Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces

advertisement
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
I. Description of Operations Financed: The spacelift ranges are composed of the Western Range (WR) headquartered at the 30th Space Wing,
Vandenberg AFB, CA and the Eastern Range (ER) headquartered at the 45th Space Wing, Patrick AFB, FL. The spacelift ranges provide
tracking, telemetry, communications, range safety, weather and other support for DoD, civil and commercial space launches, intercontinental and
sea-launched ballistic missile test and evaluations (T&E) and aeronautical T&E. The spacelift ranges consist of range operations control centers,
and the hardware and software required to provide command and control of day-to-day range and launch operations. They consist of
instrumentation that provides range safety and user metric data through the use of launch vehicle telemetry, weather instruments, metric radars,
optics, and uplink capabilities. They also provide a conduit for sending all voice, video, and data to and from remote and local instrumentation
sites. The spacelift ranges are responsible for infrastructure maintenance functions, to include heating and air conditioning, fire
protection/detection, and corrosion control. Also, spacelift range funding pays for contract range activities necessary to support launch of
operational space vehicles and payloads, and contract activities necessary to operate and maintain range systems. The spacelift range functions
are critical to the success of all DoD, civil, and commercial space launch, ballistic missile and aeronautical test and evaluation from the Eastern
and Western Ranges. Operations and maintenance of launch pads is funded in Subactivity Group, Launch Vehicles.
II. Force Structure Summary: The spacelift ranges are composed of the Western Range (WR) headquartered at the 30 th Space Wing,
Vandenberg AFB, CA and the Eastern Range (ER) headquartered at the 45th Space Wing, Patrick AFB, FL. The ranges are composed of facilities
and equipment, including launch pads, command centers, radar and optical tracking sites, and telemetry sites.
215
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
III. Financial Summary ($s in Thousands)
FY 2001
A. Program Elements:
Western Space Launch Facility/Range
Eastern Space Launch Facility/Range
Total
FY 2000
Actuals
$63,728
160,588
$224,316
B. Reconciliation Summary:
Baseline Funding
Congressional Adjustments (Distributed)
Congressional Adjustments (Undistributed)
Adjustments to Meet Congressional Intent
Congressional Adjustments (General Provisions)
Subtotal Appropriated Amount
Rescission
Program Changes (CY to CY only)
Subtotal Baseline Funding
Reprogrammings
Price Changes
Functional Transfers
Program Changes
Current Estimate
Budget
Request
$67,945
166,450
$234,395
Appn
$66,789
173,440
$240,229
Current
Estimate
$67,879
174,791
$242,670
Change
FY 01/01
Change
FY 01/02
$234,395
0
0
10,000
-4,166
$240,229
-763
0
$239,466
3,204
0
$242,670
$242,670
216
5,290
-267
11,099
$258,792
FY 2002
Estimate
$71,470
187,322
$258,792
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
C. Reconciliation of Increases and Decreases ($s in Thousands):
FY 2001 President's Budget Request .......................................................................................................................
$234,395
1. Congressional Adjustments ...................................................................................................................................
$5,834
a) Distributed Adjustments .......................................................................................................
$0
b) Undistributed Adjustments ...................................................................................................
$0
c) Adjustments to meet Congressional Intent ...........................................................................
$10,000
i) Eastern Missile Range Launch Facility Enhancements (Transfer from Subactivity Group
Space Control Systems)
$10,000
d) General Provisions ................................................................................................................
i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act)
$-4,166
$-3,204
ii) HQ and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act) .........
$-933
iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........
$-29
FY 2001 Appropriated Amount (subtotal) ..............................................................................................................
$240,229
Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) ....................
$-763
2. Program Increases and Decreases .........................................................................................................................
$0
a) Transfers ...............................................................................................................................
217
$0
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
b) Program Increases .................................................................................................................
$0
i) One-time Costs ................................................................................................................
$0
ii) Program Growth ..............................................................................................................
