Water, Sanitation & Hygiene Improvement Program
ANNUAL PROGRESS REPORT
(April – March 2010/11)
Submitted By:
Lumanti – Support Group for Shelter
April 2011
Table of Contents
CHAPTER 1: AN OVERVIEW OF PROJECT PLANS ......................................................................... 4
1.1 General Information: ................................................................................................................... 4
1.2 Implementation Status: ............................................................................................................... 5
1.3 Budget and Expenditure: ............................................................................................................ 5
1.4 List of projects and beneficiaries ............................................................................................... 5
CHAPTER 2: ORGANISATIONAL OPPORTUNITIES AND CHALLENGES ............................... 8
A: Significant changes at organizational level .............................................................................. 8
B: Change in donor relations or funding ...................................................................................... 10
C: Key operational blockages-internal/external.......................................................................... 10
CHAPTER 3: ADDITIONAL KEY EVENTS TO DATE ................................................................... 12
CHAPTER 4: ORGANIZATIONAL EFFECTIVENESS................................................................... 12
A: Timeliness (reporting, budget approval, budget release etc) .............................................. 12
B: Human Resource Development ............................................................................................... 12
C: Project management (procurement, material management) .............................................. 12
D: Non Project based agreements relevant to the WASH activities: ...................................... 12
E: Publication and dissemination: ................................................................................................ 12
F: Value added in the sector: ........................................................................................................ 12
CHAPTER 5: PROJECT WISE INFORMATION (to be completed for each on going and completed
Projects) .................................................................................................................................................. 13
Project No. : 643UE Itahari Water Environment Sanitation and Hygiene Promotion Programme 13
A. Project Information: ................................................................................................................... 13
C. Changes in Project Background, Design & Risk Management ................................................. 16
D. Progress against key planned Activities..................................................................................... 17
G Field visits and Monitoring ......................................................................................................... 47
H. Water Quality ............................................................................................................................. 53
I. Indicative Project Outcomes .................................................................................................... 55
J. Beneficiaries ................................................................................................................................ 89
Project No. : 643UD Biratnagar Integrated Water, Sanitation, Hygiene Project ........................... 90
A. Project Information: ................................................................................................................. 90
B. Executive Summary: ............................................................................................................... 90
C. Project Approach ..................................................................................................................... 91
D. Progress against key deliverables ........................................................................................ 94
E. Partnership ............................................................................................................................. 106
F. Resources ............................................................................................................................... 107
G Field visits and monitoring .................................................................................................... 108
H. Water Quality ......................................................................................................................... 113
J. Beneficiaries ........................................................................................................................... 123
Project No.: 643VB Advocacy and Post Monitoring and Project Supports in Urban Hill ........... 125
A. Project Information: ............................................................................................................... 125
B. Executive Summary: ............................................................................................................. 125
C. Changes in Project Background, Design & Risk Management ..................................... 125
D. Progress against key planned Activities ............................................................................ 125
E. Partnership ............................................................................................................................. 150
F. Resources ............................................................................................................................... 150
G Field visits and Monitoring .................................................................................................... 151
H. Water Quality ......................................................................................................................... 154
I. Indicative Project Outcomes ................................................................................................. 154
. Beneficiaries ............................................................................................................................. 164
Project No.: 643UF Advocacy and Post Monitoring and Project Supports in Urban Terai 165
A. Project Information: ............................................................................................................... 165
B. Executive Summary: ............................................................................................................. 171
C. Changes in Project Background, Design & Risk Management ..................................... 171
D. Progress against key planned Activities ............................................................................ 171
E. Partnership ............................................................................................................................. 200
F. Resources ............................................................................................................................... 200
G. Field visits and Monitoring .................................................................................................. 200
H. Water Quality ......................................................................................................................... 201
I. Indicative Project Outcomes. ................................................................................................ 201
2
3
CHAPTER 1: AN OVERVIEW OF PROJECT PLANS
1.1 General Information:
Project
Name Of the Project
No.
