Charles River Basin Pedestrian and Bicycle Study for Pathways and Bridges

advertisement
Charles River
Charles
RiverBasin
Basin
Pedestrian and
Pedestrian
and Bicycle
BicycleStudy
Studyfor
for
Pathways and
Pathways
and Bridges
Bridges
Technical
Memorandum:
Technical Memorandum:
September
UserCounts
Counts
September 2010
2011 Non-Motorized
Non-Motorized User
Along the Charles River Basin
Along the Charles River Basin
November2011
2010
November
Non-Motorized User Counts
The Halvorson Design Partnership team conducted non-motorized
user counts along the Charles River Basin in September 2011. This
data was analyzed and compared to data gathered in September
2009, May 2010, September 2010 and May 2011. Data collected
in September 2011 at 23 locations along the eight-mile-long river
corridor shows over 9,000 non-motorized users per hour on a
weekday evening and nearly 7,000 per hour on a weekend afternoon.
Complete graphics and data for each count are included in the
appendices of this Technical Memorandum.
The September 2011 counts were conducted on a weekday evening
(Tuesday, September 13, 4:30 – 6:30 PM) and a weekend afternoon
(Saturday, September 17, 12:00 – 2:00 PM), and took place at three
types of locations: 1) Charles River bridges, 2) prime locations on both
banks of the linear path system and 3) key connections to the parkland
within the Basin. While these 23 locations overlapped significantly
with the locations used in previous counts, some adjustments have
been made, which are noted in the report. Observations from the
September 2011 count include:
Midweek Count
Tuesday 9/13/11, 4:30 - 6:30 PM
Total User Count = 18,277
Weekend Count
Saturday 9/17/11, 12:00 - 2:00 PM
Total User Count = 13,710
•
The number of non-motorized users on the weekday was
higher than weekday totals from previous counts. The number of
non-motorized users on the weekend was very close to the average
weekend totals of the four previous counts.
•
The weekday non-motorized totals in Fall 2011 indicate
a steady increase in the use of the Basin area bridges and paths
for recreation and commuting.
•
As is consistent with previous counts, activity on the
pathways, crosswalks and pedestrian bridges increases as one moves
downriver. The Lower Basin has far greater activity than the Middle
and Upper basins both during the weekday evening and the weekend
joggers
bicycles
afternoon.
pedestrians
other *
•
Similar to previous counts, the ratio of male to female
pedestrians and joggers is nearly equal for both days, the ratio of male
to female cyclists is approximately 2:1. These ratios were consistent
* refers to those on roller blades,
when comparing cyclists on the roadway versus on the sidewalk.
skateboards and scooters
•
Bicyclists continue to show a strong preference for riding in
the roadway on the Harvard and Longfellow Bridges, where there are Fig. 1
bike lanes. Bicyclists riding on the sidewalks make up half or more of
total bicyclists on all the other bridges.
•
The count data revealed pedestrian usage to be fairly evenly distributed between upriver and
downriver sidewalks for most of the bridges. Two exceptions were the Craigie Dam and Bridges and the
Western Avenue Bridge. The Craigie Dam users’ dramatic preference for the upriver sidewalk on both
days can be attributed to the presence of the heavily visited Museum of Science on the upriver side of the
Dam. The Western Avenue Bridge users’ preference for the the upriver side is likely due to the fact that it
is contiguous with the Harvard Business School campus.
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-1-
Non-Motorized User Counts
LONGFELLOW BRIDGE/CHARLES CIRCLE COUNTS
The September 2011 count continued the effort to study all turning movements at Charles Circle, as was
done in the September 2010 and May 2011 counts (see Figure 2 and Figure 3). The weekday evening count
found that 236 pedestrians and joggers flowed between the Longfellow Bridge and Cambridge Street on
the north/downriver side of Charles Circle which is significantly higher than the volumes recorded for this
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
CA
MB
RID
HARD LEFT
HARD LEFT
UPRIVER
RE
ET
LEFT
WAY
MUGAR
THRU
U-TURN
U-TURN
LEFT
RIGHT
RIGHT
THRU
Fig. 2 Longfellow Bridge/Charles Circle Counts, Tuesday 9/13/11, 4:30 - 6:30 PM
W CEDAR STREET
D
OA
TR
EN
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Fig. 3 Longfellow Bridge/Charles Circle Counts, Saturday 9/17/11, 12:00 - 2:00 PM
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-2-
Non-Motorized User Counts
movement in previous counts. Similarly, the largest volumes of bicyclists traveled westward on Cambridge
Street to the Longfellow Bridge. This overall pattern follows the flow of evening commuters out of
downtown Boston into Cambridge, and is consistent wth the previous counts. The weekend count from
September 2011 showed slightly heavier use on the south/upriver side of the circle, consistent with
the May 2011 count. More data will be needed before a trend can be identified. Of note in both the
September 2011 and May 2011 counts is the heavy use of the crosswalk on the north/downriver side of
the circle which connects the MBTA overpass and the refuge island at the end of the southbound ramp
from Storrow Drive.
COMPARING THE COUNTS
The weekday total for the September 2011 count was higher than any of the four counts previously
recorded by the Halvorson team (See Figure 4 and Figure 7) and the weekend total was nearly equal to
the average of the previous four weekend counts. The weekday evening count on Tuesday, September
13, recorded 21% greater non-motorized users than the weekday average of the previous counts, and the
weekend mid-day count on Saturday, September 17, recorded just 1% fewer users than the average. The
increase varied slightly across the different modes. Cyclist turnout on the weekday evening count was
29% higher than the previous counts’ average, while the pedestrian turnout was 21% higher and jogger
turnout 15% higher. On the weekend mid-day count, cyclist turnout was down 18%, while pedestrian
turnout increased by 3% and jogger turnout by 10%. As has been previously observed in the Charles
River Basin counts, the weekday totals represent a higher percent of commuters and potentially more
consistent behavior, whereas the weekend totals represent more recreational use, which fluctuate more
easily depending upon the weather, holidays, and events (concerts, fundraising walks, etc.) along the
Basin. Consistent with data from previous counts, the weekday total indicates a steady increase in the use
of the Basin for recreation and commuting.
WEEKEND SUMMARY
4123
7004
4598
178
15,903
4076
6605
4006
72
14,759
4706
7569
5313
170
17,758
2579
5486
3714
81
11,860
Fig. 4 Basin-wide Counts Summary by Year
5007
8066
5082
122
18,277
*
t9
/
(2 2 6 /
2
lo 200
c
9
Su aƟo
ns
n
5/
)
(2 1 6
5 /2
lo 01
c
0
Su aƟo
ns
n
9/
)
(2 1 9
3 /2
lo 01
ca 0
Ɵo
Sa
ns
t
)
5
(2 / 1
3
4
lo /1
ca 1
Ɵo
Sa
ns
t9
)
/1
(2 7 /
3
lo 201
ca 1
Ɵo
ns
)
MODE TYPE TOTALS
Bicyclists
Pedestrians
Joggers
Other
TOTAL
W
ed
s9
(2 / 2 3
3
lo /20
ca 0
Ɵo 9
Tu
ns
es
)
5/
(2 1 1
6
lo /20
ca 1 0
Ɵo
Tu
ns
es
)
9/
(2 2 1
3
/
lo 20
ca 1 0
Ɵo
W
ns
ed
)
s5
(2 / 1
3
lo 1/1
ca 1
Ɵo
Tu
ns
es
)
9/
(2 1 3
3
lo /20
ca 1 1
Ɵo
ns
)
*
Sa
WEEKDAY SUMMARY
2580
6806
2831
93
12,310
4605
9166
3611
334
17,716
4023
8507
3104
203
15,837
2055
4901
2684
84
9,724
2710
7552
3356
92
13,710
* cool weather with threat of rain
The cooler weather during the Saturday count may have contributed to slightly lower cyclist numbers,
as temperatures were in the mid-60s. It should also be noted that there was a free concert taking place
at the Hatch Shell on the Esplanade Saturday afternoon; the concert officially started at 2:00 p.m. and
music began at 3:45 p.m. The three count locations potentially impacted by this event include the Arthur
Fiedler Footbridge, the Lower Basin South Bank Path and the Charles River Boathouse Path. The Arthur
Fiedler Footbridge user count was significantly higher than average for pedestrians and modestly higher
for cyclists and joggers. The Lower Basin South Bank Path count was significantly higher than average in all
three categories, while the Charles River Boathouse Path had higher than average cyclists and joggers but
lower than average pedestrian users.
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-3-
Non-Motorized User Counts
In conclusion, the data from the counts is intended to give MassDOT and DCR a baseline of walking,
running and bicycling activity at key locations, helping to inform design and implementation decisions
for bridge and path improvement projects. In the future, the rate of change will be compared with bikeand pedestrian-oriented improvements along the Basin’s paths and bridges, adjacent intersections and
in the communities that surround the Basin. The count times and overall guidelines were developed in
conjunction with the National Bicycle and Pedestrian Documentation Project (NBPDP), a joint collaboration
between Alta Planning + Design and the Institute of Transportation Engineers. The NBPDP guidelines
should be used for all subsequent counts within the Charles River Basin and all data from the counts will be
forwarded to the NBPDP for further analysis and to add to the growing collection of consistent information
about people who are walking and bicycling in different parts of the country.
PLEASE NOTE: The total number of bridge and path users in this count are not a literal representation of the
number of people using the Basin within a two-hour period. This effort involved screen-line counts made
independently at all locations throughout the Basin and did not take into account any turning movements
(with the exception of the Longfellow Bridge.) Therefore, some individuals may have been counted more
than once if, for instance, they had biked the path system for long stretches, walked across a bridge and
turned onto a path, jogged in a short loop along both sides of the Basin, etc.
