GKN Aerospace - St. Louis Supplier Quality Assurance Manual This manual contains requirements that are applicable when invoked by GKN Aerospace – St. Louis Purchase Orders. Use of this manual is required for Contract Review and Quality Planning Activities. Revision date: 25 February 2014 Section 1 - Introduction 1.1 Section 1: Introduction Table of Contents 5 1.1 Table of Contents 5 1.2 Mission Statement 9 1.3 Introduction to the Supplier Quality Assurance Manual 10 1.4 Goal of the GKN-STL Supplier Quality Assurance Manual 11 1.5 Anticipated Benefits GKN-STL Supplier Quality Assurance Manual 1.6 How to Use the Supplier Quality Assurance Manual 13 Section 2: Initial Approval of Direct Material Sources 2.1 Initial Approval of Sources 12 14 14 Search Function 13 Overview 14 Minimum Requirements for Inclusion on the GKN-St. Louis ASL 14 AS/ISO Registration 14 Compliance with AS 9003 Requirements 15 NADCAP Certification – Outside Processors Only 15 A Pre-existing Customer/Supplier Relationship 15 Customer-Directed Sources 15 Additional Suppliers “Approved” Only As Needed Maintenance of “Approved Supplier” Status Definitions and Links 15 15 18 5 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 3: Initial Production Part/Material Approval 3.1 Quality Requirements 19 19 Overview 19 Identifying Applicable Quality Requirements (QRs) Integration of QRs into Production Processes Process Flow Chart 20 21 3.2 First Article Inspection Requirements Definitions and Links 19 23 22 Overview 23 Development of First Article Inspection Report Data 23 Submission of First Article Inspection Report & Associated Part 23 GKN Review and Approval of Individual Part First Article Submissions 24 GKN Review and Validation of Supplier First Article “Processes” 24 Process Flow Chart 25 Definitions and Links 26 Section 4: On-going Formal Communications 4.1 Supplier Requests For Specification Deviation Or Change 27 27 Overview 27 Temporary Specification Deviations 27 Permanent Specification Changes 28 Process Flow Chart 29 Process Flow Chart 30 4.2 Supplier Process Change Approvals 32 Definitions and Links 31 Overview 32 Initiation of Requests for Manufacturing Process Changes 32 6 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Production Shipment Approval for Authorized Process Changes 32 Process Flow Charts 33 4.3 Nonconformance Reporting 35 Definitions and Links 34 Overview 35 Recording & Reporting of Supplier-responsible Nonconformances Supplier Responsibilities upon Notification 35 36 Supplier-responsible Nonconformance Cost Recovery 36 Post-Delivery Notification from Supplier to GKN 36 Process Flow Charts 37 4.4 Supplier Corrective Action Requests Definitions and Links 39 38 Overview 39 Initiation of a Supplier Corrective Action Request 39 Supplier Corrective Action Request Response Development 39 Supplier Corrective Action Request Implementation & Closure 40 Probationary Status & CAST Process Flow Charts 42 4.5 Supplier Performance Rating Definitions and Links 41 44 43 Overview 44 Supplier Appeal Process 47 Process Flow Charts 48 Definitions and Links 49 7 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 5: Continuous Improvement 5.1 On-site Supplier Assessments 50 50 Overview 50 Scheduling of On-site Assessments 50 Supplier Preparation for an On-site Assessment 51 The Opening Meeting 51 Conducting the On-site Assessment The Closing Meeting 51 51 Improvement Plan Review & Follow-Up 52 Process Flow Charts 53 5.2 Supplier Process Assessments (SPAs) Definitions and Links 55 54 Overview 55 Initial Data Search & Review 55 Coordination & Scheduling of SPAs with Suppliers Conducting the SPA SPA “Out Brief” 55 56 56 Corrective Actions Based on SPA Findings Process Flow Chart 57 Definitions and Links 59 56 5.3 Consultation, Action, Selection and Termination Process Flow Chart 60 59 Overview 60 CAST Process Steps 60 Step 1 - Consultation Meeting Step 2 - Action Meeting 60 61 Step 3 - Decision Meeting 61 Process Flow Charts 62 8 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 1.2 Mission Statement It is the responsibility of the GKN Aerospace - St. Louis Supply Chain function to establish and develop a base of suppliers with the demonstrated capabilities to consistently supply parts, raw materials and processing services that meet all specified requirements while minimizing total procurement-related costs. The cornerstone of this effort will be the collective requirements and processes described within this GKN Aerospace - St. Louis Supplier Quality Assurance Manual. Principal strategies essential to the achievement of this mission are as follows: • Source qualification based on compliance with established criteria. • Utilization of this Supplier Quality Assurance Manual as a tool for communicating GKN-St. Louis expectations and for guiding supplier quality system development efforts in accordance with AS9003. • Facilitation of effective corrective/preventive actions in concert with suppliers to ensure root cause solutions to purchased part/material concerns identified by GKN-St. Louis and/or its customers. • Performance monitoring and feedback to facilitate supplier improvement and as a basis for GKN-St. Louis source selection decisions. 9 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 1.3 Introduction to the Supplier Quality Assurance Manual In supplying goods and services to its customers, GKN Aerospace- St. Louis acknowledges its important obligation to assure compliance with all specified requirements. Likewise, GKN Aerospace - St. Louis requires its suppliers to accept full responsibility for the quality of the goods and services they provide. In order to fulfill this obligation, it is necessary that GKN suppliers develop, implement, and maintain management procedures and related controls that will provide evidence that they are capable of executing contractual responsibilities to the satisfaction of GKN. It is also required that all GKN suppliers of direct parts/materials and processing services develop and maintain a plan of the overall organization defining the responsibility and authority for the Assurance of Quality in the form of a Quality Manual or similar document which at minimum encompasses those requirements outlined within AS 9003 – Inspection & Test Quality System. Guidance for the development of this Quality Management Systems Manual may be found in ISO 10013. This Supplier Quality Assurance Manual contains prescribed methods for interaction between GKN Aerospace - St. Louis and its suppliers. These methods are to be adhered to at all times in order to further ensure the conformance of products and services to specified requirements. This document is a contractual obligation of the supplier, when invoked in whole or in part by a GKN Aerospace - St. Louis purchase order. 10 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 1.4 Goal of the GKN-STL Supplier Quality Assurance Manual GKN Aerospace - St Louis is proud of its heritage as a producer of high performance structures to the aerospace industry. Maintaining and enhancing this reputation demands a total commitment to continuous quality improvement and product performance. In order to achieve these objectives, GKN expects no less than this same level of commitment to product/service excellence and continuous quality improvement from its suppliers. In order to satisfy its customers and effectively compete in worldwide markets, GKN must continue to aggressively minimize the occurrences of nonconforming products/services and their related costs. Toward this end, GKN recognizes that Quality and Continuous Improvement can only be managed effectively when customers and suppliers share a partnership based on common objectives and effective communication. It is the hope of GKN Aerospace - St. Louis that the systems, tools, and expectations described within this manual will define these objectives and foster the communication necessary to build such partnerships with its suppliers. 11 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 1.5 Anticipated Benefits GKN-St. Louis Supplier Quality Assurance Manual • Minimization of supplied nonconformances and their related costs. • Enhanced customer satisfaction through consistent and cost-effective conformance to requirements leading to optimal value for GKN and its customers. • Implementation of efficient and effective problem reporting and resolution methods. • Rapid and open communication between GKN it suppliers through the use of defined systems, tools, resources and contacts for routine qualityrelated business practices. 12 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 1.6 How to Use the Supplier Quality Assurance Manual Table of Contents The Table of Contents links the user to the topics in the text. Click on the topic to go to the desired text. Search Function This Supplier Quality Assurance Manual is a Microsoft WORD® document. Use the Edit/Find functionality within WORD® to locate various terms within the Manual. 13 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 2 - Initial Approval of Direct Material Sources 2.1 Initial Approval of Sources Overview GKN Aerospace - St. Louis maintains an Approved Supplier List (ASL) as a basis for identifying those direct part/material and processing suppliers who meet the minimum standards necessary to fulfill its procurement needs. In order to be considered eligible for the GKN Aerospace - St. Louis Approved Supplier List (ASL), prospective new suppliers must meet at least one of the following criteria: Site registration to AS 9100, ISO 9000:2000 Compliance with AS 9003: Inspection & Test Quality System Site certification to NADCAP (Processors only) Demonstration of a pre-existing supplier relationship with GKN Directed for use by a GKN customer Purchases of direct parts/materials and outside processing services may be made only from those suppliers on the Approved Supplier List (ASL). Once added to the ASL, the supplier must continue to demonstrate an acceptable level of performance in order to remain eligible for new business and to maintain their approved status. Minimum Requirements for Inclusion on the GKN-St. Louis ASL In order to be considered eligible for the GKN Aerospace - St. Louis Approved Supplier List (ASL), prospective new suppliers must meet at least one of the following criteria: AS9100 / ISO Registration Prospective suppliers of direct parts/materials or outside processing services that can substantiate a current site registration to AS9100 or ISO 9000:2000 through an accredited Registrar will be considered eligible for addition to the GKN Aerospace - St. Louis ASL. 14 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Compliance with AS 9003 Requirements Prospective suppliers of direct parts/materials or outside processing services that can substantiate compliance with all quality system requirements outlined within AS 9003 Inspection & Test