Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
I. Description of Operations Financed: Launch vehicles for satellites include Delta II, Atlas IIA, Titan II, and Titan IV launch vehicles and the
Inertial Upper Stage (IUS) flown on the Titan IV for Defense Support Program satellites. The medium launch vehicles and the Titan II and IV programs provide launch and orbital support for operational DoD space programs. The Atlas IIA, Titan IV, and Delta II space launch capability at Cape Canaveral AS, FL and the Delta II, Titan II and Titan IV space launch capability at Vandenberg AFB, CA must satisfy the launch requirements of the DoD satellite programs. Delta II, Atlas II and Titan IV launch vehicles mission will transition to the Evolved Expendable
Launch Vehicle (EELV) beginning in FY 2002. EELV will satisfy the launch requirements of the DoD, national and civil users at Vandenberg
AFB, CA and Cape Canaveral AS, FL. The launch rate requirements are a function of the number of satellites on-orbit and their success and failure rates. Resources finance services supporting the various launch capabilities: fuel; overtime; and pad refurbishment and maintenance. The
Launch Vehicles subactivity group also provides rescue and recovery services for Space Shuttle Missions.
II. Force Structure Summary: Launch Vehicles support the various DoD satellite systems, including: Navigational Satellite/Global Positioning
System (NAVSTAR/GPS); Defense Meteorological Satellite Program (DMSP); Space Based Infrared System (SBIRS); Defense Support Program
(DSP); Defense Satellite Communications System (DSCS); and the Military Strategic and Tactical Relay Satellite System (MILSTAR). This subactivity group also supports all Space Shuttle missions.
III.
Financial Summary ($s in Thousands):
FY 2001
A. Program Elements:
FY 2000
Actuals
Budget
Request Appn
Current
Estimate
FY 2002
Estimate
Medium Stage Vehicles
Inert Upper Stage Space Vehicles
Titan Space Launch Vehicles
*Evolved Expendable Launch Vehicle
Space Shuttle Operations
$31,641
4,208
65,321
6,309
1,535
$35,486
0
79,770
0
1,510
$34,682
0
78,313
0
1,486
$34,397
0
78,515
9,442
1,503
$32,117
0
85,239
28,576
1,578
Total $109,014 $116,766 $114,481 $123,857 $147,510
*The Evolved Expendable Launch Vehicle (Space) program is a functional transfer in FY01. FY00 obligations occurred in SPACE CONTROL
SYSTEMS Subactivity Group, and are displayed here for historical purposes, only.
224
B. Reconciliation Summary:
Baseline Funding
Congressional Adjustments (Distributed)
Congressional Adjustments (Undistributed)
Adjustments to Meet Congressional Intent
Congressional Adjustments (General Provisions)
Subtotal Appropriated Amount
Rescission
Program Changes (CY to CY only)
Subtotal Baseline Funding
Reprogrammings
Price Changes
Functional Transfers
Program Changes
Current Estimate
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
Change
FY 01/01
Change
FY 01/02
$123,857 $116,766
0
0
0
-2,285
$114,481
-394
8,045
$122,132
1,725
$123,857
2,753
-446
21,346
$147,510
225
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
C. Reconciliation of Increases and Decreases ($s in Thousands):
FY 2001 President's Budget Request .......................................................................................................................
1. Congressional Adjustments ................................................................................................................................... a) Distributed Adjustments ....................................................................................................... b) Undistributed Adjustments ................................................................................................... c) Adjustments to meet Congressional Intent ........................................................................... d) General Provisions ................................................................................................................ i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY Appn Act) ii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act)
$-1,725
$-559 iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........
FY 2001 Appropriated Amount (subtotal) ..............................................................................................................
$-1
Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) ....................
2. Program Increases and Decreases ......................................................................................................................... a) Transfers ............................................................................................................................... i) Transfers In ......................................................................................................................
1) Evolved Expendable Launch Vehicle Transfer ................................................
Transfer of Evolved Expendable Launch Vehicle from subactivity group Space
Control Systems to subactivity group Launch Vehicles.
$9,829
$9,829
226
$0
$0
$0
$-2,285
$9,829
$116,766
$-2,285
$114,481
$-394
$8,045
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles ii) Transfers Out ................................................................................................................... b) Program Increases ................................................................................................................. c) Program Decreases ...............................................................................................................