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-4-
Non-Motorized User Counts
Fig. 5 Relative Weighting of Non-motorized User Counts -- Tuesday 9/13/11, 4:30 - 6:30 PM
Vehicular Bridges
Paths, Crosswalks, Bike/Ped Bridges
Midweek Evening
bicycles
pedestrians
joggers
other*
Vehicular Bridges
Total Count = 9,250
Paths, Crosswalks,
Bike/Ped Bridges
Total Count = 9,027
* refers to those on roller blades,
skateboards and scooters
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-5-
Non-Motorized User Counts
Fig. 6 Relative Weighting of Non-motorized User Counts -- Saturday 9/17/11, 12:00 - 2:00 PM
Vehicular Bridges
Paths, Crosswalks, Bike/Ped Bridges
Weekend Afternoon
bicycles
pedestrians
joggers
other*
Vehicular Bridges
Total Count = 6,113
Paths, Crosswalks,
Bike/Ped Bridges
Total Count = 7,597
* refers to those on roller blades,
skateboards and scooters
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-6-
Non-Motorized User Counts
Fig. 7 2009 - 2011 Count Summary
Charles River Basin Non-Motorized User Counts
/2
01
1
Sp
rin
g 2
0
12
Fa
ll 2
01
2
9/
23
/2
00
9
5/
11
/2
01
0
9/
21
/2
01
0
5/
11
/2
01
1
9/
13
/2
01
1
Sp
rin
g 2
01
Fa
2
ll 2
01
2
9/
23
/2
00
9
5/
11
/2
01
0
9/
21
/2
01
0
5/
11
/2
01
1
9/
13
/2
01
1
Sp
rin
g 2
01
Fa
2
ll 2
01
2
9/
23
/2
00
5/
9
11
/2
01
0
9/
21
/2
01
0
5/
11
/2
01
1
9/
13
/2
01
1
Sp
rin
g 2
0
12
Fa
ll 2
01
2
11
13
90
220
42
140
125
7
51
227
445
379
‐‐
‐‐
‐‐
57
76
57
6
266
26
78
25
48
32
51
60
69
‐‐
178
381
110
424
197
25
153
554
735
404
‐‐
‐‐
‐‐
148
142
148
17
462
92
132
102
185
56
81
135
146
‐‐
2577
5007
0
0
887
652
524
‐‐
332
86
298
382
854
454
‐‐
‐‐
‐‐
96
153
335
341
1237
21
58
44
22
37
52
48
65
26
818
526
585
‐‐
192
91
231
263
882
471
268
168
89
49
132
327
246
859
26
64
58
39
35
43
43
55
45
1005
619
724
244
420
77
286
380
786
473
‐‐
‐‐
‐‐
88
201
407
338
1087
33
82
56
51
15
68
54
75
‐‐
808 772
389 609
437 904
396 269
179 423
44
92
127 285
189 408
682 973
326 396
‐‐
‐‐
‐‐
‐‐
‐‐
‐‐
57
72
134 226
302 481
271 391
881 1310
15
29
35
61
26 101
17
62
10
27
60
67
41
41
55
67
‐‐
‐‐
7004
6605
7569
5481 8066
250
123
443
368
241
14
598
982
661
177
‐‐
‐‐
‐‐
123
113
164
112
178
41
238
145
85
25
56
78
98
‐‐
4598
4006
5313 3708 5082
163
196
247
424
295
10
320
639
472
85
‐‐
‐‐
‐‐
85
53
123
78
124
11
141
67
48
35
44
27
21
‐‐
217
252
327
522
235
31
531
924
581
110
‐‐
‐‐
‐‐
88
91
175
106
212
38
201
166
80
27
94
38
36
‐‐
6
2
24
‐‐
9
0
35
38
29
4
0
0
2
1
0
0
11
0
1
4
3
2
2
3
1
1
4
3
2
‐‐
6
1
3
17
3
3
3
1
1
3
3
2
0
2
0
1
1
7
2
1
1
2
0
7
9
31
37
8
0
4
32
11
6
‐‐
‐‐
‐‐
2
6
5
3
2
0
1
2
2
0
0
0
2
‐‐
8
0
11
20
42
0
2
14
4
5
‐‐
‐‐
‐‐
3
0
2
0
3
0
2
0
0
0
0
0
0
‐‐
5
0
9
35
11
0
0
19
9
1
‐‐
‐‐
‐‐
2
1
2
2
2
0
2
10
11
0
0
0
1
‐‐
178
72
170
116
122
Joggers
0
0
11
Sp
rin
g 2
01
Fa
2
ll 2
01
2
9/
26
/2
01
0
5/
16
/2
01
0
9/
19
/2
01
0
5/
14
/2
01
9/
17 1
/2
01
1
Sp
rin
g 2
01
Fa
2
ll 2
01
2
9/
26
/2
01
0
5/
16
/2
01
0
9/
19
/2
01
0
5/
14
/2
01
9/
17 1
/2
01
1
Sp
rin
g 2
01
Fa
2
ll 2
01
2
9/
26
/2
01
5/
0
16
/2
01
9/
0
19
/2
01
0
5/
14
/2
01
9/
17 1
/2
01
1
Sp
rin
g 2
01
Fa
2
ll 2
01
2
Other
/2
0
86
120
49
‐‐
95
13
99
285
439
238
‐‐
‐‐
‐‐
74
48
60
11
184
42
148
80
171
102
91
97
48
‐‐
210
135
98
‐‐
‐‐
10
185
503
475
367
282
46
38
135
106
91
19
198
89
630
182
202
172
111
188
103
30
125
117
65
293
92
14
161
450
402
260
‐‐
‐‐
‐‐
106
93
88
24
275
79
616
161
216
108
71
122
85
‐‐
109
114
37
129
48
2
126
174
299
190
‐‐
‐‐
‐‐
51
43
49
7
127
29
90
39
75
57
60
99
99
‐‐
103
116
69
248
59
6
93
311
424
204
‐‐
‐‐
‐‐
57
66
42
28
217
38
117
60
127
101
61
90
73
‐‐
2580 4605
4023
2053 2710
0
0
407
329
840
‐‐
590
41
316
469
1012
254
‐‐
‐‐
‐‐
80
111
336
307
1165
29
144
72
88
28
66
58
64
‐‐
822
432
802
‐‐
‐‐
64
428
653
768
429
184
84
99
99
110
441
637
813
59
493
317
498
331
421
83
67
32
776
372
689
257
602
132
417
671
914
260
‐‐
‐‐
‐‐
93
159
437
447
816
55
244
432
89
25
450
71
99
‐‐
6806
9166
8507 4889 7552
563
252
557
276
625
49
137
238
543
133
‐‐
‐‐
‐‐
43
96
250
236
561
31
56
44
55
21
40
41
42
‐‐
711
369
1325
331
840
128
341
449
793
294
‐‐
‐‐
‐‐
103
120
255
297
793
35
46
57
56
28
69
46
66
‐‐
0
0
200
148
163
‐‐
78
4
343
427
341
120
‐‐
‐‐
‐‐
62
63
116
80
131
18
171
100
80
57
47
55
27
‐‐
245
175
533
‐‐
‐‐
6
357
461
330
170
268
23
19
87
63
46
62
74
8
149
86
51
213
47
70
50
18
154
65
216
292
142
20
349
540
346
96
‐‐
‐‐
‐‐
65
49
41
48
91
18
212
101
79
38
45
50
47
‐‐
2831
3611
3104 2684 3356
157
123
169
550
89
3
201
399
278
72
‐‐
‐‐
‐‐
63
34
68
40
75
10
115
62
58
34
26
24
34
‐‐
145
202
185
280
100
6 359
612
421
100
‐‐
‐‐
‐‐
90
71
39
72
125
22
153
104
87
70
49
35
29
‐‐
1
13
3
2
7
1
1
5
0
1
10
6
21
2
9
‐‐
‐‐
36
13
25
7
‐‐
3
14
8
0
0
0
5
4
0
4
13
16
1
12
53
31
10
24
25
33
7
6
10
3
27
7
0
0
‐‐
4
‐‐
‐‐
‐‐
‐‐
22
‐‐
‐‐
‐‐
‐‐
0
‐‐
‐‐
‐‐
Charles
Basin
1
10 River
6
2
1 Non-Motorized User
5
1+ Design
0
1
Alta 3Planning
0
7
4
2
0
WEEKDAY SUMMARY
0
1
0
0
0
4
7
1
1
1
1
3
5
2
0
3
95
58
2
0
3
12
0
1
0
MODE TYPE TOTALS
9
18
1
2
0
1
5
0
1
0 4123
Bicyclists
4076
4706
3
7
1
1
0
Pedestrians
7004
6605
7569
3
1
0
1
0
Joggers
4006
5313
3
0
0
1
0 4598
‐‐ 178
‐‐
0
‐‐
‐‐
Other
72
170
Counts
Charles River Basin Non-Motorized User Counts
Alta Planning + Design
WEEKDAY SUMMARY
WEEKEND SUMMARY
0
0
93
TOTAL
334
203
84
92
0
0
15,903
14,759
17,758
2577
5481
3708
116
11,882
MODE TYPE TOTALS
Bicyclists
5007
Pedestrians
8066
Joggers
5082
Other
122
TOTAL
18,277
WEEKEND SUM
4123
2580
7004
6806
4598
2831
178
93
15,903
12,310
4076
4605
6605
9166
4006
3611
72
334
14,759
17,716
4706
4023
7569
8507
5313
3104
170
203
17,758
15,837
2053
2577
4889
5481
2684
3708
84116
9,710
11,882
2710
5007
7552
8066
3356
5082
92122
13,710
18,277
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
November 2011
-7-
Sa
t 9
/
(2 26/
2 20
lo
c 09
Su atio
ns
n 5/
)
1
11
9/
17
/2
0
10
5/
14
10
/2
0
9/
19
/2
0
0
213
219
186
‐‐
204
17
509
677
484
180
214
22
28
85
71
113
79
116
20
170
102
64
48
56
58
48
23
Pedestrians
5/
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
16
/2
0
26
Site #
10
Bicyclists
0
240
260
322
‐‐
153
20
571
810
592
201
‐‐
‐‐
‐‐
95
67
155
92
219
41
213
191
63
92
93
32
44
32
WSat
ed 9
/
(2 s 92/6/
(22 232
l
3 o /00
loc 2 9
Su caattio 009
Tu n
in
e 5 ons)
(2 s 5//16 s)
(25 l 11/2
6 oc /201
l
0
Su ocaatio 010
Tu n tions
9
n)
e
(2 s 9//19 s)
(23 l 21/20
3 oc /2 1
lo a 0 0
Sa cattion 10
W t ions)
(2eds5/1 s)
(23 lo 5/14/1
3 ca 1 1
l
/ Sa ocatio 11 t
Tu 9 tions) / n
(2es 917/ s)
(23 lo/13 201
3 ca /2 1
lo ti 0 c a on 1 1
tio s) ns )
5/
215
374
139
337
189
20
132
514
569
528
‐‐
‐‐
‐‐
130
143
148
21
426
83
172
79
152
42
68
139
86
‐‐
Other
9/
11
/2
0
10
10
/2
0
21
9/
11
23
190
330
70
‐‐
177
13
84
392
587
430
171
125
43
107
95
100
11
291
78
148
63
138
101
92
127
86
27
Non-Motorized User
4123 Counts
4076 4706
Site Locations
Craigie Dam & Bridges
Longfellow Bridge
Charles Street Pedestrian Overpass
Charles River Boathouse Path
Arthur Fiedler Footbridge
Ames Street Crosswalk
Lower Basin North Bank
Lower Basin South Bank
Harvard Bridge
BU Bridge
BU Bridge Crosswalk
Memorial Drive Crosswalk
Magazine Street Pedestrian Overpass
River Street Bridge
Western Ave Bridge
Dewolfe Street Crosswalk
Weeks Bridge
Anderson Memorial Bridge
Hawthorn Street Crosswalk
Middle Basin North Bank
Eliot Bridge
Middle Basin South Bank
Upper Basin North Bank
Arsenal Street Bridge
Upper Basin South Bank
North Beacon Street Bridge
Brooks Street Crosswalk
TOTALS
139
334
111
‐‐
171
21
114
436
669
510
‐‐
‐‐
‐‐
96
140
135
7
377
62
105
82
159
121
111
111
85
27
5/
9/
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Joggers
Pedestrians
9/
Charles River Basin
TOTALS
Alta Planning + Design
WEEKEND COUNTS
/2
0
Site #
Site Locations
Craigie Dam & Bridges
Longfellow Bridge
Charles Street Pedestrian Overpass
Charles River Boathouse Path
Arthur Fiedler Footbridge
Ames Street Crosswalk
Lower Basin North Bank
Lower Basin South Bank
Harvard Bridge
BU Bridge
BU Bridge Crosswalk
Memorial Drive Crosswalk
Magazine Street Pedestrian Overpass
River Street Bridge
Western Ave Bridge
Dewolfe Street Crosswalk
Weeks Bridge
Anderson Memorial Bridge
Hawthorn Street Crosswalk
Middle Basin North Bank
Eliot Bridge
Middle Basin South Bank
Upper Basin North Bank
Arsenal Street Bridge
Upper Basin South Bank
North Beacon Street Bridge
Brooks Street Crosswalk
/2
0
09
Bicyclists
W
ed
s 9
(2 /23
3 lo /20
ca 0
tio 9
Tu
ns
es
)
5
(2 /11
6 /2
lo
ca 0 1 0
tio
Tu
ns
es
)
9
(2 /21
3 /2
lo
ca 0 1 0
tio
W
ns
ed
)
s 5
(2 /1
3 lo 1/1
ca 1
tio Tu
ns
es
)
9
/
1
(2
3 3/2
lo
ca 0 1 1
tio ns )
Alta Planning + Design
WEEKDAY COUNTS
2580
6806
2831
93
12,310
4605
9166
3611
334
17,716
Appendices
Appendix A.1 - 7 ........ September 2011 Count
Appendix B.1 - 7 ........ May 2011 Count
Appendix C.1 - 7 ........ September 2010 Count
Appendix D.1 - 5 ......... May 2010 Count
Appendix E.1 - 5 ......... September 2009 Count
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix A.1
Vehicular Bridges
September 2011 Count - MIDWEEK
Harvard
Square
Tuesday 9/13/11 4:30 - 6:30 PM
PARKING AREA
Eliot Bridge
totals: 379
Western Ave Bridge
totals: 460
CROSS
Craigie Dam & Bridges
CA
totals:
1172
MB
R
IDG
ES
HARD LEFTKendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
Upper Basin North Bank
total: 110
LEFT
RIGHT
Harvard Bridge
totals: 2298
RIGHT
W CEDAR STREET
EMBA
NK
M
u
D
OA
TR
EN
THRU
CHARLES
STREET
Allston
er
nriv
THRU
w
o
d
er
priv
BICYCLISTS
Legend
BOSTON
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Hawthorn Street Crosswalk
total: 159
Harvard
Square
Middle Basin South Bank
Weeks Bridge
total: 338
total: 516
WATERTOWN
T
Bridge
totals: 1242
U-TURN
U-TURN
Middle Basin North Bank
total: 396
EE
Longfellow
LEFT
BU Bridge
totals: 911
Paths, Crosswalks,
Bike/Ped Bridges
TR
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
River Street Bridge
totals: 310
North Beacon Street Bridge
totals: 250
THRU
LEFT
BRIDGE
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
LONGFELLOW
Central
Square
WATERTOWN
Arsenal Street Bridge
totals: 242
THRU
STAIRS
Anderson Memorial Bridge
totals: 1986
Allston
Total Count = 18,277
DOWNRIVER
PARKING AREA
Dewolfe Street Crosswalk
DOWNRIVER
