585 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12) CUCUMBERS, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CUCUMBERS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 250.00 6.50 $ 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦CUCUMBER SEED 3.00 ♦NITROGEN (LIQ) 40.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 1.00 ♦FUNGICIDE 5.00 PESTICIDE APPLI. 5.00 BEEHIVE RENT 0.50 ♦NITROGEN (DRY) 40.00 GEN. & HAIL INS. 1 .00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.50 IRRIGATION 1 .60 0.49 EOUIPMENT OTHER 10.00 18.61 OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS 250.00 HRV.PKG.MKT SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CRTN PROJECTED YOUR VA L U E E S T I M AT E $/UNIT LB. LB. LB. ACRE APPL APPL ACRE ACRE LB. ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE CRTN ACRE 1625.00 1625.00 $ 5.30 0.25 0.30 6.00 10.00 7.00 3.50 15.00 0.25 13.00 15.90 10.00 24.00 6.00 10.00 35.00 17.50 7.50 10.00 13.00 5.00 3.80 3.80 3.80 0. 135 $ 14.79 1 .08 50.56 3.60 2.61 12. 16 12.48 6.08 1 .86 38.00 2.51 294.63 $ 4.25 ACRE 1062.50 $ 1062.50 $ $ 1357.13 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 5.43/CRTN CUCUMBERS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 6 7 . 8 7 $ _ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE ACRE 27.50 22.87 32.64 30.00 30.00 15.00 7.50 $ 1$2 0 . 5 1 $. $ 1477.65 $. $ 5.91/CRTN CUCUMBERS ACRE $ 147.35 $ CUCUMBERS ARE PACKED AND MARKETED IN 50 POUND CARTONS BUDGET BASED ON A FALL CROP INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. if*S PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 585 B-1241(C12) CUCUMBERS. IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER OFFSET DISC MOLDBOARD PLOW LAND PLANE HERBICIDE SPRAYR DRY FERT SPRDER BEDDER 6R CULTIVATOR 4R STANHAY PLANTER CULTIVATOR 4R MACH LABOR ITEM OPER TIMES LABOR MACHINE OPER NO. MONTH OVER HOURS HOURS COSTS COSTS 3.30 3.34 1.32 1,50 63 3,60 1,36 3,39 3,44 3.39 JUNE JUNE JUNE JUNE JUNE JULY AUG AUG AUG SEPT 1.00 2.20 1 .00 0.20 1 .00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION z - * ^ 0.263 0.203 0. 151 0.227 0.303 0.227 0.199 0.380 0.432 0.038 0.264 0.154 0 . 11 5 0.172 0.230 0.172 2.497 2.156 0.501 0.571 0.050 0.0 APPL. ACRE LABOR MONTH INCHES HOURS NOV AUG SEPT OCT TOTALS 1.92 3.57 6.42 0.50 0.08 1.46 1.52 1.57 2.20 1.57 1.31 2.51 2.85 0.25 0.0 1.02 0.76 1.13 1.52 1. 13 20.82 12.48 APPL. MACH INPUT FIXED COSTS COSTS TOTAL 0.0 3.62 0.0 10.39 0.0 13.81 0.0 1 .22 6.00 2.13 34.00 3.82 0.0 2.43 0.0 3. 19 15.90 5.16 0.0 3. 19 6.85 16.47 23.09 1 .97 8.21 40.29 4.71 5.90 24.78 5.90 OPER. COST 5 5 . 9 0 48.97 138.17 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 25.36 25.36 35.36 25.36 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 15.68 15.68 15.68 15.68 1.52 1.52 1.52 1.52 0.0 0.0 10.00 0.0 8.16 8. 16 8. 16 8. 16 16.00 1.600 0.0 62.72 6.08 1 0 . 0 0 3 2 . 6 4 111 . 4 4 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT -^*%. INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CUCUMBERS (DOLLARS) 5.20 5.85 6.50 7.15 7.80 200.00 -104.63 25.37 155 37 285.36 4 1 5 36 225.00 -80.88 65.37 211 6 2 357.86 5 0 4 11 250.00 -57.13 105.37 267 87 430.36 5 9 2 86 275.00 -33.38 145.37 324 11 502.86 681 61 300.00 -9.63 185.37 380 3 6 575.36 770 3 6 CRTN QUANTITY OF CUCUMBERS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. -z^V 5 8 6 P R O J E C T I O N S F O R P L A N N I N G P U R P O S E S O N LY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12) CUCUMBERS (PICKLES) IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CUCUMB. PICKLES TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 105.00 PROJECTED YOUR VALUE ESTIMATE $/UNIT CWT. 7.50 $ 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦CUCUMBER-PCKL SD 2.25 ♦NITROGEN (LIO) 40.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 6.00 PESTICIDE APPLI. 6.00 BEEHIVE RENT 0.50 ♦NITROGEN (DRY) 40.00 GEN. & HAIL INS. 1.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C TO R EQUIPMENT IRRIGATION LABOR MACHINERY 2.72 IRRIGATION 1.20 0.28 EQUIPMENT OTHER 10.00 OPERATING CAPITAL 35.41 SUBTOTAL, PREHARVEST HARVEST COSTS 105.00 HARVEST, PICKLES SUBTOTAL, HARVEST TOTAL VARIABLE COSTS LB. LB. LB. ACRE APPL ACRE ACRE LB. ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 11 .93 • 10.00 5.30 0.25 0.30 6.00 10.00 3.50 15.00 0.25 13.00 24.00 6.00 60.OO 21 .00 7.50 10.00 13.00 5.00 3.80 3.80 3.80 0.135 $ 4.00 CWT. ACRE ACRE 787.50 787.50 $ 15.95 0.62 37.92 3.89 2.65 9. 12 13.62 4.56 1 .06 38.00 4.78 295.60 $ $ 420.00 420.00 $ $ 715.60 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 6.82/CWT. CUCUMB. PICKLES 3. INCOME ABOVE VA R I A B L E COSTS 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE ACRE $ 30.00 15.00 ACRE 71.90 $. $ 29.75 23.22 24.48 30.00 7.50 11 4 . 9 4 $ $ 830.54 $ $ 7.91/CWT. CUCUMB. PICKLES ACRE $ -43.04 $ PRODUCTION VALUE AND HARVESTING EXPENSE BASED ON A WEIGHTED AVERAGE OF 8%AM'S 13%#2'S, 34%#3'S, NAD 45%#4'S. BUDGET BASED ON FALL CROP. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. /P*\ 586 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83, B-1241(C12) CUCUMBERS (PICKLES) IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER OFFSET DISC MOLDBOARD PLOW LAND PLANE BEDDER 6R CULTIVATOR 4R HERBICIDE SPRAYR DRY FERT SPRDER STANHAY PLANTER CULTIVATOR 4R CULTIVATOR 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 3 30 3 ,34 1 ,32 1 ,50 1 36 3 39 63 3 ,60 3 .44 3 ,39 3 .39 3.62 0.0 0 . 0 10.39 0 . 0 13.81 0.0 1.22 0.0 2.43 0.0 3. 19 6 . 0 0 2. 13 34.00 3.82 11 .93 5. 16 0.0 3. 19 0.0 3. 19 6.85 16.47 23.09 1.97 4.71 5.90 8.21 40.29 20.80 5.90 5.90 AUG AUG AUG AUG AUG AUG AUG AUG AUG SEPT OCT 1.00 2.20 1.00 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1 .00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION / * ^ k 0.263 0.501 0.571 0.050 0. 151 0.227 0.0 0.203 0.303 0.227 0.227 0. 199 0.380 0.432 0.038 0. 115 0. 172 0.264 0. 