Quality System will be considered eligible for addition to the GKN Aerospace - St. Louis ASL. In order to substantiate compliance, prospective suppliers are required to complete a GKN-STL Supplier Self-Assessment including references to their quality system documentation that supports each required element. Suppliers who fail to meet the requirements outlined above may be offered the opportunity to improve or develop their systems and resubmit their self-assessment at a later time. When warranted, GKN Aerospace - St. Louis may elect to conduct a GKN-STL On-site Supplier Assessment prior to addition to the ASL. NADCAP Certification – Outside Processors Only Prospective suppliers of processing services who can substantiate a current site accreditation to NADCAP (National Aerospace and Defense Contractors Accreditation Program) requirements will be considered eligible for addition to the - ASL. Such suppliers will be required to provide a completed GKN-Aerospace – St. Louis Supplier Self-Assessment for informational purposes. A Pre-existing Customer/Supplier Relationship Suppliers who provide direct parts/materials and/or outside processing services to an existing business venture at the time of a transition to GKN Aerospace - St. Louis will be added to the Approved Supplier List (ASL). Suppliers will be required to complete a GKN-STL Supplier Self-Assessment for informational purposes. Customer-Directed Sources Suppliers of direct parts/materials and/or outside processing services who are directed for use by one or more GKN customers will be added to the Approved Supplier List (ASL). Customer-directed sources are also required to complete a GKN-STL Supplier Self-Assessment for informational purposes. Additional Suppliers “Approved” Only As Needed When there is a need to add a supplier to its ASL, GKN Aerospace - St. Louis Procurement personnel will contact the supplier and invite them to substantiate their eligibility. GKN Supplier Quality Engineering and/or Procurement Management will review the supplier’s eligibility and add the supplier to the ASL only upon verification of compliance with one or more of the criteria outlined above. Suppliers will be added to the ASL only when a specific sourcing need has been identified. Maintenance of “Approved Supplier” Status 15 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Purchases of direct parts/materials and outside processing services affecting product quality may be made only from those suppliers on the Approved Supplier List (ASL). Once added to the ASL, the supplier must continue to demonstrate an acceptable level of performance in order to maintain their eligibility for new business and their approved status. GKN Supplier Quality Engineering and Procurement Management monitor suppliers’ performance on a monthly basis. Suppliers who demonstrate continued unsatisfactory performance are subject to formal Supplier Corrective Action Requests (SCAR’s) and/or other more extensive remedial action. In those cases where supplier performance does not respond to this remedial action, suppliers may be removed from the ASL. 16 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. GKN Aerospace - St. Louis Supplier Approval & Selection Process Flow Chart GKN IDENTIFIES A NEED FOR A SUPPLIER GKN REVIEWS ASL FOR AN APPROVED SUPPLIER SUPPLIER FOUND? YES SUPPLIER SELECTED NO SEARCH FOR NEW SUPPLIER POTENTIAL SUPPLIER IDENTIFIED NO SUPPLIER MEETS ASL CRITERIA? YES SUPPLIER ADDED TO GKN ASL 17 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links GKN-STL Supplier Self-Assessment A formal documented evaluation of the supplier’s quality system in order to verify compliance with minimum requirements (ref. AS9003) for inclusion on the GKN Approved Supplier List (ASL). GKN-STL On-Site Supplier Assessment An on-site review of a supplier’s processes, systems, and capabilities as conducted by GKN personnel. Supplier Corrective Action Request (SCAR) A request to a supplier for formal documented corrective and preventive action in response to a nonconformance or performance concern. Supplier Performance Ratings – the GKN Aerospace - St. Louis quantified measure of supplier performance. Supplier Performance Ratings Approved Supplier List – a list of those direct part/material and processing sources deemed capable of supporting GKN-St. Louis procurement needs. ASL 18 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 3 - Initial Production Part/Material Approval 3.1 Quality Requirements Overview GKN Aerospace - St. Louis purchase orders for direct parts/materials and outside processing services will include a number of clauses relating to specific quality assurance requirements. Applicable QR clauses are assigned on a part number basis and are identified on GKN purchase orders by their unique alphanumeric identifiers (QC2098 = First Article in accordance with AS9102, e.g.). In order to view the complete text of QR’s applicable to their individual purchase orders, Suppliers are required to access the following web site: http://www.gkn.com/aerospace/supplier-info/st-louis/Pages/Quality-Information.aspx GKN Buyers will assist Suppliers in gaining the necessary access to this site for purposes of reviewing Quality Requirements. Identifying Applicable Quality Requirements (QR’s) In addition to identifying the applicable technical requirements as specified within engineering drawings/blueprints, material and processing specifications, etc., GKN Aerospace - St. Louis purchase orders will contain a number of additional Quality Requirement (QR) clauses. QR’s encompass a broad range of additionally imposed contractual requirements, including but not limited to: • Critical Part/Material Traceability and/or Serialization Requirements • GKN Right of Entry for review of Products/Processes/Systems • Record Retention Requirements • Special Restrictions on the Use of Qualified Sources • Special Control and Disposition of Nonconforming Materials • Program or Customer-specific Quality System Requirements The Quality Requirements selected for individual purchase orders will vary based upon a number of factors including the criticality of the procured part/material and the needs of individual programs and GKN customers. Applicable QR clauses are assigned on a part number basis and are identified on GKN purchase orders by their unique alphanumeric identifiers (QC2098 = First Article in accordance with AS9102, e.g.). In order to view the complete text of QR’s applicable to their individual purchase orders Suppliers are required to access the following GKN Virtual Community web site: GKN Virtual Community GKN Buyers will assist Suppliers in gaining the necessary access to this site for purposes of reviewing Quality Requirements. 19 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Integration of QR’s into Production Processes Suppliers are expected to review all applicable QR's as a part of their Contract Review and Quality Planning processes. Requirements imposed by QR’s should be integrated into the Supplier’s Quality Systems and/or productspecific planning and related controls to ensure consistent compliance for all parts/materials supplied. Certificates of Conformance supplied to GKN indicating compliance with all purchase order requirements should take into account and reflect compliance with all applicable QR's listed on the GKN purchase order. 20 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Chart Compliance with applicable Quality Requirements (QRs) Supplier GKN START Identification of appropriate Quality Requirements (QRs) associated with individual parts/materials. Applicable QRs linked to GKN Purchase Order. GKN Purchase Order transmitted to Supplier by GKN Buyer. Contract Review initiated to identify all GKN purchase order requirements including QRs. P.O. Acceptance? NO STOP YES Planning developed to ensure compliance with all GKN purchase order requirements including QRs. Manufacture and/or Processing in accordance with all GKN purchase order requirements including QRs. Review and Confirmation of compliance with all GKN Purchase Order Requirements including QRs. Certificate of Conformance issued attesting to compliance with all P.O. requirements including QRs. Parts/Materials shipped to GKN. STOP 21 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links Quality Requirement – a defined special purchase order condition relative to quality assurance needs for procured direct parts/materials or processing services. QR GKN Virtual Community Web Site. http://www.gkn.com/aerospace/supplie r-info/st-louis/Pages/QualityInformation.aspx 22 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 3.2 First Article Inspection Requirements Overview GKN Aerospace - St. Louis requires its suppliers of direct production parts to employ a First Article Inspection process in accordance with AS9102. The purpose of this requirement is to develop objective evidence to support that all engineering design and specification requirements are properly understood, accounted for, and verified. A copy of the completed First Article Inspection Report and the sample part from which First Article data were obtained are to be provided to GKN Aerospace - St. Louis for its review and approval. GKN Quality Assurance personnel will review the First Article part and associated data for compliance to engineering requirements and for required content in accordance with AS9102. Suppliers will be notified in writing of the acceptance or rejection of their First Article Inspection Report submission through their GKN Buyer. Until formal GKN acceptance of the First Article is received, suppliers are not authorized to make on-going production shipments. Partial or complete re-accomplishment of the First Article Inspection for affected characteristics is required for changes in product design, any change in the supplier’s manufacturing process, or other events as prescribed within AS9102 Development of First Article Inspection Report Data Prior to shipment of production parts, GKN suppliers are required to conduct and submit for GKN review/approval a complete, independent, and documented physical and functional inspection to verify that prescribed production methods have produced an acceptable item in accordance with engineering drawings, planning, purchase order, engineering specifications, and/or other applicable design documents. These data are to be developed and documented in accordance with methods prescribed within AS9102 - Aerospace First Article Inspection Requirement (revision 2000-08). Suppliers are to utilize the forms associated with this standard where possible. Suppliers’ own equivalent forms may be used in place of those contained within AS9102, provided all content prescribed within AS9102 is included. Suppliers may acquire copies of AS9102 and the associated forms at the following web-site address: www.sae.org NOTE: This requirement