Sub-Program
643UE
Itahari Integrated
Water, Sanitation and
Hygiene (IiWASH)
Improvement Project
Biratnagar Integrated
Water, Sanitation and
Hygiene (BiWASH)
Improvement Project
Post Monitoring and
Project Supports in
Urban Terai
Urban Terai
Post Monitoring and
Project Supports in
Urban Hill
643UD
643UF
643VA
Water/
Sanitation/
Hygiene
Water,
Sanitation,
Hygiene
Service Delivery/
Capacity Building/
Sector Influencing
Service Delivery,
Capacity Building, Sector
Influencing
Urban Terai
Water,
Sanitation,
Hygiene
Service Delivery,
Capacity Building, Sector
Influencing
Urban Terai
Water,
Sanitation,
Hygiene
Capacity building
Urban Hill
Water,
Sanitation,
Capacity Building/
Sector Influencing
4
1.2 Implementation Status:
Project
Funding
Approval
No.
(Confirmed/
(Approved/
Contingent)
Not approved)
643UD
7621432.00
Approved
643UE
4789000.00
Approved
643UF
1453338.00
Approved
643VB
1449230.00
Approved
Implementation
(Commenced/
Not Start)
Commenced
Commenced
Commenced
Commenced
Planned
or Actual
Start Date
April 2010
April 2010
April 2010
April 2010
Proposed
Completion Date
June 2010
June 2010
June 2010
June 2010
1.3 Budget and Expenditure:
Total (Annual)
Project
Plan
Numbe
r
Original
Budget
(MPB)
Approve
d/
Revised
Budget
Expend
%
Utili
z
Reporting Quarter- Q1+Q2+Q3+Q4
Original
%
Budget
Utili
(MPB)
Revised
z
Expend
Budget
Sub Programme: Hill
643VB
Sub
Total
(A)
1449230
1389260
1209291
87%
1449230
1389260
1209291
87%
1449230
1449230
1209291
87%
1449230
1389260
1209291
87%
Sub Programme: Tarai
643UE
4789000
4789001
4750450
99%
4789000
4789001
4750450
99%
643UD
7621432
7736152
7589967
98%
7621432
7736152
7589967
98%
643UF
Sub
Total
(B)
Total
1453338
1398588
1274520
91%
1453338
1398588
1274520
91%
13,863,770.0
0
13923741
13614937
98%
13863770
13923741
13614937
98%
15,313,000.0
0
15,372,97
1
14,824,22
8
97%
15,313,00
0
15,313,00
1
14,824,22
8
97%
(A + B)
Justification for Variance in Grand Total (+/- 10%):
1.4 List of projects and beneficiaries (Six month and Annual Report only – six month report just
completed projects & annual report all projects)
Project
Nos.
Planned
Achieved
Water
San
Hyg
Water San
Hyg
Water San
Hyg
643UD
4,000
2,200
4000
3764
9764
-6%
144%
3402
Variance (%)
55%
Justification for
variance
Water: Due to graded
subsidy the total
number of water
points rehabiliated at
the communities were
414 against planned
350.
5
Sanitaition: In case of
Sanitation the
achieved number of
beneficiaries exceeds
the planned as
because 3 institutional
latrines were
constructed against 1
planned.
643UE
4,300
1,200
4300
1984
1483
1984
-54%
24%
-54%
Water:Earlier during
the time of planning
,the benificiary from
the Water Safety Plan
was termed Direct
Benificiaries but Later
the definition of
Direct Benificiaries
was strictly defined to
be the one with
access through
Service
Delivery,Hence Such
Benificiary planned
couldnot be achieved
Sanitation:Additional
6 toilets were
constructed to
address the
community demand
for ODF and hence
206 toilets were
constructed which
resulted higher
number of benificiary
643UF
643VB
525
1137
117%
An agreement has
been signed with the
Sri Adharsa Higher
Secondary School,in
thimi ,for institutional
latrine construction in
joint partnership and
theinstitutionallatrine
construction is under
process .However
the School is
lobbyingfor fundsfrom
other stake holders
like DOE and
Municipality.
6
TOTAL
8,300
3,925
8,300 5,748
6,022 11,748 -31%
53%
42%
In Case of Advocacy…..
List of projects and Influencing Beneficiaries (Annual Report only)
Project
WASH Influencing Beneficiary
Justification for Variance
Nos.
Planned
Achieved
Variance
2,978
13,250
345%
In case of water pipelines in Jamungachi,
Jatuwa, Bakhari and Mangad is not yet
extended but the budget for extension had
been disburesed and in case of Munalpath
two phase transmitter was installed in
NWSC premises resulting no load shedding
benefitting 2000 more household for water
distribution.