154 0.230 0. 172 0. 172 2.723 2.328 APPL. ACRE LABOR MONTH INCHES HOURS AUG SEPT OCT NOV TOTALS 1 .92 3.57 6.42 0.50 1.52 1.57 0.08 1.46 2.20 1.57 1.57 1.31 2.51 2.85 0.25 0.76 1.13 0.0 1.02 1.52 1.13 1 . 13 2 2 . 3 9 13.62 51.92 52. 16 140.09 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 3.00 3.00 3.00 3.00 0.300 0.300 0.300 0.300 0.0 0.0 0.0 0.0 11 .76 11 .76 11 . 7 6 11 . 7 6 1.14 1 . 14 1.14 1.14 0.0 0.0 10.00 0.0 6. 6. 6. 6. 12 12 12 12 19.02 19.02 29.02 19.02 12.00 1 .200 0.0 47.04 4.56 10.00 24.48 86.08 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT z ^ \ INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CUCUMB. PICKLES (DOLLARS) 6.00 6.75 7.50 8.25 9.00 84.00 -127.60 -64.60 -1.60 61.40 124.40 94.50 QUANTITY OF CUCUMB. PICKLES 105.00 -106.60 -35.72 35.15 106.03 176.90 -85.60 -6.85 71.90 150.65 229.40 115.50 -64.60 22.03 108.65 195.28 281.90 126.00 -43.60 50.90 145.40 239.90 334.40 CWT. NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. r^*%k 587 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C12) LETTUCE, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS LETTUCE TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 500.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦LETTUCE SEED 1.00 ♦NITROGEN (LIO) 150.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1 .00 ♦INSECTICIDE 11 . 0 0 ♦FUNGICIDE 6.00 PESTICIDE APPLI. 11 .00 ♦NITROGEN (DRY) 75.00 IRRIGATION WATER 12.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.55 IRRIGATION 1 .20 0.63 EQUIPMENT OTHER 12.00 OPERATING CAPITAL 15.48 SUBTOTAL. PREHARVEST HARVEST COSTS 500.00 HARV,PKG,HAUL SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CRTN PROJECTED VALUE $/UNIT 5.50 YOUR ESTIMATE 2750.00 $ 2750.00 $ LB. LB. LB. ACRE APPL APPL ACRE LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE CRTN ACRE 28.00 0.25 0.30 9.00 8.00 5.40 3.50 0.25 28.00 37.50 24.00 9.00 88.00 32.40 38.50 18.75 16.34 1 .39 37.92 3.90 2.66 9. 12 12.73 4.56 4 52 .. 3 6 90 5.00 3.80 3.80 ' 3.80 0. 135 2.09 $ 414.85 4.25 ACRE $ 2125.00 $ 2125.00 $ $ 2539.85 $ BREAK-EVEN PRICE. VARIABLE COSTS $ 5.08/CRTN LETTUCE 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 1 0 . 1 5 $ _ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT IRRIGATION LAND-CASH RENT 1 .00 MISC ADMIN 0/H 0.50 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE ACRE TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS 40.00 15.00 $ 29.84 22.92 24.48 40.00 7.50 124.74 $ $ 2664.59 $ $ 5.33/CRTN LETTUCE ACRE $ 85.41 $ LETTUCE IS PACKED AND MARKETED IN 50 POUND CARTONS. BUDGET BASED ON A FALL CROP INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83, 587 B-124KC12) LETTUCE, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE /<=^L MACH APPL. MACH TO TA L M A C H I N E RY I T E M O P E R T I M E S L A B O R M A C H I N E O P E R L A B O R I N P U T F I X E D O P E R . O P E R AT I O N N O . M O N T H O V E R H O U R S H O U R S C O S T S C O S T S C O S T S C O S T S C O S T SHREDDER OFFSET DISC OFFSET DISC MOLDBOARD PLOW LAND PLANE BEDDER 6R BED SHAPER 6R STANHAY PLANTER BED SHAPER 6R HERBICIDE SPRAYR DRY FERT SPRDER 3 30 3 34 3 34 1 32 1 50 1 .36 1 .48 3 ,44 1 .48 63 3 60 JULY JULY AUG AUG AUG AUG SEPT OCT OCT OCT OCT 1 .00 1.00 1.20 1.00 0 .20 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.203 0 0 0 0 0 0 0 0 0 0 0 2.547 2. 194 0.263 0.228 0.273 0.571 0.050 0.151 0.252 0.303 0.252 0.0 APPL. ACRE LABOR MONTH INCHES HOURS OCT NOV DEC TOTALS 4 00 4 00 4 00 0 400 0 400 0 400 199 173 207 432 038 115 191 230 191 264 154 1 .92 1 .62 1.95 6 42 0 .50 1.52 2 .50 2 .20 2 .50 0 .08 1 46 1 1 1 2 0 0 1 1 1 0 1 31 14 37 85 25 76 26 52 26 0 02 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3 4 5 13 1 2 4 28.00 5 4 0.0 9.00 2 42.75 3 2 2 . 6 7 12.73 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS 0.0 0.0 0.0 12.00 1.200 O.0 15 68 15 68 15 68 1.52 1.52 1.52 62 72 67 81 22 43 19 16 19 13 82 6 85 7 49 8 98 23 09 1 97 4 .71 7 .94 36 .88 7 .94 11 .21 49 04 7 9 . 7 5 5 0 . 9 5 1 6 6 . 11 APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 18 75 0 0 18 75 44 11 25 36 44 11 8 16 8 16 8 16 4 7 . 0 4 4 . 5 6 3 7 . 5 0 2 4 . 4 8 11 3 . 5 8 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF LETTUCE (DOLLARS) 4.40 4.95 5.50 6.05 6.60 400.00 -354.85 -134.85 85 15 305 15 525.15 450.00 -347.35 -99.85 147 65 395 15 642.65 500.00 -339.85 -64.85 210 15 485 15 760.15 550.00 -332.35 -29.85 272 65 575 15 877.65 600.00 -324.85 5. 15 335 15 665 15 995.15 CRTN QUANTITY OF LETTUCE NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. 588 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12) ONIONS. IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS ONIONS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 450.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦ONION SEED 3.00 ♦NITROGEN (LIQ) 50.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 3.00 ♦FUNGICIDE 6.00 PESTICIDE APPLI. 6.00 ♦NITROGEN (DRY) 50.00 GEN. & HAIL INS. 1.00 IRRIGATION WATER 18.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 3.20 IRRIGATION 1.80 0.49 EQUIPMENT OTHER 10.00 80.34 OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS 450.00 HARV, PKG, MKT SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT BAG LB. LB. LB. ACRE APPL APPL ACRE LB. ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 5 . 5 0 2475.00 $ 2475.00 $ 20.00 0.25 0.30 4.00 6.00 6.00 3.50 0.25 13.00 60.00 12.50 24.00 4.00 18.00 36.00 21 .00 12.50 13.00 19.05 5.00 3.80 3.80 3.80 0.135 $ 1 .08 56.88 4.63 2.95 13.68 16.01 6.84 1 .86 38.00 10.85 372.83 $ BAG ACRE 3.30 1485.00 $ 1485.00 $ ACRE $ 1857.83 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 4.13/BAG ONIONS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 6 1 7 . 