System Safety Assessment - Heavy Airtanker Program
Heavy Airtanker Program System - Airworthiness
Additional Local Mitigation
Additional Local Mitigation
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Mitigation
Achieved?
Yes or No
Additional Local Mitigation
Mitigation
Achieved?
Yes or No
Medium
Additional Local Mitigation
Mitigation
Achieved?
Yes or No
Severity
Marginal
Marginal
Marginal
Likelihood
Remote
Improbabl
e
Marginal
Perform F&DT analysis IAW 25.571 for the tanker
mission and require inspection programs and life
limits based on that analysis.
Remote
Significant exposure to airframe stresses in the
firefighting mission profile poses additional
fatigue factors that shorten airframe life
expectancy.
Remote
Outcome
High
Medium
Perform prescribed engine maintenance and
overhaul. Reduce overhaul intervals.
Serious
Engine Failures
Serious
Severity
Catastrophic
Critical
A) Maintain a load monitoring system, and
Incorporate the latest inspection technology. B)
Maintain routine (daily) inspection program.
Catastrophi
Marginal
c
Airframe Fatigue
Damage
Likelihood
Load limit excedence
Frequent
Continue contractual requirements commensurate
with industry standards required by FAR 25.571 for
aircraft continued airworthiness. Incorporate the
latest inspection technology.
Maintenance programs have not been modified
to compensate for structural loads experienced
in the fire mission.
Continued
Airworthiness
Mitigation
Remote
Hazards
Post mitigation
Frequent
Sub-systems
Occasional
Pre Mitigation
Heavy Airtanker Program System - Contract Process
Outcome
Medium
Post
Mitigation
Value
Severity
Implement airtanker modernization and evaluation
criteria in contracts including but not limited to:
performance, sustainable airframes, contractor
offered technology, damage tolerant design and
technology.
Critical
Mitigation
Likelihood
Post mitigation
Remote
Outcome
High
Severity
Contract Incentive
Aging of the airtanker fleet includes 50 year old
aircraft
Catastrophic
Hazards
Frequent
Sub-systems
Likelihood
Pre Mitigation
Heavy Airtanker Program System - Mission Environment
Post
Mitigation
Value
Outcome
Serious
Medium
Severity
Critical
Critical
A) Ensure high level recon is completed prior to
commencing low level flight. B) Manage radio
communication. C) Proper aircraft configuration. D)
Reduce exposure time in low level. E) Consult
sectional chart/hazard map, consult ground
personnel/other aircraft. F) Request a leadplane.
Occasional
Conduct simulator refresher training. Demonstrate
IFR capability during FS checkride.
Remote
Outcome
High
Severity
Catastrophic
Mitigation
High
CFIT due to low level operations
Frequent
Flight Profile
Catastrophic
Lack of proficiency/experience for IFR flights.
Likelihood
Hazards
Probable
Sub-systems
Likelihood
Post mitigation
Pre Mitigation
Heavy Airtanker Program System - Facilities
1
Outcome
Medium
Post
Mitigation
Value
Severity
Ensure micro motion meters have been calibrated.
Vendor and government personnel review mixing
procedures.
Marginal
Mitigation
Likelihood
Outcome
Severity
Post mitigation
Remote
Overloading and mixing errors
Serious
Tanker Bases
Hazards
Critical
Sub-systems
Occasional Likelihood
Pre Mitigation
Revised 2011
Heavy Airtanker Program System - Human Factors
Additional Local Mitigation
Additional Local Mitigation
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Additional Local Mitigation
Serious
Serious
Serious
Additional Local Mitigation
Mitigation
Achieved?
Yes or No
Severity
Critical
Critical
Likelihood
Occasional
Critical
Address airtanker pilot training and proficiency to
reduce frequency of accidents. Aircraft
performance planning for successful outcome in a
high rate of descent, level off, and climb out profile.
Occasional
Provide additional food and administrative support.
Adhere to duty limits. Improve the management
model for national deployment of the fleet. Add
more airtankers.
Occasional
Outcome
High
Mitigation
High
Severity
Catastrophic
Critical
Post mitigation
A) Vendors have instituted training programs such
as CRM, risk management, and flight safety with
the intent to standardioze cockpit procedures. B)
Increase the scope and complexity of the NAFA
program, enhance the McClellan training center for
fire environment.
High
Target fixation and tactical maneuvering
errors.
Catastrophic
Mission Induced
Stress
The limited number of airtankers has resulted
in more frequent travel and change of duty
station, which increases stress and has a
negative effect on crew quality of life.
Probable
Pilot Proficiency and Lack of fire mission training and Lack of
proficiency flight time.
Training
Frequent
Hazards
Probable
Sub-systems
Likelihood
Pre Mitigation
Heavy Airtanker Program System - Policy, Procedure, and Doctrine Administration
Post
Mitigation
Value
Outcome
Medium
Medium
Severity
Marginal
Likelihood
Marginal
Enforce QA program for improved oversight of the
contracted fleet.
Remote
Provide program oversight to assure risk is at
lowest practical level. Improve crew risk
management.
Remote
Mitigation
High
Outcome
Post mitigation
High
Severity
Critical
Operator's lack of quality assurance and
inspection program results in non compliance
with contract airworthiness standards.
Critical
Quality Assurance
and Inspections
"Can do" philosophy has fostered aviation
programs with high risk operations.
Probable
Agency Culture
Hazards
Probable
Sub-systems
Likelihood
Pre Mitigation
Heavy Airtanker Program System - Technology
Outcome
Low
Post
Mitigation
Value
Severity
Develop new technologies for the mission such as
glass cockpit, synthetic vision, electronic target
identification, lazer targeting, etc.
Negligible
Mitigation
Likelihood
Post mitigation
Occasional
Outcome
Medium
Severity
HAT underutilized resulting in task saturation
Marginal
Human Aided
Technology
Hazards
Likelihood
Sub-systems
Occasional
Pre Mitigation
Heavy Airtanker Program System - Training
2
Outcome
Medium
Post
Mitigation
Value
Severity
Increase the scope and complexity, and fund the
development and implementation of fire simulation
training in the flight environment for contract and
agency personnel.
Marginal
Mitigation
Likelihood
Post mitigation
Occasional
Severity
Outcome
Serious
Flight crew lacks currency / proficiency in fire
environment.
Critical
Fire Mission Training
Hazards
Occasional
Sub-systems
Likelihood
Pre Mitigation
Revised 2011
Download