applies to supplied castings & forgings but excludes supplied basic raw materials such as metallic plate/sheet, chemicals, fibers, fabrics, and outside processing services unless otherwise a part of approval processes administered by a GKN customer. Submission of First Article Inspection Report & Associated Part Suppliers are to coordinate the transmission of their First Article Inspection Reports and the associated part through their GKN Buyer. Packaging associated with such parts should be sufficient to prevent potential damage during shipment to GKN. To facilitate GKN identification and verification of First Article parts and data, suppliers are required to attach a GKN-STL Supplier First Article Label to applicable packaging in a manner that 23 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. conspicuously identifies the First Article part as such. On-going production shipments for such parts are not to proceed until authorization from their GKN Buyer indicating that their First Article has been successfully verified by GKN. NOTE: For critical and other select parts, GKN may elect to have the supplier withhold their First Article submission in order to allow GKN Supplier Quality Engineering to conduct a verification of the First Article part and data at the supplier’s production facility. Arrangements for this review will addressed by a specific Quality Requirement (QR) and be coordinated well in advance between GKN Supplier Quality Engineering and the supplier. GKN Review and Approval of Individual Part First Article Submissions GKN Quality Assurance personnel will review the First Article part and associated inspection report data for compliance to engineering requirements and for required content in accordance with AS9102. Suppliers will be notified of the acceptance or rejection of their First Article submission through their GKN Buyer. Until informed of the acceptance of their First Article by their GKN Buyer, suppliers are not authorized to make on-going production shipments. Rejected First Articles will require resubmission of complete or partial First Articles part and data. Partial or complete re-accomplishment of the First Article Inspection for affected characteristics is required for changes in product design, any change in the supplier’s manufacturing process, or other events as prescribed within AS9102 and this Supplier Quality Manual. GKN Review and Validation of Supplier First Article “Processes” Where appropriate GKN Supplier Quality Engineering may utilize specifically tailored Supplier Process Assessments (SPA’s) in order to validate the thoroughness and effectiveness of those processes developed and deployed by individual suppliers for purposes of generating and verifying their First Article documentation in accordance with AS9102. Those suppliers whose processes are successfully validated in this manner will still be required to transmit their First Article Reports along with the labeled parts from which the data were derived but will not be required to seek GKN First Article Verification approval for individual parts prior to commencing ongoing production shipments. 24 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Chart Supplier First Article Submission Supplier GKN START Acceptance of GKN P.O. requiring First Article Inspection Report development per AS9102. Supplier conducts and documents First Article per AS9102. GKN Supplier First Article Part Label affixed to applicable packaging. First Article Part and associated data shipped to GKN. Supplier's FA Process validated by GKN? NO GKN Buyer coordinates First Article Verification with BU Quality Business Unit Quality conducts First Article Verification. FA Verified successfully? YES YES NO Supplier notified of Part FA Verification Rejection by GKN Buyer. STOP Supplier notified of Part FA Verification Approval by GKN Buyer. Supplier commences on-going production shipments. STOP 25 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links First Article Inspection The development of objective evidence to support that all engineering design and specification requirements are properly understood, accounted for, and verified. AS9102 The SAE Aerospace Standard (AS) that establishes documentation requirements for the First Article Inspection. GKN-STL Supplier First Article Label A specific label used to facilitate GKN identification and verification of supplier First Article parts. First Article Verification A review of supplied parts and associated data to confirm compliance with AS9102 as conducted by GKN personnel. 26 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 4: On-going Formal Communications 4.1 Supplier Requests For Specification Deviation Or Change Overview Suppliers are not to ship parts or materials that violate engineering specifications or other contractual requirements without prior authorization from GKN Aerospace St. Louis. A deviation is a temporary modification to specifications as approved by the appropriate design authority. In the event that a temporary specification deviation is considered necessary, suppliers must submit a formal documented request to their GKN Buyer and obtain documented approval prior to shipment to GKN. If a permanent specification change is required, suppliers must also request and obtain formal documented approval through their GKN Buyer prior to shipment of such materials. Temporary Specification Deviations Temporary specification deviations are to be requested by Suppliers when there is a need for relief from engineering specifications for a limited number of parts/material or for a limited time. Suppliers should initiate specification deviation requests only after all efforts to meet GKN Aerospace - St. Louis purchase order requirements have been exhausted. Suppliers must withhold shipment of production parts/materials that do not meet contractual requirements pending receipt of an approved request for temporary specification deviation request that authorizes a “use as is” disposition. Suppliers may also ship parts based on alternate dispositions such as rework at supplier, rework at GKN, or ship to GKN for GKN Engineering analysis/review when documented within a GKN response. When a supplier determines that a temporary specification deviation request is necessary, they are to complete a GKN-STL Supplier Request for Specification Deviation/Change and transmit to their GKN Buyer. For deviations to the Material Issue Card (MIC) for raw/prepped material, the GKN Buyer forwards the GKN-STL Supplier Request for specification Deviation/Change Form to Manufacturing Engineering for review/approval. If Manufacturing Engineering determines that a finished part can be produced from the material without deviating from the engineering drawing/specification, then the Manufacturing Engineer shall approve the form and revise the original MIC. If the raw/prepped material will deviate from the engineering drawing/specification, GKN will need to submit a Request for Deviation to the customer and obtain approval. If the customer approves the deviation, then the Manufacturing Engineer shall approve the form and revise the original MIC. The supplier shall note the material size that is actually being shipped to GKN on their associated certification and shipper. For requests other than deviations to the MIC for raw/prepped material the GKN Buyer will review the GKN-STL Supplier Request for Specification Deviation/Change Form for completeness and link it to a GKN Nonconformance Tag for purposes of acquiring the necessary review by GKN Engineering and/or GKN customer engineering personnel. The supplier will receive notification of the request disposition from their GKN Buyer in the form of the copy of the approved or rejected request and the associated Nonconformance Tag. 27 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. To facilitate GKN identification of deviated parts/materials, suppliers are required to attach a GKN-STL Deviated Supplied Parts Cover Sheet to applicable packaging in a manner, which conspicuously identifies the parts/materials as such. Such labels are also required for nonconforming parts/materials dispositioned for rework at GKN, engineering analysis/review at GKN, or scrap at GKN. Supplier certificates of conformance must also note the applicable GKN Nonconformance Tag number. Suppliers are authorized to ship deviated materials only in accordance with the quantity or timeframe indicated on the approved deviation request. NOTE: Materials shipped in accordance with approved specification deviations will not be charged against Supplier Performance Rating. Permanent Specification Changes Permanent specification change requests are to be initiated only when the supplier has determined that established processes are not able to produce materials in compliance with existing engineering requirements and that necessary improvements to processes and/or appropriate control systems are believed to be prohibitive. Suppliers are to submit permanent specification change requests to their GKN Buyer using a GKN-STL Supplier Request for Specification Deviation/Change. The GKN Buyer will coordinate the review of the request by GKN Engineering and/or applicable GKN customers. The supplier will withhold shipment of production parts/materials pending receipt of the approved change request, the modified applicable engineering documentation from GKN and/or its customer, and an updated GKN purchase order where appropriate. 28 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Chart Requesting a Temporary Specification Deviation Supplier GKN START Supplier identifies need for temporary specification deviation. Supplier completes a "GKN Supplier Request for Temp. Deviation" and transmits to GKN Buyer. GKN Buyer links Request for Spec. Deviation to a Nonconformance Tag & routes for GKN Engineering review. END Yes "Scrap at Supplier" ? GKN Eng. conducts coordination internally at GKN & with customer as required. No "Rework at Supplier"? No Disposition (USE AS IS, SCRAP, REWORK AT GKN, REWORK AT SUPPLIER, ETC.) Yes documented on NC TAG by GKN ENG. Supplier carries out prescribed rework. "Use as Is" or "Rework at GKN" or "Scrap at GKN" ? GKN Buyer returns Request for Spec. Deviation & associated GKN Nonconformance Tag to Supplier. No Consult GKN SQE Yes Supplier attaches Deviation label(s) to subject parts/materials. Supplier includes GKN Nonconformance Tag number on certificate of conformance. Supplier ships deviated parts/materials to GKN. STOP 29 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Chart Requesting a Permanent Specification Change Supplier GKN START Supplier identifies need for permanent change in specified requirement. Supplier completes a "GKN Supplier Request for Specification Change" and transmits to GKN Buyer. GKN Buyer transmits request to GKN Engineering for review. GKN Business Unit Eng. review Approved Approved or Rejected? GKN Buyer returns approved Request to Supplier along with modified Engineering documentation. Supplier ships parts/ materials in accordance with modified GKN P.O. and approved change request.. Rejected Disposition for subject parts/ materials identified by GKN. GKN Buyer updates P.O. as necessary to incorporate modified Engineering documentation. STOP Supplier carries out disposition. GKN Buyer returns rejected Request to Supplier. 