total: 806
Central
Square
THRU
STAIRS
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Charles
Street
CA
MB
RID
Pedestrian
Overpass
GE
ST
RE
total: 1350
ET
Kendall
HARD
LEFT
Square
HARD LEFT
CAMBRIDGE
UPRIVER
CHARLES MGH
T STATION
LEFT
OUTBOUND
G
VID
DA
WAY
MUGAR
Charles River
Boathouse Path
total: 1250
Ames Street Crosswalk THRU
total: 148
U-TURN
U-TURN
LEFT
D
OA
TR
RIGHT
EN
Lower Basin North
Bank
total: 969
THRU
RIGHT
CHARLES
STREET
Arthur Fiedler Footbridge
total: 866
Lower Basin South Bank
total: 1905
BOSTON
W CEDAR STREET
Upper Basin South Bank
total: 214
EMBA
NK
M
Vehicular Bridges
Total = 9,250
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 9,027
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Appendix A.2
September 2011 Count - MIDWEEK
Harvard
Square
Vehicular Bridges
Tuesday 9/13/11 4:30 - 6:30 PM
PARKING AREA
Total Count = 18,277
DOWNRIVER
THRU
STAIRS
WATERTOWN
LONGFELLOW
BRIDGE
Central
Square
Allston
THRU
LEFT
CROSS
CA
MB
RID
HARD LEFT
HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
Kendall
Square
RE
ET
LEFT
THRU
U-TURN
U-TURN
LEFT
RIGHT
RIGHT
W CEDAR STREET
AD
RO
THRU
BOSTON
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
T
EN
GE
BICYCLISTS
bicycles
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
Harvard
Square
Paths, Crosswalks,
Bike/Ped Bridges
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
Central
BRIDGE
Square
WATERTOWN
Allston
THRU
LEFT
CROSS
CA
MB
RID
CAMBRIDGE
Kendall
Square
HARD LEFT
HARD LEFT
UPRIVER
Vehicular Bridges
Total = 9,250
RE
ET
LEFT
WAY
MUGAR
THRU
U-TURN
U-TURN
RIGHT
RIGHT
THRU
BOSTON
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 9,027
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix A.3
Vehicular Bridges
September 2011 Count - WEEKEND
Harvard
Square
Saturday 9/17/11 12:00 - 2:00 PM
PARKING AREA
Eliot Bridge
total: 221
Western Ave Bridge
total: 258
CROSS
Craigie Dam & Bridges
CA
total:
966
MB
R
IDG
ES
HARD LEFTKendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
er
nriv
THRU
w
o
d
er
priv
u
LEFT
RIGHT
Harvard Bridge
total: 1648
RIGHT
W CEDAR STREET
D
OA
TR
EN
THRU
CHARLES
STREET
EMBA
NK
M
T
Bridge
total: 688
U-TURN
U-TURN
Middle Basin North Bank
total: 316
EE
Longfellow
LEFT
BICYCLISTS
BU Bridge
total: 598
Paths, Crosswalks,
Bike/Ped Bridges
TR
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
River Street Bridge
total: 251
North Beacon Street Bridge
total: 168
THRU
LEFT
BRIDGE
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
LONGFELLOW
Central
Square
WATERTOWN
Arsenal Street Bridge
total: 179
THRU
STAIRS
Anderson Memorial Bridge
total: 1136
Allston
Total Count = 13,710
DOWNRIVER
Legend
BOSTON
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Hawthorn Street Crosswalk
total: 95
Harvard
Square
Dewolfe Street Crosswalk
total: 336
PARKING AREA
DOWNRIVER
Middle Basin South Bank
Weeks Bridge
total: 270
total: 397
WATERTOWN
Upper Basin North Bank
total: 199
Upper Basin South Bank
total: 171
Allston
THRU
STAIRS
Central
Square
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Charles Street
Pedestrian
Overpass
CA
MB
total:RID1588
GE
Kendall
Square
ST
RE
UPRIVER
LEFT
OUTBOUND
G
VID
DA
WAY
MUGAR
Ames Street Crosswalk
total: 144
U-TURN
LEFT
Arthur Fiedler Footbridge
RIGHT
total: 1007 THRU
CHARLES
STREET
EMBA
NK
M
THRU
Lower Basin South
Bank
RIGHT
total: 1396
BOSTON
W CEDAR STREET
Lower Basin North Bank U-TURN
D
OA
total: 794
TR
EN
ET
Charles River
CHARLES MGH
Boathouse Path
T STATION
total: 884
HARD LEFT
HARD LEFT
CAMBRIDGE
Vehicular Bridges
Total = 6,113
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 7,597
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Appendix A.4
Vehicular Bridges
September 2011 Count - WEEKEND
Harvard
Square
Saturday 9/17/11 12:00 - 2:00 PM
PARKING AREA
Total Count = 13,710
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
BRIDGE
Central
Square
Allston
THRU
LEFT
CROSS
CA
MB
RID
HARD LEFT
HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
Kendall
Square
RE
ET
LEFT
THRU
U-TURN
U-TURN
LEFT
RIGHT
RIGHT
W CEDAR STREET
AD
RO
THRU
BOSTON
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
T
EN
GE
BICYCLISTS
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
Paths, Crosswalks,
Bike/Ped Bridges
bicycles
Harvard
Square
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
Central
BRIDGE
Square
WATERTOWN
Allston
THRU
LEFT
CROSS
CA
MB
RID
CAMBRIDGE
Kendall
Square
HARD LEFT
HARD LEFT
UPRIVER
RE
ET
LEFT
WAY
MUGAR
THRU
U-TURN
U-TURN
RIGHT
RIGHT
THRU
BOSTON
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
GE
Vehicular Bridges
Total = 6,113
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 7,597
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Appendix A.5
WEEKDAY -- Tuesday, September 13, 2011
September 2011 Count
Bridge Bicyclists’ Location Preference
PARKING AREA
Eliot Bridge
DOWNRIVER
THRU
STAIRS
Anderson Memorial Bridge
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Craigie Dam & Bridges
CA
MB
RID
HARD LEFT
HARD LEFT
Western Ave Bridge
UPRIVER
Arsenal Street Bridge
LEFT
RIGHT
Harvard Bridge
RIGHT
W CEDAR STREET
AD
RO
THRU
CHARLES
STREET
EMBA
NK
M
ET
THRU
U-TURN
U-TURN
T
EN
RE
LEFT
Longfellow
Bridge
OUTBOUND
North Beacon Street Bridge
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
River Street Bridge
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
BU Bridge
N
WEEKEND -- Saturday, September 17, 2011
Arse
North Beacon Street Bridge
PARKING AREA
Eliot Bridge
DOWNRIVER
Bicyclists on Sidewalk
THRU
STAIRS
Anderson Memorial Bridge
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Craigie Dam & Bridges
CA
MB
Bicyclists on Roadway
RID
Western Ave Bridge
Arsenal Street Bridge
HARD LEFT
HARD LEFT
UPRIVER
River Street Bridge
ST
RE
ET
CHARLES MGH
T STATION
Longfellow
Bridge
LEFT
OUTBOUND
VID
DA
GE
AR WAY
G MUG
North Beacon Street Bridge
U-TURN
U-TURN
RIGHT
Harvard Bridge
RIGHT
THRU
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
Legend
THRU
BICYCLISTS
BU Bridge
PEDESTRIANS
+ JOGGERS
Bicyclists on Sidewalk
N
Bicyclists on Roadway
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
WEEKDAY -- Tuesday, September 13, 2011
Appendix A.6
September 2011 Count
Longfellow Bridge/Charles Circle
Turning Movement Counts
WEEKEND -- Saturday, September 17, 2011
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
C harles R iver B as in Non-Motorized Us er C ount
Appendix A.7
Alta Planning + Design
MIDW E E K - Tues day, S ept. 13, 4: 30 - 6: 30 P M
F . R oadway M. R oadway F . P ath
M. P ath
F . Upriver M. Upriver F . Downriver M. Downriver F .
M.
B ic yc lis t
B ic yc lis ts B ic yc lis ts P eds
P eds
P eds
P eds
J oggers J oggers Other Totals
S ite L oc ations
S ite # B ic yc lis t
Craigie Dam & Bridges
1
14
45
34
85
301
284
91
96
103
114
5
1172
Longfellow Bridge
2
133
229
4
15
144
108
157
200
116
136
0
1242
Charles Street Pedestrian Overpas
3
35
496
408
138
189
9
1350
75
Charles River Boathouse Path
4
133
291
163
106
235
287
35
1250
Arthur Fiedler Footbridge
5
42
155
240
183
110
125
11
866
Ames Street Crosswalk
6
8
17
42
50
16
15
0
148
Lower Basin North Bank
7
54
99
144
141
242
289
0
969
Lower Basin South Bank
8
147
407
238
170
447
477
19
1905
Harvard Bridge
9
217
416
34
68
179
269
240
285
284
297
9
2298
BU Bridge
10
75
130
77
122
103
83
97
113
64
46
1
911
River Street Bridge
11
10
26
23
89
14
22
16
20
33
55
2
310
Western Ave Bridge
12
15
32
29
66
92
99
15
20
46
45
1
460
Dewolfe Street Crosswalk
13
56
92
216
265
101
74
2
806
Weeks Bridge
14
6
11
189
202
47
59
2
516
Anderson Memorial Bridge
15
64
158
74
166
253
412
294
351
81
131
2
1986
Hawthorn Street Crosswalk
16
33
59
17
12
21
17
0
159
Middle Basin North Bank
17
49
83
32
29
100
101
2
396
Eliot Bridge
18
0
1
30
71
12
10
30
49
77
89
10
379
Middle Basin South Bank
19
48
137
29
33
40
40
11
338
Upper Basin North Bank
20
20
36
15
12
4
23
0
110
Arsenal Street Bridge
21
10
36
8
27
16
21
16
14
38
56
0
242
Upper Basin South Bank *
22
21
114
26
15
14
24
0
214
CNorth
harles
R iver
B asBridge
in Non-Motorized
Beacon
Street
23 Us er12C ount
62
12
60
16
12
25
14
17
19
1
250
Alta
Planning + Design
Totals
550
1135
977
2345
2977
2946
981
1162
2374
2708
122 18277
September 2011 Count Tables
WE E K E ND - S aturday, S ept. 17, 12 - 2 P M
F . R oadway
M. R oadway F . P ath
* Nonantum Road sidewalk closed; no pavement
west of bridge.
S ite L oc ations
S ite # B ic yc lis t
B ic yc lis t
B ic yc lis ts
Craigie Dam & Bridges
1
7
18
16
Longfellow Bridge
2
37
60
12
Charles Street Pedestrian Overpass
3
26
Charles River Boathouse Path
4
102
Arthur Fiedler Footbridge
5
21
Ames Street Crosswalk
6
3
Lower Basin North Bank
7
36
Lower Basin South Bank
8
122
Harvard Bridge
9
106
230
29
BU Bridge
10
35
51
48
River Street Bridge
11
5
12
9
Western Ave Bridge
12
5
13
18
Dewolfe Street Crosswalk
13
16
Weeks Bridge
14
8
Anderson Memorial Bridge
15
34
69
31
Hawthorn Street Crosswalk
16
17
Middle Basin North Bank
17
35
Eliot Bridge
18
1
1
10
Middle Basin South Bank
19
43
Upper Basin North Bank
20
31
Arsenal Street Bridge
21
6
15
12
Upper Basin South Bank *
22
23
North Beacon Street Bridge
23
5
27
9
T otals
241
496
677
M. P ath
F . Upriver M. Upriver F . Downriver M. Downriver F .
B ic yc lis ts P eds
P eds
P eds
P eds
J oggers
62
347
321
21
22
74
7
119
112
60
78
106
43
804
521
92
146
184
147
149
38
445
395
67
3
51
77
5
57
164
177
206
189
271
178
351
59
128
170
236
259
248
70
45
101
83
65
49
31
34
42
15
12
50
30
51
59
4
6
28
26
111
144
19
20
124
173
39
83
177
198
193
225
58
21
20
15
13
82
24
22
74
48
11
7
20
19
48
84
24
32
44
70
10
18
29
28
15
12
19
23
21
67
23
23
16
32
14
10
25
17
8
1296
3196
2954
676
726
1794
M.
J oggers
71
96
93
131
33
1
153
261
173
51
40
43
20
33
67
9
79
56
43
41
28
19
21
1562
Other T otals
7
966
1
688
9
1588
25
884
8
1007
4
144
1
794
24
1396
10
1648
0
598
1
251
1
258
0
336
0
397
1
1136
0
95
0
316
0
221
0
270
0
199
0
179
0
171
0
168
92
13710
* Nonantum Road sidewalk closed; no pavement
west of bridge
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November
2011 Road sidewalk
* Nonantum
closed; no pavement west of bridge.