1 7 $ . FIXED COSTS DEPREC. INTEREST, TAXES & INSUR. TRACTOR EOUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 1.00 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE ACRE 35.40 25.54 36.72 50.00 50.00 15.00 15.00 $ 162.66 $. $ 2020.49 $. $ 4.49/BAG ONIONS ACRE $ 454.51 $ ONIONS ARE PACKED AND MARKETED IN 50 POUND BAGS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. a*1*\ PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 588 B-124KC12) ONIONS. IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER OFFSET DISC OFFSET DISC MOLDBOARD PLOW LAND PLANE BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER BED SHAPER 6R CULTIVATOR 4R STANHAY PLANTER CULTIVATOR 4R CULTIVATOR 4R CULTIVATOR 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 3,30 3,34 3,34 1,32 1,50 1,36 63 3,60 1,48 3.39 3.44 3.39 3.39 3.39 SEPT SEPT OCT OCT OCT OCT OCT OCT OCT NOV NOV JAN FEB MAR 1.00 1.00 1.20 1.00 0.20 1.00 1.00 1.00 1.00 1 .00 1.00 1.00 1 .00 1.00 TOTALS IRRIGATION APPLICATION 0.263 0.228 0.273 0.571 0.050 0.151 0.0 0.203 0.252 0.227 0.303 0.227 0.227 0.227 0. 199 0. 173 0.207 0.432 0.038 0.115 0.264 0. 154 0. 191 0.172 0.230 0.172 0. 172 0. 172 3.202 2.690 OCT DEC JAN MAR APR TOTALS 1.31 1.14 1.37 2.85 0.25 0.76 0.0 1 .02 1.26 1 .13 1.52 1 .13 1 .13 1 . 13 0.0 0.0 0.0 0.0 0.0 0.0 3.62 4.72 5.67 13.81 1 .22 2.43 4.00 2.13 36.50 3.82 0.0 0.0 60.00 0.0 0.0 0.0 4. 19 3. 19 5. 16 3. 19 3. 19 3.19 TOTAL OPER. COST 6.85 7.49 8.98 23.09 1.97 4.71 6.21 42.79 7.94 5.90 68.88 5.90 5.90 5.90 26.46 1 6 . 0 1 1 0 0 . 5 0 59.54 202.51 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 1.92 1.62 1.95 6.42 0.50 1.52 0.08 1.46 2.50 1.57 2.20 1.57 1.57 1.57 APPL. MACH INPUT FIXED COSTS COSTS 4.00 4.00 4.00 3.00 3.00 0.400 0.400 0.400 0.300 0.300 0.0 0.0 0.0 0.0 0.0 15.68 15.68 15.68 11.76 11.76 1.52 1 .52 1.52 1 . 14 1. 14 18.00 1.800 0.0 70.56 6.84 APPL. IRRIG INPUT FIXED COSTS COSTS 0.0 12.50 0.0 0.0 0.0 8. 16 8. 16 8. 16 6.12 6.12 TOTAL IRRIG COSTS 25.36 37.86 25.36 19.02 19.02 1 2 . 5 0 36.72 126.62 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF ONIONS (DOLLARS) 4.40 4.95 5.50 6.05 6.60 360.00 23 17 221 17 419 17 617 17 815 17 405.00 72 67 295 42 518 17 740 92 963 67 450.00 122 17 369 67 617 17 864 67 1112 17 495.00 171 67 443 92 716 17 988 42 1260 67 540.00 221 17 518 17 815 17 111 2 17 BAG QUANTITY OF ONIONS 1409 17 m ' E%> 589 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12) FRESH MARKET SPINACH, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS SPINACH, FRESH TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 400.00 BU. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SPINACH-FRESH SD 8.00 ♦NITROGEN (LIQ) 60.00 ♦PHOSPHATE 120.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 6.00 ♦FUNGICIDE 7.00 PESTICIDE APPLI. 7.00 ♦NITROGEN (DRY) 30.00 IRRIGATION WATER 16.00 FUEL & LUBE--TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.98 IRRIGATION 1 .60 0.77 EQUIPMENT OTHER 7.00 OPERATING CAPITAL 79.82 SUBTOTAL. PREHARVEST HARVEST COSTS 400.00 HARV.PKG.MKT SUBTOTAL. HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 5.75 LB. LB. LB. ACRE APPL APPL ACRE LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 2.20 0.25 0.30 20.00 10.00 5.40 3.50 0.25 BU. ACRE 4.50 2300.00 $ 2300.00 $ 17.60 15.00 36.00 20.00 60.00 37.80 24.50 7.50 19.63 5.00 3.80 3.80 3.80 0.135 ACRE $ 1 .70 50.56 4.77 3. 16 12. 16 14.88 6.08 2.93 26.60 10.78 371.64 $ 1800.00 $ 1800.00 $ $ 2171.64 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 5.43/BU. SPINACH, FRESH 3. INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS 5. TO TA L PROJECTED COSTS ACRE $ 128.36 $_ ACRE ACRE ACRE ACRE ACRE ACRE 34.77 26.69 32.64 40.00 40.00 7.50 15.00 $ 141 .60 $~ ACRE B R E A K - E V E N P R I C E , T O TA L C O S T S $ 5 . 7 8 / B U . 6. NET PROJECTED RETURNS ACRE $ 2313.24 $ SPINACH, FRESH $ -13.24 $ SPINACH IS PACKED AND MARKETED IN 25 POUND BUSHELS INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 589 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-124KC12) FRESH MARKET SPINACH, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER OFFSET DISC MOLDBOARD PLOW LAND PLANE BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER CULTIVATOR 4R PLANTER 4R BED SHAPER 6R CULTIVATOR 4R CULTIVATOR 4R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 1 .31 2.51 2.85 0.25 0.76 0.0 1.02 1. 13 1.52 1.26 1 . 13 1 . 13 3.62 0.0 0 . 0 10.45 0 . 0 13.81 1.22 0.0 2.43 0.0 20.00 2. 13 43.50 3.82 0.0 4.02 17.60 6 . 4 5 0.0 3.27 0.0 4.02 0.0 4.02 6.85 17.40 23.09 1.97 4.71 22.21 49.79 7.41 28.00 6.26 7.41 7.41 3 ,30 2 ,34 1 ,32 1 .50 1 .36 63 3 .60 1.39 3 .41 3 .48 1,39 1 .39 AUG AUG AUG AUG AUG AUG AUG SEPT SEPT SEPT OCT NOV 1.00 2.20 1.00 0.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.263 0. 199 0.501 0.380 0.571 0.432 0 . 0 5 0 0.038 0. 151 0 . 11 5 0.0 '0.264 0 . 2 0 3 0.154 0 . 2 2 7 0. 172 0 . 3 0 3 0.230 0 . 2 5 2 0. 191 0.227 0. 172 0 . 2 2 7 0. 172 2.975 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION MAR SEPT NOV JAN TOTALS 2.519 1.92 4.44 6.42 0.50 1.52 0.08 1.46 2.26 2.43 1.73 2.26 2.26 27.29 14.88 81.10 59.25 182.52 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 25.36 40.36 25.36 25.36 4.00 4.00 4.00 4.00 0.400 0.400 0.400 0.400 0.0 0.0 0.0 0.0 15.68 15.68 15.68 15.68 1.52 1.52 1.52 1.52 0.0 15.00 0.0 0.0 8. 8. 8. 8. 16 16 16 16 16.00 1.600 0.0 62.72 6.08 15.00 32.64 116.44 >-^8v RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SPINACH , FRESH (DOLLARS) 4 .60 5. 18 5.75 6.32 6 90 320.00 -339 .64 -155.64 28.36 212.36 396 36 360.00 -335 64 -128.64 78.36 285.36 492 36 400.00 -331 64 -101.64 128.36 358.36 588 36 440.00 -327 64 -74.64 178.36 431.36 684 36 480.00 -323 64 -47.64 228.36 504.36 780 36 BU. QUANTITY OF SPINACH. FRESH NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. 590 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-1241(C12) PROCESSED SPINACH, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY . GROSS RECEIPTS SPINACH, PROCESS SPINACH SECONDS TOTAL PROJECTED RETURNS Jp\ PROJECTED YIELD UNIT 7.50 0.80 !. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SPINACH-PROC. SD 16.00 ♦NITROGEN (LIO) 60.00 ♦PHOSPHATE 150.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 8.00 ♦FUNGICIDE 3.00 PESTICIDE APPLI. 8.00 ♦NITROGEN (DRY) 60.00 IRRIGATION WATER 20.00 FUEL & LUBE—TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION LABOR MACHINERY 2.98 IRRIGATION 2.00 0.42 EQUIPMENT OTHER 6.00 OPERATING CAPITAL 105.29 SUBTOTAL, PREHARVEST HARVEST COSTS 9.00 HARV,PKG,HAUL SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR $/UNIT VALUE ESTIMATE TON TON 84.50 1 .50 LB. LB. LB. ACRE APPL APPL ACRE LB. ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 1.75 0.25 0.30 20.00 10.00 5.40 3.50 0.25 TON ACRE 4.85 5.00 3.80 3.80 3.80 0. 135 ACRE $ 633.75 1.20 634.95 $ 28.00 15.00 45.00 20.00 80.00 16.20 28.00 15.00 $ 21 .91 0.93 63.20 5.24 3.04 15.20 14.88 7.60 1.60 22.80 14.21 417.81 $ $ 43.65 43.65 $ $ 461.46 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 61.37/TON SPINACH, PROCESS INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE $ 173.49 $ ACRE ACRE ACRE ACRE ACRE ACRE 40.00 15.00 $ 37.56 25.68 40.80 40.00 7.50 151.55 $ ACRE $ 613.00 $ $ 81.57/TON SPINACH, PROCESS ACRE $ 21.95 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 590 B-1241(C12) PROCESSED SPINACH, IRRIGATED TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER OFFSET DISC MOLDBOARD PLOW LAND PLANE BEDDER 6R HERBICIDE SPRAYR DRY FERT SPRDER CULTIVATOR 4R PLANTER 4R BED SHAPER 6R CULTIVATOR 4R CULTIVATOR 4R M A C H A P P L . M A C H TO TA L ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST 2 30 2 34 1 32 1 50 1 .36 63 1 .60 1 .39 1.41 1 .48 1 .39 1,39 AUG AUG AUG AUG AUG AUG AUG SEPT SEPT SEPT OCT NOV 1 .00 2 .20 1 .00 0 .20 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION SEPT OCT NOV DEC JAN FEB TOTALS 0.0 3 65 0 . 0 10 45 0 . 0 13 81 0.0 1 22 0.0 2 43 20.00 2 13 60.00 4 56 4 02 0.0 28.00 7 55 4 19 0.0 4 .02 0.0 4 .02 0.0 7 34 17 4 0 23 09 1 97 4 71 22 21 67 65 7 41 40 42 7 .94 7 .41 7 41 0.199 0.380 0.432 0.038 0. 115 0.264 0.154 0.172 0.230 0.191 0.172 0.172 2.975 2 . 5 1 9 3 0 . 0 4 14.88 108.00 62.04 214.96 APPL. ACRE LABOR MONTH INCHES HOURS 2.38 4.44 6.42 0.50 1.52 0.08 2.08 2.26 3.35 2.50 2.26 2.26 1 31 2 51 2 85 0 25 0 76 0 0 1 .02 1 13 1 52 1 .26 1 .13 1 .13 0.263 0.501 0.571 0.050 0.151 0.0 0.203 0.227 0.303 0.252 0.227 0.227 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 0.0 15.00 0.0 0.0 0.0 0.0 25 40 19 19 19 19 4.00 4.00 3.00 3.00 3.00 3.00 0.400 0.400 0.300 0.300 0.300 0.300 0.0 0.0 0.0 0.0 0.0 0.0 15 15 11 11 11 11 68 68 76 76 76 76 20.00 2.000 0.0 78 40 1 1 1 1 1 1 52 52 14 14 14 14 7 60 8 8 6 6 6 6 16 16 12 12 12 12 36 36 02 02 02 02 15.00 4 0 8 0 141 80 ^ \ RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SPINACH . PROCESS (DOLLARS) 67 60 76.05 84.50 92.95 101 40 6.00 - 4 6 17 4.53 55.23 105.93 156 63 6.75 0 29 57.33 114.36 171.40 228 44 7.50 46 74 110.12 173.49 236.87 300 24 8.25 93 20 162.91 232.62 302.34 372 05 9.00 139 65 215.70 291.75 367.80 443 85 TON QUANTITY OF SPINACH, PROCESS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. /■**% 591 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83 B-1241(C12) SPINACH, (PROCESSED) IRRIGATED (GRAIN DRILL PLANTING) TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS SPINACH, PROCESS SPINACH SECONDS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 7.50 0.80 TON TON 84.50 1.50 $ 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦SPINACH-PROC. SD 21.00 ♦NITROGEN (LIQ) 100.00 ♦PHOSPHATE 160.00 CUSTOM FERTILIZE 1.00 ♦INSECTICIDE 6.00 ♦FUNGICIDE 3.00 PESTICIDE APPLI. 6.00 ♦NITROGEN (DRY) 50.00 ♦HERBICIDE 1.00 HERBICIDE APPLI. 1.00 IRRIGATION WATER 21.00 FUEL & LUBE—TRACTOR EQUIPMENT IRRIGATION R E PA I R S T R A C T O R EQUIPMENT IRRIGATION 1.52 LABOR MACHINERY IRRIGATION 2. 10 0.42 EQUIPMENT OTHER 6.00 19.28 OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS 9.00 HARV,PKG,HAUL SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VA L U E E S T I M AT E $/UNIT LB. LB. LB. ACRE APPL APPL ACRE LB. ACRE ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 1.75 0.25 0.30 1.80 10.00 5.40 3.50 0.25 20.00 4.00 TON ACRE 4.85 36.75 25.00 48.00 1.80 60.00 16.20 21 .00 12.50 20.00 4.00 10.85 0.93 66.36 2.68 1 .91 15.96 7.62 7.98 5.00 3.80 3.80 3.80 0.135 ACRE 633.75 1 .20 634.95 $ $ 1.60 22.80 2.60 385.54 $ $ 43.65 43.65 $ $ 429.19 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 57.07/TON SPINACH. PROCESS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ 2 0 5 . 7 6 $ . 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT I R R I G AT I O N LAND-CASH RENT 1.00 MISC ADMIN 0/H 0.50 TO TA L FIXED COSTS TOTAL PROJECTED COSTS BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS ACRE ACRE ACRE ACRE ACRE ACRE 40.00 15.00 $ 18.21 18. 17 42.84 40.00 7.50 126.72 $ ACRE $ 555.90 $ $ 73.96/TON SPINACH, PROCESS ACRE $ 79.04 $ BUDGET BASED ON GRAIN DRILL METHOD OF PLANTING. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. 591 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 03/23/83. B-124KC12) SPINACH, (PROCESSED) IRRIGATED (GRAIN DRILL PLANTING) TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION OFFSET DISC MOLDBOARD PLOW OFFSET DISC GRAIN DRILL MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS AUG AUG SEPT OCT 2,34 1,32 2,34 1,46 1.00 1.00 2.00 1.00 TOTALS IRRIGATION APPLICATION SEPT OCT NOV DEC JAN FEB TOTALS TOTAL OPER. COST 0.228 0.571 0.456 0.270 0.173 0.432 0.345 0.205 2.02 6.42 4.04 2.81 1. 14 2.85 2.28 1.35 4.75 0.0 0 . 0 13.81 0.0 9.50 36.75 7 . 11 7.91 23.09 15.82 48.03 1.524 1. 155 15.29 7.62 36.75 35.17 94.84 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 25.36 37.86 25.36 31.52 19.02 19.02 APPL. ACRE LABOR VIONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION APPL. MACH INPUT FIXED COSTS COSTS 4.00 4.00 4.00 3.00 3.00 3.00 0.400 0.400 0.400 0.300 0.300 0.300 0.0 0.0 0.0 0.0 0.0 0.0 15.68 15.68 15.68 11 .76 11 .76 11.76 1.52 1.52 1.52 1 . 14 1. 