The Project Management Body of Knowledge (PMBOK) Study Guide The PMBOK guide is an attempt to document the generally accepted PM information and practices and has since become the standard amongst project management around the globe. Map Source: PMBOK 4th Ed. 1 Map Source: PMBOK 4th Ed. 2 The Project Management Body of Knowledge (PMBOK) is a collection of processes and knowledge areas generally accepted as best practice within the project management discipline. As an internationally recognized standard (IEEE Std 1490-2003) it provides the fundamentals of project management, irrespective of the type of project be it construction, software, engineering, automotive etc. PMBOK recognizes 5 basic process groups containing 42 processes and 9_knowledge areas typical of almost all projects. Processes overlap and interact throughout a project or phase. Processes are described in terms of: • Inputs (documents, plans, designs, etc.) • Tools and Techniques (mechanisms applied to inputs) • Outputs (documents, products, etc.) Map Source: PMBOK 4th Ed. 3 The Project Management Knowledge Areas organize the 42 project management processes into nine Knowledge Areas. 1. Integration Management 2. Scope Management 3. Time Management 4. Cost Management 5. Quality Management 6. HR Management 7. Communication Management 8. Risk Management 9. Procurement Management Project Management Knowledge Areas describe the key competencies that project managers must develop. • Four core knowledge areas lead to specific project objectives (scope, time, cost, and quality). • Four facilitating knowledge areas are the means through which the project objectives are achieved (human resources, communication, risk, and procurement management). • One knowledge area (project integration management) affects and is affected by all of the other knowledge areas. Map Source: PMBOK 4th Ed. 4 Project Management Process Groups and Knowledge Areas Map Knowledge Areas Project Integration Management (Process Matrix Chart) Project Management Process Groups Initiating Develop Project Charter Planning Develop Project Management Plan Executing Direct and Manage Project Execution Monitoring & Controlling Monitor and Control Project Work Perform Integrated Change Control Project Scope Management Collect Requirements Define Scope Create Work Breakdown Structure (WBS) Verify Scope Control Scope Project Time Management Project Time Management •Define Activities •Sequence Activities •Estimate Activity Resources •Estimate Activity Durations •Develop Schedule •Control Schedule Project Cost Management Estimate Costs Determine Budget Control Costs Project Quality Management Plan Quality Perform Quality Assurance Project Human Resource Management •Develop Human Resource Plan Acquire Project Team Develop Project Team Manage Project Team Plan Communications Distribute Information Manage Stakeholder Expectations Project Communications Management Identify Stakeholders Project Risk Management •Plan Risk Management •Identify Risk •Perform Qualitative Risk Analysis •Perform Quantitative Risk Analysis •Plan Risk Response Project Procurement Management Plan Procurements Closing Close Project or Phase Perform Quality Control Report Performance •Monitor & Control Risk Conduct Procurements Administer Procurements Close Procurements Map Source: PMBOK 4th Ed. 5 Project Management Process Groups and Knowledge Areas Map Knowledge Areas Project Integration Management (Process Matrix Chart) Project Management Process Groups Initiating Develop Project Charter Planning Develop Project Management Plan Executing Direct and Manage Project Execution Monitoring & Controlling Monitor and Control Project Work Perform Integrated Change Control Project Scope Management Collect Requirements Define Scope Create Work Breakdown Structure (WBS) Verify Scope Control Scope Project Time Management Project Time Management •Define Activities •Sequence Activities •Estimate Activity Resources •Estimate Activity Durations •Develop Schedule •Control Schedule Project Cost Management Estimate Costs Determine Budget Control Costs Project Quality Management Plan Quality Perform Quality Assurance Project Human Resource Management •Develop Human Resource Plan Acquire Project Team Develop Project Team Manage Project Team Plan Communications Distribute Information Manage Stakeholder Expectations Project Communications Management Identify Stakeholders Project Risk Management •Plan Risk Management •Identify Risk •Perform Qualitative Risk Analysis •Perform Quantitative Risk Analysis •Plan Risk Response Project Procurement Management Plan Procurements Closing Close Project or Phase Perform Quality Control Report Performance •Monitor & Control Risk Conduct Procurements Administer Procurements Close Procurements Map Source: PMBOK 4th Ed. 6 Develop Project Charter PROCESS GROUP = Initiating | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Project Statement of work Business case Contract Enterprise environmental factors Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Project Charter Map Source: PMBOK 4th Ed. 7 Identify Stakeholders PROCESS GROUP = Initiating | KNOWLEDGE AREA = Project Communications Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project Charter Procurement documents Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. Stakeholder analysis Expert judgment Outputs 1. 2. Stakeholder register Stakeholder management strategy Map Source: PMBOK 4th Ed. 8 Develop Project Management Plan PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project charter Outputs from planning processes Enterprise environmental factors Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. Project Management Plan Map Source: PMBOK 4th Ed. 9 Collect Requirements PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. Project charter Stakeholder register Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. Interviews Focus groups Facilitated workshops Group creativity techniques Group decision-making techniques Questionnaires and surveys Observations Prototypes Outputs 1. 2. 