Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces

advertisement

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

I. Description of Operations Financed: Launch vehicles for satellites include Delta II, Atlas IIA, Titan II, and Titan IV launch vehicles and the

Inertial Upper Stage (IUS) flown on the Titan IV for Defense Support Program satellites. The medium launch vehicles and the Titan II and IV programs provide launch and orbital support for operational DoD space programs. The Atlas IIA, Titan IV, and Delta II space launch capability at Cape Canaveral AS, FL and the Delta II, Titan II and Titan IV space launch capability at Vandenberg AFB, CA must satisfy the launch requirements of the DoD satellite programs. Delta II, Atlas II and Titan IV launch vehicles mission will transition to the Evolved Expendable

Launch Vehicle (EELV) beginning in FY 2002. EELV will satisfy the launch requirements of the DoD, national and civil users at Vandenberg

AFB, CA and Cape Canaveral AS, FL. The launch rate requirements are a function of the number of satellites on-orbit and their success and failure rates. Resources finance services supporting the various launch capabilities: fuel; overtime; and pad refurbishment and maintenance. The

Launch Vehicles subactivity group also provides rescue and recovery services for Space Shuttle Missions.

II. Force Structure Summary: Launch Vehicles support the various DoD satellite systems, including: Navigational Satellite/Global Positioning

System (NAVSTAR/GPS); Defense Meteorological Satellite Program (DMSP); Space Based Infrared System (SBIRS); Defense Support Program

(DSP); Defense Satellite Communications System (DSCS); and the Military Strategic and Tactical Relay Satellite System (MILSTAR). This subactivity group also supports all Space Shuttle missions.

III.

Financial Summary ($s in Thousands):

FY 2001

A. Program Elements:

FY 2000

Actuals

Budget

Request Appn

Current

Estimate

FY 2002

Estimate

Medium Stage Vehicles

Inert Upper Stage Space Vehicles

Titan Space Launch Vehicles

*Evolved Expendable Launch Vehicle

Space Shuttle Operations

$31,641

4,208

65,321

6,309

1,535

$35,486

0

79,770

0

1,510

$34,682

0

78,313

0

1,486

$34,397

0

78,515

9,442

1,503

$32,117

0

85,239

28,576

1,578

Total $109,014 $116,766 $114,481 $123,857 $147,510

*The Evolved Expendable Launch Vehicle (Space) program is a functional transfer in FY01. FY00 obligations occurred in SPACE CONTROL

SYSTEMS Subactivity Group, and are displayed here for historical purposes, only.

224

B. Reconciliation Summary:

Baseline Funding

Congressional Adjustments (Distributed)

Congressional Adjustments (Undistributed)

Adjustments to Meet Congressional Intent

Congressional Adjustments (General Provisions)

Subtotal Appropriated Amount

Rescission

Program Changes (CY to CY only)

Subtotal Baseline Funding

Reprogrammings

Price Changes

Functional Transfers

Program Changes

Current Estimate

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

Change

FY 01/01

Change

FY 01/02

$123,857 $116,766

0

0

0

-2,285

$114,481

-394

8,045

$122,132

1,725

$123,857

2,753

-446

21,346

$147,510

225

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

C. Reconciliation of Increases and Decreases ($s in Thousands):

FY 2001 President's Budget Request .......................................................................................................................

1. Congressional Adjustments ................................................................................................................................... a) Distributed Adjustments ....................................................................................................... b) Undistributed Adjustments ................................................................................................... c) Adjustments to meet Congressional Intent ........................................................................... d) General Provisions ................................................................................................................ i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY Appn Act) ii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act)

$-1,725

$-559 iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........

FY 2001 Appropriated Amount (subtotal) ..............................................................................................................

$-1

Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) ....................

2. Program Increases and Decreases ......................................................................................................................... a) Transfers ............................................................................................................................... i) Transfers In ......................................................................................................................

1) Evolved Expendable Launch Vehicle Transfer ................................................

Transfer of Evolved Expendable Launch Vehicle from subactivity group Space

Control Systems to subactivity group Launch Vehicles.

$9,829

$9,829

226

$0

$0

$0

$-2,285

$9,829

$116,766

$-2,285

$114,481

$-394

$8,045

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles ii) Transfers Out ................................................................................................................... b) Program Increases ................................................................................................................. c) Program Decreases ...............................................................................................................

$0 i) One-time Costs ................................................................................................................

