Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 1 of 10 FOREST SERVICE HANDBOOK BAKER CITY, OREGON 5409.17 – RIGHT-OF-WAY ACQUISITION HANDBOOK Wallowa-Whitman Supplement No. 5409.17-91-2 Effective 05/15/91 POSTING NOTICE. Supplements to this handbook are number consecutively. Check the last transmittal received for this title to see that the above supplement number is in sequence. If not, obtain intervening supplement(s) at once on Form 1100-6. Do not post this supplement until the missing one(s) is received and posted. After posting retain this transmittal until the next supplement to this title is received. Place it at the front of the title. Document Name No. of Sheets Superseded 63.3-64.2 Digest: Entire text is replaced except for ID’s. Subsequent supplements will be issued by document. /s/Charles L. Ernst for R.M. RICHMOND Forest Supervisor 0 New 10 Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 2 of 10 RIGHT-OF-WAY ACQUISITION HANDBOOK CHAPTER 60 – ROAD RIGHT-OF-WAY CONSTRUCTION AND USE AGREEMENTS The cost share work for the Wallowa-Whitman National Forest is to be accomplished by the Northeast Oregon Lands Zone, headquartered in Baker City, in consultation with each District. When the need for a Supplement to the Agreement is identified, the cost share critical path schedule on page 10 (Exhibit 2) will be completed jointly by the District, Engineering, and Zone staff responsible for the case. This critical path will set target dates for the crucial steps in the process and will be signed by the appropriate staff as itemized on the form. Cases can be completed in a timely and cost effective manner if communication is maintained between all involved personnel, and each step of the process is accomplished by the target dates as assigned. The outline which follows lists the steps and the responsible party in the Agreement and Supplemental preparation process. It provides additional details about the steps identified on the Critical Path. Essentially the same process will be followed for either Forest Service or Cooperator initiated projects. The process is intended as a guideline. It is recognized that some projects will have ramifications that will dictate other actions. For additional information on the Northeast Oregon Lands Zone and Forest responsibilities for right-of-way and cost share cases, refer to Wallowa-Whitman Forest Supplement 5400-91-2 in FSM 5400. Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 3 of 10 RIGHT-OF-WAY ACQUISITION HANDBOOK NORTHEAST OREGON LANDS ZONE ROAD RIGHT-OF-WAY CONSTRUCTION AND USE AGREEMENTS FSH 5409.17 Chapter 60 DR – District Ranger FS – Forest Supervisor/ Appropriate Staff ENG – Zone Engineering ZONE – Northeast Oregon Lands Zone COOP – Cooperator RESPONSIBILITY DR FS ENG ZONE COOP PROGRAM PLANNING AND ADMINISTRATION BUDGET DEVELOPMENT AND TRAINING X X X * X X * X Provide overall agreement and administration. * X Determine need for Supplement to Agreement * X Coordinate long term transportation plans. (Section 12 of the Agreement) X Inform cooperator, in writing, of any proposed construction or reconstruction within the Agreement Area. (Section 3 of the agreement). X Develop and administer maintenance plans on all agreement roads. (Section 9 and 12a-d of the Agreement) X Responsible Party * Provides consultation and technical assistance, as needed Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 4 of 10 RESPONSIBILITY DR FS ENG ZONE COOP X X X X X X Annually account for and document in writing the maintenance obligations of the two parties, including surface replacement obligations. (Section 11 of the Agreement) * Negotiates prolonged, on the ground problems. X Prepare and submit annual cost share accounting statements and reports. (Section 11 of the Agreement) X Request monies for acquisitions and grants annually. X Assess and provide for appropriate training of District and Forest personnel in the cost share process. X Prepares excess cost plan (FSM 5467.85C). * Schedule timber sales and assign collection rights to pay off excess costs (Make provisions for meeting FS share). * X Resolve damage disputes. PROJECT DEFINITION – PRE TRANSPORATION PLANNING X X X Indentify access needs as part of preliminary project transportation plan. X X X Analyze all alternative routes in terms of economics, whether long or short term access is needed, resource values, road densities, other impacts. X * X Select preliminary route. Notify cooperating party. Request written response, within thirty days, whether Cooperator will share in the proposed project or if they decline to share. The decision will dictate how to proceed. Use Exhibit 1, Cost Share Process – Selection Key, on the following page, to determine how to proceed. * X Responsible Party * Provides consultation and technical assistance, as needed Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 5 of 10 EXHIBIT 1 COST SHARE PROCESS – SELECTION KEY 1. Forest Service or Cooperator propose new construction within the Agreement Area boundary. Nonconstructing party agrees to share in the proposed construction. Process Cost Share Supplement - Skip to page 6 2. Cooperator or Forest Service proposes construction across their own lands. Nonconstructing part determines they do not wish to share in the proposed construction. No further coordination is necessary. Declining party internally documents decision not to share. 