SECTION 00300 BID FORMS 00310 Bid Proposal Form 00320 Quantity Schedule SECTION 00310 BID PROPOSAL FORM POUDRE SCHOOL DISTRICT BID PROPOSAL FORM TO: Board of Education Poudre School District c/o Planning, Design & Construction 2445 LaPorte Avenue Fort Collins, CO 80521 FROM: PROJECT IDENTIFICATION: Poudre High School Parking Lot Pavement Project ACKNOWLEDGMENTS: The undersigned Bidder acknowledges examination of the following: a) Contract Documents • Drawings dated February 2013 • Contract Documents and Specifications dated February 2013 • Schedule restrictions outlined in the Instructions to Bidders, Agreement and General Conditions b) Project Sites/Existing Conditions c) Receipt of Addenda Numbers: # # # , dated , dated , dated AGREEMENTS: The undersigned Bidder agrees to the following: a) b) c) d) e) f) g) h) To hold bid open for 45 calendar days from date of Bid Opening. To enter into and execute the Construction Agreement within fifteen (15) calendar days of award, including identified Bonds of Insurance. To accomplish the Work in accordance with the Contract Documents. Poudre School District reserves the right to reject any or all bids and to waive informalities. Poudre School District reserves the right to award separate or single contracts. Poudre School District reserves the right to award the contract on the basis of either cost or schedule. The Contractor agrees to pay the Poudre School District Liquidated Damages according to the terms, amount(s) and date(s) defined in the Instructions to Bidders, Agreement and General Conditions. To reinstate or omit Alternates at the amounts submitted herein for sixty days after Contract Date. TOTAL BASE BID PRICE: Poudre High School Phase 1 Dollars ($ ) Dollars ($ ) Dollars ($ ) Section 00310 Page 1 Poudre High School Phase 2 Poudre High School Phase 3 UNIT PRICING: Unit Price #1: Remove Concrete Dollars ($ ) Per SF Unit Price #2: Remove Asphalt Pavement Dollars ($ ) Per SF Unit Price #3: New Vertical Curb and Gutter (18" Outfall) Dollars ($ ) Per LF Unit Price #4: New Vertical Curb and Gutter (30" Infall) Dollars ($ ) Per LF Unit Price #5: New Concrete Drain Pan Dollars ($ ) Per SF Unit Price #6: New Concrete Sidewalk Dollars ($ ) Per SF Unit Price #7: New Concrete Flatwork (6" Thick) Dollars ($ ) Per SF Unit Price #8: New Concrete Flatwork (8" Thick) Dollars ($ ) Per SF Unit Price #9: Aggregate Base Course Dollars ($ ) Per TON Unit Price #10: Hot Bituminous Pavement Dollars ($ ) Per TON Unit Price #11: Fly Ash Stabilization Dollars ($ ) Per SY BID CONDITIONS: 1. In compliance with your Invitation to Bid dated , and subject to all conditions thereof, the undersigned a **(Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items shown in the Drawings, listed on the following Quantity Schedule and in the Measurement and Payment Section (01270). 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. All the various phases of Work enumerated in the Drawings and Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR and included in the Total Bid Price. 5. The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Section 00310 Page 2 6. Unit Prices provided on this Bid Proposal Form will be used in conjunction with actual quantities of work performed to determine the price of additional work requested by the OWNER, in writing, that is not included in the present Drawings or Contract Documents. 7. Bidder acknowledges that the OWNER has the right to delete items of Work or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: Signature Date Title License Number (If Applicable) (Seal - if Bid is by corporation) Attest Address Telephone Section 00310 Page 3 SECTION 00320 QUANTITY SCHEDULE Project: Date: Item Number Poudre High School Parking Lot Pavement Project February 2013 Phase 1 Quantity Schedule Description Measurement Unit Estimated Quantity LS (NA) LS (NA) LS (NA) SF SF LF LF SF SF SF SF ------- --- 1 2 3 4 5 6 7 8 9 10 11 Mobilization Traffic Control Surveying Remove Concrete Remove Asphalt Pavement New Vertical Curb & Gutter (18" Outfall) New Vertical Curb & Gutter (30" Infall) New Concrete Drain Pan New Concrete Sidewalk New Concrete Flatwork (6" Thick) New Concrete Flatwork (8" Thick) 12 13 14 New Curb Access Ramp Pipe Bollards (6" Dia.) Security Camera Pole Base (1 Total) NA EA EA 15 Aggregate Base Course TON 16 17 18 19 20 21 Hot Bituminous Pavement - Grade S and SX (incl. Striping) Fly Ash Stabilization Fence (6' Chain Link) Signage BMP Inlet Filters Silt Fence TON SY NA LS (NA) EA NA ------- Section 00320 Page 1 SECTION 00320 QUANTITY SCHEDULE Project: Date: Item Number Poudre High School Parking Lot Pavement Project February 2013 Phase 2 Quantity Schedule Description Measurement Unit Estimated Quantity LS (NA) LS (NA) LS (NA) SF SF LF LF SF SF SF NA ------- ------- 1 2 3 4 5 6 7 8 9 10 11 Mobilization Traffic Control Surveying Remove Concrete Remove Asphalt Pavement New Vertical Curb & Gutter (18" Outfall) New Vertical Curb & Gutter (30" Infall) New Concrete Drain Pan New Concrete Sidewalk New Concrete Flatwork (6" Thick) New Concrete Flatwork (8" Thick) 12 13 14 New Curb Access Ramp Pipe Bollards (6" Dia.) Security Camera Pole Base (1 Total) NA NA NA 15 Aggregate Base Course TON 16 17 18 19 20 21 Hot Bituminous Pavement - Grade S and SX (incl. Striping) Fly Ash Stabilization Fence (6' Chain Link) Signage BMP Inlet Filters Silt Fence --- TON SY NA LS (NA) EA NA ------- Section 00320 Page 2 SECTION 00320 QUANTITY SCHEDULE Project: Date: Item Number Poudre High School Parking Lot Pavement Project February 2013 Phase 3 Quantity Schedule Description Measurement Unit Estimated Quantity LS (NA) LS (NA) LS (NA) SF SF LF LF SF SF SF SF ------- 1 2 3 4 5 6 7 8 9 10 11 Mobilization Traffic Control Surveying Remove Concrete Remove Asphalt Pavement New Vertical Curb & Gutter (18" Outfall) New Vertical Curb & Gutter (30" Infall) New Concrete Drain Pan New Concrete Sidewalk New Concrete Flatwork (6" Thick) New Concrete Flatwork (8" Thick) 12 13 14 New Curb Access Ramp Pipe Bollards (6" Dia.) Security Camera Pole Base (1 Total) SF EA NA 15 Aggregate Base Course TON 16 17 18 19 20 21 Hot Bituminous Pavement - Grade S and SX (incl. Striping) Fly Ash Stabilization Fence (6' Chain Link) Signage BMP Inlet Filters Silt Fence --- TON SY LF LS (NA) EA LF --- Section 00320 Page 3