WORKSHOP SPACE PLANS AP30/30A & AP30B

advertisement
WORKSHOP
SPACE PLANS
AP30/30A & AP30B
1
Objectives
 Deepen your technical & regulatory
knowledge about
Space Plans procedures
Appendices 30/30A and 30B
 How to use BR tools (Version 7) to:
• Submit notices / comments
• Get/analyze BR examination’s results
• Perform examinations
Time
Subject
09:00-09:10
Introduction
Exercise on submission
09:10-10:15
AP30/30A
Technical examination
Exercise on SPS_REPORTs
Description
Exercise on validation of a
sample with a correction of few
often wrongly
submitted parameters using
SpaceCap and cross check with
GIMS data
Technical examination
introduction (list of specific
concepts, list of examination...)
Exercise on viewing results of
MSPACE available in
BR IFICs
10:15-10:45
Coffee break
10:45-12:00
Introduction
AP30B
Exercise on technical examination
to analyze results of GIBC
Exercise on technical
examination
(GIBC/Art.21, ANX3, 6.6, ANX4)
Exercise on viewing results
available in BR IFICs using
Reporting tools
12:00-12:30
RESOLUTIONS 49 and 552
12:30-14:00
Lunch break
14:00-14:30
AP30/30A & AP30B :
BR IFIC and Web
What to do on issue of a BR IFIC?
Navigating through the BR IFIC
and the BR web to find
information about Plans
Satellite project: from Radio Spectrum to MIFR
RADIO SPECTRUM
Operator requirements
(type of space service, freq. band,
station type, ITU Region...)
RR Art. 5
Table of Frequency Allocations
From 9KHz to 275GHz
TERRESTRIAL SERVICES
Selecting the appropriate
band in the Radio
Spectrum
SPACE SERVICES
bands/services
under
RR Art. 9/11
GSO
non-GSO
bands/services
under
AP30/30A/30B
Earth
station
GSO
PLAN
Selecting the appropriate
PLAN / regulatory
procedure
SOF
guard band
AP30/30A
Submitting to ITU satellite
network characteristics
Seeking agreements
with affected/affecting
Administration
Submitting to ITU
agreements and
final characteristics
Submitting to ITU
notification for recording
assignments in MIFR
Submitting to ITU
date of bringing into use
confirmation
and due diligence
Internationally recognised
Operating space network
Assistance
Time between regulatory date of receipt of the 1st submission
and the date limit for bringing into use the network
Submission provisions and
publication references
AP30/30A
New member
API/A (+ API/B)
Art. 9 Sect. I
Advanced publication
CR/C + CR/D
Coordination
Art. 9 Sect. II
BSS
AP30/30A
AP30-30A/F/C
AP30/30A
AP30-30A/F/D
Art.2A
Coordination
AP30/30A
Art. 4.1.26
FSS
AP30B
AP30B/A7 AP30B
New allot. Art.7
AP30/30A/E
Part A + D
Pending
AP30/30A
Art.4.1.5 (R13)
Art.4.2.8 (R2)
AP30B/A6A
AP30B
Add.
Art.6.7
system
AP30/30A/E
Part B
List(R13)
Plan(R2)
AP30/30A
Art.4.1.15 (R13)
Art.4.2.19 (R2)
AP30B/A6B
List
AP30B
Art.6.23/25/35
BR IFIC Part I-S
Notification
Art. 11.28
AP30/30A
Art.5.1.6/5.1.10
AP30B
Art.8.5
BR IFIC
Part II-S/ Part III-S
Notification
Art. 11.43
AP30/30A
Art.5.2.2/4
AP30B
Art.8.12
Due diligence
information
RES49
Resolutions
MIFR
RESxxx
Which software can be used?
Preparation of
a submission
Analyses of
publications
• SpaceCap
• SpaceVal/(SpacePub)
• SpaceQry/SNS-Online/SNL-Online
• GIBC / SPS including reporting tool
• GIMS
Making comments
on publications
• SpaceCom
Coordination with
administrations
• SpaceQry/SNS-Online/SNL-Online
• GIBC / SPS including reporting tools
• GIMS
Workshop on Space Plans
(AP30/30A & AP30B)
Contact: veronique.glaude@itu.int
Download