Change/Proposal – Utility Relocation Schedule Acceptance (L-2PA) May 30, 2016 XXXX Contractor Company PO Box XXX Town, MA 55555 Town Route XXX – XXX Road over YYY River MassDOT-Highway Contract No. (#) Project No. (#) Dear XXX, MassDOT has received (Contractor’s Company name)’s request to modify aspects of the requirements of the previously approved utility relocations and has reviewed your utility Proposal Schedule, with a data date of (date). In accordance with the requirements of Subsection 8.14 Utility Coordination, Documentation, and Monitoring Responsibilities , and Subsection 8.02 Schedule of Operations, MassDOT acknowledges and accepts the utility changes to the schedule. We will continue to review the changes to the non-utility items on the schedule. If you have any questions or require any additional information, please contact the District Responsible Party, (Name) (Phone #) (Email). Sincerely yours, (Name/Signature) District Highway Director (Author/Typist Initials) CC: (Name) – Resident Engineer (Name) – State Utility Engineer (Name) – District Utility Constructability Engineer (Name) – District Construction Engineer (Name) – Scheduler Leading the Nation in Transportation Excellence