3. Requirements documentation Requirements management plan Requirements traceability matrix Map Source: PMBOK 4th Ed. 10 Define Scope PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project charter Requirements documentation Organizational process assets Tools & Techniques 1. 2. 3. 4. Expert judgment Product analysis Alternative identification Facilitated workshops Outputs 1. 2. Project scope statement Project document updates Map Source: PMBOK 4th Ed. 11 Create Work Breakdown Structure (WBS) PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Scope Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project Scope Statement Requirements documentation Organizational process assets Tools & Techniques 1. Decomposition Outputs 1. 2. 3. 4. 5. WBS WBS dictionary Scope baseline Project document updates Map Source: PMBOK 4th Ed. 12 Define Activities PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Scope baseline Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. Decomposition Rolling wave planning Templates Expert judgment Outputs 1. 2. 3. Activity list Activity attributes Milestone list Map Source: PMBOK 4th Ed. 13 Sequence Activities PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Activity List Activity attributes Milestone list Project scope statement Organizational process assets Tools & Techniques 1. 2. 3. 4. Precedence diagram method (PDM) Dependency determination Applying leads and lags Schedule Network Templates Outputs 1. 2. 3. Project schedule network diagrams Project document updates Map Source: PMBOK 4th Ed. 14 Estimate Activity Resources PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Activity List Activity attributes Resource calendars Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. Expert judgment Alternative analysis Published estimating data Bottom-up estimating Project Management software Outputs 1. 2. 3. 4. 5. Expert judgment Alternative analysis Published estimating data Bottom-up estimating Project Management software 6. Map Source: PMBOK 4th Ed. 15 Estimate Activity Durations PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. Activity list Activity attributes Activity resource requirements Resource calendars Project scope statement Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. Expert judgment Analogous estimating Parametric estimating Three-point estimates Reserve analysis Outputs 1. 2. 3. Activity duration estimates Project document updates 8. Map Source: PMBOK 4th Ed. 16 Develop Schedule PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. 8. 9. Activity List Activity attributes Project Schedule Network diagram Activity Resource requirements Resource Calendars Activity duration estimates Project scope statement Enterprise Environmental Factors Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. Schedule network analysis Critical path method Critical chain method Resource levelling What-if scenario analysis Applying leads and lags Schedule Compression Scheduling tool Outputs 1. 2. 3. 4. Project Schedule Schedule baseline Schedule data Project document updates Map Source: PMBOK 4th Ed. 17 Estimate Costs PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Cost Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. Scope Baseline Project Schedule HR Plan Risk Register Enterprise Environmental Factors Organizational Process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. 9. Expert Judgment Analogous Estimate Parametric Estimate Bottom-Up Estimate Three-Point Estimate Reserve Analysis Cost Of Quality Project Management Estimating Software Vendor Bid Analysis Outputs 1. 2. 3. Activity Cost Estimate Basis of Estimates Project Document updates Map Source: PMBOK 4th Ed. 18 Determine Budget PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Cost Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. Activity Cost Estimates Basis of Estimate Scope Baseline Project Schedule Resource Calendars Contracts Organizational Process Assets Tools & Techniques 1. 2. 3. 4. 5. Cost Aggregation Reserve Analysis Expert Judgment Historical relationships Funding limit reconciliation Outputs 1. Cost Performance Baseline Project Funding requirements Project document updates 8. Map Source: PMBOK 4th Ed. 19 Plan Quality PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Quality Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. Scope baseline Stakeholder register Cost performance baseline Schedule baseline Risk register Enterprise environmental factors Organizational Process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. 9. Cost-benefit analysis Cost of quality Control charts Benchmarking Design of experiments Statistical sampling Flow charting Proprietary quality management methodology Additional quality planning tools Outputs 1. 2. 3. 4. 5. 6. Quality management plan Quality metrics Quality checklists Process improvement plan Project document updates 10. Map Source: PMBOK 4th Ed. 20 Develop Human Resource Plan PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Human Resource Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Activity resource requirements Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. Organization charts and position descriptions Networking Organizational Theory Outputs 1. Human resource plan Map Source: PMBOK 4th Ed. 21 Plan Communications PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Communications Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Stakeholder register Stakeholder management strategy Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. Communication requirements analysis Communication technology Communication models Communication methods Outputs 1. 2. 