NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway Authority August 20, 2009 Who We Are – History Origins with TTA Created in 1997 as a Texas political subdivision No tax revenue 2 Who We Are – Governance Typical double photo use 3 1968-1997 - TTA Approx. 124 lane miles 1997-Present - NTTA Approx. 655 lane miles Being constructed or final planning Nearly 250 lane miles In early design and planning stages About 204 lane miles 4 By the Numbers Total TollTags® issued More than 1.7 million Projected annual revenue - 2009 Approx. $ 298.6 million Average daily TollTag® transactions 1.3 million 5 Cooperative Partnerships Supports regional growth 6 Economic Development 7 Regional Plan 8 DALLAS NORTH TOLLWAY 4B & 5A STUDY AREA DALLAS NORTH Length-TBD 4A SAMTOLLWAY RAYBURNPHASE TOLLWAY Segment 3S Est. open to traffic-TBD Approx. 6 miles SAM RAYBURN North of Hillcrest Rd. to Est. open to traffic-TBD TOLLWAY/DALLAS south Custer Rd. NORTH TOLLWAY STATE HIGHWAY 170 Opened INTERCHANGE to traffic Approx. 11.8 milesEst. open to 1, traffic-2012 September 2009 Est. open to traffic-TBD SAM RAYBURN TOLLWAY SAM RAYBURN TOLLWAY Segment 3N LLTB Bridge Segment 4 South of Custer Rd. to Opened to traffic Approx. 2.9 miles North of Hardin August 1, 2009 Est. open to traffic-2011 Opened to traffic September 29, 2009 PRESIDENT GEORGE BUSH TURNPIKE EASTERN EXTENSION Approx. 9.9 miles Est. open to traffic-2011 President George Bush All-ETC STATE HIGHWAY 161Turnpike STATE HIGHWAY 161 Conversion Phase 2 (TxDOT) Approx. 7.4 miles TwoEst. main lanes eachOpened to traffic open to traffic-2012 TRINITY PARKWAY direction from SH 183 July 1, 2009 Approx. 9 miles to Egyptian Way open to360 traffic-TBD SOUTHWEST Opened to traffic PARKWAY STATEEst. HIGHWAY TRAIL August 2,CHISHOLM 2009 Section 1-Approx. 9.7 miles PARKWAY Approx. 27.7 miles Sections 2 & 3 Length-TBD Est. open to traffic-TBD Est. open to traffic-TBD REGIONAL OUTER LOOP STATE HIGHWAY 190 EAST BRANCH Approx. 11 miles Est. open to traffic-TBD 2009 Mobility Progress 9 Project Costs Project Estimated Project Cost Sam Rayburn Tollway $639 million Lewisville Lake Toll Bridge $122 million Southwest Parkway & Chisholm Trail $1.3 billion State Highway 161 $640 million President George Bush Turnpike Eastern Extension $610 million Dallas North Tollway Phase 3 $264 million Total $3.6 billion 10 Toll Rate Increase • Reasons to adjust rates –Meet revenue and coverage targets • Bond holder’s confidence in Authority –Implement distance based toll rates –Adopt toll policy consistent with RTC regional toll policy • 14.5 cents/mile in 2010 • 2.75% annual compounding rate • Resets every two years –User equity throughout system 11 Tolls Support Bond Sales: Expansion • Latest Bonds – Priced on Monday, August 3, 2009 – Financial close on Wednesday, August 12, 2009 • Successfully sold $1,421,475,000 NTTA Revenue Bonds 12 2010 Focus • ETC conversion- fully cashless system • SH161 – Finance and construction • SWP and Chisholm Trail – Finance and construction • Continued Construction – SRT – PGBT Eastern Extension 13 All-ETC Conversion 14 All-ETC Conversion Final Steps 15 SRT – Segment 5 and Upcoming Items DNT/SRT interchange • 4th Quarter 2009 Construction lettings – DNT/SRT interchange » Engineers estimate- $108M » Low Bid at $79M (Williams Bros.) • Segments 1-3 landscaping Segment 5 planned opening January 2012 16 SH 161 – Phase 4 Design-Build construction – Approximately 6.5 miles – 2 major interchanges: • IH 30 and IH 20 – 2 main lanes in each direction – 11 gantries • 1 main lane gantry • 10 ramp gantries – September 2012 opening 17 SH 161 – Phase 4 Design-Build Prairie Link Constructors, LLC – Base Price: $414,154,692 • ~12% lower than next lowest proposal • ~17% lower than engineer's estimate – Value-added concepts (VAC) - optional • VAC-002: Anti-graffiti coating: $1,865,057 • VAC-006: On-the-job training: $0 – Combined cost not to exceed: $416,019,749 18 Southwest Parkway/ Chisholm Trail North segment (Tarrant County) – Limits: IH 30 to Altamesa Blvd. – Length: 8.74 miles – Six lane all-ETC toll road South segment (Tarrant County) – Limits: Altamesa Blvd. to FM 1187 – Length: 5.82 miles – Four lane all-ETC toll road Chisholm Trail (Johnson County) – Limits: FM 1187 to U.S. 67 – Length: 13.01 miles – Four lane all-ETC toll road 19 Stimulus Funds American Recovery and Reinvestment Act of 2009 (ARRA) – $787 billion stimulus bill Infrastructure Funding – $150 billion total – $27.5 billion highways, bridges • 3% transportation enhancement projects/30% local MPOs/67% to state DOTs – State stimulus funding distribution same as gas tax monies – No local match required Texas – 8.44% of $27.5 billion highway, bridge funding – Funding allocation – total $2.25 billion • $675,004,544 local MPOs - regional priority projects • $1,507,510,148 TTC - state priority projects • $67,500,454 transportation enhancement projects 2020 ARRA – Section 3A IH 20 / SWP History March 2009 – TTC & RTC allocated $133.9M • Build IH 20 / SH 183 / SWP interchange • Funds 40% of total cost – NTTA plan repackaging effort • TxDOT and Fort Worth assisted • Focus was local access improvements – Bid documents developed • NTTA, TxDOT, Fort Worth – Project agreement being developed 21 Annual Program Expenditures 22 Questions 23