FOREST SERVICE HANDBOOK SANDY, OREGON 2409.22-2010-1

advertisement
e (5)
Page 1 of 5
FOREST SERVICE HANDBOOK
SANDY, OREGON
FSH 2409.22 – TIMBER APPRAISAL
CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA
Mt. Hood Supplement No.: 2409.22-2010-1
Effective Date: October 18, 2010
Duration: Effective until superseded or removed
Approved: /s/ Kathryn J. Silverman for
GARY L. LARSEN
Forest Supervisor
Date Approved: October 14, 2010
Posting Instructions: Supplements are numbered consecutively by Handbook number and
calendar year. Post by document name. Remove entire document and replace with this
supplement. Retain this transmittal as the first page of this document.
New Document(s):
Superseded Document(s):
Chapter 2
e. (5)
Chapter 2
e. (5)
(MH Supp. No. 2001-1 May 2001)
5 Pages
5 Pages
Digest:
e. (5)
Updates Road Maintenance rates for timber sale appraisal. Based on Rd
Maintenance Commensurate Share spreadsheet program developed in
2004 and updated in Sept 2010. Adds a mandatory list of road segments
that make up the Forest coop pool.
MH SUPPLEMENT:2409.22-2010-1
EFFECTIVE DATE: October 18, 2010
DURATION: Effective until superseded or removed
e(5)
Page 2 of 5
FSH 2409.22 - TIMBER APPRAISAL
CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA
e. Adjustment for Sale Characteristics.
(5) Sale Operational Costs
ROAD MAINTENANCE.
Road Maintenance Cost Guide
1. Table I:
Mandatory deposit and user maintained rates for timber haul includes:
A. Recurrent traffic and non-traffic generated maintenance, i.e. blading,
spot subgrade repair, spot surface replacement, brushing, logging out,
culvert–ditch maintenance, slough-slide removal, etc.
B. Operational maintenance, i.e. pavement markings, signs, traffic controls,
etc.
In addition to the above, mandatory deposit for timber haul includes:
D. Chip seals, surface treatments, bridges, etc.
E. Overhead - 29%.
MAINTENANCE COST PER CCF MILE
MAINTENANCE
LEVEL
2
2
3
3
3
4&5
Rd 46
SURFACE
TYPE
NAT & AGG
AC & ST
AGG wo/SRR
AGG w/SRR
AC & ST
AC & ST
AC
RECREATION SHARE
LOW
MEDIUM
0.27
/////
0.41
/////
1.59
1.24
2.39
1.88
0.76
0.66
1.04
0.91
////
0.91
HIGH
/////
/////
/////
/////
/////
0.85
////
MH SUPPLEMENT:2409.22-2010-1
EFFECTIVE DATE: October 18, 2010
DURATION: Effective until superseded or removed
e(5)
Page 3 of 5
FSH 2409.22 - TIMBER APPRAISAL
CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA
Table II: Mandatory COOP Road Segments
Road #
13
18
42
42
43
44
46
48
57
57
63
Segment
Lost Lake to County
Segment
M.P. 17 – End of
County
Jct SH 26 – Jct 57
Jct 46 – Jct 57
All Segments
All Segments
All Segments
All Segments
Jct 46 – Jct 5810
Jct 5820 – Jct 42
Jct 46 – Jct 70
SADT
Rec. Class
260
High
250
Medium
420
High
Medium
Medium
Medium
High
High
Medium
High
Medium
100
110-175
420
300+
110-220
210
All other roads are Low Rec
2. Table III: Rock haul. Same elements included for timber haul are included in the following
table.
MAINTENANCE COST PER C.Y. MILE
MAINTENANCE
LEVEL
2
2
3
3
4
SURFACE
TYPE
NAT & AGG
AC & ST
NAT & AGG
AC & ST
AC & ST
RECREATION SHARE
LOW
MEDIUM
0.24
/////
0.35
/////
1.36
1.06
0.66
0.59
1.04
0.91
HIGH
/////
/////
/////
/////
0.85
MH SUPPLEMENT:2409.22-2010-1
EFFECTIVE DATE: October 18, 2010
DURATION: Effective until superseded or removed
e(5)
Page 4 of 5
FSH 2409.22 - TIMBER APPRAISAL
CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA
3. Table IV: Rock haul and any other type of haul that can be measured by the
ton. Same elements included for timber haul are included in the
following table.
MAINTENANCE COST PER TON MILE
MAINTENANCE
LEVEL
2
2
3
3
4
SURFACE
TYPE
NAT & AGG
AC & ST
NAT & AGG
AC & ST
AC & ST
RECREATION SHARE
LOW
MEDIUM
0.17
/////
0.26
/////
1.03
0.88
0.54
0.46
0.63
0.55
HIGH
/////
/////
/////
/////
0.52
4. Table V: Water haul. Same elements included for timber haul are included in the
following table.
MAINTENANCE COST PER M GAL MILE
MAINTENANCE
LEVEL
2
2
3
3
4
SURFACE
TYPE
NAT & AGG
AC & ST
NAT & AGG
AC & ST
AC & ST
RECREATION SHARE
LOW
MEDIUM
0.71
/////
1.04
/////
5.28
3.52
2.16
1.84
2.52
2.20
HIGH
/////
/////
/////
/////
2.08
5. All Maintenance Level 2, 3, 4, 5, with Asphalt Cement or Bituminous Surface Treatment
are mandatory deposit. See Mandatory Coop Table II.
6.
All Native and Aggregate Maintenance Level 2 or 3 may be accomplished by the
user or by cooperative deposits.
7.
Dust abatement allowance - $3500.00 per lane-mile
MH SUPPLEMENT:2409.22-2010-1
EFFECTIVE DATE: October 18, 2010
DURATION: Effective until superseded or removed
e(5)
Page 5 of 5
FSH 2409.22 - TIMBER APPRAISAL
CHAPTER 2 – DEVELOPMENT OF APPRAISAL DATA
INSTRUCTIONS
1. District Timber Departments are responsible for furnishing the following information to
Engineering Departments:
a.
b.
c.
d.
Sale area map
Timber Volume
Average Volume per log Truck
Costs per Round Trip Minute (RTM)
2. Engineering Departments are responsible for furnishing the following information
to the District Timber Departments:
a. Road maintenance appraisal
b. All appropriate “C” provisions
3. Recurrent Maintenance – Includes those activities which are anticipated to be needed
on a continuing basis on all roads under Forest Service jurisdiction. Recurrent maintenance
may be accomplished by the user or by cooperative deposits.
4. Subtract 29% from unit costs in Tables I, III, IV and V for Purchaser performed maintenance.
5. Road maintenance rates listed are based on average road maintenance requirements, the
Engineer has the latitude to adjust the rates if the situation warrants, such variation must be
justified and documented in the appraisal.