CHAPTER 20 – TRAFFIC MANAGEMENT
RRS Supplement No.: 7709.59-2010-2
Effective Date: July 1, 2010
Duration: This supplement is effective until superseded or removed.
Approved:
Scott D. Conroy
Forest Supervisor
Date Approved: June 16, 2010
Posting Instructions: (Paper copies of this supplement should be printed on green paper).
Supplements are numbered consecutively by Handbook number and calendar year. Post by
document; remove the entire document and replace it with this supplement. Retain this
transmittal as the first page(s) of this document. The last Forest supplement to this Handbook
was RRS-FSH 7709.59-2010-1 to FSH 7709.59, 20.42 dated July 1, 2010.
New Document
7709.59, 24.1
2 Pages
Superseded Document(s)
by Issuance Number and
Effective Date
None
0 Pages
Digest: Provides additional direction for submitting Road Use Permit Applications and
additional responsibilities for Ranger prepared permits.
RRS SUPPLEMENT FSH-7709.59-2010-2
EFFECTIVE DATE: July 1, 2010
DURATION: This supplement is effective until superseded or removed.
7709.59, 24.1
Page 2 of 2
FSH 7709.59 – ROAD SYSTEMS OPERATIONS AND MAINTENANCE HANDBOOK
CHAPTER 20 – TRAFFIC MANAGEMENT
24.1 – Road Use Permits
1. Require the proposed permittee to provide the Forest Service with the following
information:
c. Applicant shall attach a map of the road(s) to be used.
3. District Ranger will:
a. Work through the Road Manager to determine:
(1) Construction / reconstruction requirements and need for an Engineering
Representative.
(2) Bonding requirements.
(3) Maintenance requirements including deposits.
(4) Cost recovery.
(5) Termination date.
(6) Special requirements to comply with NEPA documents
(7) Road restrictions and signing.
(8) Completion of the permit in original form and two copies.
(9) Completion of all Bills for Collection.
b. Ensure payments for Federal Timber Cost Recovery and maintenance
deposits are received in advance of haul.