1,230
810
-34%
Municipality has invested for the
construction of public latrine in local market
of Janata Basti where Lumanti has
contributed for Biogas Plant
643UD
Extension of water pipeline had been done
by Itahari Small Town Water & Sanitation
Users Corporation in all areas of
Malangbaba, Namuna &
Manakamana.Many communities adjacent
to theses communities are having access
to pipeline water by borrowing with theses
communities
Itahari Municipality and ISTWSUC have
wor ked out that 60- 65 km pipeline
extension is required for full coverage of IM
and both of the insitutions are lobbying with
partnership with CF Itahari with other
institution for this work to be carried out for
future.
643UE
643UF
1,874
2,000
7%
943
1,987
111%
Sanitation:
New Public Toilet Construction in
Sankhadhar Chowk, Thimi=about 550 daily
users
Water:
Pipeline extension in Ward 15=100 m
benefiting 300 population
Adarsha Higher Secondary School
(Installation of water purification
plant)=1070 students and 67 Teachers
643VB
TOTAL
7,025
18,047
157%
7
Justification for variance in Total (+/- 10%)
CHAPTER 2: ORGANISATIONAL OPPORTUNITIES AND CHALLENGES
A: Significant changes at organizational level- staffing, new policies/strategies, priorities etc
Appointment of New Technical Supervisor
Technical Supervisor Mr. Sagar Baniya resigned from his post from the end of July 2010 and
his position is later replaced by Mr. Hari Bardewa. He has joined Lumanti from 23rd August
2010.
Appointment of CHMs/CHVs
Ms. Shrijana Pokhrel, who has been working as CHV for Purba Mushari Community in ward
no. 6 left Itahari for her further study and she was replaced by Ms. Firni Chaudhary from Purba
Mushari from 1st May 2010.
Ms. Hira Chaudhari, CHV for Dedhgaria Tole, ward no. 6 of Itahari Municipality passed away
on 3rd June 2010. Her post of CHV remained vacant for around one month (June). Water and
Sanitation Users Committee recommended Ms. Hem Kumari Chapagain, resident of
Dedhgaria Tole, as potential CHV to replace Ms. Hira and she was appointed from July 1,
2010. After a month of her appointment, Ms. Hem Kumari Chapagain left for Kathmandu and
the post remained vacant again. The Water and Sanitation Users Committee then appointed
Ms. Rina Chaudhary to fulfill the vacant post from 1st September 2010.
List of CHMs and CHVs appointed from ward no. 7, 8 and 9 of Itahari Municipality during April
– September 2010 were as follows:
Name Lists of CHM/s
S.N
1
2
3
Name
Appointment Date
Ms. Kamali Chaudhari– CHM for ward no. 7 and CHV for
June 2010
Bhurki Kadmaha
Ms. Darshana Adhikari – CHM for ward no. 8 and CHV for
June 2010
Tengra Tole
Ms. Mango Chaudhary – CHM for ward no 9 and CHV for
July 2010
Laliguras
Name Lists of CHV/s
S.N
1
2
3
4
5
Name
Appointment Date
Ms. Ambika Chaudhari – CHV for Bhurki Nahar, Ward no.
June 2010
7
Ms. Kalpana Harijan - CHV for Manakamana Tole, Ward
July 2010
no. 7
Ms. Laxmi Sardar – CHV for Bhurki Sahara Tole, Ward no
July 2010
7
Ms. Pooja Poudel – CHV for Marik Vasti, Ward no. 8
June 2010
Mr. Sanjay Thapa – CHV for Himalaya Tole, Ward no 8
August 2010
8
9
Ms. Sushila Kumari Chaudhari – CHV for Adarsha Tole,
Ward no. 9
Ms. Sahena Khatun – CHV for Jame Maszid Tole, Ward
no. 9
Ms. Bobby Kumari Podar – CHV for Pragati Tole, Ward
no. 9
Ms. Sarita Karki - CHV for Namuna Tole, Ward no. 9
10
Ms. Poonam Sardar – CHV for Prativa Tole, Ward no. 9
6
7
8
June 2010
June 2010
June 2010
June 2010
August 2010
Visit of CLIFF team to Lumanti Head Office:
Lumanti had submitted an EOI to CLIFF-Homeless International to partner with them in order to
improve housing conditions of poor in Nepal. Of the 120 applicants, Lumanti was among the 4
selected for the next step of the evaluation for the qualification. This was the fourth step to qualify for
the CLIFF programme for 2011/2012. For this purpose, a team of four personals from the organization
visited Lumanti on 22nd of September, 2010 on a week’s trip. The principal objective of this visit was to
get to know the organization and its approaches better.
