KEY PROPOSED PRELIMINARY DESIGN CURB LINES Ø3 Ø1 PROPOSED “RIGHT-TURN-LANE” ALTERNATIVE AREA BETWEEN CURB LINES Ø CA SE YA RB OR WA YW B CA SE ST. YA RB SOUTH OR WA Y EB (UNDER PED ACTUATION) WASHING TON ST. SOUTH ST. SOUTH CASEY ARBORWAY PROJECT PRELIMINARY DESIGN* SOUTH STREET/ WASHINGTON INTERSECTION DRAFT FOR REVIEW JUNE 15, 2012 Ø1 ST. Ø2 The drawing shown here is subject to change and revision as the design progresses to the 25% submittal stage. *THIS DRAFT BASE PLAN IS A WORK-IN-PROGRESS OF THE 25% DESIGN BASED ON THE SELECTED AT GRADE ALTERNATIVE CONCEPT . Ø3 20 0 20 40 SCALE 1" = 20'