79 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE FROM: PRESIDENT SUBJECT: March 5, 2012 Facilities Master Plan (FMP) Semi-Annual Update, Revision and Project Status REASON FOR BOARD CONSIDERATION ACTION ITEM NUMBER ENCLOSURE(S) Page 1 of 5 C.7 Background: This report provides a detailed summary of Facilities Master Plan (FMP) projects recently completed, projects under construction or active planning, projects approved for future construction as well as recommendations for changes to FMP projects, scope, budget or schedule. The FMP is officially revised in the spring and fall each year and was last presented in September 2011, with the latest revisions of January 2012. RECOMMENDATION: It is recommended that the Governing Board approve the Facilities Master Plan as presented in this report. Administrator Initiating Item: Joe Nugent Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition Approved 80 January, 2012 – Cabrillo College Facilities Master Plan A. Summary of Revisions to the Approved September 2011 FMP and New Activities Arts Education Classrooms Project As reported in the fall of 2011, the VAPA Complex continues to be fully occupied and operational not withstanding construction deficiencies. The project has been submitted to DSA for final approval and is expected to receive final certification. Arts Education Remediation Project. Staff is working to identify alternative corrective measures in order to resolve deficiencies such as HVAC (Heating, Ventilation & Air Conditioning) throughout the five buildings and water leaks in the Theater and Music buildings. Health and Wellness Project Nursing, Radiology Technology, Medical Assisting, Dental Hygiene, Health and Wellness, and the Stroke Center are fully operational. The project has been submitted to DSA for final certification and close out. Equipment is in the process of being purchased by Cabrillo Purchasing department. Building 300 Renovation With renovations to the building complete, the twelve classrooms and eight offices have been occupied for an entire year with minor adjustments to operating systems. Staff is working with DSA to complete the project closeout. DSA is currently processing project closeout requests received in February 2011. Equipment is in the process of being purchased by Cabrillo Purchasing department. Watsonville Green Technology Center This project was developed in collaboration with staff and faculty in order to construct a 14,000 square foot LEED Platinum Level certified “green” community education center. The District received a grant for $2.5 million from Economic Development Agency for the project, and the grant was augmented by $865,000 to help fund the upgrade to a LEED Platinum Level certified “green” building. The Division of State Architect (DSA) approved the plans in June of 2010 and EDA approved the plans and specifications in July 2010. The project went to bid in August 2010. In October, the Board approved Dilbeck and Sons as well as an augmentation to the budget of $517,000. A deductive change order for the value engineering items discussed at the October Board meeting was approved at the November Board Meeting. The District has received a generous donation from the Ley Family of $100,000 for construction which allowed us to add back some of the items that were value engineered out. Staff is working with the Architect, Contractor and Faculty to add back items as necessary throughout the course of the project. The project is very near completion as of January 31, 2012 and the contractor is working on punch list. Equipment is in the process of being purchased by Cabrillo Purchasing department. 81 800 Bldg. STEM Grant Project (The 800 Bldg. STEM Grant project currently consists of 3 phases) Cabrillo College has been awarded a $4,339,878 million federal five-year Title III grant for the STEM fields (Science, Technology, Engineering, and Mathematics). The grant will fund the renovation of classrooms and laboratory space in the 800 building in the amount of $1,952,530. Additional renovations to the 800 building will be required and include repairs to the heating and ventilation systems, office space and restrooms. Administrative Services and student service programs within the 800 building have been relocated. Bond funds will be needed to accomplish the additional required renovations and relocation of functions which are not covered by the grant. 800 Bldg. Moves Phase I: Project #9276 (This phase includes renovations and relocation to buildings SAC, 100, 900 bldg.) The 800 building moves were initiated in December and substantially complete by the end of January with the exception of phase II work. Administrative offices and Student Services (Fast track to Work and Student Job Placement) located in the 800 building are now relocated to the SAC, 100 and 900 buildings. Contracts for construction services include Michael Wolcott Construction in the amount of $29,274; Epico Systems Inc. in the amount of $13,322; Carpet King in the amount of $6,442. Other services include project management, furniture and equipment, as well as moving services. The initial Measure D budget for this phase of the project is $248,283 and was completed in the amount of $112,422 and the remaining funds $126,679 will be used for 800 Bldg. Phase II Moves. Phase I was substantially complete in January, 2012. 