20 40 The drawing shown here is subject to change and revision as the design progresses to the 25% submittal stage. U P P E R L E V E L B U S WAY A S T I CO U R OA D WA S H I N G TO N S T R E E T Figure 2B: Mitigation Concept G TO N S TREET Design for the relocated bus bays will include mitigation concepts to block bus headlights from spilling over onto adjacent buildings. WA S H I N 0 A S T I CO U R OA D CASEY ARBORWAY PROJECT PRELIMINARY DESIGN FOREST O HILLS STATION O AREA DRAFT FOR REVIEW OCTOBER 1, 2012 UPPER LEVEL B U S WAY