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix B.1
Vehicular Bridges
May 2011 Count - MIDWEEK
Harvard
Square
Wednesday 5/11/11 4:30 - 6:30 PM
PARKING AREA
Eliot Bridge
total: 118
THRU
STAIRS
LONGFELLOW
Central
Square
WATERTOWN
Arsenal Street Bridge
total: 155
Western Ave Bridge
total: 268
CROSS
Craigie Dam & Bridges
CA
total:
MB 1071
R
IDG
ES
HARD LEFTKendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
RIGHT
Harvard Bridge
total: 1603
RIGHT
Upper Basin South Bank
total: 128
W CEDAR STREET
Upper Basin North Bank
total: 77
LEFT
THRU
CHARLES
STREET
EMBA
NK
M
u
D
OA
TR
EN
BICYCLISTS
Legend
BOSTON
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Square
PARKING AREA
Dewolfe Street Crosswalk
DOWNRIVER
total: 484
Allston
er
nriv
THRU
w
o
d
er
priv
Hawthorn Street Crosswalk
Harvard
total: 52
Middle Basin South Bank
Weeks Bridge
total: 113
total: 355
WATERTOWN
T
Bridge
total: 805
U-TURN
U-TURN
Middle Basin North Bank
total: 256
EE
Longfellow
LEFT
BU Bridge
total: 795
Paths, Crosswalks,
Bike/Ped Bridges
TR
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
River Street Bridge
total: 202
North Beacon Street Bridge
total: 145
THRU
LEFT
BRIDGE
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total: 1274
Allston
Total Count = 11,860
DOWNRIVER
THRU
STAIRS
Central
Square
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Charles Street
CA
Pedestrian
MB Overpass
R
total: 738 IDGE ST
Kendall
HARD
LEFT
Square
HARD LEFT
CAMBRIDGE
UPRIVER
Vehicular Bridges
Total = 6,436
Charles River
Boathouse Path
total: 985
CHARLES MGH
T STATION
WAY
MUGAR
Ames Street Crosswalk
total: 61
U-TURN
U-TURN
THRU
LEFT
Arthur
Fiedler Footbridge
RIGHT
THRU
total: 605
BOSTON
CHARLES
STREET
RIGHT
Lower Basin South Bank
total: 1070
W CEDAR STREET
Lower Basin North Bank
D
OA
total: 500 ENT R
EMBA
NK
M
ET
LEFT
OUTBOUND
G
VID
DA
RE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 5,424
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Appendix B.2
Vehicular Bridges
May 2011 Count - MIDWEEK
Harvard
Square
Wednesday 5/11/11 4:30 - 6:30 PM
PARKING AREA
Total Count = 11,860
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
BRIDGE
Central
Square
Allston
THRU
LEFT
CROSS
CA
MB
RID
HARD LEFT
HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
Kendall
Square
RE
ET
LEFT
THRU
U-TURN
U-TURN
LEFT
RIGHT
RIGHT
W CEDAR STREET
AD
RO
THRU
BOSTON
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
T
EN
GE
BICYCLISTS
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
Paths, Crosswalks,
Bike/Ped Bridges
bicycles
Harvard
Square
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
Central
BRIDGE
Square
WATERTOWN
Allston
THRU
LEFT
CROSS
CA
MB
RID
CAMBRIDGE
Kendall
Square
HARD LEFT
HARD LEFT
UPRIVER
Vehicular Bridges
Total = 6,436
RE
ET
LEFT
WAY
MUGAR
THRU
U-TURN
U-TURN
RIGHT
RIGHT
THRU
BOSTON
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 5,424
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix B.3
Vehicular Bridges
May 2011 Count - WEEKEND
Harvard
Square
Saturday 5/14/11 12:00 - 2:00 PM
PARKING AREA
Eliot Bridge
total: 146
THRU
STAIRS
LONGFELLOW
Central
Square
WATERTOWN
Arsenal Street Bridge
total: 127
Western Ave Bridge
total: 173
CROSS
Craigie Dam & Bridges
CA
total:
827
MB
R
IDG
ES
HARD LEFTKendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
RIGHT
Harvard Bridge
total: 1126
RIGHT
Upper Basin South Bank
totals: 165
THRU
BICYCLISTS
bicycles
joggers
pedestrians
other
N
Legend
BOSTON
PEDESTRIANS
+ JOGGERS
Square
PARKING AREA
Dewolfe Street Crosswalk
DOWNRIVER
totals: 370
Allston
LEFT
W CEDAR STREET
EMBA
NK
M
u
D
OA
TR
EN
CHARLES
STREET
Upper Basin North Bank
totals: 113
er
nriv
THRU
w
o
d
er
priv
Hawthorn Street Crosswalk
Harvard
totals: 72
Middle Basin South Bank
Weeks Bridge
totals: 190
totals: 283
WATERTOWN
T
Bridge
total: 497
U-TURN
U-TURN
Middle Basin North Bank
totals: 262
EE
Longfellow
LEFT
BU Bridge
total: 395
Paths, Crosswalks,
Bike/Ped Bridges
TR
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
River Street Bridge
total: 159
North Beacon Street Bridge
total: 176
THRU
LEFT
BRIDGE
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total: 764
Allston
Total Count = 9,724
DOWNRIVER
THRU
STAIRS
Central
Square
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
CA
MB
Kendall
HARD
LEFT
Square
HARD LEFT
CAMBRIDGE
UPRIVER
CHARLES MGH
T STATION
Charles River
Boathouse Path
THRU totals: 978
WAY
MUGAR
Ames Street Crosswalk
totals: 59
U-TURN
U-TURN
LEFT
RIGHT
THRU
CHARLES
STREET
EMBA
NK
M
Arthur Fiedler Footbridge
totals: 776
RIGHT
Lower Basin South Bank
totals: 821
BOSTON
W CEDAR STREET
Lower Basin North Bank
D
OA
totals: 480 ENT R
Vehicular Bridges
Total = 4,390
LEFT
OUTBOUND
G
VID
DA
RID
Charles
Street
GE
ST
RE
Pedestrian
ET
Overpass
totals: 765
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 5,334
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Appendix B.4
Vehicular Bridges
May 2011 Count - WEEKEND
Harvard
Square
Saturday 5/14/11 12:00 - 2:00 PM
PARKING AREA
Total Count = 9,724
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
BRIDGE
Central
Square
Allston
THRU
LEFT
CROSS
CA
MB
RID
HARD LEFT
HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
Kendall
Square
RE
ET
LEFT
THRU
U-TURN
U-TURN
LEFT
RIGHT
RIGHT
W CEDAR STREET
AD
RO
THRU
BOSTON
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
T
EN
GE
BICYCLISTS
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
Paths, Crosswalks,
Bike/Ped Bridges
bicycles
Harvard
Square
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
Central
BRIDGE
Square
WATERTOWN
Allston
THRU
LEFT
CROSS
CA
MB
RID
CAMBRIDGE
Kendall
Square
HARD LEFT
HARD LEFT
UPRIVER
Vehicular Bridges
Total = 4,390
RE
ET
LEFT
WAY
MUGAR
THRU
U-TURN
U-TURN
RIGHT
RIGHT
THRU
BOSTON
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
ST
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 5,334
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Appendix B.5
WEEKDAY -- Wednesday, May 11, 2011
May 2011 Count
Bridge Bicyclists’ Location Preference
PARKING AREA
Eliot Bridge
DOWNRIVER
THRU
STAIRS
Anderson Memorial Bridge
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Craigie Dam & Bridges
CA
MB
RID
HARD LEFT
HARD LEFT
Western Ave Bridge
UPRIVER
Arsenal Street Bridge
LEFT
RIGHT
Harvard Bridge
RIGHT
W CEDAR STREET
AD
RO
THRU
CHARLES
STREET
EMBA
NK
M
ET
THRU
U-TURN
U-TURN
T
EN
RE
LEFT
Longfellow
Bridge
OUTBOUND
North Beacon Street Bridge
ST
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
River Street Bridge
GE
BICYCLISTS
PEDESTRIANS
+ JOGGERS
BU Bridge
N
WEEKEND -- Saturday, May 14, 2011
Arse
North Beacon Street Bridge
PARKING AREA
Eliot Bridge
DOWNRIVER
THRU
STAIRS
Anderson Memorial Bridge
Bicyclists on Sidewalk
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
Craigie Dam & Bridges
CA
MB
RID
Bicyclists on Roadway
Western Ave Bridge
Arsenal Street Bridge
HARD LEFT
HARD LEFT
UPRIVER
River Street Bridge
ST
RE
ET
CHARLES MGH
T STATION
Longfellow
Bridge
LEFT
OUTBOUND
VID
DA
GE
AR WAY
G MUG
North Beacon Street Bridge
U-TURN
U-TURN
RIGHT
Harvard Bridge
RIGHT
THRU
W CEDAR STREET
D
OA
TR
EN
LEFT
CHARLES
STREET
EMBA
NK
M
Legend
THRU
BICYCLISTS
BU Bridge
PEDESTRIANS
+ JOGGERS
Bicyclists on Sidewalk
N
Bicyclists on Roadway
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
WEEKDAY -- Wednesday, May 11, 2011
Appendix B.6
May 2011 Count
Longfellow Bridge/Charles Circle
Turning Movement Counts
WEEKEND -- Saturday, May 14, 2011
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
C harles R iver B as in Non-Motorized Us er C ount
Appendix B.7
Alta Planning + Design
MIDW E E K - W ednes day, May 11, 4: 30 - 6: 30 P M
F . R oadway M. R oadway F . P ath
M. P ath
F . Upriver M. Upriver F . Downriver M. Downriver F .
M.
B ic yc lis t
B ic yc lis ts B ic yc lis ts P eds
P eds
P eds
P eds
J oggers J oggers Other Totals
S ite L oc ations
S ite # B ic yc lis t
Craigie Dam & Bridges
1
9
30
13
39
0
3
424
381
68
96
8
1071
Longfellow Bridge
2
70
141
0
9
89
108
88
104
97
99
0
805
Charles Street Pedestrian Overpas
3
8
35
198
239
115
132
11
738
Charles River Boathouse Path
4
29
111
174
227
183
241
20
985
Arthur Fiedler Footbridge
5
32
93
77
102
122
173
6
605
Ames Street Crosswalk
6
1
6
17
27
2
8
0
61
Lower Basin North Bank
7
14
37
74
53
144
176
2
500
Lower Basin South Bank
8
48
179
110
79
269
370
15
1070
Harvard Bridge
9
108
289
14
34
110
183
164
225
230
242
4
1603
BU Bridge
10
75
190
37
77
2*
8*
161
155
32
53
5
795
River Street Bridge
11
2
19
12
24
10
7
14
26
37
48
3
202
Western Ave Bridge
12
9
25
11
31
47
60
15
12
26
32
0
268
Dewolfe Street Crosswalk
13
13
44
125
177
67
56
2
484
Weeks Bridge
14
2
4
108
163
36
42
0
355
Anderson Memorial Bridge
15
30
93
41
102
167
224
233
257
52
72
3
1274
Hawthorn Street Crosswalk
16
11
15
10
5
5
6
0
52
Middle Basin North Bank
17
25
53
20
15
62
79
2
256
Eliot Bridge
18
9
16
5
4
10
7
33
34
0
118
Middle Basin South Bank
19
16
32
9
8
25
23
0
113
Upper Basin North Bank
20
6
26
2
8
19
16
0
77
Arsenal Street Bridge
21
9
12
8
22
12
19
15
14
18
26
0
155
Upper Basin South Bank
22
20
40
23
18
7
20
0
128
North
Beacon
Street
Bridge
23
8 C ount
39
9
13
13
11
16
15
6
15
0
145
C harles
R iver
B as
in Non-Motorized
Us er
Totals
320
838
379
1042
1402
1748
1140
1196
1655
2059
81
11860
Alta Planning + Design
May 2011 Count Tables
WE E K E ND - S aturday, May 14, 12 - 2 P M
S ite L oc ations
Craigie Dam & Bridges
Longfellow Bridge
Charles Street Pedestrian Overpass
Charles River Boathouse Path
Arthur Fiedler Footbridge
Ames Street Crosswalk
Lower Basin North Bank
Lower Basin South Bank
Harvard Bridge
BU Bridge
River Street Bridge
Western Ave Bridge
Dewolfe Street Crosswalk
Weeks Bridge
Anderson Memorial Bridge
Hawthorn Street Crosswalk
Middle Basin North Bank
Eliot Bridge
Middle Basin South Bank
Upper Basin North Bank
Arsenal Street Bridge
Upper Basin South Bank
North Beacon Street Bridge
T otals
F . R oadway M. R oadway F . P ath
S ite # B ic yc lis t
B ic yc lis t
B ic yc lis ts
1
12
28
25
2
29
69
6
3
13
4
44
5
19
6
1
7
41
8
55
9
75
159
22
10
55
85
15
11
4
8
15
12
5
16
4
13
15
14
3
15
22
47
19
16
15
17
36
18
0
0
11
19
26
20
13
21
3
23
6
22
21
23
2
16
20
207
451
445
M. P ath
F . Upriver M. Upriver F . Downriver M. Downriver F .
B ic yc lis ts P eds
P eds
P eds
P eds
J oggers
44
268
214
36
40
83
12
74
99
40
45
56
24
279
278
74
85
144
142
316
29
381
244
45
1
24
25
1
85
74
63
87
119
121
117
184
43
105
121
160
157
136
35
0*
5*
67
61
42
24
12
7
12
12
30
18
32
55
1
8
18
34
94
157
34
4
94
142
24
39
114
116
145
186
35
14
15
16
4
54
29
27
70
28
3
6
12
23
33
49
21
34
30
44
2
19
13
28
12
14
5
9
11
78
16
25
17
61
16
13
3
10
18
952
1930
1939
481
551
1361
M.