3. Communications management plan Project document updates Map Source: PMBOK 4th Ed. 22 Plan Risk Management PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. Project Scope Management Cost management plan Schedule management plan Communication management plan Enterprise environmental factors Organizational process assets Tools & Techniques 1. Planning meetings & analysis Outputs 1. Risk Management plan Map Source: PMBOK 4th Ed. 23 Identify Risk PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. Risk Management plan Activity Cost Estimates Activity duration estimates Scope Baseline Stakeholder register Cost Management plan Schedule Management plan 8. Quality Management plan 9. Project documents 10. Enterprise environmental factors 11. Organizational Process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. Documentation reviews Information gathering technique Checklist analysis Assumptions analysis Diagramming techniques SWOT analysis Expert judgment Outputs 1. Risk register Map Source: PMBOK 4th Ed. 24 Perform Qualitative Risk Analysis PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Risk register Risk Management plan Project scope statement Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. Risk probability and impact assessment Probability and impact assessment Risk data quality assessment Risk categorization Risk urgency assessment Expert judgment Outputs 1. Risk register updates Map Source: PMBOK 4th Ed. 25 Perform Quantitative Risk Analysis PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Risk register Risk Management Plan Cost Management plan Schedule Management plan Organizational Process assets Tools & Techniques 1. 2. 3. 4. Data gathering and representative techniques Quantitative risk analysis and modelling techniques Expert Judgment Outputs 1. Risk register updates 6. Map Source: PMBOK 4th Ed. 26 Plan Risk Response PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Risk register Risk Management Plan Tools & Techniques 1. 2. 3. 4. Strategies for negative risks or threats Strategies for positive risks or opportunities Contingent response strategies Expert judgment Outputs 1. 2. 3. 4. Risk register updates Risk-related contract decisions Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 27 Plan Procurements PROCESS GROUP = Planning | KNOWLEDGE AREA = Project Procurement Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. Scope baseline Requirements documentation 3. Teaming agreements 4. Risk register 5. Risk-related contract decisions 6. Activity resource requirements 7. Project schedule 8. Activity cost estimates 9. Cost performance baseline 10. Enterprise environmental factors 11. Organizational process assets Tools & Techniques 1. 2. 3. 4. Make-or-buy analysis Expert judgment Contract types Outputs 1. 2. 3. 4. 5. 6. Procurement management plan Procurement statements of work Make-or-buy decisions Procurement documents Source selection criteria Change requests Map Source: PMBOK 4th Ed. 28 Direct and Manage Project Execution PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management plan Approved change requests Enterprise Environmental factors Organizational Process Assets Tools & Techniques 1. 2. Expert judgement Project management information system Outputs 1. 2. 3. 4. 5. Deliverable Work performance information Change requests Project Management Plan Updates Project document updates Map Source: PMBOK 4th Ed. 29 Perform Quality Assurance PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Quality Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management plan Quality metrics Work performance information Quality control measurements Tools & Techniques 1. 2. 3. Plan Quality and Perform Quality Control tools and techniques Quality audits Process analysis Outputs 1. 2. 3. 4. Organizational process updates Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 30 Acquire Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project management plan Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. 4. Pre-assignment Negotiation Acquisition Virtual teams Outputs 1. 2. 3. Project staff assignments Resource calendars Project management plan updates Map Source: PMBOK 4th Ed. 31 Develop Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project staff assignments Resource calendars Project management plan updates Tools & Techniques 1. 2. 3. 4. 5. 6. 7. Interpersonal skills Training Team-building activities Ground rules Co-location Recognition and rewards Outputs 1. 2. 3. 4. 5. 6. Interpersonal skills Training Team-building activities Ground rules Co-location Recognition and rewards Map Source: PMBOK 4th Ed. 32 Manage Project Team PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Human Resource Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Project staff assignments Project management plan Team performance assets Performance reports Organizational process assets 6. Tools & Techniques 1. 2. 3. 4. 5. Observation and conversation Project performance appraisals Conflict management Issue log Interpersonal skills Outputs 1. 2. 3. 4. Enterprise environmental factors updates Organizational process assets updates Change requests Project management plan updates Map Source: PMBOK 4th Ed. 33 Distribute Information PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Communications Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project management plan Performance reports Organizational process assets Tools & Techniques 1. 2. Communication methods Information distribution tools Outputs 1. Organizational process assets updates Map Source: PMBOK 4th Ed. 34 Manage Stakeholder Expectations PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Communications Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. Stakeholder register Stakeholder management strategy Project management plan Issue log Change log Organizational process assets Tools & Techniques 1. 2. 3. 4. Communication methods Interpersonal skills Management skills Outputs 1. 2. 3. 4. Organizational process assets updates Change requests Project management plan updates Project document updates 7. Map Source: PMBOK 4th Ed. 35 Conduct Procurements PROCESS GROUP = Executing | KNOWLEDGE AREA = Project Procurement Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. 8. 9. Project Management Plan Procurement documents Source Selection criteria Qualified seller list Seller proposals Project documents Make-or-buy decisions Teaming agreements Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. Bidder conferences Proposal evaluation techniques Independent estimates Expert judgment Advertising Internet search Procurement negotiations Outputs 1. 