30 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links Temporary Specification Deviation A temporary modification to any specified product requirement (blueprint, specifications, etc.) as approved by the appropriate design authority. Deviations are typically bounded by a timeframe or quantity of parts/material. Permanent Specification Change A modification to any specified product requirement (blueprint, specification, etc.) as approved by the appropriate design authority which is unbounded by quantity or time. Nonconformance Tag An internal GKN tool used for documenting conditions that violate specified requirements. Supplier Request for Specification Deviation or Change A formal request for a temporary deviation or permanent change to a GKN-STL purchase order specification requirement. GKN-STL Deviated Supplied Parts Cover Sheet Label to be affixed by supplier in order to facilitate GKN identification of deviated parts/materials. Supplier Performance Ratings – the GKN Aerospace - St. Louis quantified measure of supplier performance. Supplier Performance Ratings 31 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.2 Supplier Process Change Approvals Overview Once an approved First Article Inspection Report and part have been provided to, and approved by GKN Aerospace - St. Louis, suppliers are not to make any changes to the process that produces the part (i.e. methods, materials, machinery, etc.) or the location at which the part is produced without prior written authorization from GKN. In the event that it becomes necessary or desirable to modify the process or location, suppliers are required to submit a GKN-STL Supplier Process Change Request to their GKN Buyer through the GKN Virtual Community web site or via fax. Any manufacture of parts from changed processes without prior GKN approval will be done so at the supplier’s risk. Suppliers are not authorized to ship parts from modified processes until they have: • Received documented authorization in the form of an approved GKN Supplier Process Change Request from their GKN buyer and, • Achieved applicable First Article process validation or part approvals as described in section 3.2 of this manual. Initiation of Requests for Manufacturing Process Changes In the event that a change to the established part process is desirable, suppliers are required to submit a GKN-STL Supplier Process Change Request to their GKN Buyer. Completion of this form will require the supplier to fully describe the nature and reasons for the proposed change including the benefit to be derived by GKN as a result of the proposed change. It will also require the supplier to fully describe how the change will be verified as producing materials in accordance with all specified requirements. Typically this will include a detailed description of a proposed partial or complete First Article Inspection in accordance with AS9102. The GKN Buyer will review the form for completeness and route it through GKN for the necessary internal review by GKN Supplier Quality Engineering and Business Unit Quality Assurance. Suppliers will receive notification of acceptance or rejection of the request from their GKN Buyer in the form of the approved or rejected request. Production Shipment Approval for Authorized Process Changes After a supplier has received the necessary approval to proceed with a proposed process changes, they may also be required to develop and transmit appropriate First Article data (and labeled part as appropriate) prior to commencing ongoing production shipments. This will enable the supplier and GKN to substantiate that the change has not had any substantial detrimental impact on the supplier’s ability to produce parts in accordance with all specified requirements. Any required First Article data and associated parts will be defined within the approved GKN-STL Supplier Process Change Request. 32 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts Requesting a Process Change Supplier GKN START Supplier identifies need for a change in a manufacturing process. Supplier completes a "GKN Supplier Process Change Request" and transmits to GKN Buyer. GKN Buyer transmits request to GKN SQE and Business Unit Quality Assurance for review. SQE and Business Unit Quality review. Approved or Rejected? Approved Supplier conducts entire or partial First Article per AS9102 where directed by GKN on change request. GKN Buyer returns approved Request to Supplier. Rejected GKN Buyer returns rejected Request to Supplier. Supplier transmits First Article data and subject parts to GKN Buyer. STOP GKN FA Approval? NO YES or Not Applicable Supplier commences shipments of parts/materials from modified process. STOP 33 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links Process Change Any change to the materials, methods, machinery, or location from that previously approved by GKN Aerospace - St. Louis. GKN-STL Supplier Process Change Request A form used to document a supplier’s request for implementation of a process change with respect to production of parts/materials to be supplied to GKN - St. Louis. First Article Inspection The development of objective evidence to support that all engineering design and specification requirements are properly understood, accounted for, and verified. AS9102 The SAE Aerospace Standard (AS) that establishes documentation requirements for First Article Inspection. 34 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.3 Nonconformance Reporting Overview Supplier-responsible nonconformances are defined as any violation of a specified contractual requirement imposed by a GKN Aerospace - St. Louis purchase order. Nonconforming parts/materials or related processing services will be recorded on GKN-STL Nonconformance Tag documents when encountered. Such documents will be developed as a result of supplier-responsible nonconformances encountered at any point in the value chain established between GKN and its customers. Copies of “Nonconformance Tags” will be transmitted to appropriate supplier personnel by their GKN Buyer via the GKN Virtual Community web site or fax. Upon notification, suppliers are required to undertake immediate containment actions to minimize further impact to GKN and its customers. Suppliers will also be expected to participate in discussions with their GKN Buyer regarding appropriate disposition options for nonconformances encountered as well as the future availability of replacement stock as required. Suppliers may request return of nonconforming parts/materials, at their expense, when they are not otherwise suitable for immediate use or rework by GKN. Alternately, Suppliers may examine nonconformances at GKN prior to final disposition in order to aid the development of timely and appropriate corrective/preventive actions provided arrangements are made in a timely manner. Recording & Reporting of Supplier-Responsible Nonconformances Supplier-responsible nonconformances are defined as any violation of a specified contractual requirement imposed by a GKN Aerospace - St. Louis purchase order. This includes technical engineering requirements defined on blueprints, specifications, etc. as well as requirements for Certificates of Conformance, quantified test results, use of appropriately qualified sources, special part/material identification requirements, or any other requirement imposed by GKN Quality Requirements (QR’s) applied to the subject purchase order. Nonconforming parts/materials or processing services will be recorded on GKN Aerospace - St. Louis “Nonconformance Tag” documents when encountered. Such documents will be developed as a result of supplierresponsible nonconformances encountered at any point in the value chain established between GKN and its customers. The GKN Buyer will transmit copies of GKN’s Quality Management Information System (QMIS) generated “Nonconformance Tags” to the applicable Suppliers. Nonconformances found by the supplier prior to delivery to GKN shall be documented on a Supplier Nonconformance Record (Form MI 7.4-16 (b)) using Attachment Form (MI 8.1-11 (e) or MI 8.1-11 (f)), as applicable. The GKN Buyer will consider processing such non-conformances, and if approved, will record the nonconformance into GKN’s QMIS and provide the system generated GKN Nonconformance Number and Nonconformance Tag to the supplier for inclusion on all documentation. The supplier is required to attach Form MI 7.4-16 (d) to applicable packaging in a manner which conspicuously identifies the parts/materials with the associated Nonconformance Tag. Supplier Certificates of Conformance must also note the applicable GKN Nonconformance Tag Number. A copy of GKN’s Nonconformance Tag must also be included within the documentation package. Suppliers are authorized to ship deviated materials only in accordance with the quantity or timeframe indicated on the approved Nonconformance Tag. 35 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Supplier Responsibilities upon Notification Suppliers are expected to immediately route GKN-STL Nonconformance Tag information internally to appropriate Operations and Quality personnel. Once notified, Suppliers are required to undertake immediate containment action to minimize or eliminate any further impact to GKN and its customers as a result of similar nonconformances, which may be in-process, in inventory, or in-transit. Suppliers will also be expected to participate in discussions with their GKN Buyer regarding appropriate disposition options for nonconformances encountered as well as the future availability of known-acceptable replacement stock as required. Suppliers may request return of nonconforming parts/materials, at their expense, when such parts/materials are not otherwise suitable for immediate use or rework by GKN. Alternately, Suppliers are encouraged to examine nonconformances at GKN prior to final disposition in order to aid the development of timely and appropriate corrective/preventive actions. Supplier-responsible Nonconformance Cost Recovery Suppliers are subject to charges for recovery of costs associated with any/all supplier-responsible nonconforming parts/materials in accordance with QR # QC1900. Such charges will at minimum include: • An administrative charge for each nonconformance document generated by GKN-STL, • A rework charge for each part requiring rework by GKN or GKN customer personnel, Part and/or material charges