J oggers
75
67
95
234
44
2
114
215
142
30
33
16
34
16
40
6
44
29
28
21
15
7
16
1323
Other T otals
2
827
0
497
2
765
13
978
14
776
5
59
16
480
10
821
6
1126
0
395
2
159
0
173
2
370
0
283
1
764
2
72
2
262
1
146
2
190
1
113
1
127
1
165
1
176
84
9724
* Upriver sidewalk on the BU Bridge was closed
during count due to construction.
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix C.1
Vehicular Bridges
September 2010 Count - MIDWEEK
Harvard
Square
Tuesday 9/21/10 4:30 - 6:30 PM
PARKING AREA
Eliot Bridge
total: 282
THRU
STAIRS
LONGFELLOW
Central
Square
WATERTOWN
THRU
LEFT
BRIDGE
CROSS
BR
IDG
Western Ave Bridge
total: 463
Allston
North Beacon Street Bridge
total: 261
HARD LEFTKendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
River Street Bridge
total: 343
Craigie Dam & Bridges
CA
total:
1477
M
WAY
MUGAR
WATERTOWN
RIGHT
Allston
THRU
BICYCLISTS
Legend
BOSTON
Hawthorn Street Crosswalk
Middle Basin North Bank total: 157 Harvard
Square
total: 493
Dewolfe Street Crosswalk PARKING AREA
total: 724
DOWNRIVER
Middle Basin South Bank
STAIRS
Weeks Bridge
total: 290
total: 474
Central LONGFELLOW BRIDGE
Square
Upper Basin North Bank
total: 82
Upper Basin South Bank
total: 271
RIGHT
Harvard Bridge
total: 2027
BU Bridge
total: 1184
Paths, Crosswalks,
Bike/Ped Bridges
LEFT
CHARLES
STREET
EMBA
NK
M
u
T
W CEDAR STREET
U-TURN
U-TURN
D
OA
TR
EN
EE
CHARLES MGH
er
nriv
THRU
w
o
d
er
priv
TR
T STATION
Longfellow
Bridge
LEFT
total: 1125
OUTBOUND
G
VID
DA
ES
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total: 1693
Arsenal Street Bridge
total: 192
Total Count = 17,758
DOWNRIVER
PEDESTRIANS
+ JOGGERS
THRU
LEFT
CAMBRIDGE
G
VID
DA
joggers
pedestrians
other
N
THRU
CROSS
Charles
Street
CA
MB
RID
Pedestrian
GE Overpass
S
total: 1337 TREET
Kendall
HARD
LEFT
Square
HARD LEFT
UPRIVER
bicycles
CHARLES MGH
T STATION
Charles River
Boathouse Path
total: 986
OUTBOUND
Ames
Street Crosswalk LEFT
total: 111
WAY
MUGAR
THRU
LEFT
Arthur Fiedler Footbridge
RIGHT
THRU
total: 858
Lower Basin South Bank
RIGHT
total: 1908
BOSTON
CHARLES
STREET
EMBA
NK
M
U-TURN
U-TURN
W CEDAR STREET
Lower Basin North Bank
total: 1020ENT ROAD
Vehicular Bridges
Total = 9,047
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 8,711
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix C.2
Anderson Memorial
Bridge: 1693
Eliot Bridge: 282
September 2010 Count - MIDWEEK
Harvard
Square
Tuesday 9/21/10 4:30 - 6:30 PM
Craigie Dam + Bridges: 1477
PARKING AREA
Total Count = 17,758
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 192
BRIDGE
Western Avenue Central
Bridge: 463
Square
Allston
THRU
LEFT
CROSS
Longfellow Bridge:
1125
HARD LEFT
CAMBRIDGE
River Street
Bridge: 343
UPRIVER
OUTBOUND
EMBA
NK
M
RIGHT
RIGHT
WATERTOWN
Allston
Middle Basin
South Bank
Path: 290
W CEDAR STREET
Weeks
Bridge: 474
ET
THRU
BOSTON
Harvard Bridge: 2027
BICYCLISTS
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Harvard
Square
Dewolfe Street
Crosswalk: 724
Upper Basin
North Bank Path: 82
RE
CHARLES MGH
T STATION
CHARLES
STREET
Hawthorn Street
Crosswalk: 157
ST
LEFT
AD
RO
BU Bridge: 1184
Paths, Crosswalks,
Bike/Ped Bridges
GE
THRU
U-TURN
U-TURN
T
EN
RID
LEFT
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge: 261
Upper Basin
South Bank Path: 271
Kendall
HARD LEFT
Square
CA
MB
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
Middle Basin Central
BRIDGE
Square
North Bank
Path: 493
THRU
LEFT
CAMBRIDGE
UPRIVER
Lower Basin
North Bank
Path: 1020
CROSS
CA
Kendall
HARD LEFT
HARD LEFT
Ames Street Square
Crosswalk:
111
OUTBOUND
AY
G
VID
DA
LEFT
W
MUGAR
THRU
RIGHT
Lower
Basin
RIGHT
South Bank Path: 1908
CHARLES
STREET
EMBA
NK
M
D
OA
TR
EN
LEFT
BOSTON
Vehicular Bridges
Total = 9,047
W CEDAR STREET
U-TURN
U-TURN
MB
RID
Charles
Street
GE
ST
RE
ET
Pedestrian
CHARLES MGH
T STATIONOverpass: 1337
Charles River
Boathouse
Path: 986
Arthur Fiedler
THRU
Footbridge:
858
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 8,711
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix C.3
Vehicular Bridges
September 2010 Count - WEEKEND
Harvard
Square
Sunday 9/19/10 12:00 - 2:00 PM
PARKING AREA
Eliot Bridge
total: 694
LONGFELLOW
CROSS
Craigie Dam & Bridges
CA
MB 1058
total:
RID
GE
HARD LEFTKendall
HARD LEFT
Square
Western Ave Bridge
total: 302
CAMBRIDGE
UPRIVER
EMBA
NK
M
upr
Upper Basin North Bank
total: 171
Upper Basin South Bank
total: 243
LEFT
RIGHT
Harvard Bridge
total: 1669
RIGHT
THRU
BICYCLISTS
Legend
BOSTON
Hawthorn Street Crosswalk
Middle Basin North Bank total: 157
Harvard Square
total: 1130
Allston
iver
D
OA
TR
EN
er
THRU
riv
n
dow
CHARLES
STREET
WATERTOWN
ET
W CEDAR STREET
U-TURN
U-TURN
Middle Basin South Bank
Weeks Bridge
total: 385
total: 519
RE
Longfellow
Bridge
LEFT
total: 559
BU Bridge
total: 623
Paths, Crosswalks,
Bike/Ped Bridges
ST
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
River Street Bridge
total: 270
North Beacon Street Bridge
total: 231
THRU
LEFT
BRIDGE
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Central
Square
WATERTOWN
Arsenal Street Bridge
total: 567
THRU
STAIRS
Anderson Memorial Bridge
total: 1183
Allston
Total Count = 15,837
DOWNRIVER
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
PARKING AREA
DOWNRIVER
Dewolfe Street Crosswalk
total: 570
LONGFELLOW
Central
Square
THRU
STAIRS
THRU
LEFT
BRIDGE
CROSS
Charles Street
CA
MB
Pedestrian
Overpass
RID
GE
ST
total: 991 REET
Kendall
HARD LEFT
Square HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
G
VID
DA
Ames Street Crosswalk
total: 166
Charles River
Boathouse Path
total: 878
LEFT
LEFT
ArthurRIGHT
Fiedler Footbridge
THRU
total: 839
Lower Basin South Bank
RIGHT
total: 1692
BOSTON
W CEDAR STREET
U-TURN
U-TURN
THRU
CHARLES
STREET
EMBA
NK
M
CHARLES MGH
T STATION
WAY
MUGAR
Lower Basin North Bank
AD
total: 940 ENT RO
Vehicular Bridges
Total = 7,156
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 8,681
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix C.4
Anderson Memorial
Bridge: 1183
Eliot Bridge: 694
September 2010 Count - WEEKEND
Harvard
Square
Sunday 9/19/10 12:00 - 2:00 PM
Craigie Dam + Bridges: 1058
PARKING AREA
Total Count = 15,837
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 567
BRIDGE
Western Avenue Central
Bridge: 302
Square
Allston
THRU
LEFT
CROSS
Longfellow Bridge:
559
HARD LEFT
CAMBRIDGE
River Street
Bridge: 270
UPRIVER
OUTBOUND
EMBA
NK
M
RIGHT
RIGHT
WATERTOWN
Allston
Middle Basin
South Bank
Path: 385
W CEDAR STREET
Weeks
Bridge: 519
ET
THRU
BOSTON
Harvard Bridge: 1669
BICYCLISTS
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Harvard
Square
Dewolfe Street
Crosswalk: 570
Upper Basin
North Bank Path: 171
RE
CHARLES MGH
T STATION
CHARLES
STREET
Hawthorn Street
Crosswalk: 157
ST
LEFT
AD
RO
BU Bridge: 623
Paths, Crosswalks,
Bike/Ped Bridges
GE
THRU
U-TURN
U-TURN
T
EN
RID
LEFT
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge: 231
Upper Basin
South Bank Path: 243
Kendall
HARD LEFT
Square
CA
MB
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
BRIDGE
Middle Basin Central
Square
North Bank
Path: 1130 CAMBRIDGE
UPRIVER
THRU
LEFT
Lower Basin
North Bank
Path: 940
CROSS
CA
M
Kendall
HARD LEFT
HARD LEFT
Ames Street Square
OUTBOUND
Crosswalk:
166
UGAR WAY
G
VID
DA
LEFT
M
THRU
RIGHT
CHARLES
STREET
EMBA
NK
M
D
OA
TR
EN
LEFT
Lower
Basin
RIGHT
South Bank Path: 1692
BOSTON
Vehicular Bridges
Total = 7,156
W CEDAR STREET
U-TURN
U-TURN
BR
IDG
Charles
E S Street
TR
EE
T
Pedestrian
CHARLES MGH
T STATIONOverpass: 991
Charles River
Boathouse
Path: 878
Arthur Fiedler
THRU
Footbridge:
839
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 8,681
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Appendix C.5
WEEKDAY -- Tuesday, September 21, 2010
September 2010 Count
Bridge Bicyclists’ Location Preference
PARKING AREA
Eliot Bridge
DOWNRIVER
THRU
STAIRS
Anderson Memorial Bridge
LONGFELLOW
THRU
LEFT
BRIDGE
CROSS
CA
Craigie Dam
& Bridges
MB
HARD LEFT
HARD LEFT
Western Ave Bridge
UPRIVER
LEFT
AR WAY
G MUG
VID
DA
River Street Bridge
THRU
U-TURN
U-TURN
ET
LEFT
AD
RO
RIGHT
Harvard Bridge
RE
RIGHT
W CEDAR STREET
T
EN
*
ST
THRU
CHARLES
STREET
EMBA
NK
M
North Beacon Street Bridge
GE
CHARLES MGH
T STATION
OUTBOUND
Arsenal Street Bridge
RID
BICYCLISTS
PEDESTRIANS
+ JOGGERS
BU Bridge
Arse
N
North Beacon Street Bridge
WEEKEND -- Sunday, September 19, 2010
Legend
PARKING AREA
Eliot Bridge
DOWNRIVER
Bicyclists on Sidewalk
Anderson Memorial Bridge
LONGFELLOW
Bicyclists on Roadway
THRU
LEFT
BRIDGE
CROSS
Craigie Dam
& Bridges
CA
HARD LEFT
HARD LEFT
Western Ave Bridge
UPRIVER
Arsenal Street Bridge
River Street Bridge
LEFT
WAY
MUGAR
THRU
North Beacon Street Bridge
GE
ST
RE
ET
Bicyclists on Sidewalk
Bicyclists on Roadway
LEFT
RIGHT
Harvard Bridge
RIGHT
THRU
W CEDAR STREET
EMBA
NK
M
U-TURN
U-TURN
D
OA
TR
EN
*
RID
BICYCLISTS
BU Bridge
Legend
CHARLES MGH
T STATION
OUTBOUND
G
VID
DA
MB
CHARLES
STREET
Legend
THRU
STAIRS
PEDESTRIANS
+ JOGGERS
N
* Data for the Longfellow Bridge count
did not distinguish between bicyclists
riding on the roadway and on the
sidewalk.
