Air Force Operation and Maintenance, Active Forces

advertisement
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
I. Description of Operations Financed: Technical Support Activities O&M funds acquisition functions at Air Force Materiel Command
(AFMC) product centers. These centers include the Aeronautical Systems Center (ASC), Wright-Patterson AFB, OH; Electronic Systems Center
(ESC), Hanscom AFB, MA; Space and Missile Systems Center (SMC), Los Angeles AFB, CA; and Human Systems Center (HSC), Brooks AFB,
TX. Technical Support Activities do not provide funds for Research, Development, Test and Evaluation (RDT&E) activities which are funded in
the RDT&E appropriation.
Acquisition and Command Support (ACS) provides resources to support the staff functions, technical mission, and support activities at AFMC
acquisition organizations. Resources within ACS are used for civilian workforce pay and associated travel and transportation costs. Resources
also support contractual services, supplies and equipment for the four centers.
Air Force Operational Test and Evaluation Center (AFOTEC) manages the Air Force Operational Test and Evaluation (OT&E) program in
accordance with Air Force and Department of Defense (DoD) policy and guidance. OT&E program evaluates weapon system operational
capabilities and identifies deficiencies in the system before designated production and acquisition decisions. This program pays for all phases of
HQ AFOTEC conducted Follow-On OT&E (FOT&E) and Qualification OT&E (QOT&E), also normal overhead and administration operating
expenses for the Headquarters, three Detachments, and twenty-two operating locations.
II. Force Structure Summary: Air Force Materiel Command’s four Product Centers conceive, design, develop, integrate and acquire Air Force
systems, subsystems, and equipment. ASC is responsible for management of aeronautical systems acquisition. ESC is responsible for command,
control, communications, and intelligence systems acquisition. SMC plans, programs, and manages space systems. HSC manages aerospace
medicine studies, analysis, and technology.
515
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
III. Financial Summary ($s in Thousands):
FY 2001
A. Program Elements:
FY 2000
Actuals
Budget
Request
Appn
Current
Estimate
FY 2002
Estimate
AF Operational Test and Evaluation Center
Acquisition and Command Support
Total
$34,349
357,421
$391,770
$35,612
360,532
$396,144
$33,837
353,373
$387,210
$38,492
350,496
$388,988
$37,318
367,360
$404,678
B. Reconciliation Summary:
Baseline Funding
Congressional Adjustments (Distributed)
Congressional Adjustments (Undistributed)
Adjustments to Meet Congressional Intent
Congressional Adjustments (General Provisions)
Subtotal Appropriated Amount
Rescission
Program Changes (CY to CY only)
Subtotal Baseline Funding
Reprogrammings
Price Changes
Functional Transfers
Program Changes
Current Estimate
Change
FY 01/01
Change
FY 01/02
$396,144
0
0
0
-8,934
$387,210
-1,166
-2,634
$383,410
5,578
0
$388,988
$388,988
516
15,202
5,540
-5,052
$404,678
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
C. Reconciliation of Increases and Decreases ($s in Thousands):
FY 2001 President's Budget Request .......................................................................................................................
$396,144
1. Congressional Adjustments ...................................................................................................................................
$-8,934
a) Distributed Adjustments .......................................................................................................
$0
b) Undistributed Adjustments ...................................................................................................
$0
c) Adjustments to meet Congressional Intent ...........................................................................
$0
d) General Provisions ................................................................................................................
$-8,934
i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act)
$-5,578
ii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........
$-1,682
iii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act)
$-1,674
FY 2001 Appropriated Amount (subtotal) ..............................................................................................................
$387,210
Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) ....................
$-1,166
2. Program Increases and Decreases .........................................................................................................................
$-2,634
a) Transfers ...............................................................................................................................
517
$0
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
b) Program Increases .................................................................................................................
$10,934
i) One-time Costs ................................................................................................................
a. Technical Support Activities (FY 2001 Base $387,210) ..................................