800 Bldg. Moves Phase II: Project #9276 (This phase includes additional punch list, renovation, relocation and equipment needs to SAC/100/900/HW bldg.) Signage was needed to facilitate way finding for the programs that have been relocated in phase I of this project and is approximately 70% complete. Additional renovation work has been identified to facilitate the needs of the programs (President’s component and Student Assessment) located in the upper SAC west and is nearing completion. Furniture and equipment also remains on the list to complete the transition for the moves. Disabled Student Program & Services (DSP&S) space has been identified as part of the program needs for the 800 building STEM project. This will require relocation of DSPS to the Health & Wellness building where it will share space with Stroke Center Program. 800 Bldg. Construction / Renovation Phase III: Project # TBD (This phase includes all design and construction elements of the project) As authorized in the December Board meeting, the District is in contract with RMW for architectural services and is expected to submit drawings to the Division of the State Architect (DSA) in March, 2012. Some modifications have been identified to the scope of the project which will include the portion of the lower elevation of the building that currently houses DSP&S. It is estimated that all renovation work (restrooms, offices, HVAC & ADA) that is not within the scope of the approved grant will increase the overall project budget by approximately 1,000,000 and Measure D funds will be assigned. 82 January, 2012 – Cabrillo College Facilities Master Plan FMP Projects Closed Since March, 2011 Student Activities Center (SAC) The Student Activities Center was occupied in October 2007. The Office of General Services, an office of the Division of the State Architect (DSA), required compliance on a variety of processes, including the monitoring of the soil nail wall, before closing and final certification of the building could occur. The building received final certification on March 22, 2011 and is effectively closed as of June 30, 2011. FMP Projects in Active Planning, Construction or Substantial Completion This section includes projects in active planning, under construction or substantially complete as of June 30, 2011. Project & Planned Completion Date Arts Education Classrooms (AEC) Total Construction AEC Equipment Total Equipment Total Project Allied Health Classrooms Total Construction Allied Health Equipment Total Equipment Project Budget Funding Source State Capital 20,357,000 Outlay Funds 5,345,114 Measure C 51,909,024 Measure D 77,611,138 State Capital 1,136,000 Outlay Funds Measure D 1,126,453 Equipment 2,262,453 79,873,591 State Capital 10,490,000 Outlay Funds 121,741 Measure C 15,420,538 Measure D 26,032,279 Measure D 1,465,493 Equipment State Capital 1,185,000 Outlay Funds 2,650,493 Substantial Completion Date Paid to Date (thru 1/31/12) 20,357,000 5,345,114 51,891,087 77,593,201 Project is in DSA closeout 1,126,453 2,262,453 79,855,654 10,490,000 121,741 15,329,282 25,941,023 Project is in DSA closeout 5/18/2010 1,076,344 Equipment is being purchased. 716,281 1,792,625 28,682,772 Total Project 10,965,000 8,407,692 119,521,363 115,996,994 Total this Page 7/15/2009 1,136,000 Total Project Watsonville Green Technology Center Watsonville Green Technology Center Watsonville Green Technology Center 27,733,648 7,500,000 Measure D 6,771,302 100,000 Foundation 0 3,365,000 Status / Comment Federal Grant 1,636,390 EDD Grant Anticapted in March 2012 83 January, 2012 – Cabrillo College Facilities Master Plan FMP Projects in Progress or Active Planning, con’t Project & Planned Completion Date DSA Project Close Out Project Budget 61,337 Building 300 Renovation Building 300 Renovation Building 300 Renovation 1,166,000 1,051,000 33 Building 300- Equipment Building 300- Equipment Total Project Campus Master Plan 931,000 931,000 4,079,033 54,189 Campus Wide Signage 800 Bldg. STEM Grant Proj Total This Page Funding Source Measure C Measure D Building Upgrades State Funds Measure C Measure D Equipment State Funds 323,291 Measure C Measure D Accessibility 1,952,530 Federal Grant Substantial Completion Date Status / Comment This is an ongoing project to close out projects completed in prior years (curently 12) with DSA. 33,784 Paid to Date (thru 1/31/12) 1,120,970 1,047,739 33 317,953 295,058 2,781,753 53,078 268,373 0 4,517,850 3,136,988 From Page Five $119,521,363 $117,315,432 Total FMP Projects In-Progress $124,039,213 $120,452,420 1/17/2011 Project is in DSA closeout Equipment is being purchased. Ongoing updates. Ongoing updates. Schamatic design phase