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Appendix C.6
WEEKDAY -- Tuesday, September 21, 2010
September 2010 Count
Longfellow Bridge/Charles Circle
Turning Movement Counts
PARKING AREA
THRU: 131
STAIRS: 40
LONGFELLOW
BRIDGE
THRU: 109
LEFT: 10
CROSS: 57
CA
MB
RID
HARD LEFT: 1
HARD LEFT: 5
ST
RE
ET
CHARLES MGH
T STATION
LEFT: 2
OUTBOUND: 73
VID
DA
GE
AR WAY
G MUG
THRU: 37
LEFT: 13
RIGHT: 52
W CEDAR STREET
D
OA
TR
EN
THRU: 42
CHARLES
STREET
EMBA
NK
M
U-TURN: 10
U-TURN: 12
RIGHT: 80
WEEKEND -- Sunday, September 19, 2010
BICYCLISTS
N
PEDESTRIANS
+ JOGGERS
PARKING AREA
THRU: 101
STAIRS: 15
LONGFELLOW
THRU: 37
LEFT: 9
BRIDGE
CROSS: 195
CA
MB
RID
HARD LEFT: 1
HARD LEFT: 6
ST
RE
ET
CHARLES MGH
T STATION
LEFT: 4
OUTBOUND: 30
VID
DA
GE
AR WAY
G MUG
THRU: 27
RIGHT: 34
RIGHT: 60
THRU: 25
W CEDAR STREET
D
OA
TR
EN
LEFT: 2
CHARLES
STREET
EMBA
NK
M
U-TURN: 3
U-TURN: 5
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
BICYCLISTS
November 2011
PEDESTRIANS
+ JOGGERS
N
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
C harles R iver B as in Non-Motorized Us er C ount
Appendix C.7
Alta Planning + Design
MIDW E E K - Tues day, S eptember 21, 2010 4: 30 - 6: 30pm (70s , s unny)
F . R oadway M. R oadway F . P ath
M. P ath
F . Upriver M. Upriver
B ic yc lis t
B ic yc lis ts B ic yc lis ts P eds
P eds
S ite L oc ations
S ite # B ic yc lis t
Craigie Dam & Bridges
1
26
82
26
81
262
205
Longfellow Bridge
2
*
*
374
*
155
*
Charles Street Pedestrian Overpas
3
43
96
391
333
Charles River Boathouse Path
4
110
227
144
100
Arthur Fiedler Footbridge
5
45
144
217
203
Ames Street Crosswalk
6
4
16
22
55
Lower Basin North Bank
7
34
98
124
162
Lower Basin South Bank
8
134
380
198
182
Harvard Bridge
9
123
325
38
83
110
156
BU Bridge
10
103
242
78
105
279
194
River Street Bridge
11
5
17
27
81
10
25
Western Ave Bridge
12
10
35
34
64
74
108
Dewolfe Street Crosswalk
13
50
98
180
227
Weeks Bridge
14
8
13
148
190
Anderson Memorial Bridge
15
56
130
81
159
258
308
Hawthorn Street Crosswalk
16
29
54
24
9
Middle Basin North Bank
17
52
120
53
29
Eliot Bridge
18
0
0
21
58
12
10
Middle Basin South Bank
19
44
108
37
14
Upper Basin North Bank
20
8
34
5
10
Arsenal Street Bridge
21
8
25
11
24
20
18
Upper Basin South Bank
22
35
104
27
27
North Beacon Street Bridge
23
29
9
41
12
12
C harles R iver B as in Non-Motorized
Us er7C ount
Totals
338
885
1295
2188
2762
2577
Alta Planning + Design
* Bicyclists counted on Longfellow Bridge were not distinguished by roadway or path, all are listed here under path.
were
notSdistinguished
gender,
all- are
here, partly
under cfemale.
WEUsers
E K E ND
- Salso
unday,
eptember 19,by
2010,
12: 00
2: 00listed
pm (70s
loudy)
F . R oadway
R oadway F . P ath
M. P ath
F . Upriver M. Upriver
** Downriver sidewalk on the BU Bridge was closed
due to M.
construction.
S ite L oc ations
S ite # B ic yc lis t
B ic yc lis t
B ic yc lis ts B ic yc lis ts P eds
P eds
Craigie Dam & Bridges
1
13
55
19
38
166
160
Longfellow Bridge
2
*
*
117
*
105
*
Charles Street Pedestrian Overpass
3
29
36
355
334
Charles River Boathouse Path
4
123
170
130
127
Arthur Fiedler Footbridge
5
33
59
324
278
Ames Street Crosswalk
6
3
11
62
70
Lower Basin North Bank
7
63
98
223
194
Lower Basin South Bank
8
170
280
371
300
Harvard Bridge
9
76
203
50
73
194
179
BU Bridge
10
42
98
46
74
134
126
River Street Bridge
11
9
9
32
56
13
16
Western Ave Bridge
12
7
13
26
47
64
72
Dewolfe Street Crosswalk
13
38
50
196
241
Weeks Bridge
14
8
16
205
242
Anderson Memorial Bridge
15
38
79
74
84
192
185
Hawthorn Street Crosswalk
16
24
55
29
26
Middle Basin North Bank
17
229
387
124
120
Eliot Bridge
18
0
0
59
102
284
104
Middle Basin South Bank
19
62
154
47
42
Upper Basin North Bank
20
39
69
9
16
Arsenal Street Bridge
21
9
14
14
34
16
26
Upper Basin South Bank
22
37
85
37
34
North Beacon Street Bridge
23
1
9
25
50
33
29
T otals
195
480
1320
2028
3313
2921
HALVORSON
DESIGN
PARTNERSHIP
with ALTA
+ HDR
* Bicyclists
counted
on Longfellow
Bridge
were not distinguished by roadway or path, all are listed here under path.
Users were also not distinguished by gender, all are listed here under female.
November
2011 sidewalk on the
** Downriver
BU Bridge was closed due to construction.
F . Downriver M. Downriver F .
M.
P eds
P eds
J oggers J oggers Other Totals
267
271
115
135
7
1477
464
*
123
*
9
1125
219
224
31
1337
175
193
37
986
116
125
8
858
7
7
0
111
302
296
4
1020
478
504
32
1908
222
298
299
362
11
2027
0**
0**
90
87
6
1184
19
34
48
75
2
343
10
9
34
79
6
463
104
60
5
724
59
53
3
474
234
287
76
102
2
1693
20
21
0
157
126
112
1
493
13
21
74
71
2
282
39
46
2
290
10
15
0
82
8
22
21
35
0
192
25
53
0
271
25
26
30
68
2
261
1262
968
2590
2723
170 17758
F . Downriver M. Downriver F .
P eds
P eds
J oggers
233
217
73
267
*
65
119
152
61
14
198
277
251
290
179
**
**
52
34
30
22
10
13
17
21
26
174
265
39
6
101
18
26
40
39
15
208
200
16
25
19
18
20
1214
1059
1577
M.
J oggers
81
*
97
140
81
6
151
263
167
44
43
32
20
22
52
12
111
61
40
23
29
25
27
1527
Other T otals
3
1058
5
559
21
991
36
878
3
839
0
166
13
940
31
1692
7
1669
7
623
6
270
1
302
4
570
0
519
1
1183
5
157
58
1130
0
694
1
385
0
171
1
567
0
243
0
231
203 15837
September 2010 Count Tables
* Bicyclists counted on Longfellow Bridge were
not distinguished by roadway or path, all are listed
here under “Path Bicyclists.” Users were also not
distinguished by gender, all are listed here under
“Female.”
** Downriver sidewalk on the BU Bridge was
closed during count due to construction.
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix D.1
Vehicular Bridges
May 2010 Count - MIDWEEK
Harvard
Square
Tuesday 5/11/10 4:30 - 6:30 PM
PARKING AREA
Eliot Bridge
total:224
THRU
STAIRS
LONGFELLOW
THRU
LEFT
BRIDGE
Central
Square
WATERTOWN
Western Ave Bridge
total:301
Allston
River Street Bridge
total:244
CROSS
Craigie Dam & Bridges
CAtotal:1225
M
BR
IDG
HARD LEFT Kendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
THRU iver
nr
dowLEFT
er
priv
u
Harvard Bridge
total:1956
RIGHT
RIGHT
THRU
CHARLES
STREET
EMBA
NK
M
T
W CEDAR STREET
U-TURN
U-TURN
D
OA
TR
EN
EE
CHARLES MGH
T STATION
WAY
MUGAR
North Beacon Street Bridge
total:191
TR
Longfellow Bridge
LEFT
total:1078
OUTBOUND
G
VID
DA
ES
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total:1268
Arsenal Street Bridge
total:192
Total Count = 14,759
DOWNRIVER
BICYCLISTS
Legend
BOSTON
BU Bridge
total:1084
PEDESTRIANS
+ JOGGERS
bicycles
joggers
pedestrians
other
N
Middle Basin North Bank
total: 383
Paths, Crosswalks,
Bike/Ped Bridges
Hawthorn Street Crosswalk
total: 124
Harvard
Middle Basin South Bank
total: 248
Square
PARKING AREA
Dewolfe Street Crosswalk
DOWNRIVER
total: 542
Weeks Bridge
total: 336
THRU
STAIRS
THRU
LEFT
LONGFELLOW
BRIDGE
Central
Square
WATERTOWN
Allston
Charles
Street
CA
MB
RID
Pedestrian
Overpass
GE
total: 843 STREE
Kendall
HARD LEFT
Square
HARD LEFT
CAMBRIDGE
UPRIVER
OUTBOUND
ID
AV
AR WAY
G MUG
T
Vehicular Bridges
Total = 7,763
CHARLES MGH
T STATION
Ames Street Crosswalk
LEFT
total: 122
Lower Basin North Bank
total: 827
THRU
LEFT
RIGHT
Arthur Fiedle
er Footbridge
total: 579
THRU
Lower Basin South Bank
total:
1349
RIGHT
BOSTON
W CEDAR STREET
U-TURN
U-TURN
CHARLES
STREET
D
Magazine Street
Pedestrian Overpass
total: 161
Memorial Drive Crosswalk AD
O
TR
total: 316
EN
BU Bridge Crosswalk
total: 656
EMBA
NK
M
Upper Basin North Bank
total: 186
Upper Basin South Bank
total: 229
Brooks Street Crosswalk
total: 95
CROSS
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,996
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix D.2
Anderson Memorial
Bridge: 1268
Eliot Bridge: 224
May 2010 Count - MIDWEEK
Harvard
Square
Tuesday 5/11/10 4:30 - 6:30 PM
Craigie Dam + Bridges: 1225
PARKING AREA
Total Count = 14,759
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 192
BRIDGE
Western Avenue Central
Bridge: 301
Square
Allston
THRU
LEFT
CROSS
Longfellow Bridge:
1078
HARD LEFT
CAMBRIDGE
River Street
Bridge: 244
UPRIVER
OUTBOUND
EMBA
NK
M
RIGHT
RIGHT
WATERTOWN
Allston
THRU
BOSTON
Harvard Bridge: 1956
BICYCLISTS
bicycles
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
BRIDGE
Middle Basin Central
Square
North Bank
Path: 383 CAMBRIDGE
THRU
LEFT
Lower Basin
North Bank
Path: 827
CROSS
CA
MB
RID
Magazine Street
UPRIVER
OUTBOUND
Crosswalk:
122
AR WAY
Pedestrian Overpass: 161
G MUG
D
I
V
DA
Memorial Drive
U-TURN
Crosswalk: 316
LEFT
THRU
LEFT
Vehicular Bridges
Total = 7,763
RE
RIGHT
THRU
Lower
Basin
RIGHT
South Bank Path: 1349
BOSTON
E
Arthur Fiedler
Footbridge: 579
CHARLES
STREET
BU Bridge
Crosswalk: 656
D
OA
TR
EN
ST
W CEDAR STREET
U-TURN
GE
T
Charles Street
CHARLES MGH
T STATION
Pedestrian
Overpass: 843
Kendall
Ames Street Square
HARD LEFT
HARD LEFT
EMBA
NK
M
Brooks Street
Crosswalk: 95
Middle Basin
South Bank
Path: 248
W CEDAR STREET
Weeks
Bridge: 336
ET
Harvard
Square
Dewolfe Street
Crosswalk: 542
Upper Basin
North Bank Path: 186
RE
CHARLES MGH
T STATION
CHARLES
STREET
Hawthorn Street
Crosswalk: 124
ST
LEFT
AD
RO
BU Bridge: 1084
Paths, Crosswalks,
Bike/Ped Bridges
GE
THRU
U-TURN
U-TURN
T
EN
RID
LEFT
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge:191
Upper Basin
South Bank Path: 229
Kendall
HARD LEFT
Square
CA
MB
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,996
