WORKSHOP SPACE PLANS AP30/30A & AP30B 1 Objectives Deepen your technical & regulatory knowledge about Space Plans procedures Appendices 30/30A and 30B How to use BR tools (Version 7) to: • Submit notices / comments • Get/analyze BR examination’s results • Perform examinations Time Subject 09:00-09:10 Introduction Exercise on submission 09:10-10:15 AP30/30A Technical examination Exercise on SPS_REPORTs Description Exercise on validation of a sample with a correction of few often wrongly submitted parameters using SpaceCap and cross check with GIMS data Technical examination introduction (list of specific concepts, list of examination...) Exercise on viewing results of MSPACE available in BR IFICs 10:15-10:45 Coffee break 10:45-12:00 Introduction AP30B Exercise on technical examination to analyze results of GIBC Exercise on technical examination (GIBC/Art.21, ANX3, 6.6, ANX4) Exercise on viewing results available in BR IFICs using Reporting tools 12:00-12:30 RESOLUTIONS 49 and 552 12:30-14:00 Lunch break 14:00-14:30 AP30/30A & AP30B : BR IFIC and Web What to do on issue of a BR IFIC? Navigating through the BR IFIC and the BR web to find information about Plans Satellite project: from Radio Spectrum to MIFR RADIO SPECTRUM Operator requirements (type of space service, freq. band, station type, ITU Region...) RR Art. 5 Table of Frequency Allocations From 9KHz to 275GHz TERRESTRIAL SERVICES Selecting the appropriate band in the Radio Spectrum SPACE SERVICES bands/services under RR Art. 9/11 GSO non-GSO bands/services under AP30/30A/30B Earth station GSO PLAN Selecting the appropriate PLAN / regulatory procedure SOF guard band AP30/30A Submitting to ITU satellite network characteristics Seeking agreements with affected/affecting Administration Submitting to ITU agreements and final characteristics Submitting to ITU notification for recording assignments in MIFR Submitting to ITU date of bringing into use confirmation and due diligence Internationally recognised Operating space network Assistance Time between regulatory date of receipt of the 1st submission and the date limit for bringing into use the network Submission provisions and publication references AP30/30A New member API/A (+ API/B) Art. 9 Sect. I Advanced publication CR/C + CR/D Coordination Art. 9 Sect. II BSS AP30/30A AP30-30A/F/C AP30/30A AP30-30A/F/D Art.2A Coordination AP30/30A Art. 4.1.26 FSS AP30B AP30B/A7 AP30B New allot. Art.7 AP30/30A/E Part A + D Pending AP30/30A Art.4.1.5 (R13) Art.4.2.8 (R2) AP30B/A6A AP30B Add. Art.6.7 system AP30/30A/E Part B List(R13) Plan(R2) AP30/30A Art.4.1.15 (R13) Art.4.2.19 (R2) AP30B/A6B List AP30B Art.6.23/25/35 BR IFIC Part I-S Notification Art. 11.28 AP30/30A Art.5.1.6/5.1.10 AP30B Art.8.5 BR IFIC Part II-S/ Part III-S Notification Art. 11.43 AP30/30A Art.5.2.2/4 AP30B Art.8.12 Due diligence information RES49 Resolutions MIFR RESxxx Which software can be used? Preparation of a submission Analyses of publications • SpaceCap • SpaceVal/(SpacePub) • SpaceQry/SNS-Online/SNL-Online • GIBC / SPS including reporting tool • GIMS Making comments on publications • SpaceCom Coordination with administrations • SpaceQry/SNS-Online/SNL-Online • GIBC / SPS including reporting tools • GIMS Workshop on Space Plans (AP30/30A & AP30B) Contact: veronique.glaude@itu.int