REMINDER: The Facilities Services Department has an on line system to submit your work request. Please go online to http:// arc.uccs.edu/uccs/ menupage.cfm. For questions or assistance with completing this on line form please contact our services desk. Monday through Friday 7:30 am - 5:00 pm at 255-3313 Facilities Services Cell (7:30 am—11:00 pm) at 492-8329 In order to keep up with the growth and services of the UCCS campus, the Facilities Services department has organized itself into two primary areas; Planning & Construction and Physical Plant Maintenance. The Planning & Construction team is actively working major projects including the renovation of the existing Science Bldg and Heller Property. The Physical Plant team includes five work groups; Maintenance, Grounds, Electrical, Plumbing/ HVAC, and Custodial. Their responsibilities include maintaining 890,675 square feet of General Fund buildings along with 250 acres of landscaped property. Our Facilities Services administrative team is the glue that keeps our teams connected. Each team is committed to the continued improvement of the UCCS campus and serving you. Pedestrian Spine The third phase of the Pedestrian Spine is almost complete. This decorative concrete walkway serves both as the main east/west walkway through the central campus and as a fire lane. To increase pedestrian safety, new bollards are being installed in front of Dwire Hall to prevent unauthorized vehicles from driving on the walkway. These bollards can be unlocked when necessary for deliveries, maintenance and emergencies. In the near future, colorful new banners will be installed along the pedestrian spine. UCCS FACILITIES J U L Y 2 0 1 0 NEW FACES IN FACILITIES With Graduation and the reorganization of our department, some people have moved on and we have new faces in Facilities. Lauren Dreiling, student, is assisting at the Front Desk of Facilities. Mounika Namburu, student, has been hired to redesign our website. Look for wonderful changes in the near future! Robin Grasso and Caitlin Geerdes, students, have been hired to work in our Sign Shop— they are making huge strides in getting our Sign Shop organized and caught up. Tom Gomez moved to Custodial servicing SENG and now Thomas Zanandrie, student, works with Jimmy Muniz on Surplus work requests. Lance Hanks is now co-supervising with Mac on the custodial crew. A new student on our General Maintenance crew is Michael Zamorski. Lance Hanks Robert McGann, has been hired into the Grounds crew as well. Welcome to the new members of our team! From left to right: Caitlin Geerdes, Lauren Dreiling, Robin Grasso, and Mounika Namburu. CENTENNIAL HALL ALMOST COMPLETE The renovation of the Science Building is quickly coming to a close. Faculty has already moved into their offices and research labs, furniture for classrooms and teaching labs arrives almost daily and the work outside the building is moving at a very fast pace. The renovation includes a complete upgrade of the interior, new heating and cooling, lighting, and network systems. The exterior of the building has had the brick repaired, new operable windows installed, a new roof and entrance enhancements so you can now find the entrances. The site around the building is also receiving a lot of attention to improve drainage so the building no longer floods, new landscaping in front of the building and a small amphitheater and xeriscape garden in the “backyard.” Finally, significant improve- ments are being made to the auditorium. It is being completely renovated with all new interior, seating, lighting (including a small amount of theatrical lighting) and audio/ visual including high definition projection capability along with surround sound. It will be a breath taking “crown jewel of the campus” for lectures, movies and small performances.