$0
c) Program Decreases ...............................................................................................................
$0
FY 2001 Baseline Funding (subtotal) .......................................................................................................................
$239,466
3. Reprogrammings ...................................................................................................................................................
$3,204
a) Working Capital Fund Transfer (Sec 8005, P.L. 106-259, FY2001 Appn Act)...................
$3,204
Revised FY 2001 Estimate.........................................................................................................................................
$242,670
4. Price Change .........................................................................................................................................................
$5,290
5. Transfers ................................................................................................................................................................
$-267
a) Transfers In ...........................................................................................................................
i) Competition and Privatization .........................................................................................
This is a transfer into O&M from the Military Personnel Appropriation. After careful
review, the Air Force has designated these activities/functions as not military
essential. A cost comparison study/direct conversion is underway to determine
whether the workload will be contracted or remain in-house in accordance with the
guidelines in OMB Circular A-76.
$386
$386
b) Transfers Out ........................................................................................................................
i) Federally Funded Research and Development Center Funding ......................................
218
$-653
$-653
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
Increase reflects transfer of funding to Other Space Operations to properly align
funding with efforts.
6. Program Increases .................................................................................................................................................
$21,099
a) Annualization of New FY 2001 Program .............................................................................
$0
b) One-time FY 2002 Costs ......................................................................................................
$763
i) Rescission Restoration ....................................................................................................
Restoration of FY01 Government-Wide Rescission.
$763
c) Program Growth in FY 2002 ................................................................................................
$20,336
i) Space Lift Range System (FY 2001 Base $174,791) .....................................................
The increase represents increased costs for the Joint Based Operating Support
Contract ($12,000). Contract pays for maintaining launch facilities at Patrick AFB,
FL and Cape Canaveral AFS, FL. Joint venture with NASA had hoped to reduce
costs based on multi-tasking employees; however, union action prevented this action.
Increase also pays for the Range Standardization and Automation SATCOM lease
($5,050). This SATCOM lease is the critical link to operations at Antigua and
Ascension. The wideband circuit transmits telemetry data from designated primary
tracking site (Antigua/Ascension) to the Regional Operations Control Center.
$17,050
ii) Civilian Pay (FY 2001 Base $28,127) ............................................................................
The increase represents revised civilian pay funding requirements based on updated
assessment of actual workyear costs to reflect the impact of changes such as FY 2001
locality pay. It also represents the addition of 6 positions associated with testing and
integrating equipment procured for the Range Standardization and Automation
$3,286
219
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
program. Further, the increase is attributable to the fact that there are 261
compensable calendar workdays in FY 2002 versus 260 days in FY 2001.
7. Program Decreases ................................................................................................................................................
a) One-time FY 2001 Costs ......................................................................................................
i) Eastern Missile Range Launch Facility Enhancements (FY01 Congressional Add) ......
$-10,000
$-10,000
$-10,000
b) Annualization of FY 2001 Program Decreases ....................................................................
$0
c) Program Decreases in FY 2002 ............................................................................................
$0
FY 2002 Budget Request ...........................................................................................................................................
220
$258,792
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
IV. Performance Criteria and Evaluation Summary:
FY 2000
FY 2001
FY 2002
8
6
4
2
2
4
7
0
2
35
4
11
6
3
1
8
7
1
0
41
4
13
5
2
0
9
5
2
0
40
SUPPORTED LAUNCHES BY VEHICLE (DoD, NASA AND COMMERCIAL)
Atlas ...............................................................................................
Delta ...............................................................................................
Titan ...............................................................................................
Pegasus...........................................................................................
Taurus ............................................................................................
Space Shuttle .................................................................................
ICBMs ............................................................................................
EELV .............................................................................................
Other ..............................................................................................
Total ..........................................................................................
