yonge street Spring/Summer 2014 how to sign up for construction notices 1. Visit vivanext.com 2. Click on ‘Subscribe’ on the left side 3. Select the ‘Yonge Street’ boxes [Newmarket and/or Richmond] and any others of interest 4. Provide your contact info 5. Click on ‘Submit’ keep in touch For a more in-depth look at different elements of vivaNext project plans, ongoing activities and to sign up for construction notices, visit vivanext.com. Yonge Street rapidway moves forward VivaNext is committed to designing and delivering an exceptional rapid transit system – one that will help shape growth in our communities, connect York Region’s urban centres and provide faster, more reliable transit. As you will see from the transformation of Highway 7 East in Richmond Hill, the vivaNext rapidways are more than just a transit project. They also include urban design elements such as pedestrian-friendly boulevards, wider sidewalks, attractive landscaping, bicycle lanes and green open spaces for the whole community to enjoy. This spring we awarded the contract to design and build approximately 9 km of dedicated centre lane rapidways along Follow us on twitter. Find us on facebook. Read our blog. Go to vivanext.com. Yonge Street for viva rapid transit vehicles [flip the page to see a map]. This rapidway is a key part of York Region’s transit network, and will connect with the Richmond Hill Centre/Langstaff Urban Gateway at Highway 7 – with GO Transit, the proposed Yonge Subway Extension and other transit services. During the next few months, you can expect to see contractors and surveyors walking along Yonge Street, reviewing designs, taking photos and gathering data. Preliminary construction activities will begin later this year and construction of the rapidway will be completed by the end of 2018. Green Lane rapid transit stations East Gwillimbury GO Station Da vi s Davis Drive Sa M Ea va ulo gl g e ck e Yonge Street will feature 10 new rapid transit vivastations along the centre rapidway. In Newmarket, the rapidway will extend 2.4 km on Yonge Street from just south of Mulock Drive to Davis Drive, and will include 3 new vivastations. Newmarket GO Station NEWMARKET In Richmond Hill, the rapidway will extend 6.5 km from Highway 7 to 19th Avenue/ Gamble Road, and will include 7 new vivastations. AURORA Highway 404 Leslie Street e bl am -G th 19 RICHMOND HILL Heritage Area Major MacKenzie Dr. VAUGH A N Ba During construction, we realize the importance of minimizing the impact on businesses and people using the road by keeping travel lanes open whenever possible and safe to do so. For more information on how the construction process works, visit vivanext.com/blog. Stouffville Rd. Cr 1 M El Be W aj os e g nt 6th r or ry -C ldr by in M na M ic -S ar ill rd k a co rv ck s tt ill en e zi e Building a roadway is a process that follows clearly defined steps and uses modern technology, equipment and materials. Although we have access to some of the best, most experienced construction contractors anywhere, building the rapidway down the middle of some of the Region’s busiest roads is a complicated undertaking. That said, we have an experienced team of dedicated staff and constructors who are on board and up for the challenge. Yonge Street building a rapidway Bayview Avenue Bloomington Rd. Bathurst Street All vivastations feature a fully accessible, 27-metre-long platform, including a 9-metre-long enclosed section with motion-activated heaters. Wellington St. E. Richmond Hill Centre Now that the contract has been awarded, our next step will be to work closely with the contractor to finalize the design of the rapidway and develop a construction schedule. Later this year, crews will be working along the Yonge Street corridor to prepare for construction. During this pre-construction phase, these teams will more accurately document existing conditions above and below the ground. This work is mainly conducted during off-peak driving hours and sometimes requires lane closures. Highway 7 2011-2014 construction 2011-2015 construction 2014-2018 construction M A Rapidway RKHAM Open 2015-2019 construction Future rapid transit Proposed Yonge Subway Extension Yonge Street project schedule Highway 7 Steeles Avenue Terminal Finch Avenue Finch Station Leslie Pawlowski Community Liaison Specialist Tel: 905.886.6767 ext. 71357 Cell: 905.505.1430 Email: leslie.pawlowski@york.ca vivanext.com