SISD Perspective • Launch Feb 28 • New information

advertisement

SISD Perspective

• Launch Feb 28

• New information

– Data handbooks released yesterday

• Major update, now modular (separate “books” for different instruments), and available both in PDF and HTML

• Kudos to the team, including Bahram Mobasher, Jennifer Mack,

Tom Brown, Sylvia Baggett, Matt McMaster, Mark Dickinson,

Ed Nelan, Russ Makidon, Susan Rose, and Jim Younger

– New NICMOS web site online

– work about to start on FGS/OSG and HD internal site

21 Feb 2002 H. Ferguson TIPS 1

Near-term priorities

• SMOV

– Science enabled:

• FGS astrometry

• STIS 3/27 (CCD & MAMA)

• WFPC2 3/27

• ACS basic ccd science 4/6 – SBC 5/6

• NICMOS 4/24

• Cycle-11 Calibration plan

– Work beginning now

– Director’s office review early May

– Phase-2 proposals mid May

• Calibration workshop

– October, 2002 coordinated with ADASS

• Either as part of ADASS (downtown), or tacked on to the end (held at

STScI).

• Need volunteers for organizing committee

21 Feb 2002 H. Ferguson TIPS 2

• Dither working group formed

– Anton Koekemoer coordinating

– Coordinate near-term testing

– Develop road map for dither package evolution

• SHARE/FASST committees

• Study of Hubble Archive & Reprocessing Enhancements

• Future of Archive Services at Space Telescope

– Implementation study to begin, led by Chris Blades

21 Feb 2002 H. Ferguson TIPS 3

• Cycle-12 Preparations

• Unofficially: call for proposals likely to be released

October 2002

• proposals due Jan 24, 2003

• Execution starts July 2003

• Compressed schedule will reduced time from proposal to receipt of data, but also poses a challenge when rolling out APT

– APT

• Rollout of NICMOS & STIS exposure-time calculators in June

– Common background model for all instruments

• Phase-1 tools to be released in June

– Incorporation of help facility requires coordination with HD on documentation

• Orbit planner prototype testing underway