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix D.3
Vehicular Bridges
May 2010 Count - WEEKEND
Harvard
Square
Total Count = 17,716
DOWNRIVER
THRU
STAIRS
LONGFELLOW
THRU
LEFT
BRIDGE
Central
Square
WATERTOWN
Western Ave Bridge
total:284
Allston
River Street Bridge
total:331
CROSS
Craigie Dam & Bridges
CA total:1290
M
BR
IDG
Kendall
Square
HARD LEFT
HARD LEFT
CAMBRIDGE
UPRIVER
LEFT
OUTBOUND
EMBA
NK
M
RIGHT
RIGHT
THRU
CHARLES
STREET
Harvard Bridge
total:1606
r
rive
wn
doLEFT
er
priv
u
BICYCLISTS
4605
9166
bicycles
joggers
pedestrians
other
N
Legend
BOSTON
BU Bridge
total:993
3611
T
W CEDAR STREET
D
OA
TR
EN
EE
Longfellow Bridge
total:743
THRU
U-TURN
U-TURN
TR
CHARLES MGH
T STATION
AR WAY
G MUG
VID
DA
North Beacon Street Bridge
total:220
ES
334
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total:1092
Arsenal Street Bridge
total:586
Sunday 5/16/10 12:00 - 2:00 PM
PARKING AREA
Eliot Bridge
total:597
PEDESTRIANS
+ JOGGERS
Middle Basin North Bank
total:1367
Paths, Crosswalks,
Bike/Ped Bridges
Hawthorn Street Crosswalk
total:159
Harvard
Middle Basin
Square
South Bank
Dewolfe Street Crosswalk
total:769
DOWNRIVER
total:585
Weeks Bridge
total:719
Vehicular Bridges
Total = 7,742
PARKING AREA
THRU
STAIRS
THRU
LEFT
LONGFELLOW
BRIDGE
Central
Square
WATERTOWN
Upper Basin North Bank
total:721
Allston
CA
MB
RID
Kendall
HARD LEFT
HARD LEFT
Square
CAMBRIDGE
UPRIVER
OUTBOUND
ID
AV
AR WAY
G MUG
GE
ST
RE
4888
E
T
Charles Street
CHARLES MGH
Pedestrian Overpass
T STATION
Ames Street Crosswalk total:1439
Paths, Crosswalks,
Bike/Ped Bridges
Total = 9,974
LEFT
total:80
Lower Basin North Bank
total:974
THRU
U-TURN
U-TURN
LEFT
THRU
Lower Basin South Bank
total:1670
RIGHT
BOSTON
W CEDAR STREET
RIGHT
2583
CHARLES
STREET
D
Magazine Street
Pedestrian Overpass
total:156
Memorial Drive Crosswalk OAD
TR
total:175
EN
BU Bridge Crosswalk
total:738
EMBA
NK
M
Upper Basin South Bank
total:342
Brooks Street Crosswalk
total:80
CROSS
BICYCLISTS
PEDESTRIANS
+ JOGGERS
2284
N
219
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix D.4
Anderson Memorial
Bridge: 1092
Eliot Bridge: 597
May 2010 Count - WEEKEND
Harvard
Square
Sunday 5/16/10 12:00 - 2:00 PM
Craigie Dam + Bridges: 1290
PARKING AREA
Total Count = 17,716
DOWNRIVER
THRU
STAIRS
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 586
BRIDGE
Western Avenue Central
Bridge: 284
Square
Allston
THRU
LEFT
CROSS
Longfellow Bridge:
743
HARD LEFT
CAMBRIDGE
River Street
Bridge: 331
334
UPRIVER
OUTBOUND
Kendall
HARD LEFT
Square
EMBA
NK
M
WATERTOWN
Allston
9166
RIGHT
RIGHT
THRU
BOSTON
Harvard Bridge: 1606
BICYCLISTS
bicycles
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
Vehicular Bridges
Total = 7,742
PARKING AREA
DOWNRIVER
THRU
STAIRS
LONGFELLOW
BRIDGE
Middle Basin Central
Square
North Bank
Path: 1367 CAMBRIDGE
Magazine Street
UPRIVER
Pedestrian Overpass: 156
CA
MB
RID
Kendall
Square
GE
ST
4888
RE
ET
Charles Street
Pedestrian
Overpass: 1439
HARD LEFT
HARD LEFT
CHARLES MGH
T STATION
LEFT
VI
DA
Paths, Crosswalks,
Bike/Ped Bridges
Total = 9,974
THRU
U-TURN
U-TURN
D
OA
TR
EN
2583
LEFT
RIGHT
THRU
CHARLES
STREET
BU Bridge
Crosswalk: 738
Lower Basin
North Bank
Path: 974
CROSS
Ames Street
OUTBOUND
Crosswalk:
WAY 80
MUGAR
DG
EMBA
NK
M
Memorial Drive
Crosswalk: 175
THRU
LEFT
RIGHT
Lower
Basin
South Bank Path: 1670
BOSTON
2284
W CEDAR STREET
Brooks Street
Crosswalk: 80
Upper Basin
South Bank Path: 342
Middle Basin
South Bank
Path: 769
ET
W CEDAR STREET
Weeks
Bridge: 719
RE
Harvard
Square
Dewolfe Street
Crosswalk: 585
Upper Basin
North Bank Path: 721
4605
CHARLES MGH
T STATION
CHARLES
STREET
Paths, Crosswalks,
Bike/Ped Bridges
ST
LEFT
AD
RO
BU Bridge: 993
Hawthorn Street
Crosswalk: 159
GE
THRU
U-TURN
U-TURN
T
EN
3611
RID
LEFT
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge: 220
CA
MB
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
219
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Charles River Basin Non-Motorized User Count
Alta Planning + Design
Appendix D.5
Tuesday, May 11, 2010 4:30 - 6:30 pm (cloudy, 55)
Site Locations
Site # F. BicyclistsM. BicyclistsF. Upriver PedsM. Upriver PedsF. Downriver Peds
M. Downriver Peds
F. JoggersM. JoggersOther Totals
Craigie Dam & Bridges
1
48
142
115
107
311
285
85
128
4
1225
Longfellow Bridge
2
94
236
116
104
131
175
93
126
3
1078
Charles Street Pedestrian Overpass 3
21
49
277
308
96
90
2
843
Arthur Fiedler Footbridge
4
42
135
87
105
95
109
6
579
Ames Street Crosswalk
5
6
7
36
55
9
8
1
122
Lower Basin North Bank
6
27
57
112
119
254
255
3
827
Lower Basin South Bank
7
100
292
154
109
319
358
17
1349
Harvard Bridge
8
174
413
135
220
238
289
216
268
3
1956
BU Bridge
9
132
298
208
263
0*
0 *
95
85
3
1084
BU Bridge Crosswalk
10
41
130
124
144
123
91
3
656
Memorial Drive Crosswalk
11
41
84
89
79
12
10
1
316
Magazine Street Pedestrian Overpass12
7
36
39
50
14
14
1
161
River Street Bridge
13
27
80
12
9
10
18
35
50
3
244
Western Ave Bridge
14
33
62
47
65
11
9
30
41
3
301
Dewolfe Street Crosswalk
15
32
68
143
184
64
49
2
542
Weeks Bridge
16
4
7
102
144
44
35
0
336
Anderson Memorial Bridge
17
82
209
178
228
195
258
50
66
2
1268
Hawthorn Street Crosswalk
18
26
52
16
10
10
10
0
124
Middle Basin North Bank
19
42
106
36
28
80
90
1
383
Eliot Bridge
20
15
48
5
16
17
20
53
49
1
224
Middle Basin South Bank
21
38
100
20
19
26
38
7
248
Upper Basin North Bank
22
18
83
9
26
17
31
2
186
Arsenal Street Bridge
23
16
76
8
9
13
13
27
29
1
192
Upper Basin South Bank
24
26
101
24
19
33
25
1
229
North Beacon Street Bridge
25
14
72
16
11
12
16
21
27
2
191
C harles
R iver
B as in Non-Motorized
Us6er C ount21
Brooks
Street
Crosswalk
26
28
17
12
11
0
95
Alta Planning + Design
Totals
1112
2964
2136
2448
938
1083
1913
2093
72 14759
S unday, May 16, 2010, 12: 00 - 2: 00 pm (70s , partly c loudy)
S ite L oc ations
S ite # F . B ic yc lis t M. B ic yc lis tsF . Upriver P ed M. Upriver P ed F . Downriver P edM. Downriver P edF . J oggersM. J oggersOther T otals
Craigie Dam & Bridges
1
66
144
401
350
31
40
125
120
13
1290
Longfellow Bridge
2
49
86
122
127
93
90
93
82
1
743
Charles Street Pedestrian Overpass 3
31
67
439
363
292
241
6
1439
Arthur Fiedler Footbridge
4
NO DATA COLLECTED
0
Ames Street Crosswalk
5
1
9
22
42
3
3
0
80
Lower Basin North Bank
6
67
118
217
211
174
183
4
974
Lower Basin South Bank
7
179
324
378
275
199
262
53
1670
Harvard Bridge
8
162
313
110
121
252
285
159
171
33
1606
BU Bridge
9
145
222
211
218
0*
0 *
73
97
27
993
BU Bridge Crosswalk
10
107
175
95
89
134
134
4
738
Memorial Drive Crosswalk
11
17
29
44
40
10
13
22
175
Magazine Street Pedestrian Overpa 12
16
22
50
49
13
6
0
156
River Street Bridge
13
47
88
34
36
13
16
34
53
10
331
Western Ave Bridge
14
31
75
59
41
5
5
40
23
5
284
Dewolfe Street Crosswalk
15
35
56
220
221
20
26
7
585
Weeks Bridge
16
4
15
357
280
35
27
1
719
Anderson Memorial Bridge
17
61
137
243
235
148
187
27
47
7
1092
Hawthorn Street Crosswalk
18
34
55
41
18
5
3
3
159
Middle Basin North Bank **
19
243
387
274
219
72
77
95
1367
Eliot Bridge
20
65
117
106
97
56
58
44
42
12
597
Middle Basin South Bank
21
66
136
288
210
19
32
18
769
Upper Basin North Bank
22
53
119
201
130
169
44
5
721
Arsenal Street Bridge
23
32
79
18
22
231
150
18
29
7
586
Upper Basin South Bank
24
60
128
40
43
40
30
1
342
North Beacon Street Bridge
25
40
63
15
14
21
17
29
21
0
220
Brooks Street Crosswalk
26
5
25
12
20
10
8
0
80
T otals
1616
2989
3997
3471
850
848
1837
1774
334 17716
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
May 2010 Count Tables
* Downriver sidewalk closed at time of count
** Memorial Drive closed to vehicle traffic
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix E.1
Vehicular Bridges
September 2009 Count - MIDWEEK
Harvard
Square
Wednesday 9/23/09 4:30 - 6:30 PM
PARKING AREA
Eliot Bridge
total:321
THRU
STAIRS
LONGFELLOW
THRU
LEFT
BRIDGE
Central
Square
WATERTOWN
Arsenal Street Bridge
total:258
Western Ave Bridge
total:361
River Street Bridge
total:289
CROSS
Craigie Dam & Bridges
CA
total:1272
M
BR
IDG
HARD LEFT Kendall
HARD LEFT
Square
CAMBRIDGE
UPRIVER
EE
T
Longfellow
LEFT
Bridge
total:1248
upr
D
OA
TR
EN
iver
RIGHT
THRU
CHARLES
STREET
Harvard Bridge
total:2144
THRU r
e
nriv
w
do LEFT
RIGHT
W CEDAR STREET
U-TURN
U-TURN
EMBA
NK
M
TR
CHARLES MGH
T STATION
OUTBOUND
AR WAY
G MUG
VID
DA
North Beacon Street Bridge
total:195
ES
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
Anderson Memorial Bridge
total:1844
Allston
Total Count = 15,903
DOWNRIVER
BICYCLISTS
Paths, Crosswalks,
Bike/Ped Bridges
pedestrians
other
PEDESTRIANS
+ JOGGERS
Middle Basin North Bank
total: 377
Hawthorn Street Crosswalk
total: 124
Harvard
Middle Basin South Bank
total: 247
Square
PARKING AREA
DOWNRIVER
Dewolfe Street Crosswalk
total: 625
Weeks Bridge
total: 440
THRU
STAIRS
THRU
LEFT
LONGFELLOW
BRIDGE
Central
Square
WATERTOWN
Allston
CROSS
CA
MB
RID
Kendall
Square
CAMBRIDGE
UPRIVER
OUTBOUND
G
VID
DA
WAY
MUGAR
ST
RE
ET
Vehicular Bridges
Total = 9,101
CHARLES MGH
Pedestrian
T STATION
LEFT
RIGHT
Arthur Fiedler Footbridge
total: 665
THRU
CHARLES
STREET
Lower Basin South Bank
total:
1666
RIGHT
BOSTON
W CEDAR STREET
U-TURN
U-TURN
D
OA
TR
EN
GE
Charles Street
Overpass
total: 981
Ames Street
Crosswalk
LEFT
total: 127
Lower Basin North Bank
THRU
total: 1018
HARD LEFT
