Chabot College - Facilities Committee Update February 9, 2012 Item Building Project / Designer Phase Activity / Issue Punch List Occupancy April 2010 Punch List Occupancy Jan 2010 1 CSSC/700 Community and Student Services Center - tBP 2 IOB/400 Instructional Office Building - LPA 3 Site Athletic Facilities - Verde Design DSA Close Out Awaiting DSA close Out 4 Site Football Field DONE PROJECT CLOSE-OUT COMPLETE 5 1900 Punch List Occupancy Jan 2010 6 Site Planetarium / Lecture Halls - DSK Pool Renovation - Aquatic Design Group DONE PROJECT CLOSE-OUT COMPLETE 7 Site M & O Facility - Gould On Hold On Hold 8 4000 PE Strength Fitness Center Construction Occupancy December 2011 9 800, 900, 1000 Classroom Building - HMC DSA Close Out B800 Occupancy Jan. 2009, B900 is occupied 10 500 Classroom Building - HMC DSA Close Out Occupancy Jan. 2010 11 Site Portable Offices Central Plant / Utility Loop - ESCO DSA Close Out Temporary Faculty Offices Charles Ham DONE 12 13 14 1000, 1400, 1200, 1300 508, 904, 1814, 2205 15 Art Gallery Doors, Industrial Tech Improvements, PAC Interior Improvements Phase 3 underway, Completion Dec. 2008 PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE Technology Enhanced Classroom Classroom Standards and Office Standards DONE PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE 16 Site Campus Security Plan - Catalyst Close Out Under Construction, complete Nov. 2008 17 300 Construction Occupancy Ddecember 2012 18 Site Classroom Building - HMC College Landscape Guidelines RHAA DONE standard is complete 19 Site Asbestos Inspections - HMS On-site Investigation HazMat removal in B1200 / B2800 20 2500, 2600, 2700, 2800, 2900 PE Complex - SKW Construction Construction scheduled completion June 2013 21 Site Commissioning Authority - AEC On-going B4000, B1200, B1400, B1800 22 Site District-Wide FF&E Consultant On-going Dovetail working with B1700/1800 23 Site IT Infrastructure Project - ESCO Close Out Scope of work coupled with Central Plant item #11. Responsibility / Action On Hold Chabot College - Facilities Committee Update February 9, 2012 24 Site Site Design Committee On Call As Needed Chaired by Tim Nelson 25 100 Building Modernization - Steinberg Schematic Design 26 Site College Marquee - tBP Working Drawings Revised program underway to utilize vacated spaces 50% CDs underway due January 2012 - to be bundled with #44 Security 27 Site Complete Finished with CSSC project On-going 28 Site Founders Plaza - CSSC/tBP Space / Program Relocation Dovetail 29 2200 Dental Hygiene - HMC Close Out Occupancy October 2009 - Project Close -Out 30 Site Campus Signage - HM PAC Rigging Beam Analysis George Famous Working Drawings CDs under way DONE Analysis Done Site Parking Lots - tBP Close Out Finished Aug. 2008 Renovation - CHA Construction Phase 1 renovation of Auto, Classrooms, Yard complete. Phase 2 renovation of Welding behind schedule. Phase 3 renovation of Machine shop complete Dec. 2011 Renovation - CHA 31 32 33A 1400 33B 1600 Construction Renovation of 1618 and 1620 needs punch list completion 34 Site Solar - Chevron Energy DSA Close Out Solar Panels are operational 35 1700/1800 Renovation - Steinberg Construction Construction underway B1800 36 1600 Renovation - TBD FPP revisions FPP revised for FY 12/13. Awaiting state input 37 Site Soccer Field Restoration - Verde Close Out Construction finish October 2010/in maintenance period 38 200 1100, 1500, 2000 Light Renovation - Dovetail Construction Light Renovation Pre-Design project finished Budget does not allow for wall changes to accommodate the Chabot College office standard of 100 s.f. Light Renovation Pre-Design 41 2300 B1200, SOTA Plaza Renovation - bfgc Construction Construction underway 42 Site Parking Lot F Restoration DONE February/March 2010 43 Site Traffic Signal Construction 44 Site Parking Lot G/H/F/J Security Working Drawings October 2010 start construction, signal install Fall 2011 50% CDs underway due January 2012 - to be bundled with #26 Marquee 45 Site Villas Removal DONE Removal complete February 2010 46 3400 Security Relocation Light Renovation - CHA Schematic Design Design underway Dovetail Feasibility Study B700 - Feasibility Study underway 39 40 47 48 Punchlist underway PGE Electrical Hook-up