per P.O. or contract pricing for each part and/or material scrapped at GKN or its customer. Additional charges may also apply where parts or materials, as supplied by GKN and/or its customer, require scrapping at the supplier as a result of the supplier’s actions. • Additional charges may also apply where supplied parts/materials require extraordinary rework at GKN or its customer. Post-Delivery Notification from Supplier to GKN In the event that a supplier knows or suspects that it may have delivered nonconforming goods to GKN, they are required to promptly notify their GKN Buyer in writing. Such notifications should describe the affected part numbers, the specific nonconforming conditions, the quantities affected, applicable lot identification information, and the dates delivered to GKN. 36 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts Supplier-responsible Nonconformances Supplier GKN START Supplier-responsible Nonconformance encountered at GKN and/or its Customer. Nonconformance documented at GKN on "Nonconformance Tag" GKN Buyer transmits preliminary copy of Nonconformance Tag to applicable Supplier. Supplier initiates immediate containment actions and develops corrective/preventive measures. GKN Buyer and Supplier review availability of replacement stock and potential disposition options. Disposition determined and Nonconformance Tag completed. Copy of completed Nonconformance Tag transmitted to Supplier by GKN Buyer. Supplier debited for related expenses including, freight, material, rework, and adminstrative efforts. Formal Supplier Corrective Action initiated by GKN Supplier Quality Engineering. Supplier responds to Corrective Action Request within timeframe requested. STOP 37 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links Supplier-responsible Nonconformance Any violation of a specified contractual requirement imposed by a GKN Aerospace - St. Louis purchase order. Supplier Non-Conformance Record GKN template completed by the Supplier for submittal of Supplier Non-Conformances to GKN. Nonconformance Tag An internal GKN tool used for documenting conditions that violate specified requirements. Disposition Engineering determination of the appropriate further actions associated with nonconforming parts/materials. Typical options include Scrap, Rework, Use as Is, etc. Form MI 7.4-16 (d) GKN Nonconformance Tag and Instructions 38 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.4 Supplier Corrective Action Requests Overview GKN Aerospace - St. Louis requires its suppliers to employ a closed loop Corrective and Preventive Action methodology in order to address product, process, and Quality System nonconformances. GKN Supplier Quality Engineering initiates the Supplier Corrective Action Request process by documenting an observed nonconforming product, process, or Quality System condition on a formal Supplier Corrective Action Request and transmitting it to the responsible supplier. Each Supplier Corrective Action Request requires the supplier to utilize the following multi-step approach in order to successfully and permanently resolve the condition: (a) Description of the Problem or Nonconformance (b) Interim Containment Action (c) Root Cause Analysis (d) Permanent Corrective Action (e) Permanent Corrective Action Verification Plan (f) Controls to prevent recurrence (g) Preventive actions associated with similar products/processes/systems Suppliers are required to respond prior to the deadline noted on the request (typically no more than 7 calendar days from initiation) with a comprehensive action plan encompassing each of the above aspects. GKN Supplier Quality Engineering will review the supplier’s response for completeness and timeliness. Late and/or rejected responses will be documented and have an adverse impact on Supplier Performance Indicator Ratings. Suppliers who demonstrate a consistent inability to provide acceptable responses to Supplier Corrective Action Requests or within the deadlines established are subject to probationary status or CAST. Initiation of a Supplier Corrective Action Request GKN Supplier Quality Engineering initiates the Supplier Corrective Action process by documenting the nonconforming product, process, or Quality System condition on a formal GKN-STL Supplier Corrective Action Request Cover Sheet. Also included in the request is a detailed GKN-STL Supplier Corrective Action Response Form upon which the supplier is to document the various actions taken to resolve the concern. These documents are transmitted to the responsible supplier’s Quality Assurance Manager or other appropriate managerial representative through the GKN Virtual Community web site or fax. GKN Supplier Quality Engineering subsequently contacts the supplier to confirm receipt and to answer any questions they may have. Supplier Corrective Action Request Response Development 39 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Receipt of a GKN Aerospace - St. Louis Supplier Corrective Action Request is an important event. It is a formal notification that nonconforming supplied parts/material have created a significant unplanned disruption in the manufacturing operations of GKN and/or its customer. A Supplier Corrective Action Request should be given the highest priority within the supplier’s operations and thus requires the urgent and active participation of the supplier’s management team. Response development should begin immediately upon notification and include the identified actions, due dates, responsibilities and the resultant outcomes appropriate to each step in the process. Suppliers are required to respond to the requestor (GKN Supplier Quality Engineering) via the GKN Virtual Community web site or fax within the timeframe indicated using the GKN-STL Supplier Corrective Action Response Form provided. A step-by-step Supplier Corrective Action Guide is also available on the GKN Virtual Community web site. Suppliers are strongly encouraged to utilize this guide as it reflects the expectations that GKN has for acceptable content to Supplier Corrective Action Request responses. GKN Supplier Quality Engineering reviews the Supplier Corrective Action Request responses for completeness and timeliness upon receipt. The assigned GKN Supplier Quality Engineer will communicate the response acceptance or rejection and compliance with established response timing. Responses received after the response due date indicated are identified as late and will have a negative effect on the supplier’s Performance Indicator rating as described in section 4.5 of this manual. Extensions to the required due date may be granted by GKN Supplier Quality Engineering when warranted. Suppliers are cautioned, however, not to rely on due date extensions because they are granted only in rare circumstances. Responses, which do not fully address appropriate content for all sections on the response form are rejected and require supplier modification and resubmission. Such rejections will also have a negative effect on the supplier’s Performance Indicator rating. The due date for resubmission is established by the Supplier Quality Engineer on a case-by-case basis but is typically no longer than 2-3 business days from the date of the initial rejection. Suppliers who demonstrate a consistent inability to provide acceptable responses to Supplier Corrective Action Requests or within the response deadlines established are subject to Probationary Status and/or CAST. Supplier Corrective Action Request Implementation & Closure Upon notification that a Supplier Corrective Action Request response is acceptable, suppliers are expected to complete all actions within the timeframe indicated on the request. This is typically no more than 28 calendar days from the date of the request initiation. Information/data supporting the implementation and effectiveness of actions cited on Supplier Corrective Action Request responses must be provided to GKN Supplier Quality Engineering before a Supplier Corrective Action Request is successfully completed. Typical examples of evidence supporting the implementation and/or effectiveness of corrective/preventive actions include but are not limited to: modified procedures or work instructions, training records, inspection/test records, modified engineering planning, experimental data, and inspection results. Evidence supporting successful implementation and effectiveness should be transmitted via the GKN Virtual Community web site to the requesting Supplier Quality Engineer. Having developed and implemented an appropriate and comprehensive Supplier 40 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Corrective Action Request response, subsequent shipments of the subject part/material should then conform to all GKN Aerospace - St. Louis purchase order requirements. Suppliers will be notified by GKN Supplier Quality Engineering regarding the open/closed status of their assigned Supplier Corrective Action Requests. Probationary Status & CAST In those cases where suppliers demonstrate an inability to respond properly to Supplier Corrective Action Requests, such suppliers will be placed on Probationary Status and will thus be considered ineligible for new business opportunities unless otherwise directed by a GKN customer. Such suppliers will be removed from this probationary status and returned to full ASL Approval status 90 days after the successful completion of the applicable Supplier Corrective Action Request. Thresholds for Probationary Status are as follows: • or more rejected responses to the same Corrective Action Request. • Failure to provide an acceptable comprehensive response within 14 calendar days of the SCAR initiation date. Failure to provide appropriate evidence of successful implementation and/or effectiveness within 45 days of the SCAR initiation date. Suppliers who fail to address outstanding Corrective Action Requests after being placed on probation may be subject to CAST as described in section 5.3 of this manual. • 41 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts Supplier Corrective Action Requests Supplier GKN START Supplier-responsible Nonconformance encountered at GKN and/or its Customer. Nonconformance documented at GKN on "Nonconformance Tag" & transmtted to Supplier by GKN Buyer. Supplier initiates immediate containment actions and develops corrective/preventive measures. GKN SQE initiates Supplier Corrective Action Request (SCAR) via transmission of GKWI 5.11 (A) and 5.11 (B) to Supplier. Supplier develops comprehensive response encompassing containment, short and long term corrective actions, etc. and responds to GKN SQE prior to established deadline. GKN SQE reviews response for timeliness and completeness. NO Response Acceptable? Supplier implements defined actions in accordance with targeted schedule. YES Supplier transmits evidence to substantiate implementation & effectiveness