QUICK SPEC STRUCTURAL CONCRETE & TRANSITE - UNISIL & UNISIL HS NOTE: The following “Quick Spec” is an abbreviated specification and is not meant to replace the detailed specification. Read the entire 3-Part CSI System Specification prior to starting the project. Method Spray, roller, or brush Requirements Moisture survey recommended. Roof must be clean, dry, and tight. Adhesion test required to ensure proper adhesion to substrate(s). Apply at 50°F (10°C) and rising with no rain or freezing temperatures in forecast for 24 hours. 1. 2. Application Instructions 3. 4. 5. 6. 7. Conduct moisture survey and remove/replace all wet areas. Repair or replace damaged or deteriorated sections with like materials, allowing cementitious products to cure properly. Repair membrane including seams, penetrations, flashings, curbs, and terminations with like materials. Power-wash roof. It is recommended to use United Cleaning Concentrate (UCC) to clean the roof. Allow the roof to completely dry. Treat all roof penetrations, drains, curbs, and scuppers. Treat any loose seams. Apply coating per the chart below: STRUCTURAL CONCRETE & TRANSITE UNISIL & UNISIL HS Coating 1st Coat 2nd Coat Unisil (solvent) 1.50 Unisil HS Product DFT* Limited Warranty Warranty Emerald Pledge Diamond Pledge 2.50 27 Yes Yes No 1.75 27 Yes Yes No 1.00 3.25 35 Yes Yes No 1.00 2.25 35 Yes Yes No 1.50 1.50 1.00 4.00 44 Yes Yes No 1.50 1.25 2.75 42 Yes Yes No 3rd Coat Coating Gal/Sq 1.00 1.00 0.75 Unisil (solvent) 1.25 1.00 Unisil HS 1.25 Unisil (solvent) Unisil HS 10 Year 15 Year 20 Year * Dry Film Thickness (DFT) uses the average % solids by volume between the two coatings, is rounded to nearest mil, and is theoretical. Actual DFT will vary dependent on substrate profile, application technique & waste factor).