$0 i) One-time Costs ................................................................................................................
1) Realignment of Funds (FY 2001 Base $114,481) .............................................
The FY 2001 Flying Hour Program reprice, based on the CY 2000 AFCAIG consumption factors, resulted in an overall shortfall which Air Force cash flowed from other Air Force Operation and Maintenance programs. After careful consideration of the alternatives, funds were realigned from this Sub Activity Group.
While we recognize the detrimental impact on this Sub Activity Group, this one-time realignment was necessary to ensure continued aircrew readiness and safety of flight, and will be restored in subsequent years.
$-1,655
$-1,655 ii) Program Reductions ........................................................................................................ $-129
1) Civilian Pay (FY 2001 Base $3,506) ................................................................
The decrease represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay.
$-129
FY 2001 Baseline Funding (subtotal) .......................................................................................................................
3. Reprogrammings: .................................................................................................................................................. a. Working Capital Fund Transfer (Sec 8005, P.L. 106-259, FY 2001 Appropriation Act) .............................. $1,725
Revised FY 2001 Estimate.........................................................................................................................................
227
$0
$-1,784
$122,132
$1,725
$123,857
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
4. Price Change .........................................................................................................................................................
5. Transfers ................................................................................................................................................................ a) Transfers In ........................................................................................................................... b) Transfers Out ........................................................................................................................ i) Federally Funded Research and Development Centers ...................................................
Increase reflects transfer of funding to Other Space Operations to properly align funding with efforts.
$-446
6. Program Increases ................................................................................................................................................. a) Annualization of New FY 2001 Program ............................................................................. b) One-time FY 2002 Costs ...................................................................................................... i) Rescission Restoration ....................................................................................................
Restoration of FY01 Government-Wide Rescission ii) Restoration of Flying Hour Reprice Realignment (FY 2001 Base $123,858) ...............
When the FY 2001 Flying Hour Program was repriced using the CY2000 AFCAIG factors, the resultant shortfall was cash flowed from other Air Force Operation and
Maintenance programs. Funds realigned from this Sub-Activity Group in FY 2001 have been restored in full for FY 2002.
$394
$1,655
228
$0
$-446
$0
$2,049
$2,753
$-446
$25,829
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles c) Program Growth in FY 2002 ................................................................................................ i) Civilian Pay (FY 2001 Base $3,437) ..............................................................................
Program increase provides necessary personnel to begin phase out of the Atlas program. Further, the increase is attributable to the fact that there are 261 compensable calendar workdays in FY 2002 versus 260 days in FY 2001. ii) Titan Space Launch Vehicles (FY 2001 Base $78,515) ................................................
Although the number of Titan vehicles that will be launched in FY 2002 is the same as in FY 2001, the mix between Titan II launches and Titan IV launches changes.
This drives an increase in fuels and supplies as the Titan IV consumes larger quantities of both commodities.
$350
$4,475 iii) Evolved Expendable Launch Vehicles (FY 2001 Base $9,442) .....................................
Unit Stand-up ($5,500) - Funding is needed to stand-up units on the east and west coasts to support upcoming launches. Pathfinder Activities ($6,500) - EELV will conduct launch base pathfinder activities for both medium and heavy variants in
FY02. Pathfinder activities will require essentially the same range support as an actual launch but will have no government or commercial mission to charge for required support. Pathfinder activities must be completed prior to first launch.
Critical Infrastructure Upgrades ($3,500) - EELV must fund infrastructure upgrades necessary to support the program (e.g., move overhead obstruction in payload tow route). Upgrades must be accomplished in FY02 to support a December 2002 west coast launch. Training ($3,455) - Air Force Space Command training requirements to support launch operations and pathfinder activities safely and effectively.
$18,955
7. Program Decreases ................................................................................................................................................ a) One-time FY 2001 Costs ...................................................................................................... b) Annualization of FY 2001 Program Decreases ....................................................................
$23,780
$0
$0
$-4,483
229
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles c) Program Decreases in FY 2002 ............................................................................................ i) Medium Stage Vehicles (FY 2001 Base $34,397) .........................................................
The number of launches (Atlas IIA and Delta II) will decrease from 6 in FY 2001 to 3 in FY 2002. Thus, less contractors, supplies, and fuel will be needed to support this program.
$-4,483
FY 2002 Budget Request ...........................................................................................................................................