to requesting GKN SQE. Supplier identifies 1st post-corrective action shipment with required label. GKN verifies effectiveness of Supplier's Corrective Actions on subsequent shipment. STOP 42 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links Actions planned and implemented to contain, correct, and prevent the causes of a product, process, or system nonconformance. Corrective & Preventive Action Supplier Corrective Action Request (SCAR) A request to a supplier for a formal documented corrective and preventive action in response to a nonconformance or performance concern. This forms describes the nonconformance condition encountered, defines required response and implementation dates and provides GKN contact information. GKN-STL Supplier Corrective Action Request Coversheet This form details the steps necessary for the supplier to respond to the Request for Corrective Action. GKN-STL Supplier Corrective Action Request Response Form 43 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.5 Supplier Performance Rating Overview GKN Aerospace - St. Louis monitors the performance of its direct part/material and processing suppliers on a monthly basis. When utilized Supplier Performance Rating measure a supplier’s demonstrated performance with respect to product delivery, product quality (percentage of supplied materials/services which meet all specified requirements) and the supplier’s responsiveness to formal Supplier Corrective Action Requests (quantity of late or rejected responses). These measures when weighted appropriately may be combined to achieve an overall measure of each supplier’s performance on a scale of 0-100. GKN Suppliers who do not maintain satisfactory Supplier Performance Rating scores will be required to provide formal documented corrective action plans and/or to participate in formal performance reviews at GKN. Where these remedial activities are unsuccessful, suppliers may be subject to CAST and eventual removal from the Approved Supplier List (ASL). Delivery Performance Calculation: 4.5.1.Delivery performance will be calculated on a monthly basis as follows, numbers in parenthesis are used in the sample calculations: 4.5.2.Traditional or Discreet Purchase Orders to be calculated as follows: 4.5.2.1. Total Due = Current + Arrears + Lag 150 + 15 + 5 = 170 4.5.2.2. On Time % = On Time / Total Due 145 / 170 = 85% 4.5.2.3. Total Received = Total quantity received in a calendar month 4.5.2.4. Current - Total open quantity on orders scheduled in the current month (150) 4.5.2.5. Arrears - Total undelivered quantity on orders due prior to current month (15) 4.5.2.6. Lag - Total quantity delivered against orders due prior to current month (5) 4.5.2.7. Future – Total quantity delivered against orders scheduled in later months (10) 4.5.2.8. On Time – Any quantity due within the month that is received 14 calendar days prior to or 7 calendar days after the scheduled delivery date (145) 4.5.2.9. The metric will be calculated 14 days after the month ends or the next business day if the 14th day is not a business in order to allow for the +7 delivery window. 4.5.3.Min/Max orders to be calculated as follows: 4.5.3.1. Total Due = The number of Opportunities in a month 4.5.3.2. On Time % = Sum of the In Range occurrences / Total Opportunities in period 44 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 37/55 = 67.3% 4.5.3.3. Opportunities – Count of part numbers currently rated and managed by this order method each Monday morning – (excludes parts with a metric effectivity date set in the future) (e.g. 10, 15, 15, 15) 4.5.3.4. In Range – when the inventory level for a part number is between the min and max level as shown in the web portal 4.5.3.5. On Time (Within Range) – Opportunities In Range on each (e.g. 5/10, 9/15, 8/15, 15/15 = 5+9+8+15 = 37) 4.5.4.Kanban or pull items to be calculated as follows: 4.5.4.1. Total Due = Current + Lag + Arrears 400 + 50 + 50 = 500 4.5.4.2. On Time % = On Time / Total Due 375 / 500 = 75% 4.5.4.3. Current – Count of signals sent to supplier in the current month(400) 4.5.4.4. Lag – Count of signals opened in prior months but satisfied in current month(50) 4.5.4.5. Arrears – Count of unsatisfied signals open from prior months(50) 4.5.4.6. On Time – Any signal satisfied in the current month that meets contractual obligations (e.g. St. Louis cut to size is 14 calendar days) (375) 4.5.5.If a supplier is managed by a combination of the above methods the following formula should be used to calculate the on time percentage: 4.5.6.Total On Time % = (On Time + On Time + On Time) / (Total Due + Total Due + Total Due) 4.5.6.1.1. 78% = (145 + 32 + 375) / (170 + 40 + 500) 4.6. Suppliers will be monitored on a monthly basis for quality rating. Suppliers will be categorized into sub groups depending on quality rating and product will be subject to incoming receiving inspection depending on the rating category and criteria set forth. Quality Performance will be calculated on a monthly basis in the following manner: 4.6.1.Only nonconformances found at GKN Receiving Inspection (RI Tag Type), GKN Stock or Work In Process (WIP) (EX Tag Type) and coded as the supplier’s responsibility will be counted in the supplier’s quality rating. Nonconformances initiated and submitted by the supplier (SP Tag Type) will not be counted within the supplier’s quality rating. 4.6.2.Item 2.11 will be calculated as follows: 4.6.2.1. % Acceptable = (Total Received - Total Rejected) / Total Received 4.6.2.2. Total Received - Total quantity received during the time period in question. 4.6.2.3. Total Rejected – Total quantity rejected by a GKN representative (Escapes). 4.6.2.4. Data shall be calculated and reported for the last month, last 3 months and 12 month rolling time period. 45 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.6.3.The SQE will evaluate all suppliers under the 98% for the 12 month rolling calculations and document if any additional actions are required. 4.7. Service and Support Performance will be calculated in the following manner: 4.7.1.Containment Corrective Action Request (CCAR) Responsiveness (as referenced in Item 2.12) will be calculated as follows: 4.7.1.1. Initial CAR Responsiveness = On Time CCAR Responses/ (CCAR Responses Due + CCAR Responses Past Due) 4.7.1.2. On Time CCAR Containment Responses – count of GKN initiated corrective action requests that are received or accepted by GKN within the site’s window of response time (e.g. St. Louis = 7 Days) 4.7.1.3. CCAR Responses Past Due – count of GKN initiated correction action requests that are open beyond the window described above. 4.7.1.4. CCAR Responses Due – count of GKN initiated corrective action requests that are due (as defined by the window above) during the time period in question. 4.7.2.Corrective Action Request (CAR) Responsiveness (as referenced in Item 2.13) will be calculated as follows: 4.7.2.1. CAR Responsiveness = On Time CAR Responses/ (CAR Responses Due + Car Responses Past Due) 4.7.2.2. On Time CAR Responses – count of GKN initiated corrective action requests that are received or accepted by GKN within the site’s window of response time (e.g. St. Louis = 7 Days) 4.7.2.3. CAR Responses Past Due – count of GKN initiated correction action requests that are open beyond the window described above. 4.7.2.4. CAR Responses Due – count of GKN initiated corrective action requests that are due (as defined by the window above) during the time period in question. 4.7.2.5. Service and Support ratings will be calculated as 5% each of the total performance rating. 4.8. Overall Supplier rating will be calculated as follows: 4.9. Total = (Delivery rating x 45%) + (Quality rating x 45%) + (Service and Support rating x 10%) 4.10. Threshold levels for supplier performance. 4.10.1. The Quality Performance Rating will be grouped into the following categories: 4.10.1.1. Gold: Equal to 100% 4.10.1.2. Silver: Greater than or equal to 99.8% and less than 100% 4.10.1.3. Bronze: Greater than or equal to 99.55% and less than 99.8% 4.10.1.4. Yellow: Greater than or equal to 98% and less than 99.55% 4.10.1.5. Red: Less than 98% 46 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 4.10.2. The Delivery Performance Rating will be grouped into the following categories: 4.10.2.1. Gold: Equal to 100% 4.10.2.2. Silver: Greater than or equal to 98% and less than 100% 4.10.2.3. Bronze: Greater than or equal to 96% and less than 88% 4.10.2.4. Yellow: Greater than or equal to 90% and less than 96% 4.10.2.5. Red: Less than 90% 4.10.3. The Overall Supplier Rating will be grouped into the following categories: 4.10.3.1. Gold: Quality and Delivery Performance equal to 100% 4.10.3.2. Silver: Quality greater than or equal to 99.8% and less than 100%. 4.10.3.2.1.1.1. Delivery greater than or equal to 98% and less than 100% 4.10.3.3. Bronze: Quality greater than or equal to 99.55% and less than 99.8% 4.10.3.3.1.1.1. Delivery greater than or equal to 96% and less than 88% 4.10.3.4. Yellow: Quality greater than or equal to 98% and less than 99.55% 4.10.3.4.1.1.1. Delivery greater than or equal to 90% and less than 96% 4.10.3.5. Red: Quality less than 98% 4.10.3.5.1.1.1. Delivery Less than 90% 4.10.4. Suppliers with an Overall Supplier Rating of Red for 3 consecutive months will be evaluated by Supply Quality Engineering and Supply Chain Management for appropriate actions. If the Supplier does not meet the Supplier Performance criteria, corrective action per MI 7.4-23 may apply and SCM may place the Supplier in CAST (Supplier Consultation, Action, Selection, and Termination) per MI 7.4-14 or remove the suppler from the ASL. Supplier Appeal Process Suppliers may submit a written appeal to the Purchasing Manager within 10 working days of receipt of their Supplier Performance Rating Scorecard. Purchasing and Supplier Quality Engineering Management will review the appeal and respond within an additional 10 working day period. 47 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts Supplier Performance Indicator Ratings (SPIs) Supplier GKN START GKN SQE compiles nonconformance and Suppier Corrective Action Response data for supplier on a monthly basis. GKN SQE calculates and publishes Supplier Performance Indicator Ratings (SPIs) internally within GKN. GKN Buyers transmit Supplier Performance Indicator Ratings to individual Suppliers. SPI > 90? YES Supplier eligible for New Business. NO Supplier ineligible for New Business. YES SPI > 80? Supplier ineligible for New Business and subject to formal Corrective Action or CAST. NO 48 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links CAST Consultation, Action, Selection, and Termination process used to address unsatisfactory supplier performance. SCAR Supplier Corrective Action Request – tool used for identifying and reporting supplier corrective actions in response to product, process, or system nonconformances/deficiencies. Supplier Performance Rating Supplier Performance Rating – the GKN Aerospace - St. Louis quantified measure of supplier performance. Supplier Performance Rating Scorecard Report detailing the performance rating for the supplier during each month. 