Reconstruction Lenntech Overview Tel. +31-152-610-900

advertisement
Reconstruction INSIGHT
Lenntech
info@lenntech.com Tel. +31-152-610-900
www.lenntech.com Fax. +31-152-616-289
Overview
An extensive and experienced team of cooling tower
professionals can quickly and safely get your cooling
tower operational in any manner you wish.
Primary Benefits
•
•
•
astturnaroundtogettowersupandrunning
F
quickly — saves time and money for the customer
Exceptionalsafetyaboveindustrystandards—
lowers risk and cost for customer repair work
Highqualityresults—backedbyexceptional
engineering and original Marley parts
Benefit Detail
“This is to acknowledge the efforts of your
company and all of its employees in the
tireless support of our annual outage that we
have just completed”
Steve Hanson—Graphic Packaging International, Inc.
Fast Turnaround:
• Highlyscalableconstructioncrewsthatspecialize
in tower reconstruction and repair get towers up
and running quickly
• Shortoutagecapabilitieswithpre-outage
modularizationoftowercomponentsallowfor
quickinstallationintighttime-lines
• ExtensiveexperienceallowsMarleytocomplete
reconstruction correctly the first time, improving
uptime for the customer
Exceptional Safety:
• Solefocusoncoolingtowerswithover500work
referencesin2009
• Safetyresultsthatexceedindustrystandardscan
help customers reduce their risk and cost at the
jobsite
more
96% of the Reconstruction Projects
Completed Right the First Time
5
4
TOTAL RECORDABLE
INCIDENT RATE
3
2
1
0
INDUSTRY
AVERAGE
MARLEY
CLOSED SHOP
MARLEY
OPEN SHOP
FIELD ERECTED TOWER PERFORMANCE*
Reconstruction
Benefit Detail
High Quality Projects:
• Capability to complete complicated scopes,
critical or high risk environments, and online
project execution
• Engineering expertise, providingstrategic
solutions to upgrade tower performance
• Proven track record of field erected tower
performance via CTI third party testing
•
•
•
•
•
•
•
•
•
105%
100%
95%
2009
2008
MARLEY
Options
Emergency Service Team™ 24/7
Custom designed replacement cooling towers
over existing cold water basins
Natural
draft crossflow to counterflow conversions
Natural
draft counterflow fill replacement
Natural
draft crossflow re-ring
Marley
Geareducer ® rebuild service
Post
construction CTI thermal performance testing
Portable cooling tower rental during
reconstruction — stay up and running
General Sales, Service and Parts agreements
available to maintain optimumcooling tower
performance
INSIGHT
2007
2006
2005
OTHER MANUFACTURERS
*Cooling Tower Institute, Multi-Agency Thermal Testing Program
Features
•
•
•
•
•
Full Inspections pre and post construction to determine scope and ensure tower performance
Full engineering analysis by experienced
professional team is completed to make the
cooling tower perform like new or better
Use of the full line of Marley OEM quality
parts during tower construction and for future
maintenance
Regional reconstruction teams provide
fast
response.
Authorized subcontractors supervised on-site by
fully trained, full time SPX superintendents
Lenntech
info@lenntech.com Tel. +31-152-610-900
www.lenntech.com Fax. +31-152-616-289
7401 WEST 129 STREET | OVERLAND PARK, KANSAS 66213 UNITED STATES | 913 664 7400 | spxcooling@spx.com | spxcooling.com
Contact your Marley Sales Representative at spxcooling.com/en/sales/
In the interest of technological progress, all products are subject to design and/or material change without notice.
©2011 SPX Cooling Technologies, Inc. | Printed in USA
IN-RECON-11
Download