Based on Approved minutes Plant Standards Committee 04 February 2016 Meeting held in Correspondence Record of Decisions Minute No. Section and topic General (no papers) Minutes of previous meetings 16/PLT/02/005 Approval of minutes of meeting held on10 December 2015 AC Deviations against Railway Group Standards: New applications (no papers) Deviations against Railway Group Standards: Update on previous applications (no papers) Deviations against Railway Group Standards: Applications approved outside Committee (no papers) Changes to Railway Group Standards: New proposals 16/PLT/02/007 Proposal 15-041 for Support As Title: Production of a Rail Industry Standard (RIS) for 1500V and 750V DC overhead line systems Submitted by: Energy Standards Committee (Lead Committee: Energy) This proposal sought to create a new RIS with interface requirements for both 750V and 1500V DC OHL systems. It will allow for standardisation between Tram Train and the energy subsystem to allow for the interchangeability of vehicles and the free movement of passengers and rolling stock. A Approved / supported Approved / supported (subject to conditions) For further information, please contact [SC SSM – hyperlink to email address] Key: Deferred D Rejected / Not supported R For noting N Withdrawn (by submitter) W *An ‘s’ suffix is applied when acting as a supporting committee PP501_L2 AC Page 1 of 3 Issue 6: July 2012 Based on Approved minutes Minute No. Section and topic 16/PLT/02/008 Proposal 15-044 for Support As Title: RIS on Train to Infrastructure RFID Technology Submitted by: RSSB (Lead Committee: Rolling Stock) This proposal sought to produce a RIS on train to infrastructure RFID. The current primary use of this technology is for Automatic Vehicle Identification (AVI). It is also an output from research project T1010. Changes to Railway Group Standards: Project Updates and approvals 16/PLT/02/009 Project 15-027 for Support ACs Revision of GMRT2461 Sanding Equipment GMRT2461 Sanding Equipment issue 2 draft 1j December 2015 (Lead Committee: Rolling Stock) This project consisted of a Cover Paper, Impact Assessment and draft RGS. The Committee was requested to: NOTE the work done represented by Draft 1i of GM/RT2461 issue 2 and the draft Impact Assessment; DECIDE if the proposed draft document delivers the intention of the project; SUPPORT the suggested manner of the consultation to be undertaken; IDENTIFY any specific organisations or individuals to be included in the consultation. 16/PLT/02/010 Project 15-025 for Support As GIGN7608 Guidance on the Infrastructure Technical Specification for Interoperability Issue 2 draft 1f (Lead Committee: Infrastructure) This was a Pre-Consultation submission consisting of a draft GN, three Amendments and Clarifications forms, with cover paper, for SC to: NOTE the work done, in accordance with the approved scope, represented by GIGN7608 Issue 2 draft 1e and amendments to GCGN5612, GIGN7616 and GCRT5021; DECIDE if the proposed GIGN7608 Issue 2 delivers the intention of the project; APPROVE/SUPPORT the proposed manner of consultation to be undertaken; IDENTIFY any specific organisations or individuals to be included in the consultation. Page 2 of 3 Based on Approved minutes Minute No. Section and topic 16/PLT/02/011 Project Plan for 15-001 for Support To amend the guidance Note GOGN3615 – guidance on the Operations and Traffic Management Technical Specification for Interoperability Changes to Railway Group Standards: Final approval (no papers) European delegate remits, funding and reports (no papers) Development of Technical Specification for Interoperability (TSIs) and Euronorms (ENs) (no papers) AOB (no papers) Date of next meeting 06 & 07 April 2016 annual Committee away meeting Page 3 of 3 As