Increase represents one-time realignment to fund data processing equipment,
personnel training, travel, and contract services to meet unit commander’s
immediate requirements.
$10,934
$10,934
ii) Program Increases............................................................................................................
$0
c) Program Decreases ...............................................................................................................
$-13,568
i) One-time Costs ................................................................................................................
$0
ii) Program Reductions ........................................................................................................
$-13,568
a. Civilian Pay (FY 2001 Base $326,886) ............................................................
$-13,568
The decrease represents revised civilian pay funding requirements based on
updated assessment of actual workyear costs to reflect the impact of changes such
as FY 2000 locality pay.
FY 2001 Baseline Funding (subtotal) .......................................................................................................................
$383,410
3.Reprogrammings: ............................................................................................................................
a) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-754, FY 2001 Appn Act)
$5,578
$5,578
Revised FY 2001 Estimate ........................................................................................................................................
$388,988
4. Price Change .........................................................................................................................................................
$15,202
518
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
5. Transfers ................................................................................................................................................................
a) Transfers In ...........................................................................................................................
$5,540
$5,540
1) Acquisition Support (FY 2001 Base $350,496) ................................................
Realigns dollars from Logistics Operations to Technical Support Activities
Subactivity Group to support acquisition reform, Program Executive Officer
operations and business reengineering efforts.
$3,188
2) Test and Evaluation Mission Support (FY 2001 Base $350,496) ....................
Transfers mission support funds from Test and Evaluation Support (RDT&E) to the
Technical Support Activities Subactivity Group (Eglin Test Center to the new Air
Armament Center). Manpower was previously transferred.
$2,352
b) Transfers Out ........................................................................................................................
$0
6. Program Increases .................................................................................................................................................
$5,882
a) Annualization of New FY 2001 Program .............................................................................
$0
b) One-time FY 2002 Costs ......................................................................................................
$1,166
i) Rescission Restoration (Base FY 2001 $388,988) ........................................................
Restoral of FY01 Government-Wide Rescission
$1,166
c) Program Increases .................................................................................................................
$4,716
i) Follow-On Operational Test and Evaluation Support (Base FY 2001 $38,492) ...........
Funds additional technical and scientific contract support; and software and hardware
revisions and upgrades to maintain currency with state of the art technology.
$1,874
ii) ADR Team (FY 2001 Base $350,496) ............................................................................
$1,530
519
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
Funds Alternative Dispute Resolution Team to avoid high litigation costs from
acquisition contractor claims.
iii) Civilian Pay Adjustment (FY 2001 Base $313,318) .......................................................
This represents revised civilian pay funding requirements due to newly approved
special salary rates for critical skills (Air Traffic Controller (ATC) Premium Pay and
Information Technology (IT) Special Salary Rates) and annualized FY01 increases in
Federal Employee Health Benefits (FEHB) rates. These increases are offset by a
reduction in the programmed civilian pay raise percentage and expected salary
savings due to workforce restructuring. Additionally, there are 261 compensable
calendar workdays in FY 2002 versus 260 days in FY 2001.
$786
vi) Competition and Privatization Savings (Base FY 2001 $1,202) ....................................
This increase results from a change in approach to competitive sourcing and the
cancellation of A-76 studies for programs such as Precision Measurement Equipment
Laboratory (PMEL) and Corrosion Control.
$526
7. Program Decreases ................................................................................................................................................
a) One-time FY 2001 Costs ......................................................................................................
i) Technical Support Activities (FY 2001 Base $388,988) ................................................
Decrease in data processing equipment, personnel training, travel, and contract
services after a cyclical increase in FY01.
$-10,934
$-10,934
$-10,934
b) Annualization of FY 2001 Program Decreases ....................................................................
$0
c) Program Reductions ..............................................................................................................
$0
FY 2002 Budget Request ...........................................................................................................................................
520
$404,678
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
IV.
Performance Criteria and Evaluation Summary: Not Applicable.
