1 Right the st Time! Pacific Steel Casting Company Est. 1934 Facilities Management of a Steel Casting Company Robert Murillo Pacific Steel Casting Company Facilities Manager March 8th, 2012 Carbon Steel vs Cast Iron • Carbon content <2% • • Steel is an alloy of iron, • carbon, nickel, chrome, vanadium, etc… • Types: Low, Medium, High, • and Ultra-High Strengths Carbon Content >2% Cast Iron is basically carbon, iron, silicon. Types: Gray, White, Malleable, and Ductile. Pacific Steel Casting In a Nut Shell • • • • • • • • • • Plant 1 opened in 1934. Plant 2 opened in 1975. Plant 3 opened in 1982. Each plant equipped with state of the art environmental controls. 3 Carbon filtration systems to remove VOC from process. Facility has the ability to demand 9+ Mega Watts during steel production. Recycles over 2,000+ tons of scrap metal a month. Recycles all process materials either internally or through outside vendors. Largest industries serviced are Oil Tool and Industrial Trucking. Combined plant production capacity of 2000+ tons/month. 3 Production Facilities Sand Molding Types: • Green Sand • Shell • Air-Set Overview of Steel Casting Production Process My Background • Completed trade school and became a Certified Welder. • Graduated Butte College with an AS Degree in Welding Technology. • Graduated CSUChico with a BS in Manufacturing Technology with a minor in Production Operations Management. • Worked through college as a Fabricator/Machinist. • Hired by Pacific Steel Casting in 2004 as a CAD operator. • Promoted to Robotics Engineer. • Promoted to Plant Engineer. • Promoted to Facilities Manager. Professional Organizations• American Welding Society (AWS) • Society of Manufacturing Engineers (SME) • American Foundry Society (AFS) • Steel Founders Society of America (SFSA) Western Division Chairman Awards and Achievements• Westec College Challenge – Grand Prize • Technical Paper Published in Modern Casting Magazine ‘Minimizing Power Demand on Electric Arc Furnaces’. Facilities Management • Maintenance Departments • Operating Budget • Equipment Design and Engineering • Environmental Responsibility • Capital Equipment Installation/Project Management • CalOSHA Compliance • Safety/Technical Training • City of Berkeley • Energy Management • Facility Security Projects • EAF Dust Collector Projects • EAF Energy Demand Reduction Energy Director Rheostat Controller Electricity Meter Plant 1 Furnace Controller Furnace#1 PC Energy Director Rheostat Controller PC Electricity Meter Furnace#2 Plant 2 Furnace Controller Electricity Meter Energy Director Plant 3 Furnace Controller Furnace#3 Projects • LN8 Shot Blast Machine Continuous Improvement • Lean Manufacturing Implementation • 5S Projects • TPM – Total Productive Maintenance • Preventative Maintenance • Predictive Maintenance • Root Cause Analysis Quiz • What year did PSC first open for business? • What is PSC’s combined production capacity (tons)? • How much power demand does this facility require? • What does PSC call our VOC filtering equipment? • What are the two main industries PSC services?