49 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Section 5 Continuous Improvement 5.1 On-site Supplier Assessments Overview GKN Aerospace - St. Louis conducts periodic on-site assessments of its major suppliers. Such assessments encompass a broad range of supplier performance considerations including Quality, Operations, Delivery, Strategy, Capability, and Total Value. These assessments are conducted using the GKN-STL Onsite Supplier Assessment. A team of GKN personnel encompassing a variety of functional disciplines, including but not limited to Supplier Quality Engineering and Purchasing, typically conduct these on-site assessments. Areas identified by the assessment team as needing significant improvement will require suppliers to submit a formal action plan to GKN Supplier Quality Engineering detailing activities, responsibilities, and timing for achieving the targeted improvements. Scheduling of On-site Assessments GKN Aerospace - St. Louis conducts periodic on-site assessments of its major suppliers. Such assessments encompass a broad range of supplier performance considerations. These considerations are contained within 6 major assessment categories that include: Quality, Operations, Delivery, Strategy, Capability, and Total Value. The purpose of these assessments is to conduct a comprehensive evaluation of suppliers’ strengths and weaknesses and to provide direction regarding developmental needs and opportunities. GKN Supplier Quality Engineering will notify those suppliers it wishes to assess, in advance, and coordinate mutually agreeable dates and schedules for conducting on-site assessments. These schedules will include sufficient time for an Opening Meeting in order to review the planned activities, as well as a Closing Meeting to review the final assessment results. A team of GKN personnel encompassing a variety of functional disciplines including Supplier Quality Engineering and Procurement typically conducts on-site assessments. The duration for an on-site assessments varies depending on the size of the supplier’s facility, the scope of the work being undertaken for GKN, the number of GKN personnel participating, and other factors. It should be noted that on-site assessments include considerable time spent reviewing relevant manufacturing processes from receipt of raw materials through shipment of finished goods. For the majority of supplier locations, 2 full days is required to achieve a satisfactory review of all areas of interest. 50 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Supplier Preparation for an On-site Assessment Suppliers are expected to prepare for a GKN On-site Assessment. To prepare suppliers are encouraged to assess themselves with respect to each question contained within the on-site assessment form. In this manner, suppliers will be able to identify and document all meaningful evidence necessary to substantiate their true plant-wide performance relative to the established criteria. Documentation and operational evidence in support of performance should be organized to facilitate timely presentation and review by GKN personnel. The importance of preparation for the On-site Assessment cannot be over-stated. There is only a limited amount of time available to cover all the elements within the assessment. GKN personnel will not conclude compliance unless they are presented with substantiating evidence that criteria have been met. The Opening Meeting At the Opening Meeting, GKN and Supplier personnel will introduce themselves and review the final assessment schedule. Individual GKN Assessors and their Supplier counterparts will be paired according to the assignments outlined in the schedule. Finally, applicable safety precautions and any other site-specific considerations will be reviewed. Conducting the On-site Assessment The following supplier representatives, at minimum, should be available for the on-site assessment for the times and purposes noted below: • Operations Manager, Plant Manager, or General Manager to participate in both the Opening and Closing Meetings. • Site Quality Director or Quality Manager to participate in the entire process. Functional Managers of applicable areas such as Manufacturing, Engineering, and Purchasing will be available for consultation during the assessment and to address assessment topics related to their specific functional areas. The assessment will proceed on a section-by-section basis in accordance with the schedule established in advance. Applicable supplier personnel will be asked to provide evidence to GKN representatives in support of their compliance with established performance criteria detailed within the on-site assessment form. • The Closing Meeting Prior to the closing meeting, GKN personnel will seek a private office to quietly finalize the assessment scoring. Comments will be prepared for individual questions as required. At the closing meeting, GKN personnel will: • Summarize the results of the on-site assessment and identify areas that represent strengths/weaknesses. • Discuss the final percentage score from the assessment results and provide a copy of the final assessment report with scores and comments included. 51 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. • Discuss specific items that require Improvement Plans and the timing for submission of these plans (typically 30 days from date of closing meeting). Improvement Plans must be specific as to the activities being undertaken to resolve the performance issue, the individuals responsible for their completion, and the anticipated completion dates. Improvement Plan Review & Follow-Up Upon receipt of the supplier’s Improvement Plan, GKN Supplier Quality Engineering will review the plan and provide appropriate feedback. Improvement Plans that fail to appropriately address performance issues in a timely manner will require resubmission. GKN Supplier Quality Engineering will follow-up with suppliers to review the implementation of Improvement Plans. This follow-up will occur through subsequent on-site assessments and/or a specific request to the supplier to provide evidence to substantiate the successful implementation of targeted improvements. 52 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts GKN On-Site Supplier Assessments Supplier GKN START Supplier contacted by GKN Procurement & On-site Assessment date/schedule established. Supplier conducts self-assessment and conducts necessary preparation. Opening Meeting On-Site Assessment per established schedule Closing Meeting Identification of areas requiring improvement plans. Development and submission of improvement plans detailing actions, responsibilities, and targeted completion dates. Implementation of improvement plans. Request evidence to substantiate successful implementation of improvements and/or review on subsequent assessments. STOP 53 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links GKN On-Site Supplier Assessment An on-site review of a supplier’s business systems and capabilities as conducted by GKN personnel. Improvement Plan A detailed plan describing specific actions, responsibilities, and targeted completion dates associated with areas requiring significant improvement as identified through the on-site assessment. 54 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 5.2 Supplier Process Assessments (SPA’s) Overview GKN Aerospace - St. Louis conducts periodic detailed on-site examinations of the manufacturing processes, procedures, and controls used in the fabrication, assembly, inspection, and delivery of individual purchased parts/materials. Successful FAI is a prerequisite for such Supplier Process Assessments (SPA’s). The objective of such examinations is to help improve the supplier’s manufacturing and support processes and to achieve continuous improvement with respect to quality and related costs. Supplier Process Assessments entail comparisons of the supplier’s processes and controls against their internal procedures as well as contractual requirements inclusive of AS 9003. Nonconformances identified during SPA’s will require initiation of formal Supplier Corrective Action Requests in order to document the resolution. GKN will utilize SPA results as a basis for determining the amount and nature of additional supplier oversight required. Initial Data Search & Review Prior to conducting the SPA, GKN Supplier Quality Engineering will undertake a review of the following data: • Formal Corrective Action Requests issued against the supplier and/or parts / processes targeted for review. • GKN-STL Nonconformance Tags generated against the supplier and/or parts / process targeted for review. Customer escapes, i.e. nonconformances reported by GKN customers, against the parts/processes targeted for review. This information will be used as a basis for targeting specific areas of concern requiring more in-depth review and evaluation during the SPA. • Coordination & Scheduling of SPA’s with Suppliers SPA’s will be scheduled with suppliers in advance by GKN Supplier Quality Engineering in order to ensure that appropriate supplier personnel can actively participate and support the process assessment activities. Coordination will take place between supplier personnel and GKN Supplier Quality Engineering to ensure that subject parts/materials are in production at the time the SPA is conducted. Suppliers will be asked to provide a process flow chart in advance that depicts all process sequences, process inputs, process outputs, and applicable material, machines, methods, manpower, and measurements. Process Flow Charts should encompass receipt of raw materials through shipment of finished products. Upon review of the process flow chart, the full scope of the SPA will be 55 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. established. Supplier Quality Engineering will also clarify any questions the supplier may have regarding the SPA process at this time. Conducting the SPA The overall objective of the SPA is to help improve the supplier’s manufacturing and support processes and to achieve continuous improvement with respect to quality and related costs. To accomplish this, a comparison of the supplier’s processes and controls against their internal procedures as well as contractual requirements is conducted. Each part/process shall be evaluated using the GKN-STL Supplier Process Assessment Checklist. This checklist is based on the requirements outlined in AS 9003: Inspection & Test Quality System and incorporates those areas from this standard that most closely pertain to the production environment. This checklist may also be tailored to cover areas with unique or specific requirements. Particular consideration will be given to the following aspects of the subject part/material processes: • The completeness and accuracy of work instructions, • The adherence to specified work and inspection instructions, • The appropriateness and thoroughness of process controls and related data analysis, • The depth and breadth of operator knowledge and experience, effectiveness of Corrective Action efforts, • The application of preventive quality measures, and demonstrated continuous improvement SPA “Out Brief” At the conclusion of the SPA, the Supplier Quality Engineer will coordinate with the supplier to schedule sufficient time to conduct an out brief of the findings. SPA out briefs will cover the following topics: • The detailed results as documented on the SPA Checklist • Generalized Strengths and Weaknesses • Review of those areas requiring formal Corrective Action and associated timing. Corrective Actions Based on SPA Findings GKN Supplier Quality Engineering will initiation Supplier Corrective Action Requests for those nonconformances identified during SPA’s. Supplier responsibilities for response to these requests and subsequent substantiation of effective implementation will be the same as the same as those outlined within the Supplier Corrective Action Request section of this manual. 