As part of series of meetings with the Lumanti Staff members, a brief presentation was given by the
CLIFF team on the concept and approach of the whole programme. The presentation also included
the works being done in other CLIFF Partners such as Philippines, India and Sri Lanka. A general
overview of the Nepal’s urban scenario and works done by Lumanti was briefed to visiting team.
Several meetings were conducted with individual staff and project teams to learn about their roles,
responsibilities and working mechanism of these projects. A field trip to Kirtipur Housing was
organized and so was the trip to Bharatpur to see the ACCA approach of community-led housing
programme there. In addition to these, the visit also comprised of several meetings with Lumanti’s
board members, partners (both government and non government), stakeholders, federations,
cooperative and community members.
The team was immensely impressed with approaches adopted by Lumanti to make its projects
community-led. The concept to link community saving and saving and credit cooperative with housing
was well- appreciated.
Evaluation conducted by Social Welfare Council (SWC)
A study was conducted by a team consultant from SWC to evaluate the process adopted during
implementation of Lumanti’s programmes and its impact on the targeted beneficiaries. The study
seeked to assess: progress made by the projects; their impact on the slum and squatter communities;
implementation process and strategies followed; sustainability aspects; coordination and partnership
among the stakeholders; financial management and discipline maintained; use and records of the
expendable and durable items; and compliance by the institution to laws of the state and the Social
Welfare Act 2049 BS. It was conducted in three of the projects currently being implemented by the
organization namely ACCA Slum Upgrading Project in Bharatpur, Chitwan; Water, Environment and
Local Livelihood (WELL) Project in Nepalgunj; and Khadipakha and Narayan Tole Environmental
Sanitation Improvement Project in Kathmandu. A brief presentation and discussion for each of the
programmes were conducted, followed by a field trip to each of these areas. The focus of these visits
was to interact with the key stakeholders principally the community members in order to study
 To analyze socioeconomic sustainability,

To study problems encountered and efforts made to solve them,

To study coordination and partnerships among organization, project and local bodies.
9
A report was prepared by the team and presented before the Council of SWC, Lumanti personals .
Some of the key issues and suggestions highlighted in the report are as follows.
1. The ACCA program model of housing development is now replicable in local governmentprivate-community mode of project design. Since the municipalities lack such funds,
government should allocate for urban areas as it is done in “people’s residence program” for
rural housing development for dense settlement program.
2. Lumanti should change its mandate and extend coverage to rural areas as well to reach out
more communities to support shelter development.
3. The nature of urban poverty has been more dynamic with increased urbanization over time.
Lumanti should as well focus on research towards increasing urbanization and associated
problems and likely solutions. How to cope with dynamic nature of urban poverty is a
challenge faced by the nation today.
This evaluation has been beneficial for the organization so as to improve on the aspects, on which
the organization need further strengthening.
B: Change in donor relations or funding
Election of a new board
A Special Annual General Assembly was held on 12th Sep 2010 to elect a new board for the
organization. New Board members are as follows
1. President Mr. Prafulla Man Singh Pradhan
2. Vice President Ms. Eliza Baidya
3. General Secretary - Ms. Lajana Manandhar
4. Tresurer Ms. Sajana Amatya/Shakya
5. Member Mr. Padam Lal Shrestha
6. Member Mr. Kuldeep Tuladhar
7. Member Mr. Anil Sthapit
The tenure of this board will be for 2 years. During the program, the old team handed over the
roles and responsibilities to the new members.
C: Key operational blockages-internal/external
Due to a week- long indefinite strike (Aamhadtaal) called by CPN (Maoist), from May 1, 2010
till May 7 2010, all the activities planned during the period had to be postponed.
Most of the local festival, culture and tradition of Chaudhary community fall on the month of
Baishak, (April – May), this has also delayed the project activities.
The latrine construction has been affected by a continuous rainfall. Rings used for the latrine
are built onsite and inundation as well as high water table problems not only hindered the ring
production but also made the construction work was difficult.