14 1. 14 0.0 12.50 0.0 12.50 0.0 0.0 8. 16 8.16 8. 16 6.12 6. 12 6. 12 21 .00 2. 100 0.0 82.32 7.98 2 5 . 0 0 42.84 158.14 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SPINACH , PROCESS (DOLLARS) 67 .60 76.05 84.50 92.95 101 4 0 6.00 -13 .90 36.80 87.50 138.20 188 9 0 6.75 32 56 89.59 146.63 203.67 260 71 7.50 79 01 142.39 205.76 269.14 332 51 8.25 125 47 195.18 264.89 334.60 404 32 9.00 171 92 247.97 324.02 400.07 476 12 TON QUANTITY OF SPINACH, PROCESS NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. ^ * \ LISTING OF THE NAME SET AND PRICE VECTOR REGION NUMBER: 12 DATE: 030883 CODE ITEM NAME NMOD UNIT PRICE CODE ITEM NAME NMOD UNIT PRICE 13 STEER CALVES 14 HEIFER CALVES 17 CULL COWS 28 DEER LEASE 70 DEFICIENCY PMT. 71 DEFICIENCY PMT. 73 GRAIN SORGHUM 77 CORN 79 WINTER WHEAT 80 SPRING WHEAT 82 PROC. BEETS #1 83 PROC. BEETS #2 84 PROC. BEETS #3 85 USABLE CULLS 86 PROC. CARROTS #2 87 PROC. CARROTS #3 88 PROC. CARROTS #1 89 CARROT CULLS 90 DEFICIENCY PMT. 91 DEFICIENCY PMT. 92 GUAR 93 COTTON LINT 94 COTTONSEED 95 SPANISH PEANUTS 96 PECANS v98 SOYBEANS ,03 SALT 6 MIN. 107 COTTONSEED CAKE 151 PASTURE MA INT. 153 PASTURE RENT 154 PASTURE RENT 155 SORGHUM PASTURE 156 PASTURE RENT 161 CORN SILAGE 175 SORGHUM HAY 180 PASTURE MA INT. 184 SEED CORN/GRAIN 185 SEED CORN/SILAGE 186 GRAIN SORG. SEED 187 FORAGE SORG SEED 189 SOYBEAN SEED 195 GUAR SEED 212 NITROGEN (DRY) 213 NITROGEN (ANHY) 214 NITROGEN (LIQ) 215 PHOSPHATE 239 FUNGICIDE 240 INSECTICIDE 241 CUST INSECT. 247 CUST. PCNB FUNG. j f t e" 2 3 4 5 = HEAD 6 = BALE = = = = BU. TON DOZ. GAL. 7 = ACRE 8 = HOUR 9 = DAYS 10 = AUM LIVE WHET SORG FOOD FOOD FOOD FOOD BEET COTT CORN NATV UNIM PAIM IMPR IMPR DTRT ZOLO PEAN PEAN 11 12 13 14 CWT. CWT. CWT. ACRE BU. CWT. CWT. BU. BU. BU. TON TON TON TON TON TON TON TON LB. BU. CWT. LB. TON CWT. LB. BU. LB. LB. ACRE ACRE ACRE DAYS ACRE TON TON ACRE LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. GAL. APPL APPL = = = = ACIN LB. PINT QT. 67.50 60.75 36.50 2.50 0.65 0.36 4.32 3.50 3.36 3.36 52.00 65.00 16.50 1.00 64.00 36.00 15.00 1.00 0.21 0.21 20.00 0.50 90.00 28.00 1.00 6.25 0.23 0.13 2.00 3.50 4.50 0.50 7.50 23.00 60.00 3.00 1.40 1.00 O.76 0.32 0.32 0.65 0.25 0.14 0.25 0.30 9.30 2.70 16.50 43.00 15 16 17 18 = = = = 248 CUST. PCNB FUNG. 256 DEFOLIANT 260 GROWTH RETARDANT 268 CUSTOM HARVEST 269 CUSTOM HARVEST 270 CUSTOM HARVEST D 271 CUSTOM HARVEST 1 272 CUSTOM HARVEST 275 CUSTOM HARV6HAUL 282 GIN, BAG, TIES 283 HAUL GRAIN SORG 284 HAUL WHEAT 285 HAUL CORN 288 HAUL GUAR 289 CUS HARV GUAR 291 SD COTTON-UPLAND 296 HARVEST AND HAUL 297 CUSTOM COMBINE 320 CUST RETARD APPL 322 CUSTOM HAULING 328 CUST COTTON PICK 329 FUNGICIDE APPLI . 330 FERTILIZER APPLI 331 PESTICIDE APPLI. 332 HERBICIDE APPLI. 333 INSECT. APPLI. 335 DEFOLIANT APPLI . 339 MOW,RAKE,BALE 393 MISC EXPENSE 396 WATER FACIL REPR 410 VET MEDICINE 451 GEN. & HAIL INS. 452 RISK INSURANCE 479 GRAZING LEASES 486 SALES COMM 490 ZINC SULPHATE 491 SURFACTANT 492 CHAIN SAW 493 LOG SPLITTER 494 SAW LOGS 495 VENEER LOGS 499 BORON APPLICAT. 500 BORON 501 CABBAGE 502 CANTALOUPS 503 CARROTS 504 CUCUMBERS 505 CUCUMB. PICKLES 506 BUFFLE GR. PAST 507 ONIONS DOL. CWT. OZ. MILE 19 20 21 22 = = = = FEET APPL SQFT LBGN 23 24 25 26 PEAN COTT WHTI WHET SORG SORG CORN BEET CARR PEAN COTT CSTM CSTM LIVE PEAN PECN SOAP PECN PECN PECN PECN BEET BEET = = = = LB. ACRE APPL BU. ACRE ACRE CWT. ACRE TON BALE CWT. BU. BU. CWT. ACRE LB. TON CWT. APPL HEAD LB. ACRE ACRE ACRE ACRE APPL ACRE BALE DOL. HEAD DOL. ACRE ACRE ACRE DOL. LB. LB. HOUR HOUR MCF MCF ACRE ACRE BAG CRTN BAG CRTN CWT. DAYS BAG CRTN C R AT BAG TREE 27 28 29 30 0.45 12.50 12.00 0.20 15.00 18.00 0.45 25.00 8.80 49.00 0.30 0.13 0.17 0.25 25.00 0.50 9.00 1.50 3.50 0.50 0 . 11 2.75 2.50 3.50 4.00 2.75 2.75 0.70 1.00 2.00 5.00 13.00 15.00 3.50 1.00 0.32 0.60 1.50 3.00 0.15 0.40 3.00 2.75 3.50 5.50 6.50 6.50 7.50 0.50 5.50 = EACH = GPM = KWH = MCF LISTING OF THE NAME SET AND PRICE VECTOR REGION NUMBER: 12 DATE: 030883 508 SPINACH, FRESH 509 SPINACH, PROCESS 510 LETTUCE 511 OATS GRAZING AUD 512 WHEAT SD TREATED 513 BUFFLE GRASS SD 514 CABBAGE SEED 515 CANTALOUP SEED 516 CARROT SEED 517 CUCUMBER SEED 518 CUCUMBER-PCKL SD 519 ONION SEED 520 OATS SEED 521 SPINACH-FRESH SD 522 SPINACH-PROC. SD 523 LETTUCE SEED 524 PEANUT SEED 525 SUNFLOWER SEED 526 SPRIG & SPRIGGNG 527 HARV, PACK 6 MKT 528 HARV, PACK £ MKT 529 HARV, PACK 6 MKT 530 HRV,PKG,MKT 531 HARVEST, PICKLES 532 HARV,PKG,MKT 533 HARV,PKG,MKT 534 HARV,PKG,HAUL 535 HARV,PKG,HAUL 536 HARVEST & HAUL 537 CUSTOM DRYING 538 CUSTOM HAUL 539 CUSTOM HARVEST 540 CUSTOM HAUL 541 CUSTOM HAUL 542 HERBICIDE 543 HERBICIDE 544 HERBICIDE 545 HERBICIDE 546 HERBICIDE 547 HERBICIDE 548 HERBICIDE 549 HERBICIDE 550 HERBICIDE 551 HERBICIDE 552 HERBICIDE 553 HERBICIDE 554 HERBICIDE 555 HERBICIDE 556 INSECTICIDE 557 INSECTICIDE HEAD BU. TON DOZ. GAL. 6 7 8 9 10 NMOD UNIT PRICE NMOD UNIT PRICE CODE ITEM NAME CODE ITEM NAME BALE ACRE HOUR DAYS AUM CABB CANT CARR CCMB CCMB ON 10 SPIN SPPR LETT SUNF PEAN PEAN SOYB SOYB HAY HAY CABB CANT CARR CORN COTT CUCU LETT SORG ON 10 SP,B PEAN SUNF SOYB CABB CANT 11 12 13 14 BU. TON CRTN DAYS LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. LB. ACRE BAG CRTN BAG CRTN CWT. BAG BU. TON CRTN ACRE TON TON BU. BU. BALE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE APPL APPL ACIN LB. PINT QT. 5.75 84.50 5.50 0.50 0.20 3.40 48.00 6.00 6.00 5.30 5.30 20.00 0.15 2.20 1.75 28.00 0.58 0.50 40.00 2.00 4.00 4.25 4.25 4.00 3.30 4.50 4.85 4.25 25.00 25.00 7.00 0.75 0.15 0.35 2.40 8.00 6.00 7.00 10.00 4.00 6.00 9.00 8.00 4.00 20.00 4.10 4.00 4.00 8.00 5.00 15 16 17 18 558 559 56O 561 562 563 564 565 566 567 568 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 595 596 598 599 600 DOL. CWT. OZ. MILE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE INSECTICIDE FUNGICIDE FUNGICIDE FUNGICIDE FUNGICIDE FUNGICIDE FUNGICIDE FUNGICIDE FUNGICIDE CSTL PAST GRAZNG CUSTOM ROOT PLOW CSTL