Keith Noll SMOV closure review 30 Sept 2002 The short and sweet summary: All requirements have been SATISFIED NICMOS is BETTER than new! Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.1.1 SMOV Activity: NICMOS-03 Proposal ID: 8974 Requirement Status: SATISFIED Discussion: The ability to command NICMOS via the RIU, transmit data via the SDF, and ability to transition between operational states (Hold, Boot, SAA-Oper, Operate, and Observe) was verified as a matter of course during routine SMOV observations. Serendipitous image of a crowded star field Camera 2 in H-band (F160W) FWHM: 2.17 pixels (0.163“) Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.1.2 SMOV Activity: NICMOS-01/02/14 Proposal ID: 8944/ 8973/ 8985 Requirement Status: SATISFIED Discussion: Operation of all mechanical components (PAM, FOM, and filter wheel) has been verified. Filter wheel test - NICMOS filter wheels have motion sensor only on the motors, not on the wheels themselves - Concern about breaking the wheel shaft in case of mechanical contact/blockage - careful “two step forward, one step back” approach with analysis of motor currents and (short) flat field exposures -side benefit: early measurement of DQE (and more….) Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.2.1 SMOV Activity: NICMOS-10 Proposal ID: 8981 Requirement Status: SATISFIED Discussion: Aperture locations have been measured and recalculated. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.2.2 SMOV Activity: NICMOS-12/13 Proposal ID: 8983/ 8984 Requirement Status: SATISFIED Discussion: In proposal 8983 a target was successfully acquired and placed behind the coronagraphic hole. In proposal 8984 targets were placed at dithered positions within the hole to evaluate locations of optimal performance. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.3.1 SMOV Activity: NICMOS-11 Proposal ID: 8982 Requirement Status: SATISFIED Discussion: The NICMOS plate scale has been measured in all three cameras to precisions of (much) better than 1/5 pixel in each camera. PLATE SCALE We have determined the plate scale from proposal 8982 using a 9 point dither NIC1 x = 0.04326 +/- 0.00001 y = 0.04308 +/0.000002 NIC2 x = 0.07596 +/- 0.00002 y = 0.07537 +/- 0.00002 NIC3 x = 0.2030 +/- 0.0003 y = 0.2025 +/- 0.0003 Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.3.2 SMOV Activity: NICMOS-06/07/09 Proposal ID: 8977/ 8980 Requirement Status: SATISFIED Discussion: Optical alignment has been restored to levels achieved in cycle 7 for all three cameras. The PAM focus setting has been measured and trended. Encircled energies have been measured. Total wavefront error has been reestablished at levels achieved in cycle 7. NICMOS focus sweep Encircled Energy measurements Y-tilt Coma correction: NIC1 PAM tilt grid X-tilt Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.3.3 SMOV Activity: N/A Proposal ID: N/A Requirement Status: SATISFIED Discussion: There is no detectable image motion (jitter) during normal operations. Jitter has been characterized by other instruments. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.1 SMOV Activity: NICMOS-14 Proposal ID: 8985 Requirement Status: SATISFIED Discussion: Flat fields have been measured for all NICMOS filter/camera combinations. Flat fields have remained stable relative to cycle 7 with only minor changes due to additional debris on the detectors. The flat fields continue to be stable. The first flat field images (in F110W) Then… (1998, T=62 K) Now… (2002, T= 77K) NIC1 NIC2 NIC3 Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.2 SMOV Activity: NICMOS-05/15 Proposal ID: 8976/ 8986 Requirement Status: SATISFIED Discussion: Instrument throughput has been determined and is comparable to that observed in cycle 7 after allowing for the improved quantum efficiency of the detectors at our current operating temperature. Flux calibration data have been obtained and are under analysis. Ratio of Cal Factors 2.00 NCS/Pre-NCS 1.80 1.60 1.40 1.20 1.00 0.80 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 λ(µm) Camera 1 Camera 2 Camera 3 Photometric calibration factors computed from SMOV data compared to cycle 7 calibration factors. Differences are due to change in quantum efficiency at higher operating temperatures in cycle 11. 2.4 Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.3 SMOV Activity: NICMOS-15 Proposal ID: 8986 Requirement Status: SATISFIED Discussion: Photometric stability of 3% or better over one month has been demonstrated. Camera 1 -- Repeatability Flux Time 2 / Flux Time 1 1.050 1.030 1.010 0.990 0.970 0.950 F090M F110W F113N F160W F166N F187N F190N Filter Repeatability is within 3% for pairs of photometric observations in all three cameras. Camera 2 -- Repeatability 1.050 Flux Time 2 / Flux Time 1 1.040 1.030 1.020 1.010 1.000 0.990 0.980 0.970 0.960 0.950 F110W F160W F171M Filter F187N F215N F222M Camera 3 -- Repeatability Flux Time 2 / Flux Time 1 1.050 1.030 1.010 0.990 0.970 0.950 F110W F113N F160W F166N F187N Filter F190N F215N F222M Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.4 SMOV Activity: N/A Proposal ID: N/A Requirement Status: SATISFIED Discussion: There is no evidence of unusual motion of the image in the Camera 2 focal plane as measured by the observed location of the coronagraphic hole in flat fields taken at different epochs. 16 July 2002 3 June 2002 26-28 July 2002 30 May 2002 Location of the coronographic hole in SMOV/cycle 11 Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.5 SMOV Activity: NICMOS-04 Proposal ID: 8975 Requirement Status: SATISFIED Discussion: Detector read noise and dark current have been measured. Read noise is ~ 26 e- for image pairs and linear dark current is ~0.10-0.15 e-/sec, both well below the required minimum acceptable levels of 40 e- and 2.5 e-/sec respectively. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.6 SMOV Activity: N/A Proposal ID: N/A Requirement Status: SATISFIED Discussion: The cosmic ray background has been measured and is comparable to cycle 7 (after allowing for the higher quantum efficiency at the current operating temperature). Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.7 SMOV Activity: NICMOS-18 Proposal ID: 8989 Requirement Status: SATISFIED Discussion: Thermal emission has been measured over the duration of SMOV. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.8 SMOV Activity: NICMOS-16/17 Proposal ID: 8987/ 8988 Requirement Status: SATISFIED Discussion: Cosmic ray persistence has been measured. Decay timescales are comparable to those observed in cycle 7. Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.9 SMOV Activity: NICMOS-19/20 Proposal ID: 8991 Requirement Status: SATISFIED Discussion: Photometric and wavelength solutions for the G096, G141, and G206 gratings have been obtained. Grism He I 1.083 Ground [S III] Hubble 12 G096 Pa α Grism Ground Pa β Hubble 12 G141 Grism Ground He I 2.058 H2 Hubble 12 G206 Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: J.10.4.4.4.10 SMOV Activity: N/A Proposal ID: 8945 Requirement Status: SATISFIED Discussion: Dark current was measured during cool down when practical. Although it was not possible to measure darks when NICMOS was deactivated, it is possible to interpolate with high confidence. Dark current appears to obey a simple exponential function of temperature. The “bump” seen during warm up is not observed. NICMOS dark current -analysis indicates that dark current is nominal (i.e. close to Cycle 7 values) - “bump” is NOT observed Mean: 0.166 e--/s Mean:0.114 0.148e-/s e /s Mean: Keith Noll SMOV closure review 30 Sept 2002 Requirement Number: N/A SMOV Activity: EROs Proposal ID: 8933/ 9316 Requirement Status: SATISFIED Discussion: NICMOS EROs were obtained successfully! The Cone Nebula by NICMOS