The connection of water pipeline in Malangbaba Tole of ward no 6, was delayed due to conflict
between the service provider (Itahari Small Town Water & Sanitation Users Corporation) and
Malangbaba Tole Bikash Samitee. Initially in the stakeholder’s meeting, it was agreed to
provide subsidy Rs. 2000 to all the urban poor of the community. But after the Malangbaba UC
submitted the forms for the pipeline connection, Small Town disagreed to provide the subsidy
amount to the household with land ownership. According to Small Town, if the subsidy was
10
granted to those household, other beneficiaries of the Small Town will also seek for the same
support and for that Small Town cannot invest. But, the community demanded for an equal
subsidy for all the urban poor of the area, otherwise they will not allow Small Town to connect
the pipeline even in the squatter household. The pipeline connection’s work resumed only
after the decision of ISTWSUC for providing subsidy to the users in connection of pipelines.
11
CHAPTER 3: ADDITIONAL KEY EVENTS TO DATE
Every year Nepal government is celebrating 'National Sanitation Week' marking World
Environment Day, June 5. This year as well, the government has announced 'National
Sanitation Week' which started from 5th June 2010 for a week. To celebrate this national
event, the Water and Sanitation Division Office at Itahari summoned all the stakeholders,
NGOs, CBOs and VDCs for a joint meeting to share their activities. Every organizations
working in Sunsari district presented their activities focusing the sanitation issues and its
importance for the development of the area.
Lumanti, to mark the 'National Sanitation Week' conducted a week long community clean up
campaign and sanitation awareness programmes in all the six communities of ward no. 6
where Lumanti has implemented its programmes during the fiscal year 2009/2010.
CHAPTER 4: ORGANIZATIONAL EFFECTIVENESS (Six Month & Annual Reports only)
A: Timeliness (reporting, budget approval, budget release etc)
Not Applicable
B: Human Resource Development
Not Applicable
C: Project management (procurement, material management)
As practiced, procurement and material management are done at the project level in
partnership with the stakeholders.
D: Non Project based agreements relevant to the WASH activities:
Not Applicable
E: Publication and dissemination:
Not Applicable
F: Value added in the sector:
Not Applicable
12
CHAPTER 5: PROJECT WISE INFORMATION (to be completed for each
on going and completed Projects)
Project No. : 643UE Itahari Water Environment Sanitation and Hygiene Promotion
Programme
A. Project Information:
-
Project Name: Itahari Water Environment Sanitation and Hygiene Promotion Programme
Names of Sub-Projects (if applicable): Urban Terai
Project Period: 2009-2012
Name of Partner Organization: Itahari municipality, UC, Citizens Forum
Partner Organization Number:
B. Executive Summary: (Annual Report Only)- not more than 1 page
Lumanti in partnership with Itahari Municipality has been implementing 'Itahari Integrated Water,
Sanitation and Hygiene Improvement Program' (IWASH) in all targeted clusters of 4 wards.
During the program implementing period, in the fiscal year 2009/10, under IWASH program,
Lumanti in partnership with Itahari Municipality has covered 6 clusters (342 HH) of ward 6. To
address the water, sanitation and hygiene situation in the targeted clusters of ward 6, Lumanti has
initiated hardware and software programs. Likewise, during the fiscal year 2010/11, the program
has covered five clusters (252 HH) of ward 7 and two clusters (87 HH) of ward 8 to address the
water, sanitation and hygiene situation. The program has also covered one added cluster (94 HH),
Shiva Parbati tole of ward 6, during the fiscal year 2010/11 with the recommendation of Itahari
Municipality as the clusters is just adjacent to Dedhgaria tole focusing the declaration of ODF
zone.
In this fiscal year 2010/11, IWASH program has also intervened six clusters (369 HH) of ward 9
through its hygiene promotion program through CHM and CHV.
For all the WASH programs initiated under IWASH, one Water & Sanitation Users Coordinating
Committee (WSUCC) is formed in ward no 6 representing six Water & Sanitation Users
Committee (WSUC). Likewise another WSUCC is formed representing seven WSUC from ward 7
and 8. The WSUC and WSUCC have been given trainings on pre construction, post construction
and operation and management of the water facilities provided. One WSUCC is formed in ward
no 9 representing six WSUC from ward 9.
The program has delivered water access to the targeted clusters. Around 1984 people from the
eight communities of wards no. 6, 7 and 9 including 1000 students from Shree Saraswati Satan
Ma Vi in ward no. 7 have been provided with improved access to water facilities. Lumanti has
installed 3 public hand pumps in Kadmaha Tole of ward 7. Lumanti, under its IWASH program
planned for the fiscal year, has laso taken initiative to address the interest of the community
people and the stakeholders and contributed for the household pipeline connections in
Malangbaba Tole of ward 6, Manakamana (Harijan) Tole of ward 7 and Namuna Tole of ward 9.