BERMUDA HAY CUST HARV, STRIP GIN STRPR COTTON BL,BG,TIE-ST CTN BEEHIVE RENT BEET SEED NEMATICIDE FLORUNNER PEANUT FUNGICIDE ALLOTMENT LEASE SPINACH SECONDS GRAZING CUSTOM FERTILIZE SUNFLOWERS INNOCULANT CUSTOM HAUL MISC ADMIN 0/H HERBICIDE CORD WOOD 19 20 21 22 FEET APPL SQFT LBGN 23 24 25 26 CARR CORN COTT cue. LETT SORG ON 10 PEAN SPIN SUNF SOYB CABB CANT CARR CUC. LETT ON 10 PEAN SPIN COTT BEET PEAN GUAR PECN CRTN CRAT BAG TREE APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL APPL DAYS ACRE TON CWT. CWT. BALE ACRE LB. ACRE CWT. ACRE CWT. TON DAYS ACRE LB. ACRE CWT. ACRE ACRE KWH 27 28 29 30 6.00 16.00 7.50 10.00 8.00 8.00 6.00 4.10 10.00 6.00 7.00 7.00 4.00 4.50 7.00 5.40 6.00 7.00 5.40 0.50 45.00 60.00 1.75 1.75 13.00 15.00 2.40 8.60 28.00 6.60 2.65 1.50 0.50 1.80 0.08 0.50 0.20 15.00 4.00 45.00 EACH GPM KWH MCF i#B"A TABLE . DEFAULT PARAMETER VALUES AND DEFINITIONS R E G I O N : 1 2 D AT E : O 3 2 3 8 3 ROW PARAMETER DEFINITION DEFAULT VALUE 1. PRICE PER GALLON OF GASOLINE 1.0500 2 . PRICE PER GALLON OF L.P. GAS 0.6700 3. PRICE PER GALLON OF DIESEL 1.0000 4. PRICE PER KILOWATT HOUR OF ELECTRICITY 0.0750 5. PRICE PER 1000 CU. FT. OF NATURAL GAS 4.0000 6. NOMINAL INTEREST RATE 0.1350 7. MACHINERY INSUR. RATE (AVERAGE INVESTMENT) 0.0100 8. MACHINERY TAX RATE (PURCHASE VALUE) 0.0050 9. IRRIGATION SYSTEM NUMBER 1. 10. HOURLY MACHINERY WAGE RATE 5.00 11. HOURLY OTHER LABOR WAGE RATE 3.80 12. HOURLY IRRIG./LIVESTOCK WAGE RATE 3.80 13. DEATH LOSS (PERCENT OF TOTAL RECEIPTS) 0.0 14. LIVESTOCK INSUR. RATE (AVERAGE INVESTMENT) 0.0100 15. EQUIPMENT INSUR. RATE (AVERAGE INVESTMENT) 0.0100 16. LIVESTOCK TAX RATE (AVERAGE VALUE) 0.0050 17. EQUIPMENT TAX RATE (AVERAGE VALUE) 0.0050 18. IRRIGATION LABOR MULTIPLIER (HRS/ACIN) 0.1000 19. FACTOR TO CONVERT MACHINE HRS TO TRACTOR HRS 1.1000 20. FACTOR TO CONVERT TRACTOR HRS TO LABOR HRS 1.2000 2 1 . FACTOR TO CONVERT SELF-POWERED MACHINERY HRS TO LABOR HRS 1.2500 2 2 . LUBRICATION COST MULTIPLE OF MACHINERY FUEL COSTS 0.1000 23. I N F L A T I O N R AT E 2 4 . LUBRICATION COST MULTIPLE OF EQUIPMENT FUEL COSTS 0.0 0.0500 D AT E : 0 3 2 3 8 3 LISTING OP ECONOMIC AND ENGINEERING DATA FOR MACHINERY IN REGION 12 CODE WIDTH NO. |I»T) TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR 4 WH OR PICKUP TRUCK PECAN PICKER SHREDDER MOLDBOARD PLOW CHISEL PLOW OFFSET OISC BEDDER SR ROLLING CULT 4R ROLLING CULT 6R CULTIVATOR 4R CULTIVATOR BR PLANTER 4R PLANTER 6R STANHAY PLANTER GRAIN ORILL BED SHAPER 6R LANO PLANE TANDEM OISC DRY FERT SPRDER ANHYDROUS SPRDER HERBICIDE SPRAYR ROD WEEDER PEANUT DIG SHK2R PEANUT COMB. 4R PEANUT PLANTER HARROW SPIKE SPRAYER H. SPEED PECAN SHAKER HYD 1. 2. 3. 4. 5. 6. IO. 19 . 30. 32. 33. 34. 36. 37. 38. 39. 40. 41 . 42. 44. 46 . 48 . SO. 58. 60. 61 63 65 66 . . . . 67. 68. 73. 83 . 87 . 150. 0 125 . 0 100. 0 76 , 0 40,, 0 225. 0 0.. 5 6.. 0 14 ., 0 S.3 IS .o 12 . 0 20 o 12 .o 18 . 0 12 . 0 18 . 0 13 . 3 18 . 0 13 . 3 14 . O 12 . 0 12 . 0 14 . 0 20 . 0 18 . 0 12 . 0 16 . 0 6 .7 13 . 3 12 . 7 24 . 0 ISO . O 17 . 5 LIST PRICE 443SO. 39SBO. 326O0. 211OO. 12 100. 66000. 8500. 13000. 5180. 6480. 3780. 6590. 3780. 2700. 3780. 302S. 3240. SI 80. 6480. 3240. 3890. 2700. 6480. 4320. 2700. 1. 1300. 1 190. 3240. 16200. 5400. 1620. 3240. 4200. 4 6 6 SPEED FIELD RC1 ( M P H ) E F F. 4. 5 4. 5 4. 5 4., 5 4,. 5 4.. 5 30. O 4.. 0 3,, 7 4,, 5 4., 5 4.. 8 4., 5 3,. 5 3,. 5 5 .O 5.. 0 4.. 5 4 .5 4 .5 4 .O 4 .S 6 .0 4 .5 4 .0 5.. 0 4 .0 5 .0 2.. 5 2..S 4 .5 4 .5 0 .3 O. 6 0 . 86 0 . 88 0 . 68 0 . 86 0 . 88 0 . 88 0 ..68 0 ., 7 0 0 ,. 8 0 0 .. 8 0 0 ,.SO 0 ., 8 3 0 ,. 8 0 0 ,, 8 0 0 ., 8 0 0 ., 8 0 0 ,, 80 0 ,. 6 0 0 .. 6 0 0 .60 0 .72 0 .80 0 . 60 0 .83 0 .67 0 .80 0 , 65 0 .80 0 .60 0 .60 0 ,. 60 0 ,. 8 0 0 .70 0 . BO 1 .. 2 0 1 ., 2 0 1 ,, 2 0 1 ,, 2 0 1 ,, 2 0 1 .. 20 0 ,. 8 0 0 .33 0 . 60 1.00 1.00 0 .65 1 . OO 1.00 1.00 1.00 1.00 0 .80 0 . 80 0 .80 o. 7 5 1.00 o. 6 0 0 . 65 1. 2 0 1.20 1.00 1.00 1. 0 0 0 .BO 0 .80 0 .65 0 .80 0 .33 AGE RC3 (HRS) 0. 0. 0. 0. 0. 0. 0. 1 . 60 1 . 60 o. 1 . 80 o. 0. 0. o. 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . 0 0 0 0 0 0 0 0 0 . . . . . . . . . o. 1 . 60 1 . 60 1 . 60 1 .60 1 .60 1 . 60 1 .30 1 .80 1 .80 1 .80 1 .80 1 .80 1 .80 1 .80 1 . 60 1 . 60 1 .80 1 .80 1 .80 1 .80 1 .80 1 . 80 1 .80 1 .80 1 . 80 1 .30 1 .80 1 . 60 1 .80 1 . 60 1 . 60 ANNUAL YEARS HRS OWNED 500. 600. BOO. 300. 300. 600. 700. 100. 200. 100. 2O0. 100. 100. 100. 100. too. 100. 75. 75. 76. SO. 100. 100. 100. 50. 100. 35. 100. 250. 2S0. 7B. 35. 200. 250. 7. 7. 7. 7. 7. 7. 3. 10. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 7. 1. 7. 10. 12. 12. IO. 10. 7. 12. RFV1 RFV2 PURCH FUEL LIFE PRICE TYPE (HRS) 0 . 68 0 . 68 0 . 68 0 . 68 0 . 68 0 . 68 0. 6 0 0 ., 60 0 ,, 60 0 ,. 60 0 ., 60 0 .. 60 0 ,. 60 0 ., 60 0 ,, 6 0 0 ., 60 0 .. 6 0 0 ,, 60 0 ., 60 0 .. 6 0 0 ., 60 0 ,. 6 0 0 .. 6 0 0 .. 6 0 0 .. 6 0 1..OO 0 .. 60 0 ., BO 0 .. 60 0 . 60 0 .. 60 0 .. 60 0 . 60 0 . 60 40100. 35600. 29340. 18990. 10890. 594O0. 7650. 12000. 47SO. 6480. 3780. 6590. 1760. 2700. 3780. 2590. 3240. S180. 84SO. 3240. 3890. 19SO. 6480. 4320. 27O0. 1. 1300. 1080. 1300. 16200. 6400. 1620. 2700. 3800. 0 . 92 0 . 92 0 . 92 0 ..92 0 ,. 9 2 0 ., 9 2 0 ., 8 8 0 .,88 0 .. 8 8 0 .. 8 6 0 ,, 8 8 0 ,, 8 8 0 ,, 8 8 0 ,, 8 8 0 .. 8 8 0 ,. 8 8 0 ., 86 0 ,. 8 8 0 ,. 8 8 o .88 0 .88 0 .88 0 .88 0 .88 0 .88 1 . OO o .88 0 .88 0 .88 0 .68 0 .88 0 .88 0 .88 0 .88 3. 3. 3. 3. 3. 3. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. o. 0. 0. 12O0O. 1 5 0 . 1 2 0 0 0 . 125. 1 2 0 0 0 . IOO. 12000. 75. 40. 12000. 12000. 225. 30. 2800. 2000. 25. 2OO0. 0. 2000. 0. 2000. 0. 2OO0. 0. 2OO0. 0. 2OO0. 0. 0. 2O00. 0. 2000. 0. 2000. 1200. 0. 1200. 0. 1200. 0. 1O0O. 0. 2000. 0. 2500. 0. 0. 2000. 1200. 0. 1200. 0. 1200. 0. 2OO0. 0. 3000. 0. 3000. 0. 0. 1200. 0. 2000. 2 OOO. 0. 3OO0. 