1) Realignment of Funds (FY 2001 Base $114,481) .............................................

The FY 2001 Flying Hour Program reprice, based on the CY 2000 AFCAIG consumption factors, resulted in an overall shortfall which Air Force cash flowed from other Air Force Operation and Maintenance programs. After careful consideration of the alternatives, funds were realigned from this Sub Activity Group.

While we recognize the detrimental impact on this Sub Activity Group, this one-time realignment was necessary to ensure continued aircrew readiness and safety of flight, and will be restored in subsequent years.

$-1,655

$-1,655 ii) Program Reductions ........................................................................................................ $-129

1) Civilian Pay (FY 2001 Base $3,506) ................................................................

The decrease represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay.

$-129

FY 2001 Baseline Funding (subtotal) .......................................................................................................................

3. Reprogrammings: .................................................................................................................................................. a. Working Capital Fund Transfer (Sec 8005, P.L. 106-259, FY 2001 Appropriation Act) .............................. $1,725

Revised FY 2001 Estimate.........................................................................................................................................

227

$0

$-1,784

$122,132

$1,725

$123,857

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

4. Price Change .........................................................................................................................................................

5. Transfers ................................................................................................................................................................ a) Transfers In ........................................................................................................................... b) Transfers Out ........................................................................................................................ i) Federally Funded Research and Development Centers ...................................................

Increase reflects transfer of funding to Other Space Operations to properly align funding with efforts.

$-446

6. Program Increases ................................................................................................................................................. a) Annualization of New FY 2001 Program ............................................................................. b) One-time FY 2002 Costs ...................................................................................................... i) Rescission Restoration ....................................................................................................

Restoration of FY01 Government-Wide Rescission ii) Restoration of Flying Hour Reprice Realignment (FY 2001 Base $123,858) ...............

When the FY 2001 Flying Hour Program was repriced using the CY2000 AFCAIG factors, the resultant shortfall was cash flowed from other Air Force Operation and

Maintenance programs. Funds realigned from this Sub-Activity Group in FY 2001 have been restored in full for FY 2002.

$394

$1,655

228

$0

$-446

$0

$2,049

$2,753

$-446

$25,829

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles c) Program Growth in FY 2002 ................................................................................................ i) Civilian Pay (FY 2001 Base $3,437) ..............................................................................

Program increase provides necessary personnel to begin phase out of the Atlas program. Further, the increase is attributable to the fact that there are 261 compensable calendar workdays in FY 2002 versus 260 days in FY 2001. ii) Titan Space Launch Vehicles (FY 2001 Base $78,515) ................................................

Although the number of Titan vehicles that will be launched in FY 2002 is the same as in FY 2001, the mix between Titan II launches and Titan IV launches changes.

This drives an increase in fuels and supplies as the Titan IV consumes larger quantities of both commodities.

$350

$4,475 iii) Evolved Expendable Launch Vehicles (FY 2001 Base $9,442) .....................................

Unit Stand-up ($5,500) - Funding is needed to stand-up units on the east and west coasts to support upcoming launches. Pathfinder Activities ($6,500) - EELV will conduct launch base pathfinder activities for both medium and heavy variants in

FY02. Pathfinder activities will require essentially the same range support as an actual launch but will have no government or commercial mission to charge for required support. Pathfinder activities must be completed prior to first launch.

Critical Infrastructure Upgrades ($3,500) - EELV must fund infrastructure upgrades necessary to support the program (e.g., move overhead obstruction in payload tow route). Upgrades must be accomplished in FY02 to support a December 2002 west coast launch. Training ($3,455) - Air Force Space Command training requirements to support launch operations and pathfinder activities safely and effectively.

$18,955

7. Program Decreases ................................................................................................................................................ a) One-time FY 2001 Costs ...................................................................................................... b) Annualization of FY 2001 Program Decreases ....................................................................

$23,780

$0

$0

$-4,483

229

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles c) Program Decreases in FY 2002 ............................................................................................ i) Medium Stage Vehicles (FY 2001 Base $34,397) .........................................................

The number of launches (Atlas IIA and Delta II) will decrease from 6 in FY 2001 to 3 in FY 2002. Thus, less contractors, supplies, and fuel will be needed to support this program.

$-4,483

FY 2002 Budget Request ...........................................................................................................................................

IV. Performance Criteria and Evaluation Summary:

AIR FORCE LAUNCH SCHEDULE BY VEHICLE

Atlas IIA .........................................................................................