HARD LEFT
EMBA
NK
M
Upper Basin North Bank
total: 252
Upper Basin South Bank
total: 194
Brooks Street Crosswalk
total: 86
joggers
N
Legend
BOSTON
BU Bridge
total:1169
bicycles
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,802
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix E.2
September 2009 Count - MIDWEEK
Anderson Memorial
Bridge: 1844
Eliot Bridge: 321
Wednesday 9/23/09 4:30 - 6:30 PM
Craigie Dam + Bridges: 1272
PARKING AREA
Total Count = 15,903
DOWNRIVER
THRU
STAIRS
Central
Western Avenue Square
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 258
BRIDGE
THRU
LEFT
CROSS
Longfellow Bridge:
1248
Kendall
HARD
LEFT
Bridge: 361
Allston
CAMBRIDGE
River Street
Bridge: 289
HARD LEFT
Square
UPRIVER
EMBA
NK
M
RIGHT
RIGHT
Allston
Harvard Bridge: 2144
BOSTON
BICYCLISTS
bicycles
joggers
pedestrians
other
N
PEDESTRIANS
+ JOGGERS
PARKING AREA
DOWNRIVER
THRU
STAIRS
Central
LONGFELLOW
BRIDGE
Square
Middle Basin
North Bank
Path: 377
THRU
LEFT
CAMBRIDGE
UPRIVER
Lower Basin
North Bank
Kendall Path: 1018
CROSS
RID
HARD LEFT
Square
HARD LEFT
GE
ST
Vehicular Bridges
Total = 9,101
RE
ET
Charles Street
Pedestrian
Overpass: 981
CHARLES MGH
T STATION
Ames Street
OUTBOUND
AR WAY 127
Crosswalk:
G MUG
D
I
V
LEFT
DA
THRU
U-TURN
U-TURN
D
OA
TR
EN
LEFT
RIGHT
CHARLES
STREET
EMBA
NK
M
CA
MB
Arthur Fiedler
Footbridge:
665
THRU
BOSTON
RIGHT
Lower
Basin
South Bank Path: 1666 BICYCLISTS
W CEDAR STREET
Brooks Street
Crosswalk: 86
Upper Basin
South Bank Path: 194
Middle Basin
South Bank
Path: 247
THRU
W CEDAR STREET
Weeks
Bridge: 440
WATERTOWN
ET
Harvard
Square
Dewolfe Street
Crosswalk: 625
Upper Basin
North Bank Path: 252
RE
CHARLES MGH
T STATION
CHARLES
STREET
Hawthorn Street
Crosswalk: 124
ST
LEFT
AD
RO
BU Bridge: 1169
Paths, Crosswalks,
Bike/Ped Bridges
GE
THRU
U-TURN
U-TURN
T
EN
RID
LEFT
OUTBOUND
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge: 195
CA
MB
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,802
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Non-Motorized User Count by Mode
Appendix E.3
Vehicular Bridges
September 2009 Count - WEEKEND
Harvard
Square
Saturday 9/26/09 12:00 - 2:00 PM
PARKING AREA
Eliot Bridge
total: 255
DOWNRIVER
THRU
LEFT
BR
IDGE
Central
Square
WATERTOWN
Arsenal Street Bridge
total: 207
Allston
Western Ave Bridge
total: 225
River Street Bridge
total: 217
CROSS
Craigie Dam & Bridges
CA total: 694
M
BR
IDG
Kendall
HARD LEFT
HARD LEFT
Square
CAMBRIDGE
UPRIVER
AR WAY
G MUG
VID
DA
North Beacon Street Bridge
total: 142
r
Harvard Bridge
total: 1817
rive
wn
doLEFT
iver
RIGHT
RIGHT
THRU
CHARLES
STREET
EMBA
NK
M
upr
T
W CEDAR STREET
U-TURN
U-TURN
EE
Longfellow Bridge
total: 598
THRU
D
OA
TR
EN
TR
CHARLES MGH
T STATION
LEFT
OUTBOUND
ES
b
up icyc
d riv les
jo own er p
ot gg ri
he er ve ede
rs s r p str
ed ia
es ns
tri
an
s
LONGFELLOW
Total Count = 12,310
THRU
STAIRS
Anderson Memorial Bridge
total: 1484
BICYCLISTS
Paths, Crosswalks,
Bike/Ped Bridges
Middle Basin South Bank
total: 348
Square
WATERTOWN
E
CROSS
CA
MB
RID
Kendall
Square
GE
ST
CAMBRIDGE
UPRIVER
OUTBOUND
G
VID
DA
WAY
MUGAR
ET
Charles Street
CHARLES MGH
T STATIONPedestrian Overpass
Ames Street Crosswalk total: 1062
LEFT
total: 58
Lower Basin North Bank
THRU
total: 758
LEFT
RIGHT
Arthur Fiedler Footbridge
total: 770
THRU
Lower Basin South Bank
RIGHT
total:
1193
W CEDAR STREET
U-TURN
U-TURN
D
OA
TR
EN
Vehicular Bridges
Total = 6,254
RE
HARD LEFT
HARD LEFT
EMBA
NK
M
Allston
THRU
LEFT
FELLOW BRIDG
CHARLES
STREET
other
THRU
STAIRS
BOSTON
November 2011
pedestrians
PARKING AREA
Central
Square
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
PEDESTRIANS
+ JOGGERS
joggers
Middle Basin North Bank
total: 466
Hawthorn Street Crosswalk
Harvard
total: 90
DOWNRIVER
Dewolfe Street Crosswalk
total: 512
Weeks Bridge
total: 398
LONG
Upper Basin North Bank
total: 188
Upper Basin South Bank
total: 213
Brooks Street Crosswalk
total: 0
N
Legend
BOSTON
BU Bridge
total: 615
bicycles
BICYCLISTS
PEDESTRIANS
+ JOGGERS
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,056
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Relative Weighting of Non-Motorized User Counts
Vehicular Bridges
Appendix E.4
September 2009 Count - WEEKEND
Anderson Memorial
Bridge: 1484
Eliot Bridge: 255
Saturday 9/26/09 12:00 - 2:00 PM
Craigie Dam + Bridges: 694
PARKING AREA
Total Count = 12,310
DOWNRIVER
THRU
STAIRS
Central
Western Avenue Square
LONGFELLOW
WATERTOWN
Arsenal Street
Bridge: 207
BRIDGE
THRU
LEFT
CROSS
Longfellow Bridge:
598
Kendall
HARD
LEFT
Bridge: 225
Allston
CAMBRIDGE
River Street
Bridge: 217
HARD LEFT
Square
UPRIVER
EMBA
NK
M
RIGHT
RIGHT
Harvard Bridge: 1817
Upper Basin
South Bank Path: 213
Middle Basin
South Bank
Path: 348
BOSTON
BICYCLISTS
other
THRU
STAIRS
Central
LONGFELLOW
BRIDGE
Square
THRU
LEFT
Middle Basin
North Bank
Path: 466
Lower Basin
North Bank
Kendall Path: 758
CROSS
CA
MB
RID
Square
HARD LEFT
HARD LEFT
UPRIVER
ST
RE
ET
Charles Street
Pedestrian
Overpass: 1062
LEFT
DA
THRU
D
OA
TR
EN
LEFT
RIGHT
Arthur Fiedler
THRU
Footbridge:
770
BOSTON
RIGHT
Lower
Basin
South Bank Path: 1193
W CEDAR STREET
EMBA
NK
M
GE
Vehicular Bridges
Total = 6,254
CHARLES MGH
T STATION
AmesOUTBOUND
Street
AR WAY
Crosswalk:
58
G MUG
VID
CHARLES
STREET
pedestrians
N
PEDESTRIANS
+ JOGGERS
BICYCLISTS
PEDESTRIANS
+ JOGGERS
November 2011
joggers
DOWNRIVER
U-TURN
U-TURN
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
bicycles
PARKING AREA
CAMBRIDGE
Allston
THRU
W CEDAR STREET
Weeks
Bridge: 398
WATERTOWN
ET
Harvard
Square
Dewolfe Street
Crosswalk: 512
Upper Basin
North Bank Path: 188
RE
CHARLES MGH
T STATION
CHARLES
STREET
Hawthorn Street
Crosswalk: 90
ST
LEFT
AD
RO
BU Bridge: 615
Paths, Crosswalks,
Bike/Ped Bridges
GE
THRU
U-TURN
U-TURN
T
EN
RID
LEFT
OUTBOUND
AR WAY
G MUG
VID
DA
North Beacon Street
Bridge: 142
CA
MB
N
Paths, Crosswalks,
Bike/Ped Bridges
Total = 6,056
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Charles River Basin Non-motorized User Count
Appendix E.5
Alta Planning + Design
Wednesday, September 23, 2009 4:30 - 6:30pm
Site Locations
Site # F. Bicyclists M. Bicyclists F. Upriver Peds M. Upriver Peds F. Downriver Peds
Craigie Dam & Bridges
1
33
106
465
412
3
Longfellow Bridge
2
113
221
102
126
208
Charles Street Pedestrian Overpass
3
38
73
254
270
Arthur Fiedler Footbridge
4
38
133
179
153
Ames Street Crosswalk
5
5
16
32
54
Lower Basin North Bank
6
34
80
144
154
Lower Basin South Bank
7
117
319
219
163
Harvard Bridge
8
183
486
127
189
257
BU Bridge
9
187
323
82
62
157
River Street Bridge
10
26
70
11
17
33
Western Ave Bridge
11
46
94
67
69
6
Dewolfe Street Crosswalk
12
52
83
133
202
Weeks Pedestrian Bridge
13
2
5
146
195
Anderson Memorial Bridge
14
118
259
225
425
264
Hawthorn Street Crosswalk
15
20
42
14
7
Middle Basin North Bank
16
30
75
34
24
Eliot Bridge
17
23
59
7
5
19
Middle Basin South Bank
18
42
117
12
10
Upper Basin North Bank
19
33
88
17
20
Arsenal Street Bridge
20
22
89
7
14
18
Upper Basin South Bank
21
24
87
31
17
North Beacon Street Bridge
22
19
66
16
11
21
Brooks
Street
Crosswalk
23
2
25
16
10
Charles River Basin Non-motorized User Count
Totals
1207
2916
2340
2609
986
Alta Planning + Design
Saturday, September 26, 2009 12:00 - 2:00pm
Site Locations
Site # F. Bicyclists M. Bicyclists F. Upriver Peds M. Upriver Peds F. Downriver Peds
Craigie Dam & Bridges
1
30
56
213
186
4
Longfellow Bridge
2
37
83
84
94
75
Charles Street Pedestrian Overpass
3
17
32
434
406
Arthur Fiedler Footbridge
4
33
62
321
269
Ames Street Crosswalk
5
4
9
12
29
Lower Basin North Bank
6
45
54
158
158
Lower Basin South Bank
7
89
196
253
216
Harvard Bridge
8
150
289
163
223
320
BU Bridge
9
101
137
32
40
104
River Street Bridge
10
30
44
17
15
20
Western Ave Bridge
11
16
32
11
6
39
Dewolfe Street Crosswalk
12
19
41
154
182
Weeks Pedestrian Bridge
13
6
5
133
174
Anderson Memorial Bridge
14
67
117
234
370
214
Hawthorn Street Crosswalk
15
21
21
20
9
Middle Basin North Bank
16
55
93
82
62
Eliot Bridge
17
26
54
8
9
30
Middle Basin South Bank
18
61
110
49
39
Upper Basin North Bank
19
23
79
12
16
Arsenal Street Bridge
20
24
67
12
11
22
Upper Basin South Bank
21
19
78
34
24
North Beacon Street Bridge
22
14
34
16
14
22
Brooks Street Crosswalk
23 NO DATA COLLECTED
Totals
887
1693
2452
2552
850
M. Downriver Peds
7
216
281
153
35
11
323
13
13
17
1069
M. Downriver Peds
4
76
306
78
28
55
347
25
21
12
952
F. Joggers M. Joggers Other Totals
111
129
6
1272
95
165
2
1248
151
171
24
981
58
95
9
665
7
13
0
127
246
325
35
1018
351
459
38
1666
280
312
29
2144
101
100
4
1169
38
57
2
289
24
43
1
361
74
81
0
625
46
46
0
440
106
113
11
1844
17
24
0
124
90
123
1
377
95
96
4
321
32
31
3
247
74
18
2
252
71
22
2
258
21
11
3
194
22
22
1
195
28
4
1
86
2138
2460
178 15903
September 2009 Count Tables
F. Joggers M. Joggers Other Totals
131
69
1
694
80
68
1
598
95
68
10
1062
43
35
7
770
3
1
0
58
203
140
0
758
248
179
12
1193
191
150
25
1817
64
56
3
615
24
38
1
217
33
30
3
225
58
58
0
512
44
36
0
398
59
72
4
1484
7
11
1
90
85
86
3
466
46
54
3
255
47
33
9
348
32
25
1
188
23
24
3
207
31
24
3
213
14
13
3
142
0
1561
1270
93
12310
HALVORSON DESIGN PARTNERSHIP with ALTA + HDR
November 2011
ACCELERATED BRIDGE PROGRAM | PEDESTRIAN + BICYCLE STUDY FOR PATHWAYS + BRIDGES | CHARLES RIVER BASIN
Download