IV. Performance Criteria and Evaluation Summary:
AIR FORCE LAUNCH SCHEDULE BY VEHICLE
Atlas IIA .........................................................................................
Delta II ...........................................................................................
Titan II ...........................................................................................
Titan IV ..........................................................................................
EELV .............................................................................................
Total ...............................................................................................
FY 2000
1
2
2
2
0
7
FY 2001
12
3
3
2
4
0
$-4,483
FY 2002
2
1
1
5
1
10
$147,510
230
V. Personnel Summary
Active Military End Strength (Total)
Officer
Enlisted
Civilian End Strength (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
Active Military Average Strength (Total)
Officer
Enlisted
Civilian FTEs (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
286
141
145
56
56
0
56
0
FY 2000
278
136
142
50
50
0
50
0
277
136
141
48
48
0
48
0
FY 2001
274
135
139
49
49
0
49
0
296
157
139
52
52
0
52
0
FY 2002
315
178
137
57
57
0
57
0
Change
FY 01/02
41
43
-2
0
8
0
8
8
0
4
4
4
0
19
21
-2
231
VI. OP-32 Line Items:
LAUNCH VEHICLES
101 EXECUTIVE GENERAL SCHEDULE
103 WAGE BOARD
308 TRAVEL OF PERSONS
401 DFSC FUEL
411 ARMY MANAGED SUPPLIES/MATERIALS
412 NAVY MANAGED SUPPLIES/MATERIALS
414 AIR FORCE MANAGED SUPPLIES/MATERIALS
415 DLA MANAGED SUPPLIES/MATERIALS
417 LOCAL PROC DWCF MANAGED SUPL MAT
502 ARMY DWCF EQUIPMENT
503 NAVY DWCF EQUIPMENT
505 AIR FORCE DWCF EQUIPMENT
506 DLA DWCF EQUIPMENT
671 COMMUNICATION SERVICES(DISA) TIER 2
771 COMMERCIAL TRANSPORTATION
913 PURCHASED UTILITIES (NON-DWCF)
914 PURCHASED COMMUNICATIONS (NON-DWCF)
915 RENTS (NON-GSA)
920 SUPPLIES & MATERIALS (NON-DWCF)
922 EQUIPMENT MAINTENANCE BY CONTRACT
923 FACILITY MAINTENANCE BY CONTRACT
924 MEDICAL SUPPLIES
925 EQUIPMENT (NON-DWCF)
932 MANAGEMENT & PROFESSIONAL SUP SVS
933 STUDIES, ANALYSIS, & EVALUATIONS
934 ENGINEERING & TECHNICAL SERVICES
989 OTHER CONTRACTS
998 OTHER COSTS
TOTAL LAUNCH VEHICLES
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Vehicles
FY 2000
ACTUAL
2,937
386
655
0
13,549
4
2
11
13
7
0
29
31
0
0
0
855
0
0
0
5,046
0
813
16
13
14
84,571
62
FOREIGN
CURRENCY PRICE
RATE DIFF
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
128
18
11
0
866
2
0
0
0
0
0
0
0
1
0
0
14
0
0
0
1,354
1
0
0
81
0
13
0
PROGRAM FY 2001
GROWTH
97
-129
286
224
91
31
-7,917
1,428
1,488
6
2
99
94
-1
3
6
21
495
-595
209
-5,127
5
-255
2
21,373
417
1
0
ESTIMATE
3,162
275
952
230
93
31
6,498
1,458
1,519
6
2
110
107
6
3
6
21
495
274
209
571
18
0
5
14
14
107,298
480
FOREIGN
CURRENCY PRICE
RATE DIFF.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
141
11
16
-2
-3
-1
688
12
0
1
0
6
26
0
0
9
5
3
0
0
1,824
8
0
0
9
0
0
0
PROGRAM FY 2002
GROWTH
59
291
10
53
-7
-3
11,250
-167
-194
-2
-1
-45
-30
-1
0
5
1,923
4
0
0
-3
0
7,675
1
0
-1
83
0
ESTIMATE
3,362
577
978
281
83
27
18,436
1,297
1,351
4
1
77
77
6
3
6
21
509
2,202
216
663
18
0
4
11
14
116,797
489
109,014 0 2,489 12,354 123,857 0 2,753 20,900 147,510
232