e (5) Page 1 of 5 FOREST SERVICE HANDBOOK SANDY, OREGON FSH 2409.22 – TIMBER APPRAISAL CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA Mt. Hood Supplement No.: 2409.22-2001-1 Effective Date: May 11, 2001 Duration: Effective until superseded or removed Approved: GARY L. LARSEN Forest Supervisor Date Approved: 5/07/2001 Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. New Document(s): Superseded Document(s): (Last supplement was Mt. Hood Supplement No.62 June 1998) Chapter 2 e. (5) 415.55—1,---3 (MH Supp. No. 61 July 1995) 5 Pages 4 Pages Digest: e. (5) Updates Road Maintenance rates for timber sale appraisal. Converts rates from MBF - Mile to CCF - Mile. Increases those rates in by the average consumer index since 1995. MH SUPPLEMENT:2409.22-2001-1 EFFECTIVE DATE: 5/11/01 DURATION: Effective until superseded or removed e(5) Page 2 of 5 FSH 2409.22 - TIMBER APPRAISAL CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA e. Adjustment for Sale Characteristics. (5) Sale Operational Costs ROAD MAINTENANCE. Road Maintenance Cost Guide 1. Table I: Mandatory deposit and user maintained rates for timber haul includes: A. Recurrent traffic and non-traffic generated maintenance, ie. blading, spot subgrade repair, spot surface replacement, brushing, logging out, culvert–ditch maintenance, slough-slide removal, etc. B. Operational maintenance, ie. pavement markings, signs, traffic controls, etc. In addition to the above, mandatory deposit for timber haul includes: D. Chip seals, surface treatments, bridges, etc. E. Overhead - 29%. MAINTENANCE COST PER CCF MILE MAINTENANCE SURFACE RECREATION SHARE LEVEL TYPE LOW MEDIUM 2 NAT & AGG 0.16 ///// 2 AC & ST 0.35 ///// 3 NAT & AGG / / / / ///// 3 AC & ST //// 0.68 4 NAT & AGG / / / / ///// 4&5 AC & ST //// 0.79 Rd 46 AC //// 0.79 HIGH ///// ///// 0.53 0.52 0.82 0.58 //// MH SUPPLEMENT:2409.22-2001-1 EFFECTIVE DATE: 5/11/01 DURATION: Effective until superseded or removed e(5) Page 3 of 5 FSH 2409.22 - TIMBER APPRAISAL CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA 2. Table II: Rock haul. Same elements included for timber haul are included in the following Table. MAINTENANCE LEVEL 2 2 3 3 4 4 MAINTENANCE COST PER C.Y. MILE SURFACE RECREATION SHARE TYPE LOW MEDIUM NAT & AGG 0.14 ///// AC & ST 0.30 ///// NAT & AGG / / / / ///// AC & ST //// 0.59 NAT & AGG / / / / ///// AC & ST //// 0.79 HIGH ///// ///// 0.45 0.45 0.72 0.50 3. Table III: Rock haul and any other type of haul that can be measured by the ton. Same elements included for timber haul are included in the following table. MAINTENANCE COST PER TON MILE MAINTENANCE SURFACE RECREATION SHARE LEVEL TYPE LOW MEDIUM 2 NAT & AGG 0.10 ///// 2 AC & ST 0.22 ///// 3 NAT & AGG / / / / ///// 3 AC & ST //// 0.42 4 NAT & AGG / / / / ///// 4 AC & ST //// 0.48 HIGH ///// ///// 0.32 0.32 0.51 0.36 MH SUPPLEMENT:2409.22-2001-1 EFFECTIVE DATE: 5/11/01 DURATION: Effective until superseded or removed e(5) Page 4 of 5 FSH 2409.22 - TIMBER APPRAISAL CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA 4. Table IV: Water haul. Same elements included for timber haul are included in the following table. MAINTENANCE COST PER M GAL MILE MAINTENANCE SURFACE RECREATION SHARE LEVEL TYPE LOW MEDIUM 2 NAT & AGG 0.42 ///// 2 AC & ST 0.88 ///// 3 NAT & AGG / / / / ///// 3 AC & ST //// 1.67 4 NAT & AGG / / / / ///// 4 AC & ST //// 1.90 HIGH ///// ///// 1.30 1.30 2.04 1.44 5. All Maintenance Level 3, 4, 5, and Asphalt Cement and Surface Treatment Maintenance Level 2 are mandatory deposit. 6. All Native and Aggregate Maintenance Level 2 may be accomplished by the user or by cooperative deposits. 7. Dust abatement allowance - $1750.00 per lane-mile INSTRUCTIONS 1. Districts are responsible for furnishing the following information to the Tech Centers: a. Sale area map b. Timber Volume 2. Engineering Departments are responsible for furnishing the following information to the Districts: a. Road maintenance appraisal b. All appropriate “C” provisions MH SUPPLEMENT:2409.22-2001-1 EFFECTIVE DATE: 5/11/01 DURATION: Effective until superseded or removed e(5) Page 5 of 5 FSH 2409.22 - TIMBER APPRAISAL CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA 3. Recurrent Maintenance – Includes those activities which are anticipated to be needed on a continuing basis on all roads under Forest Service jurisdiction. Recurrent maintenance may be accomplished by the user or by cooperative deposits. 4. Subtract 29% from unit costs in Tables I thru IV for Purchaser performed maintenance. 5. Road maintenance rates listed are based on average road maintenance requirements, the Engineer has the latitude to adjust the rates if the situation warrants, such variation must be justified and documented in the appraisal.