56 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Chart GKN Supplier Process Assessments (SPAs) Supplier GKN START Supplier Quality Engineering (SQE) conducts review of supplier performance data. SQE contacts Supplier to initiate Supplier Process Assessment (SPA). Supplier develops and submits Process Flow Chart to GKN SQE. Scope of SPA and final SPA schedule established. SPA Conducted on Schedule Date(s) for targeted parts/materials and processes. SPA Outbrief Conducted to review findings and establish areas requiring Corrective Action. Development and submission of Corrective Action plans detailing actions, responsibilities, and targeted completion dates. Implementation of Corrective Actions and submission of evidence to substantiate successful implementation. Review/Approval of supplied evidence. STOP 57 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Example Process Flow Chart Receive Router Raw Materials accepted per XXX. NC Machine per Router Tape No. XXX Form per Router Clean & Apply Primer per XXX Chemical Conversion Coat per XXX Clean & Penetrant Inspect per XXX Drill per Router REWORK per Repair STD. XXX SCRAP per XXX Part Mark/ Identify per XXX PASS Final Inspect per XXX? NO YES Package for Shipping per XXX 58 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links GKN-STL Supplier Process Assessment Checklist Periodic detailed on-site examination of the manufacturing processes, procedures, and controls used in the fabrication, assembly, inspection, and delivery of individual purchased parts/materials. Successful FAI is a prerequisite for such Supplier Process Assessments (SPA’s). Supplier Corrective Action Request (SCAR) A request to a supplier for a formal documented corrective and preventive action in response to a nonconformance, system, or performance concern. Process Flow Chart A depiction of all process sequences, process inputs, process outputs, and applicable materials, machines, methods, manpower, and measurements. Process Flow Charts should encompass receipt of raw materials through shipment of finished products. 59 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. 5.3 Consultation, Action, Selection and Termination Overview CAST is a process used by GKN Aerospace - St. Louis to address chronic and/or severe performance issues with approved suppliers. CAST is an acronym for Consultation, Action, Selection, and Termination. This acronym denotes the major steps in the process for rectifying supplier performance issues, and where necessary, for terminating business with such suppliers. Suppliers with an Overall Supplier Rating of Red for 3 consecutive months will be evaluated by Supply Quality Engineering and Supply Chain Management for appropriate actions. If the Supplier does not meet the Supplier Performance criteria, corrective action per may apply and Supply Chain Management may place the Supplier in CAST or remove the supplier from the ASL. Once a supplier is placed in CAST, the supplier is ineligible for new work for a period of 6 months. If a supplier is terminated as a result of CAST, the supplier will be removed from the ASL for a minimum of 12 months from the date of termination. A GKN-STL On-site Supplier Assessment is required before the supplier may be considered for ASL reinstatement. If a supplier is successful in resolving performance issues, the supplier is taken out of CAST and placed on probation for a period of 12 months. Any recurrence of the same issues during the supplier’s probationary period will result in the supplier being placed back in CAST. CAST Process Steps Step 1 - Consultation Meeting GKN Supplier Quality Engineering initiates the CAST process with suppliers after 3 consecutive delivery months of Supplier Performance Ratings below 80% or in the event of other particularly severe or chronic performance issues. When a decision is undertaken to initiate CAST, GKN Supplier Quality Engineering will complete a Supplier Corrective Action Request documenting the specific concerns targeted for resolution. The applicable Business Unit Purchasing Manager will then formally notify the supplier of their status in CAST using the CAST Letter with the Supplier Corrective Action Request included as an attachment. A Consultation Meeting is then scheduled at the Supplier’s facility. GKN Supplier Quality Engineering will chair and document the initial Consultation Meeting with the supplier. GKN attendees will include Sourcing and/or Purchasing Management, Supplier Quality Engineering Management and affected Business Unit Quality/Operations personnel. Required Supplier attendees include: the Supplier’s executive management, including but not limited to, senior leadership from the Operations and Quality functions. Agenda items for the Consultation Meeting include: Overview of the CAST Process Problem Identification 60 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Development of a Preliminary Action Plan Definition of Action Plan Deliverables At the outset of this meeting, the CAST process is reviewed in detail. After this the specific performance problems are reviewed and approved by both parties. Finally, a preliminary action plan and key deliverables are developed in preparation for the next phase of the CAST process. Step 2 - Action Meeting Two weeks after the initial CAST Meeting, GKN will schedule an Action Meeting with the supplier. The required attendees include those present at the initial Consultation Meeting. At the Action Meeting, the Supplier will be required to present a detailed Action Plan that includes the specific tasks, schedule, responsibilities, and deliverables identified as necessary for resolving the performance problem. GKN will instruct the Supplier on any necessary changes to the Action Plan and then set a date for the Selection Meeting. Step 3 - Decision Meeting GKN will convene this meeting at an appropriate interval to review the supplier’s performance and progress with respect to identified action plans and deliverables. Based upon the data presented, GKN will determine one of the following courses of action: • Supplier is to remain in CAST with continued monitoring of progress to the established Action Plan. • Supplier is removed from CAST based upon complete resolution of identified concerns but placed on probationary status for a subsequent 12- month period. GKN Sourcing will initiate Selection of a new supplier and Termination of the existing supplier based upon insufficient objective evidence of improvement. GKN Supplier Quality Engineering will document the results of this meeting. • If the decision is for the supplier to remain in CAST a date will be set for a subsequent Decision Meeting. If a decision is made to remove the supplier from CAST, GKN Purchasing Management will notify the supplier in writing. GKN Supplier Quality Engineering and Purchasing Management will then continue to monitor the supplier’s performance for an additional 12 months. At any time during this probationary period the Supplier Quality Engineering Manager or Purchasing Manager may recommend that the supplier be returned to CAST or terminated if sufficient evidence can be provided. If at the end of this 12- month probationary period the supplier has demonstrated the ability to sustain an acceptable level of performance they will have their probationary status removed and be returned to full ASL Approval status. If the supplier is to be terminated and removed from the Approved Supplier List, Purchasing Management will formally notify the supplier in writing. 61 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Process Flow Charts Performance Remediation through CAST Supplier GKN START SPI Ratings < 80 for 3 consecutive delivery months or other severe/chronic performance concerns. SQE Initiates CAST via a Supplier Corrective Action Request documenting the performance history. Business Unit Purchasing Manager formally notifies Supplier of CAST status via CAST Letter. Consultation Meeting convened to review performance history and establish preliminary action plans. Action Meeting convened to review Supplier's detailed Action Plan for achieving improved performance. Action Plan Implementation Supplier Performance Monitored Decision Meeting Convened Performance Improved ? NO Select new supplier and remove existing source from ASL YES Remove from CAST. Supplier in probationary status. Trending Positively Continue to monitor. Supplier retained in CAST 62 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use. Definitions and Links CAST Consultation, Action, Selection, and Termination. GKN Aerospace - St. Louis process for resolving significant supplier performance concerns. CAST Letter Formal document notifying the Supplier of the initial of CAST proceedings. GKN-STL On-Site Supplier Assessment An on-site review of a supplier’s processes, systems, and capabilities as conducted by GKN personnel. Supplier Corrective Action Request (SCAR) A request to a supplier for formal documented corrective and preventive action in response to a nonconformance or performance concern. Supplier Performance Ratings Supplier Performance Ratings – the GKN Aerospace - St. Louis quantified measure of supplier performance. Supplier Performance Ratings Scorecard Report detailing the Supplier Performance Rating for the supplier. This report combines the Supplier Quality Rating and the Supplier Responsiveness Rating. 63 of 63 GKN Document Control System contains the current version of this document. Uncontrolled when printed, verify before use.