FY 2000
FY 2001
FY 2002
Change
FY 01/02
Active Military End Strength (Total)
Officer
Enlisted
3,593
3,061
532
3,476
3,002
474
3,565
3,003
562
89
1
88
Civilian End Strength (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
4,339
4,339
0
4,339
0
4,051
4,051
0
4,051
0
4,252
4,252
0
4,252
0
201
201
0
201
0
Active Military Average Strength (Total)
Officer
Enlisted
3,599
3,061
538
3,536
3,032
504
3,521
3,003
518
-15
-29
14
Civilian FTEs (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
4,555
4,555
0
4,555
0
4,202
4,202
0
4,202
0
4,150
4,150
0
4,150
0
-52
-52
0
-52
0
V. Personnel Summary
521
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Administration and Servicewide Activities
Activity Group: Logistics Operations
Detail by Subactivity Group: Technical Support Activities
VI. OP-32 Line Items:
FOREIGN
FOREIGN
101
103
107
110
308
401
411
412
415
417
502
503
505
506
771
914
915
920
921
922
923
924
925
930
937
989
998
TECHNICAL SUPPORT ACTIVITIES
EXECUTIVE GENERAL SCHEDULE
WAGE BOARD
SEPARATION INCENTIVES
UNEMPLOYMENT COMP
TRAVEL OF PERSONS
DFSC FUEL
ARMY MANAGED SUPPLIES/MATERIALS
NAVY MANAGED SUPPLIES/MATERIALS
DLA MANAGED SUPPLIES/MATERIALS
LOCAL PROC DWCF MANAGED SUPL MAT
ARMY DWCF EQUIPMENT
NAVY DWCF EQUIPMENT
AIR FORCE DWCF EQUIPMENT
DLA DWCF EQUIPMENT
COMMERCIAL TRANSPORTATION
PURCHASED COMMUNICATIONS (NON-DWCF)
RENTS (NON-GSA)
SUPPLIES & MATERIALS (NON-DWCF)
PRINTING & REPRODUCTION
EQUIPMENT MAINTENANCE BY CONTRACT
FACILITY MAINTENANCE BY CONTRACT
MEDICAL SUPPLIES
EQUIPMENT (NON-DWCF)
OTHER DEPOT MAINT (NON-DWCF)
LOCALLY PURCHASED FUEL (NON-SF)
OTHER CONTRACTS
OTHER COSTS
TOTAL TECHNICAL SUPPORT ACTIVITIES
FY 2000
CURRENCY
ACTUAL
288,302
35,330
2,644
1
6,686
2
4
2
57
58
4
1
68
66
56
391
101
11,155
38
320
1,323
1
2,659
15,980
1
26,292
228
RATE DIFF
391,770
PRICE
PROGRAM
FY 2001
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
12,743
1,664
0
0
107
2
0
0
2
0
0
0
5
3
1
6
2
179
0
6
21
0
43
256
0
420
3
GROWTH
-14,098
-10,864
-2,403
-1
2,195
1
37
12
575
604
90
31
1,456
1,395
495
-33
115
-10,374
18
1,025
-1,249
-1
-1,250
-16,236
-1
28,449
1,767
ESTIMATE
286,947
26,130
241
0
8,988
5
41
14
634
662
94
32
1,529
1,464
552
364
218
960
56
1,351
95
0
1,452
0
0
55,161
1,998
0
15,463
-18,245
388,988
522
PRICE
CURRENCY
PROGRAM
FY 2002
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
12,683
1,126
0
0
152
0
-1
0
3
11
-2
-1
163
6
9
6
4
17
1
23
2
0
26
0
0
940
34
GROWTH
-23,083
23,601
268
0
1,479
-1
-10
-4
-165
-181
-19
-8
-484
-309
-155
-63
-32
333
-9
-220
-20
0
-342
0
0
-428
340
ESTIMATE
276,547
50,857
509
0
10,619
4
30
10
472
492
73
23
1,208
1,161
406
307
190
1,310
48
1,154
77
0
1,136
0
0
55,673
2,372
0
15,202
488
404,678
RATE DIFF.
Download