Delta II ...........................................................................................

Titan II ...........................................................................................

Titan IV ..........................................................................................

EELV .............................................................................................

Total ...............................................................................................

FY 2000

1

2

2

2

0

7

FY 2001

12

3

3

2

4

0

$-4,483

FY 2002

2

1

1

5

1

10

$147,510

230

V. Personnel Summary

Active Military End Strength (Total)

Officer

Enlisted

Civilian End Strength (Total)

U.S. Direct Hire

Foreign National Direct Hire

Total Direct Hire

Foreign National Indirect Hire

Active Military Average Strength (Total)

Officer

Enlisted

Civilian FTEs (Total)

U.S. Direct Hire

Foreign National Direct Hire

Total Direct Hire

Foreign National Indirect Hire

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

286

141

145

56

56

0

56

0

FY 2000

278

136

142

50

50

0

50

0

277

136

141

48

48

0

48

0

FY 2001

274

135

139

49

49

0

49

0

296

157

139

52

52

0

52

0

FY 2002

315

178

137

57

57

0

57

0

Change

FY 01/02

41

43

-2

0

8

0

8

8

0

4

4

4

0

19

21

-2

231

VI. OP-32 Line Items:

LAUNCH VEHICLES

101 EXECUTIVE GENERAL SCHEDULE

103 WAGE BOARD

308 TRAVEL OF PERSONS

401 DFSC FUEL

411 ARMY MANAGED SUPPLIES/MATERIALS

412 NAVY MANAGED SUPPLIES/MATERIALS

414 AIR FORCE MANAGED SUPPLIES/MATERIALS

415 DLA MANAGED SUPPLIES/MATERIALS

417 LOCAL PROC DWCF MANAGED SUPL MAT

502 ARMY DWCF EQUIPMENT

503 NAVY DWCF EQUIPMENT

505 AIR FORCE DWCF EQUIPMENT

506 DLA DWCF EQUIPMENT

671 COMMUNICATION SERVICES(DISA) TIER 2

771 COMMERCIAL TRANSPORTATION

913 PURCHASED UTILITIES (NON-DWCF)

914 PURCHASED COMMUNICATIONS (NON-DWCF)

915 RENTS (NON-GSA)

920 SUPPLIES & MATERIALS (NON-DWCF)

922 EQUIPMENT MAINTENANCE BY CONTRACT

923 FACILITY MAINTENANCE BY CONTRACT

924 MEDICAL SUPPLIES

925 EQUIPMENT (NON-DWCF)

932 MANAGEMENT & PROFESSIONAL SUP SVS

933 STUDIES, ANALYSIS, & EVALUATIONS

934 ENGINEERING & TECHNICAL SERVICES

989 OTHER CONTRACTS

998 OTHER COSTS

TOTAL LAUNCH VEHICLES

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Launch Vehicles

FY 2000

ACTUAL

2,937

386

655

0

13,549

4

2

11

13

7

0

29

31

0

0

0

855

0

0

0

5,046

0

813

16

13

14

84,571

62

FOREIGN

CURRENCY PRICE

RATE DIFF

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

GROWTH

128

18

11

0

866

2

0

0

0

0

0

0

0

1

0

0

14

0

0

0

1,354

1

0

0

81

0

13

0

PROGRAM FY 2001

GROWTH

97

-129

286

224

91

31

-7,917

1,428

1,488

6

2

99

94

-1

3

6

21

495

-595

209

-5,127

5

-255

2

21,373

417

1

0

ESTIMATE

3,162

275

952

230

93

31

6,498

1,458

1,519

6

2

110

107

6

3

6

21

495

274

209

571

18

0

5

14

14

107,298

480

FOREIGN

CURRENCY PRICE

RATE DIFF.

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

GROWTH

141

11

16

-2

-3

-1

688

12

0

1

0

6

26

0

0

9

5

3

0

0

1,824

8

0

0

9

0

0

0

PROGRAM FY 2002

GROWTH

59

291

10

53

-7

-3

11,250

-167

-194

-2

-1

-45

-30

-1

0

5

1,923

4

0

0

-3

0

7,675

1

0

-1

83

0

ESTIMATE

3,362

577

978

281

83

27

18,436

1,297

1,351

4

1

77

77

6

3

6

21

509

2,202

216

663

18

0

4

11

14

116,797

489

109,014 0 2,489 12,354 123,857 0 2,753 20,900 147,510

232

Download