3. Cooperator proposes construction across NFS lands. Forest Service determines that they do not which to share. No agreement on an alternative location to meet the needs of both parties can be reached. Cooperator needs long term access and requests easement. Process Non-Cost Share Easement Grant – Skip to page 9. 4. Same scenario as #3 above, except Cooperator needs only short term access and does not request easement. Forest Service issues Temporary Cost Share Agreement Road Permit (Exhibit G of Agreement). NEPA requirements must be met for construction across NFS lands. 5. Forest Service proposes construction across cooperator lands. Cooperator declines to share. No agreement on alternative location to meet the needs of both parties can be reached. Cooperator grants Non Cost Share Easement (long term access) or Temporary Cost Share Agreement Road Permit (short term access) to Forest Service, per Section 13 of the Agreement. 6. Cooperator or Forest Service proposes to cost share and acquire an easement on an existing road (BUY-IN) across the other party’s lands. Process Cost Share Supplement – Skip to page 6. 7. Cooperator or Forest Service proposes reconstruction on previously shared road. Nonconstructing party determines they wish to share in the reconstruction. Process Cost Share Supplement – Skip to page 6. 8. Cooperator or Forest Service proposes reconstruction on a previously shared road. Nonconstructing party determines they do not wish to share in proposed work. a. Forest Service cannot proceed with reconstruction of a shared road without cooperator agreement to share (unilateral action) unless approved in writing by the Regional Forester. Contact Zone for assistance. b. If Cooperator proposes reconstruction of a previously shared road and the Forest Service determines they do not wish to share, consult with Zone on how to proceed. Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 6 of 10 RESPONSIBILITY DR FS ENG ZONE COOP FOREST SERVICE INITIATED PROPOSALS COOP INIT PROP I – PROCESS FOR A COST SHARE SUPPLEMENT DR FS ENG ZONE COOP X * X X X X Prepare Decision document for Ranger Signature. Address alternatives considered and rationale for selecting cost share alternative. X X Agree on target dates for accomplishment. Document agreement on Critical Path (Exhibit 1). Add case to Zone ROW workplan. X Agree on road standards and design criteria of the proposed construction or reconstruction to meet the long term resource management goals and transportation needs of both parties. Document agreement. Project will involve either rawland construction, buy-in of an existing road, or reconstruction of a previously shared road. If the project involves: a. Rawland Construction: X X X Locate preliminary route on the ground. X X X Notify cooperating party. Jointly inspect location. Adjust as necessary to meet needs of both parties. Document agreement. X X X X X X * Survey roads to the precision necessary to gather sufficient information to meet design criteria requirements. Collect necessary corner tie information to prepare plat. (See FSH 5409.17, R-6 Supp. No. 1, 63—1, for plat standards) b. Buy-in of Existing Road/No Reconstruction X Jointly inspect existing roads, agreeing on present day value of The road (See FSH 5409.17 section 66.12). X Gather necessary information to prepare plat (See FSH 5409.17, R-6 Supp. No. 1, 63—1, for plat standards for an existing road). X Responsible Party * Provides consultation and technical assistance, as needed. Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 7 of 10 RESPONSIBILITY DR FS ENG ZONE COOP FOREST SERVICE INITIATED PROPOSALS COOP INIT PROP I – PROCESS FOR A COST SHARE SUPPLEMENT DR FS ENG ZONE COOP c. Reconstruction of a Previously Shared Road X X X Agree on standards for the reconstruction. Determine what work is upgrade of existing standard and what is deferred maintenance. Share maintenance under Maintenance Agreement. Share work to upgrade the road under terms of the Supplement. X X Survey road as necessary to estimate quantities for reconstruction and to gather sufficient information to meet design criteria requirements only, since no easements will be exchanged. X * X Agree on specialist input necessary for resource protection and/or those required by law for actions on NFS lands. Specialists costs will be shared if their analysis is required by laws, Regulations, or Executive orders. (See FSH 5409.17, R-6 Supp. No. 3, 61.2.0—2) Any other specialist cost incurred in process can be shared if agreement is reached with cooperator. X * X Begin data collection for fact sheet – agree on road segmentation and tributary area. Tributary areas will be determined by actual and planned transportation system. * X Prepare base map to be used as Exhibit for Fact Sheet, showing