0. B-124KL12) TEXAS AGRICULTURAL EXTENSION SERVICE . THE TEXAS A&M UNIVERSITY SYSTEM l o r l o L . C a r p e n t e r. D i r e c t o r . C o l l e g e S t a t i o n , Te x a s \ TEXAS ENTERPRISE BUDGETS TEXAS WINTER GARDEN REGION Projected for 1983 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of s o c i o - e c o n o m i c l e v e l , r a c e , c o l o r, s e x . r e l i g i o n o r n a t i o n a l o r i g i n . Cooperative Extension Work in Agriculture and Home Economics, The Texas A8M university System and tho United States Department of Agriculture cooperating. Distributed in furtherance of tho Acts of Congress of May 8. 1914, as amended, and June 30, 1914. 150 3-83. New EC° " > ' *■ 592 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/18/82. jffey B-1241(L12) COW-CALF PRODUCTION TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER COW UNIMPROVED BRUSH COUNTRY INVESTMENT REQUIREMENTS PROJECTED YOUR NUMBER UNIT SIZE S/UNIT VALUE ESTIMATE COW RAISED 1.00 HEAD 1.00 684.37 684.37 BULL PURCHASED 0.05 HEAD 1.00 1250.00 62.50 HEIFER RAISED 0.13 HEAD 1.00 450.00 58.50 HORSE 0.01 HEAD 1.00 503.91 4.03 TOTAL LIVESTOCK INVESTMENT $ 809.41 $ PRODUCTION PROJECTED RETURN $/UNIT 67.50 115.42 60.75 62.27 36.50 34.67 2.50 55.00 $ 267.37 $ OPERATING INPUTS PROJECTED COST $/UNIT 0.23 11 .50 5.00 10.00 O. 13 23.40 00 9.00 50 0.50 2.00 00 WGT. TOTAL NUMBER EACH UNITS UNIT STEER CALVES 0 . 3 8 4 . 5 0 1 . 7 C W T. HEIFER CALVES 0 . 2 5 4 . 1 0 1 . 0 C W T. CULL COWS 0 . 1 0 9 . 5 0 0 . 9 C W T. DEER LEASE 22.00 1.00 22.0 ACRE TOTAL PROJECTED RETURNS INPUT USE UNIT S A LT & MIN. 50.00 LB. VET MEDICINE 2.00 DOL. COTTONSEED CAKE 180.00 LB. SALES COMM 9.00 DOL. CUSTOM HAULING 1.00 HEAD WAT E R FACIL REPR 1.00 HEAD MISC EXPENSE 10.00 DOL. EOUIPMENT FUEL AND LUBE EOUIPMENT REPAIR 1 .00 TOTAL OPERATING COST RESIDUAL RETURNS TO LAND, LABOR. CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EOUIPMENT INVESTMENT LIVESTOCK INVESTMENT QUANTITY UNIT INVESTED DOL. -8.40 54. 15 DOL. DOL. 809.41 0. 140 0. 140 0. 140 RESIDUAL RETURNS TO LAND. LABOR. OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES. AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND. LABOR. MANAGEMENT. AND PROFIT 1 .75 7.50 HOUR HOUR RATE OF RETURN 3.80 3.80 RESIDUAL RETURNS TO LAND. MANAGEMENT, AND PROFIT LAND COSTS PASTURE RENT TOTAL LAND COST INPUT USE UNIT 22.00 ACRE $ 195.61 $ RATE OF PROJECTED RETURN COST TOTAL CAPITAL COST EQUIPMENT LIVESTOCK TOTAL LABOR COST $ 10.00 4.34 1 .02 71.76 $ $ -1 . 18 7.58 113.32 119.72 $ $ 75.89 $ PROJECTED COST 9.33 36.45 $ 45.78 $ $ PROJECTED COST 6.65 28.50 $ 35.15 $ $ RATE OF RETURN 3.50 30.11 $ -5.04 $ PROJECTED COST 77.00 $ 77.00 $ $ -82.04 $ $ TOTAL PROJECTED COST OF PRODUCTION SPRING CALVING. 76% CALF CROP, 3% DEATH LOSS ON COWS. 13% REPLACEMENT RATE, 10,000 ACRE RANCH, 450 ANIMAL UNITS. 349.41 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIIE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED 9Y STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE ANO APPROVED FOR PUBLICATION. 592 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED WITHOUT UPOATING AFTER 10/18/02. COW-CALF PRODUCTION TEXAS WINTER GARDEN REGION 1983 PROJECTEO COSTS AND RETURNS PER COW UNIMPROVED BRUSH COUNTRY 1 JAN AV E R . ANNUAL C A P I TA L 2 FEB -1.35 3 MAR -0.44 4 APR -0.17 5 M AY 1.50 6 JUN -0.32 7 JUL 8 AUG 9 SEP (DOLLARS) 0.67 1.95 3.25 -9.88 10 OCT 1 .06 LABOR REQUIREMENTS (HOURS) MACHINERY LABOR 0.0 O.O 0.0 O.O O.O O.O 0.0 O.O 0.0 EOUIPMENT LABOR 0.15 O.IS 0.15 0.15 0.15 0.15 O.IS 0.15 0.15 LIVESTOCK LABOR 0.63 0.63 0.63 0.63 O.B3 0.63 0.63 0.63 0.63 O . TO TA L LABOR 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 EOUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT CODE DEPR I N T. INS. TA X R E PA I R FUEL LUB. 0.77 11 NOV -2.66 12 DEC - 2.OO O.O 0.0 0.0 O.IS 0.15 .0.15 63 0.B3 0.63 7 0. 77 0.77 0.77 TO TA L - 8.40 TO TA L 0.0 1.75 . SO 9.25 T O TA L T O TA L H O U R S A L L O C OWN. OPER. LABOR I.X) STOCK TRAILER 1 214.OO 201.18 14.37 7.18 13.OO 0.0 O.O 436.73 13.00 O.O STOCK S P R AY E R 2 90.00 83.30 5.95 2.97 10.00 0.0 0.0 182.22 10.00 0.0 TA C K 3 4S.00 4 1.65 2.98 1.49 5.00 0.0 0.0 9 1 . 11 5.00 0.0 FENCE 4 63.33 75.83 5.42 2.71 4.17 0.0 0.0 167.29 4.17 0.0 PICKUP TRUCK IO 1057.14 886.00 63.29 31.64 252.00 1662.00 82.60 2036.07 1986.60 700.OO COW RAISEO 51 18.75 95.61 6.84 3.42 0.0 0.0 O.O 124.83 O.O 0.0 BULL PURCHASEO 54 100.00 175.00 12.50 6.25 0.0 0.0 0.0 293.75 O.O O.O HEIFER RAISED 55 0.0 63.00 4.50 2.25 0.0 0.0 0.0 89.75 O.O O.O HORSE 9S 70.31 70.55 5.04 2.52 9.38 0.0 0.0 148.42 9.36 0.0 O.002 0.002 0.002 0.002 O.002 1.000 0.050 0.130 0.008 SELECTED EQUIPMENT COMPLEMENT INFORMATION 12 3 4 6 6 7 8 9 10 11 12 13 14 15 E Q U I P M E N T C O D E S 1 2 E U N I T T Y P E L I S T P U R C H L I F E S A LV. R E PA I « F U E L A N N U A L A N N U A L X X X X X X X X X X X X E F F. NO. PRICE PRICE (YRS) (XLP) (XLP) USE LABOR USE STOCK TRAILER 1. CWT. 2. 2600. 2400 S TO C K S P R AY E R 2 . 1 GAL . 2. 10O0. 1OO0 TA C K 3. DOL . 2. SOO. SOO 10 0 .. 10 o.o 0.0 FENCE 4. MILE 2. lOOO. lOOO 0 0 ..05 0.0 0.0 P I C K U P T R U C K 1 0 . 1 . TON T O N 22 .. lOSOO. 1 0 5 0 0 . 9SO0 9500. 7. 0.2 7 11440000. 0. 0 7 70 0 .00. 0 200 00. ..117 COW RAISED 51. 1 . HEAD HEAD 1 7. 5 0 . 7 5 0 750 . 750. 8 . 800 . 8 0O.. 0 O . O 0 . 0 . 0 o.o O.O 1. BULL PURCHASEO 54. HEAD 1. ISOO. ISOO SO O.. 0 0.0 o.o HEIFER RAISED SS. HEAD 1. 460. 4SO OO O,. 0 0.0 0.0 HORSE 95. HEAD 1. 7SO. 750 25 O,. 10 0.0 0.0 o .0 o.. 0 Oo,. .O 0 O.O I O..0O O.O o. . OO 0 0.0 O 0 0 o,,o o,,o o,,o <^°*l»k 593 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/18/82. /^"s B-1241(L12) COW-CALF PRODUCTION TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER COW ONE-THIRD IMPROVED AND TWO-THIRDS UNIMPROVED PASTURE INVESTMENT REQUIREMENTS PROJECTED YOUR NUMBER UNIT SIZE VALUE ESTIMATE S/UNIT COW RAISED 1.00 HEAD 1.00 684.37 684.37 BULL PURCHASED 0.04 HEAD 1.00 1250.00 50.00 HEIFER RAISED 0.13 HEAD 1.00 450.00 58.50 HORSE 0.01 HEAD 1.00 503.91 4-03 TOTAL LIVESTOCK INVESTMENT $ 796.91 $ PRODUCTION WGT TOTAL EACH UNITS UNIT 4.80 1 .9 CWT. 4.30 1.2 CWT. 9.75 1.0 CWT. 1 .00 18.0 ACRE PROJECTED RETURN $/UNIT 67.50 129.60 60.75 70.53 36.50 35.59 2.50 45.00 $ 280.72 $ INPUT USE UNIT S A LT & MIN. 50.00 LB. VET MEDICINE 2.00 DOL. COTTONSEED CAKE 180.00 LB. SALES COMM 10.00 DOL. CUSTOM HAULING 1.00 HEAD WAT E R FACIL REPR 1.00 HEAD PA S T U R E M A I N T. 4.29 ACRE MISC EXPENSE 10.00 DOL. EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR. TOTAL OPERATING COST PROJECTED COST $/UNIT 0.23 11.50 5.00 10.00 0. 