Rolling Stock 5 $175 Million Inland Route Rolling Stock 10 $351 Million Inland Route BM HSR Service Development Plans Operating and Maintenance Costs • To generate operating costs for the Corridor a flexible OM cost model was developed and based on comparable operating costs for intercity services in the Northeast United States and Canada. • The model considers the following operating characteristics: • Level of service • Peak fleet requirements • Operating speed • Revenue operating hours • Route length Inland Route BM HSR Service Development Plans Annual Operating and Maintenance Costs Segment Annual O+M Costs (Exclusive of Revenue) Inland Route $46 Million BMHSR $26 Million Inland Route BM HSR Service Development Plans Investment Options • Investment Options are utilized to describe a series of steps in infrastructure and service investments to reach full NNEIRI Service. • BMHSR and Inland Route Investment Options were developed in tandem in order to properly understand the impact of service on the Corridor as a whole. • Investment Options are organized based on an understanding of maximum ridership benefits, rational service levels, and minimal infrastructure investments to reach the desired service. • Alternative Investment Options could be developed due to changes in funding, financing, governance, construction, or other causes. Inland Route Service Development Plans Investment Option I • 3 Inland Route Roundtrips (off peak arrival/departure from Boston) • Convenient Transfer to Vermonter Services in SPG • Central Massachusetts Siding Extension to Support Services BM HSR Service Development Plans Investment Option II • One NHV-MTL Roundtrip • Full Vermont Infrastructure Capital Costs • Assumes US Customs and Immigration Facility at Montreal Central Station Inland Route Service Development Plans Investment Option III • One additional Inland Route Roundtrip (Service to include shoulder-peak arrival/departures from Boston) • Assumes improvements at Boston South Station and Springfield Union Station Inland Route BM HSR Service Development Plans Investment Option IV (Full Build) • Four Additional Inland Route Roundtrips • BOS-MTL Roundtrip • Restoration of Second Mainline between WOR and SPG • Completion of WOR Second Platform Inland Route BM HSR Service Development Plans Capital Costs Investment Option Inland Route BMSHR NNEIRI Total Investment Option I $190-192 Million N/A $190-192 Million Investment Option II N/A $553-600 Million $553-600 Million Investment Option III $35 Million N/A $35 Million Investment Option IV $387-421 Million $346-383 Million $485-523 Million $900-984 Million $1.263 – 1.350 Billion Total $612-648 Million Inland Route BM HSR Service Development Plans Annual Ridership Investment Option Inland Route BMHSR NNEIRI Total Investment Option I 160,700 N/A 160,700 Investment Option II N/A 343,131 343,131 Investment Option III 214,322 N/A 214,322 Investment Option IV (Full Build) 428,642 447,058 875,700 Inland Route Service Development Plans Inland Route O+M and Revenue Comparison Investment Option Estimated Annual Cost Estimated Annual Operating Support Revenue Investment Option I $16,759,095 $6,615,763 $10,143,332 Investment Option II NA NA NA Investment Option III $22,361,554 $8,821,017 $13,540,537 Investment Option IV $46,746,390 $17,642,033 $29,104,357 BM HSR Service Development Plans BMHSR O+M and Revenue Comparison Investment Option Estimated Annual Cost Estimated Annual Operating Support Revenue Investment Option I NA NA NA Investment Option II $13,075,752 $12,825,650 $250,102 Investment Option III NA NA NA Investment Option IV $26,203,358 $15,757,967 $10,445,391 Inland Route BM HSR Environmental Analysis National Environmental Policy Act (NEPA) • Programmatic Tier 1 Environmental Assessment (EA) currently under MassDOT, VTrans, and FRA Review • Assessment based on work done in the Alternatives Analysis Inland Route BM HSR Next Steps • Completion of Service Development Plans • Completion of EA with Any Additional Stakeholder Input • NEPA Process Completion – Finding of No Significant Impact (FONSI) issued by FRA for Tier 1 EA Discussion & Comments Contact Information Vermont: scott.bascom@state.vt.us Massachusetts: ammie.rogers@state.ma.us Project Website: www.mass.gov/massdot/northernnewenglandrail