Chabot College - Facilities Committee Update February 28, 2013 Item Building Project / Designer Phase Activity / Issue Punch List Occupancy April 2010 1 CSSC/700 Community and Student Services Center - tBP 2 IOB/400 Instructional Office Building - LPA Punch List Occupancy Jan 2010 3 Site Athletic Facilities - Verde Design DSA Close Out Awaiting DSA close Out 4 Site Football Field DONE PROJECT CLOSE-OUT COMPLETE 5 1900 Punch List Occupancy Jan 2010 6 Site Planetarium / Lecture Halls - DSK Pool Renovation - Aquatic Design Group DONE PROJECT CLOSE-OUT COMPLETE 7 Site M & O Facility - Gould On Hold On Hold 8 4000 PE Strength Fitness Center Construction Occupancy December 2011 9 800, 900, 1000 Classroom Building - HMC DSA Close Out B800 Occupancy Jan. 2009, B900 is occupied 10 500 Classroom Building - HMC DSA Close Out Occupancy Jan. 2010 11 Site Portable Offices Central Plant / Utility Loop - ESCO DSA Close Out Temporary Faculty Offices Charles Ham DONE 12 13 14 1000, 1400, 1200, 1300 508, 904, 1814, 2205 15 Art Gallery Doors, Industrial Tech Improvements, PAC Interior Improvements Phase 3 underway, Completion Dec. 2008 PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE Technology Enhanced Classroom Classroom Standards and Office Standards DONE PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE 16 Site Campus Security Plan - Catalyst Close Out Under Construction, complete Nov. 2008 17 300 Construction Occupancy Ddecember 2012 18 Site Classroom Building - HMC College Landscape Guidelines RHAA DONE standard is complete 19 Site Asbestos Inspections - HMS On-site Investigation Investigating B3400, B1700, PE Complex 20 2500, 2600, 2700, 2800, 2900 PE Complex - SKW Construction Construction scheduled completion August 2013 - anticipated to run late into Fall Semester 21 Site Commissioning Authority - AEC On-going B1200, B1400, B1800 22 Site District-Wide FF&E Consultant On-going Dovetail working with B1700/1800 23 Site IT Infrastructure Project - ESCO Close Out Scope of work coupled with Central Plant item #11. Responsibility / Action On Hold Chabot College - Facilities Committee Update February 28, 2013 24 Site Site Design Committee 25 100 Building Modernization - Steinberg Schematic Design Schematic package being assembled for review 26 Site College Marquee - tBP Working Drawings 90% CDs under review - to be bundled with #45 Security 27 Site Complete Finished with CSSC project 28 Site Founders Plaza - CSSC/tBP Space / Program Relocation Dovetail 29 2200 Dental Hygiene - HMC Close Out Occupancy October 2009 - Project Close -Out 30 Site Campus Signage - HM PAC Rigging Beam Analysis George Famous Working Drawings CDs under way DONE Analysis Done Parking Lots - tBP Close Out Finished Aug. 2008 Renovation - CHA Close Out Project is substantially complete. Punch list work underway. 31 32 Site 33A 1400 33B 1600 On Call As Needed Chaired by Tim Nelson On-going Renovation - CHA Construction Renovation of 1618 and 1620 needs punch list completion 34 Site Solar - Chevron Energy DSA Close Out Solar Panels are operational 35 1800 Renovation - Steinberg Construction Construction underway B1800, occupancy scheduled Jan. 2013 36 1700 Renovation - Steinberg Bidding Bid Award March 2013 37 1600 Renovation - TBD FPP revisions FPP revised for FY 14/15. Awaiting state input 38 Site Soccer Field Restoration - Verde Close Out Construction finish October 2010/in maintenance period 39 200 1100, 1500, 2000 Light Renovation - Dovetail Construction Light Renovation Pre-Design Light Renovation Pre-Design 42 2300 B1200, SOTA Plaza project finished Budget does not allow for wall changes to accommodate the Chabot College office standard of 100 s.f. possible light renovation project, current kitchen equipment purchase underway Renovation - bfgc Construction Construction underway, occupancy scheduled Jan 2013 43 Site Parking Lot F Restoration DONE February/March 2010 44 Site Traffic Signal Construction project finished 45 Site Parking Lot G/H/F/J Security Working Drawings CDs underway due January 2013 - to be bundled with #26 Marquee 46 Site Villas Removal DONE Removal complete February 2010 47 3400 Light Renovation - CHA Bidding Bid Opening Jan 2013 48 200 Campus Security Move Bidding Construction planned over holidays 40 41 49 50 Punchlist underway