Multi-year Expert Meeting on Transport,Trade Logistics and Trade Facilitation: Transport and logistics innovation towards the review of the Almaty Programme of Action in 2014 22-24 October 2013 TRANSPORT SYSTEM OF AZERBAIJAN: OPPORTUNITIES AND PERSPECTIVES FOR LOGISTICS. GLOBAL LOGISTICS AS A BASE FOR REGIONAL INTEGRATION by Haydar Turabov Senior Counselor Transport Policy and Economy Department Baku, Republic of Azerbaijan This expert paper is reproduced by the UNCTAD secretariat in the form and language in which it has been received. The views expressed are those of the author and do not necessarily reflect the view of the United Nations. THE REPUBLIC OF AZERBAIJAN MINISTRY OF TRANSPORT MULTI-YEAR EXPERT MEETING ON TRANSPORT, TRADE LOGISTICS AND TRADE FACILITATION TRANSPORT SYSTEM OF AZERBAIJAN: OPPORTUNITIES AND PERSPECTIVES FOR LOGISTICS. GLOBAL LOGISTICS AS A BASE FOR REGIONAL INTEGRATION October 22-24, 2013 / Geneva, SWITZERLAND Haydar Turabov Senior Counselor Transport Policy and Economy Division RUSSİAN FEDERATİON SCANDINAVIA , BALTIC & RUSSIA KAZAKHSTAN ROMANİA BLACK SEA BULGARİA TURKEY CASPIAN SEA EUROPE ASİA TURKMENİSTAN CHINA İRAN MEDİTERRANEAN SEA NEAR EAST 1 & SCANDİNAVİA, BALTIC & RUSSIA NORTH CHINA ASIA EUROPE Black Sea Caspian Sea Bosporus Mersin Mediterranean Sea Pan – European transport corridor № 4 SOUTH NEAR EAST PERSİAN GULF SEGMENT TO BE REHABILITATED: 503 KM CASPIAN SEA AKHALKALAKY BEYUK KYASIK MARABDA Σ KARS NEW ALYAT SEA PORT MISSING SEGMENT TO BE CONSTRUCTED: 105 KM 2 Baku-Russia BEYUK KYASİK Baku-Geargia Bakı-Yevlakh-Balakan SEGMENT UNDER REHABILITATION: 503 KM BAKU Baku-Yevlakh-Khankandi Σ ALYAT SEA PORT Baku-Iran EAST – WEST (TRACECA) TRANSPORT CORRIDOR CASPIAN SEA Pan – European transport corridor № 4 KAZAKHSTAN Segment to be rehabilitated is 503 km AKHALKALAKI Σ ISTANBUL Bosporus KARS ALYAT SEA PORT Missing segment to be constructed is 105 (km) Mediterranean sea 3 EXPECTED AMOUNT OF FREIGHT TRANSPORT ON THE BAKU-TBILISI-KARS NEW RAILWAY LINE Million tons 16 14 12 10 8 15 AND MORE 6 8-10 4 3-5 2 0 5 10 15 YEARS MAIN MARINE ROUTES Astrachan Aktau Mahachkala Existing Baku Sea Port Turkmanbashi Σ NEW ALYAT SEA PORT Anzali Newshehr Neka 4 NEW BAKU INTERNATIONAL SEA TRADE PORT KOMPLEX NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX 5 NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX I stage (up to 10 mln. tons, 50 thousand TEU) Terminals: 2 1 Dry cargo terminal 1 2 Ferry terminal 1 Berths: 8 Ferry berth: 2 Ro-Ro berth: 1 For dry cargo and containers: 4 Service berth: 1 II stage (up to 17 mln. tons, 150 thousand TEU) Terminals: 2 1 Dry cargo terminal 1 2 Ferry terminal 1 Berths: 6 Ferry berth: 2 For dry : 4 III stage (up to 25 mln., 1 mln. TEU) Terminal: 2 1 Container terminal: 1 2 Ferry terminal 1 Berths: 7 Ferry berth: 2 Dry cargo berth: 5 RUSSİAN FEDERATİON GEORGİA BEYUK KESİK KAZAKHSTAN BAKU REPUBLİC OF AZERBAİJAN COMBINATION OF THE FREIGHT TRANSPORT Σ NEW ALYAT SEA PORT CASPIAN SEA TURKMENİSTAN 6 • ENLARGEMENT THROUGH ACCESSION TO “VIKING” PROJECT MAIN HIGHWAY PROJECTS COMPLATED UNDER CONSTRUCTION CONSIDERED 7 MODEL HIGHWAY INITIATIVE South Caucasus section MHI : Trabzon - Sarpi (Georgia/Turkey BCP) – Batumi – Tbilisi – Krasny Most (Georgia/Azerbaijan BCP) - Baku Possible extentions: Baku port (BCP) - Turkmenbashi port (BCP) - Ashgabat SHAMAKHI – GUBA HIGHWAY PROJECT 8 TRANSPORT OPERATIONS INTELLIGENT MANAGEMENT SYSTEM BAKU BAY MARINE BRIDGE 9 MINISTRY OF TRANSPORT REPUBLIC OF AZERBAIJAN Haydar Turabov Senior Counselor Transport Policy and Economy Division 10