221
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
FY 2000
FY 2001
FY 2002
Change
FY 01/02
Active Military End Strength (Total)
Officer
Enlisted
604
150
454
610
156
454
613
159
454
3
3
0
Civilian End Strength (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
344
344
0
344
0
407
407
0
407
0
413
413
0
413
0
6
6
0
6
0
Active Military Average Strength (Total)
Officer
Enlisted
617
158
459
608
153
455
612
158
454
4
5
-1
Civilian FTEs (Total)
U.S. Direct Hire
Foreign National Direct Hire
Total Direct Hire
Foreign National Indirect Hire
436
436
0
436
0
378
378
0
378
0
414
414
0
414
0
36
36
0
36
0
V. Personnel Summary
222
Air Force
Operation and Maintenance, Active Forces
Budget Activity: Operating Forces
Activity Group: Space Operations
Detail by Subactivity Group: Launch Facilities
VI. OP-32 Line Items:
FOREIGN
101
103
107
308
401
411
412
414
415
417
502
503
505
506
671
771
914
915
920
921
922
923
924
925
930
989
998
LAUNCH FACILITIES
EXECUTIVE GENERAL SCHEDULE
WAGE BOARD
SEPARATION INCENTIVES
TRAVEL OF PERSONS
DFSC FUEL
ARMY MANAGED SUPPLIES/MATERIALS
NAVY MANAGED SUPPLIES/MATERIALS
AIR FORCE MANAGED SUPPLIES/MATERIALS
DLA MANAGED SUPPLIES/MATERIALS
LOCAL PROC DWCF MANAGED SUPL MAT
ARMY DWCF EQUIPMENT
NAVY DWCF EQUIPMENT
AIR FORCE DWCF EQUIPMENT
DLA DWCF EQUIPMENT
COMMUNICATION SERVICES(DISA) TIER 2
COMMERCIAL TRANSPORTATION
PURCHASED COMMUNICATIONS (NON-DWCF)
RENTS (NON-GSA)
SUPPLIES & MATERIALS (NON-DWCF)
PRINTING & REPRODUCTION
EQUIPMENT MAINTENANCE BY CONTRACT
FACILITY MAINTENANCE BY CONTRACT
MEDICAL SUPPLIES
EQUIPMENT (NON-DWCF)
OTHER DEPOT MAINT (NON-DWCF)
OTHER CONTRACTS
OTHER COSTS
TOTAL LAUNCH FACILITIES
FY 2000
CURRENCY
ACTUAL
22,398
2,962
64
2,478
1,719
50
16
489
797
817
28
9
479
458
2,594
795
8
2,680
1,416
15
5,102
0
26
818
762
177,164
172
RATE DIFF
224,316
FOREIGN
PRICE
PROGRAM
FY 2001
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
990
141
0
40
1,081
-2
2
32
36
14
-1
1
30
20
-10
13
0
43
23
0
82
0
1
13
12
2,833
3
GROWTH
2,495
-859
-64
-853
623
247
81
200
3,812
4,000
9
1
116
109
1,205
115
4
-2,722
2,182
-14
-1,179
101
-5
1,168
-774
-2,110
5,069
ESTIMATE
25,883
2,244
0
1,665
3,423
295
99
721
4,645
4,831
36
11
625
587
3,789
923
12
1
3,621
1
4,005
101
22
1,999
0
177,887
5,244
0
5,397
12,957
242,670
223
CURRENCY
PRICE
RATE DIFF.
PROGRAM
FY 2002
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GROWTH
1,144
96
0
28
-34
-7
-5
78
19
83
-1
0
67
2
524
16
0
0
61
0
68
2
1
33
0
3,025
90
GROWTH
663
2,623
0
19
458
-106
-34
141
-1,786
-1,924
-10
-4
-232
-163
-579
-123
0
0
876
0
26
0
-2
381
0
10,617
-9
ESTIMATE
27,690
4,963
0
1,712
3,847
182
60
940
2,878
2,990
25
7
460
426
3,734
816
12
1
4,558
1
4,099
103
21
2,413
0
191,529
5,325
0
5,290
10,832
258,792
Download