More power – reliably into the grid Electrical Solutions Instrumentation, Controls & Electrical SPPA-E3000 Power Upgrade Package comprises modification of electrical components and systems in the context of a turbine power upgrade. The Task The efficiency of power plants is constantly being improved to make them more competitive. One approach to doing this is to increase the power output delivered by the turbines. However, the electrical components also have to be able to transfer that higher output into the grid. Your Benefits ■ Reliable transmission of more power to achieve higher returns ■ Maximum availability thanks to use of highquality components with a long service life ■ Maximum certainty for planning and schedules thanks to smooth project handling Our Solution "Power Upgrade Package" is a turnkey solution for matching the electrical components to the higher turbine output. It includes an analysis of all systems serving to transfer the electric power to the grid and then adapting them, if necessary: ■ generator ■ generator leads & star-point cubicle ■ generator circuit breaker ■ unit protection (generator and transformer protection) ■ transformer voltage regulation ■ instrumentation & metering ■ excitation system ■ unit transformer ■ auxiliary power transformer ■ neutral grounding for transformers ■ high-voltage switchgear with power system protection Our services comprise: ■ analysis of the components already installed ■ design and configuration (basic and detailed engineering) of replacement components tailored to the power plant ■ selection of high-quality products ■ procurement of quality-assured products from a multitude of suppliers ■ time-optimized installation/commissioning ■ complete documentation ■ best-in-class project management (VGB Quality Award) The SPPA-E3000 Power Upgrade Package can also be connected to Siemens or other manufacturers' instrumentation and control systems. Our long years of experience and expertise as a power plant manufacturer makes sure you get a harmonized solution, perfectly tailored to your generator upgrade, that affords maximum functionality and reliability in service. It includes all interfaces and is distinguished thanks to low engineering effort, dependability in planning and scheduling and reliable fulfillment of all technical requirements. The "Power Upgrade Package" solution ensures maximum availability of power transmission after a turbine power upgrade. Grid * Transformer protection Synchronization Transformer protection Auxiliary power Generator protection * G Exciter *) not included in the scope of the solution Answers for energy. Published by and copyright © 2012: Siemens AG, Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany For more information contact sppa-e3000.energy@siemens.com www.siemens.com/energy/sppa-e3000 Siemens Energy, Inc. Instrumentation, Controls, & Electrical 1345 Ridgeland Parkway, Suite 116 Alpharetta, GA 30004, USA E304_FS00_PUP_e_V2-0 Order no. E50001-G230-A239-X-4A00 Printed in Germany Dispo 05401, c4bs-Nr. 7465 Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.