13 23.40 1 .00 10.00 0.50 0.50 2.00 00 2.00 58 1.00 10.00 6.94 1 . 17 $ 84.09 $ NUMBER STEER CALVES 0.40 HEIFER CALVES 0.27 CULL COWS O. 10 DEER LEASE 18.00 TOTAL PROJECTED RETURNS OPERATING INPUTS RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST OWNERSHIP COSTS (DEPRECIATION, TAXES. AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND. LABOR, MANAGEMENT. AND PROFIT 2.80 6.50 RATE OF RETURN HOUR 3.80 HOUR 3.80 RESIDUAL RETURNS TO LAND, MANAGEMENT. AND PROFIT LAND COSTS PASTURE RENT TOTAL LAND COST 196.63 $ QUANTITY UNIT RATE OF PROJECTED COST INVESTED RETURN 0.53 3.77 DOL. 0. 140 DOL. 4.52 32.30 0. 140 111.57 796.91 DOL. 0. 140 $ 116.62 $ RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT EQUIPMENT LIVESTOCK TOTAL LABOR COST $ INPUT USE UNIT 18.00 ACRE $ PROJECTED COST 5.76 35.27 41.03 $ $ $ 38.99 $ PROJECTED COST 10.64 24.70 35.34 $ $ $ RATE OF RETURN 4.50 80.02 $ 3.65 $ PROJECTED COST 81.00 $ 81.00 $ $ -77.35 $ $ TOTAL PROJECTED COST OF PRODUCTION SPRING CALVING. 80% CALF CROP. 3% DEATH LOSS ON COWS, 13% REPLACEMENT RATE. 4,500 ACRE RANCH, 250 ANIMAL UNITS. 358.06 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIOE ANO IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE ANO APPROVED FOR PUBLICATION. NOT TO BE USED WITHOUT UPDATING AFTER 10/18/82. PROJECTIONS FOR PLANNING PURPOSES ONLY COW-CALF PRODUCTION TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER COW ONE-THIRD IMPROVED AND TWO-THIRDS UNIMPROVED PASTURE 2 FEB 10 OCT 3 MAR AVER. ANNUAL CAPITAL 1.61 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR 0 0 0 T O TA L L A B O R o 23 54 0.77 0 . 0 0 . 2 3 0.54 O.O 0 . 2 3 0.54 0 . 0 0.23 O.S4 0 . 0 0 . 2 3 O.S4 0 . 0 0.23 0.S4 0.77 0.77 0.77 0.77 0.77 TOTAL 3.77 (DOLLARS) 3.62 ' (HOURS) 0 . 0 0.23 0.S4 0.77 0 0 0 0.77 EQUIPMENT CODE STOCK TRAILER STOCK SPRAYER TACK PICKUP TRUCK COW RAISED BULL PURCHASED HEIFER RAISED HORSE 1 2 3 10 61 54 55 95 DEPR 214 90 45 1057 18 100 0 70 OO OO 00 14 75 00 0 31 I N T. 201 83 41 886 95 175 63 70 16 30 85 OO 81 00 00 55 INS. 14 S 2 63 6 12 4 5 37 95 98 29 84 50 50 04 TA X 7 2 1 31 3 6 2 2 16 97 49 84 42 25 25 62 R E PA I R 13 10 5 252 O O o 9 00 00 00 00 0 0 0 38 FUEL 1652.00 T O TA L OWN. LUB. 0 . 0 0 . 0 0 . 0 0 77 0.77 E O U I P M E N T F I X E D A N D VA R I A B L E C O S T S P E R Y E A R 0 . 0 0 . 0 0 . 0 436 182 91 7 3 22 11 8 2 . 6 0 2038 0 7 0 . 0 0 . 0 O.O O.O 0 . 0 O.O O.O O.O 124 293 69 148 0 23 54 8 7 7 4 3 5 8 2 0 o 0 0 23 54 0.77 TO TA L OPER. 13 OO 1 0 OO 5 OO 1986 BO 0 0 0 0 0 9 3 8 o 0 23 54 T O TA L 0 . 0 2. 80 6.SO 0.77 9 .30 0 0 0 HOURS LABOR 0 . 0 O.O O.O 700.OO 0 . 0 O.O O.O O.O ALLOC (.X) . 003 . 003 .003 .004 .000 . 040 . 130 .008 SELECTED EOUIPMENT COMPLEMENT INFORMATION EOUIPMENT STOCK TRAILER STOCK SPRAYER TACK PICKUP TRUCK COW RAISEO BULL PURCHASED HEIFER RAISED HORSE CODE SI2E UNIT TYPE LIST NO. PRICE 1. 2. 3. 10. 51 . 5 4 . 5 5 . 9 5 . 16. 150. C W T. GAL . DOL. TON HEAO HEAO HEAD HEAD 2 . 2 . 2 . 2 . 1. 1. 1. 1. 26O0. lOOO. 500. 1O5O0. 750. 1500. 450. 750. 6 7 8 9 10 P U R C H L I F E S A LV. R E PA I R F U E L PRICE (YRS) (XLP) (XLP) USE 2400. 1000. 500. 9500. 750. 1500. 450. 750. 1400.0 0.0 ■ 0.0 8. 0.25 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.0 0.0 700.0 O.O 0.0 0.0 1 .00 0.0 15 EFF. O.O 0.0 594 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/18/82. B-124KL12) COW-CALF PRODUCTION TEXAS WINTER GARDEN REGION 1983 PROJECTED COSTS AND RETURNS PER COW IMPROVED PASTURE (BUFFEL GRASS) INVESTMENT REQUIREMENTS PROJECTED YOUR NUMBER UNIT SIZE $/UNIT VALUE ESTIMATE COW RAISED 1.00 HEAD 1.00 684.37 684.37 BULL PURCHASED 0.03 HEAD 1.00 1250.00 41.66 HEIFER RAISED 0.13 HEAD 1.00 450.00 58.50 HORSE 0.01 HEAD 1.00 503.91 4.03 TOTAL LIVESTOCK INVESTMENT $ 788.57 $ PRODUCTION WGT. NUMBER EACH STEER CALVES 0.43 5.00 HEIFER CALVES 0.30 4.60 CULL COWS 0 . 1 0 10.00 TOTAL PROJECTED RETURNS OPERATING INPUTS SALT & MIN. VET MEDICINE COTTONSEED CAKE SALES COMM CUSTOM HAULING WATER FACIL REPR PASTURE MAINT. MISC EXPENSE EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL UNITS UNIT 2.1 CWT. 1.4 CWT. 1.0 CWT. INPUT USE 50.00 2.00 160.00 10.00 1 ,00 1 .00 6 ,67 10.00 UNIT LB. DOL. LB. DOL. HEAD HEAD ACRE DOL. PROJECTED $/UNIT RETURN 67.50 145.12 60.75 83.83 36.50 36.50 $ 265.46 $ PROJECTED $/UNIT COST 11 . 5 0 0.23 5.00 10.00 0.13 20.80 10.00 1.00 0.50 0.50 2.00 2.00 3.00 20.01 1 .00 * TOTAL OPERATING COST RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT # ^ ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT 3.50 6.00 RATE OF RETURN HOUR 3.80 HOUR 3.80 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS PASTURE RENT TOTAL LAND COST $ 170.33 $ Q U A N T I T Y U N I T R AT E O F P R O J E C T E D RETURN COST INVESTED 51.91 DOL. 0. 140 7.27 68.42 DOL. 0. 140 9.58 788.57 DOL. 0. 140 11 0 . 4 0 TOTAL CAPITAL COST EQUIPMENT LIVESTOCK TOTAL LABOR COST $ 10.00 8.67 1 .65 95.13 $ INPUT USE UNIT 10.00 RESIDUAL RETURNS TO MANAGEMENT AND PROFIT ACRE $ 127.25 $ $ 43.08 $ PROJECTED COST 11.94 34.47 46.42 $ $ $ PROJECTED COST 13.30 22.80 36.10 $ $ $ RATE OF RETURN 7.50 -3.33 $ -39.43 $ PROJECTED COST 75.00 $ 75.00 $ $ - 11 4 . 4 3 $ $ 379.89 $ TOTAL PROJECTED COST OF PRODUCTION SPRING CALVING, 86% CALF CROP, 3% DEATH LOSS ON COWS, 13% REPLACEMENT RATE. 2000 ACRE RANCH. 200 ANIMAL UNITS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED ANO DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION.