Just Half of Data Center Capacities in Use % 100% % 1 2 2 90% 80% 13 % 3 3 8 7 13 70% 60% % 7 10 9 13 9 50% 16 40% 30% % 13 13 22 24 20% 12 10% or less 14 15 Not Sure 26 14 22 7 7 20 19 4 3 21 17 8 9 29 9 10 8 3 2 1 4 2 1 3 2 1 UPS capacity Cooling capacity Floor space* 7 2 2 5 Computing capacity Rack space On average, respondents in the 2013 Data Center Users’ Group survey, sponsored by Emerson Network Power, reported using 52% of their UPS capacity, 55% of cooling capacity and 60% of rack space, suggesting most organizations may be able to get more from their existing infrastructures. *(including allocated aisles and walkways) For more on the spring 2013 survey results, visit: EmersonNetworkPower.com/SpringDCUGSurvey Source: Spring 2013, Data Center Users' Group Survey Results Emerson, Emerson Network Power, and the Emerson Network Power logo are trademark or registered trademarks of Emerson Electric Co. or one of its affiliated companies. © 2013. Emerson Electric Co. Cost and expense analysis provided for illustration and estimation purposes only. Actual costs and expenses may vary based on various factors. Any and all other brands, product names, or trade names are the property of their respective owners.