UCCS - University Center 1st Floor Renovation
Project Number: 11-031
Addendum #2
102 E Moreno
Colorado Springs,
Colorado
80903-3918
March 18, 2011
Notice: This addendum applies to the Advertisement for Bids Package Dated 2March 2011.
Failure to acknowledge all addenda may cause rejection of the Bid submittal. Receipt of addenda
shall be acknowledged by statement in a transmittal letter accompanying the Bid submittal. All
other conditions and requirements of the Project Documents remain unchanged. The narrative
and drawings for this project are hereby modified / clarified as follows.
Drawings
Phone
719.473.7063
Fax
719.473.7092
www.hbaa.com
Drawing Sheets I-101 through I-105:
• Carpet tiles CPT-1, CPT-2 and CPT-3 will be purchased by Owner directly
through the University of Colorado Purchasing Department, and delivered to a
Denver warehouse. Contractor to pick up carpet from Citizens Carpet
Service, 4741 Moline St, Denver CO, deliver to the project site and install.
Drawing Sheets AD-100, A-203 and E-203:
• Remove and salvage existing electric unit heater in ceiling above existing Info
Desk (Room 113). Relocate in new gypsum board ceiling; reconnect to
existing circuit and panel. Coordinate unit and control switch locations with
Architect and Owner.
Drawing Sheet A-104:
• Demo and remove existing window and frame (at Radio Station just north of
door 116B) in Hallway 116 (approximate size 2’ x 2’). Infill opening with 35/8” metal studs and 5/8” gypsum board on each side of wall. Paint to match
adjacent wall color. Coordinate the removal of electrical equipment, prior to
construction, with occupant and Owner. Delete new signage associated with
window.
Drawing Sheet E-001, Light Fixture Schedule:
• Type W: Change Catalog number to “Ametrix RS SO-C-B”, and lamp type to
“CF”.
Drawing Sheet E-203, Note #4:
• Add sentences to note #4: “Route new conduit above ceiling in Hallway 108,
and inside of overhead drywall box beam in Lobby 110, no exposed conduit is
allowed. Add one (1) quad receptacle and one (1) data outlet at 18” AFF
within directory divider assembly. Coordinate with Electrical Engineer and
Architect.”