2. 3. 4. 5. 6. 7. Selected sellers Procurement contract award Resource calendars Change requests Project management plan updates Project document updates 10. Map Source: PMBOK 4th Ed. 36 Monitor and Control Project Work PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management plan Performance reports Enterprise environmental factors Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. 2. 3. Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 37 Perform Integrated Change Control PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Project management plan Work performance information Change requests Enterprise environmental factors Organizational process assets Tools & Techniques 1. 2. 3. Expert judgment Change control meetings Outputs 1. 2. 3. Change request status updates Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 38 Verify Scope PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Scope Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management plan Requirements documentation Requirements traceability matrix Validated deliverables Tools & Techniques 1. Inspection Outputs 1. 2. 3. 4. Accepted Deliverable Change requests Project document updates Map Source: PMBOK 4th Ed. 39 Control Scope PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Scope Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Project management plan Work Performance Information Requirements documentation Requirements traceability matrix Organizational process assets Tools & Techniques 1. Variance analysis Outputs 1. 2. 3. 4. 5. Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 40 Control Schedule PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Time Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management plan Project schedule Work performance information Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. Performance reviews Variance analysis Project management software Resource levelling What-if scenario analysis Adjusting leads and lags Schedule compression Scheduling tool Outputs 1. Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 41 Control Costs PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Cost Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Project management Plan Project funding requirements Work Performance information Organizational Process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. Earned Value management Forecasting To-complete performance index (TCPI) Performance reviews Variance analysis Project Management software Outputs 1. 2. 3. 4. 5. 6. Work performance measurements Budget forecast Organizational process assets updates Change request Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 42 Perform Quality Control PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Quality Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. 7. Project management plan Quality metrics Quality checklists Work performance measurements Approved change requests Deliverable Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Cause and effect diagram Control charts Flow charting Histogram Pareto chart Run chart Scatter diagram Statistical Sampling Inspection Approved change requests review Outputs 1. 2. 3. 4. 5. 6. 7. Quality control measurements Validated changes Validated deliverables Organizational process assets updates Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 43 Report Performance PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Communications Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. Project Management Plan Work performance information Work performance measurements Budget forecasts Organizational process assets Tools & Techniques 1. 2. 3. 4. 5. Variance analysis Forecasting methods Communication methods Reporting systems Outputs 1. 2. 3. Performance reports Organizational process assets updates Change requests Map Source: PMBOK 4th Ed. 44 Monitor & Control Risk PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Risk Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. Risk register Project management plan Work performance information Performance reports Tools & Techniques 1. 2. 3. 4. 5. 6. Risk assessment Risk audits variance and trend analysis Technical performance measurement Reserve analysis Status meetings Outputs 1. 2. 3. 4. 5. Risk register updates Organizational Process assets updates Change requests Project management plan updates Project document updates Map Source: PMBOK 4th Ed. 45 Administer Procurements PROCESS GROUP = Monitoring & Controlling | KNOWLEDGE AREA = Project Procurement Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. 4. 5. 6. Procurement documents Project management plan Contract Performance reports Approved change requests Work performance information Tools & Techniques 1. 2. 3. 4. 5. 6. 7. Contract change control system Procurement performance reviews Inspection and audits Performance reporting Payment systems Claims administration Records management system Outputs 1. 2. 3. 4. Procurement documentation Organizational process assets updates Change requests Project management plan updates Map Source: PMBOK 4th Ed. 46 Close Project or Phase PROCESS GROUP = Closing | KNOWLEDGE AREA = Project Integration Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. 3. Project management plan Accepted deliverables Organizational process assets Tools & Techniques 1. Expert judgment Outputs 1. 2. Final product, service or result transition Organizational process assets updates Map Source: PMBOK 4th Ed. 47 Close Procurements PROCESS GROUP = Closing | KNOWLEDGE AREA = Project Procurement Management Inputs, Tools and Techniques, and Outputs Inputs 1. 2. Project management plan Procurement documentation Tools & Techniques 1. 2. 3. Procurement audits Negotiated settlements Records management system Outputs 1. 2. Closed procurements Organizational process updates Map Source: PMBOK 4th Ed. 48