segmentation and tributary area. Consult Zone for assistance in preparation of this Exhibit. X Design roads. Secure cooperator agreement. X Prepare cost estimates for each road segment (See FSH 5409.17 sections 64.3 and 66.12). Costs for construction or reconstruction will be estimated based on when the work will be completed. Use of R-6 Cost Guide is preferred method. Secure cooperator agreement and signature on Cost Estimates. X X * X X X * X Responsible Party * Provides consultation and technical assistance, as needed Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 8 of 10 RESPONSIBILITY DR FS ENG ZONE COOP FOREST SERVICE INITIATED PROPOSALS COOP INIT PROP I – PROCESS FOR A COST SHARE SUPPLEMENT DR FS ENG ZONE COOP X X X Complete collection of data for Fact Sheet, including agreed to estimates of light traffic, road history, tributary volumes, past and projected haul. Contact Zone for assistance in this data collection phase. Secure cooperator agreement on all data used for computing shares. X X Prepare Fact Sheet. X Review and sign Fact Sheet. Secure cooperator review and signature. X Complete and approve plats. X X Prepare Supplement and Easements. X X X Certify and Sign Supplement. If no easements are to be exchanged, project can proceed at this time. X * X Execute Easements. X X Record Deeds and order final title insurance policy. X X X X X X * Clear Title. Submit Title packet to RO for OGC approval. X X Approve Title. Project can proceed at this time. Accept, in writing, work by non-constructing party, following completion of the project. X Make notation on Statement of Account when letter of acceptance is received. * Assign and manage collection rights, as necessary. X Responsible Party * Provides consultation and technical assistance, as needed Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 9 of 10 RESPONSIBILITY II– PROCESS FOR GRANTING NON-COST SHARE EASEMENT DR FS ENG ZONE COOP X X X * Prepare Transportation Plan for Forest Engineer signature. Show general route to be constructed, rationale for Forest Service not needing or sharing in road, and selected alternative access on NFS lands crossed by the proposed road (if access needed). X X Agree on road location that adequately prevents undue damage to resources and values and does not unduly interfere with the planned or anticipated uses of adjacent NFS lands. (See Section 13 of Agreement) X Survey Road. (Consult Zone for standard) X Prepare Plat to standard. * Comply with NEPA requirements for construction across NFS lands. Cooperator may choose to complete necessary analysis (to our standards) if Forest Service timeframe for completion does not satisfy cooperator scheduling needs. X X * Prepare Decision Memo (or Decision Notice, as necessary) for Director of Lands signature. X Prepare Deed for Director of Lands signature. X Secure required signatures and Decision document and Deed. X X X Prepare Plans and Specifications, insuring that road is constructed to a standard adequate to prevent damage to adjacent NFS lands, for Forest Engineer signature. Record Deed. Insure compliance with Plans and Specifications during construction. X Responsible Party * Provides consultation and technical assistance, as needed Wallowa-Whitman Supplement 5409.17-91-2 Effective 05/15/91 63.3-64.2 Page 10 of 10 EXHIBIT 2 FISCAL YEAR ACTION PLAN AND PROGRESS RECORD (COST SHARE CASES) USDA – Forest Service National Forest District Case Assigned to 1. Road Number(s) 2. Cost Share Agreement and Supp Number 3. TS or Project Name and TS Appraisal or Contract Award Date PLND ACC PLND ACC PLND ACC PLDN ACC PLND ACC RESPONSIBILITY FOR ACCOMPLISHMENT DR SO LANDS ENG AONE OR EZ 4. Preliminary Transportation Plan: Notify Cooperator of Plan XX 5. Answer Given by Cooperator on Willingness to Share 6. Agree on Location, Standards, and Specs. etc. Who Does Work 7. Approved Transportation Plan & Completed RMO XX XX XX XX 8. Approved EA/DN 9. ROW Planning & Presurvey Prework Checklist Comp. 10. Order Preliminary Title Policy* 11. Survey Roads Secure Coop Agreement 12. Design Roads Secure Coop Agreement 13. Plans-in-Hand Review Secure Coop Agreement 14. Cost Estimate Prepared XX XX XX XX XX XX XX XX XX 15. Cost Estimate Approved 16. Compiled Data for Fact Sheet Complete/to Zone XX XX 17. Approved ROW Plat to Zone* 18. Negotiations Completed; Write Fact Sheet 19. Fact Sheet signed by All Parties 20. Write Supp (and Easements*) 21. Packet to Regional Office for Certification Signed by RF 22. Supp (&Ease.*) Signed by Cooperators 23. Record Deed; Order Final Title Ins 24. Clear Title Defects* 25. Final Title Packet to RO Approval by OGC 26. Accomplishment Reported 27. Documented Approval of Completed Work XX XX XX XX XX XX XX XX XX XX XX XX 28. Update Statement of Account XX *Not needed when sharing in road project where easements have already been exchanged (road already Cost-shared) Schedule Agreed to By: ___________________________Date__________________ ____________ ________Date_______________ ____________________Date____________ District Ranger District/SO/Z Engineering Lands Zone