Reconstruction INSIGHT Lenntech info@lenntech.com Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Overview An extensive and experienced team of cooling tower professionals can quickly and safely get your cooling tower operational in any manner you wish. Primary Benefits • • • astturnaroundtogettowersupandrunning F quickly — saves time and money for the customer Exceptionalsafetyaboveindustrystandards— lowers risk and cost for customer repair work Highqualityresults—backedbyexceptional engineering and original Marley parts Benefit Detail “This is to acknowledge the efforts of your company and all of its employees in the tireless support of our annual outage that we have just completed” Steve Hanson—Graphic Packaging International, Inc. Fast Turnaround: • Highlyscalableconstructioncrewsthatspecialize in tower reconstruction and repair get towers up and running quickly • Shortoutagecapabilitieswithpre-outage modularizationoftowercomponentsallowfor quickinstallationintighttime-lines • ExtensiveexperienceallowsMarleytocomplete reconstruction correctly the first time, improving uptime for the customer Exceptional Safety: • Solefocusoncoolingtowerswithover500work referencesin2009 • Safetyresultsthatexceedindustrystandardscan help customers reduce their risk and cost at the jobsite more 96% of the Reconstruction Projects Completed Right the First Time 5 4 TOTAL RECORDABLE INCIDENT RATE 3 2 1 0 INDUSTRY AVERAGE MARLEY CLOSED SHOP MARLEY OPEN SHOP FIELD ERECTED TOWER PERFORMANCE* Reconstruction Benefit Detail High Quality Projects: • Capability to complete complicated scopes, critical or high risk environments, and online project execution • Engineering expertise, providingstrategic solutions to upgrade tower performance • Proven track record of field erected tower performance via CTI third party testing • • • • • • • • • 105% 100% 95% 2009 2008 MARLEY Options Emergency Service Team™ 24/7 Custom designed replacement cooling towers over existing cold water basins Natural draft crossflow to counterflow conversions Natural draft counterflow fill replacement Natural draft crossflow re-ring Marley Geareducer ® rebuild service Post construction CTI thermal performance testing Portable cooling tower rental during reconstruction — stay up and running General Sales, Service and Parts agreements available to maintain optimumcooling tower performance INSIGHT 2007 2006 2005 OTHER MANUFACTURERS *Cooling Tower Institute, Multi-Agency Thermal Testing Program Features • • • • • Full Inspections pre and post construction to determine scope and ensure tower performance Full engineering analysis by experienced professional team is completed to make the cooling tower perform like new or better Use of the full line of Marley OEM quality parts during tower construction and for future maintenance Regional reconstruction teams provide fast response. Authorized subcontractors supervised on-site by fully trained, full time SPX superintendents Lenntech info@lenntech.com Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 7401 WEST 129 STREET | OVERLAND PARK, KANSAS 66213 UNITED STATES | 913 664 7400 | spxcooling@spx.com | spxcooling.com Contact your Marley Sales Representative at spxcooling.com/en/sales/ In the interest of technological progress, all products are subject to design and/or material change without notice. ©2011 SPX Cooling Technologies, Inc. | Printed in USA IN-RECON-11