13
In short, 69 HH in Malangbaba Tole, 47 HH in Manakamana (Harijan) Tole and 37 HH in Namuna
Tole has now access to water pipeline by this programme in Itahari.
All the water points provided have been tested to ensure its use. Health and Hygiene programme
has been framed in the programme to address the recommendations from the water test result in
the community. 4 local cadres for WQ test has been developed in ward no 6, 7, 8 & 9 at
community/local level. CHM has been developed as a local cadre as water quality which is directly
related to public health and hygiene. It is learnt that, people are more impressed when the test is
done by their community health motivator.
CBME system has been initiated in some communities. However, the community has not
completely implemented the tools due to its complexity. Social Mobilizers and Community
Development Workers are conducting orientation programs to all UCs to initiate it in all cluster.
The technologies, learnings and good practices have been shared with the community groups and
local stakeholders at municipal level. Operation and Maintenance of large infrastructures where
many households depend is practical. However, operation and maintenance of a small scale
community hand-pump is very challenging as nobody claims responsibility and everyone claims
the right for using it. Apart from that, there is high risk of theft of hand pump head and other
accessories during night time. Therefore, the users committee themselves also did not show
interest for installation of community hand pumps. Based on the sharing, the municipality and
local stakeholders have shown interest towards extension of pipeline water wherever possible and
not promote groundwater extraction.
Likewise, the program has also delivered sanitation facilities to the targeted clusters through
which around 1483 people from the eleven communities of wards no.6, 7 and 8 are provided with
access to improved sanitation facilities in FY 10/11. The communities have adopted the
programme positively and have adopted healthy sanitation practices. Therefore five communities
of ward 6 and 4 communities of ward 7 are already declared ODF zone. Under the same program,
Lumanti has contributed its small budget for the installation of a biogas plant sized 35 m3 along
with public latrine in the local market (Hatiya Bazar) at Janata Basti of ward no 5. Total of around
144 people from 27 households will be difrectly benefited through the construction of Bio gas
plant. Apart from the contribution of Lumanti, Itahari Municipality has also contributed for the
same. Besides, other stakeholders namely SEAM-N project and District Development Committee
have also shown their greater interest for contribution and are in the process. The local
construction committee has also requested Water & Sanitaiton Division Office, Sunsari for
financial support.
The program has also intervened on Livelihood support as recommended by WESHI plan through
Saving & Credit (S&C) Groups. 14 S&C groups from ward 6, 7 & 8 are currently functioning.
Through their initiatives, Women Cooperative titled 'Sangini Mahila Bachat Tatha Rin Sahakari
Sanstha Limited' is registered recently and now is in process for group transformation. Recently
registered Women cooperative shall also contribute in the sector of water, sanitation and hygiene
improvement sector. In the present context as well, some S&C groups in the clusters have been
contributing its members for the construction of super structures in the latrines through low
interest loan. Moreover, it is understood that some households in Malangbaba Tole of ward 6
have taken loan for their investment in household water pipeline connection.
Coordination and partnership with local stakeholders, I/NGOs and government agencies has
definitely left positive impact during the implementation of the IWASH program. Support from
District Health Office, Primary Health Centre and Marie Stopes for the Health Camp and
Orientation Program on women health focusing on healthy sanitation practice conducted by
Lumanti has been well appreciated by the community people. Likewise, a good partnership with
the only water pipeline service provider of Itahari Municipality, Itahari Small Town Water and
Sanitation Users Corporation (ISTWSUC), for the water pipeline extension and household water
pipeline connection has become the most appreciable step towards participatory approach.
14
ISTWSUC has provided its significant contribution specially focusing for urban poor communities.
On the other hand, people from the urban poor communities are also highly motivated for their
participation towards water pipeline connection.
As the CHVs and CHMs are selected from the community, they will remain in the community for
longer period than recruited the external facilitators/ workers. With this concept Lumanti has
mobilised the local people as CHV/ CHM. Their mobilisation in hygiene education and promotion
has been found effective in improving hygienic behavioural practices at the community level. Also
their participation in different activities during this project intervention in the different WASH
related issues has been found effective in enhancing their capacity in one hand and developing
human resource on the other capable enough to deal with heath and hygiene issues related to
WASH at the local level.
The municipality has initiated to develop a revised WESHI plan, (WASH coordinated plan)
incorporating the development need of the municipality and the plan as well as budget of the
development partner organizations working in the WASH field within the municipality. Regarding
the adaptation of WESHI plan by the municipality and integrating it into the municipality’s planning
process, municipality has organized a one day coordination workshop in partnership with Lumanti
with support of Citizen Forum, with all the sector stakeholders of the municipality. Based on the
decision made at the one day coordination workshop conducted by Itahari Muncipality in
partnership with Lumanti with support of Citizen Forum, with all the sector stakeholders of the
municipality has conducted household data and it is under processing for the development of
WASH coordinated plan.
15
C. Changes in Project Background, Design & Risk Management (refer to Project Plan –
Sections 1, 4 & 8):
Additional cluster for WASH service
As per the project plan, the total planned number of household latrine construction for the
2009/2010 was 170. However, after the demand received from the local community through Water
and Sanitation User’s Committee of ward no 6, number of household latrines constructed in ward
no 6 is 147 (including one disable friendly latrine at Balgram). After the consultation with the
municipality regarding the remaining 23 household latrines, the municipality has recommended to
work in a new cluster in ward no. 6.
Shiva Parvati Tole of ward no 6 is the new cluster recommended by Itahari Municipality for the
construction of household latrines. Shiva Parvati Tole has been recommended on the basis of the
demand letter from the tole itself requesting for the construction of household latrines in the cluster.
Shiva Parvati Tole has 91 households in total. It has a total population of 594 out of which 289 are
female and 296 are male. There are 9 disable male members in the cluster.
Majority of the cluster members earn their living as day labors in different sectors such as factory,
transportation, agriculture etc.
There is formation of Tole Bikash Samitee (Cluster Development Committee). The Tole Bikash
Samitee is found involved in saving and credit activities in the cluster in support of Itahari
municipality. In order to explore and strengthen their livelihood alternatives, it seems appropriate to
work in close coordination with municipality and committee itself.
The major source of drinking water in the cluster is found to be dug tube wells. A total of 74 families
have their own tube wells in the cluster. Though there is the availability of piped drinking water, no
household has connected the water pipeline. Majority of the families use drinking water as it
comes from the sources, however, some of them claim of boiling water before use particularly
when there are cases of diarrhea during monsoon.
There are 69 families owning pit latrines. Rest of the families either go for open defecation in
nearby bushes or use neighboring latrines. There are no public toilets being used by the cluster.
Families show interest to build toilets if they have support.
There is no proper waste management system in the cluster. Families throw away household
wastes in an unmanaged way. There is no proper management for wastewater as well. It seems
appropriate to arrange effective drainage with provision of sanitation awareness raising events in
the cluster.
After the approval from the municipality for the implementation of construction works in Shiva
Parvati Tole, Lumanti Team visited the working site for necessary procedure. Water and Sanitation
User’s Committee has been formed for the implementation of the construction activities which has
also opened a separate bank account in the local bank at Itahari. As practiced, procurement and
material management has been done in coordination with Water and Sanitation Users Coordinating
Committee (UCC) of ward no 6.
16
D. Progress against key planned Activities (Refer to Key Deliverables in Project Plan Section
4 and Plan of action/Output Plan of the project):
Service Delivery
Sectors
Water
Key
Deliverables
(As
mentioned in
Project Plan)
Connection of
150 HH to
pipeline water
supply being
distributed by
Itahari Small
Town Water
and Sanitation
Users
Corporation
Installation of
5 new
community
hand pumps
Annual Total (Outputs)
Total Plan
Progress To
Date
Quarterly Output
Plan
Progress in
Q4
150 HH
water
pipelines
connection
was planned
for the FY
2010/11
64 HH
water
pipelines
were
connected
in
Malangba
ba Tole of
ward 6 till
Q3.
Remainin
g 86 HH
water
pipelines
connectio
n was
planned
for Q4.
Though the
planned HH
water
pipelines for
Q4 is 86,
total of 89
HH water
pipelines
were
connected
in Q4.
Lumanti
Itahari
with
consent
NA
5 new
communal
hand pumps
was planned
Total of 153
HH water
pipelines
were
connected
during the FY
2010/11
implementing
graded
subsidy
approach. 69
HH water
pipelines in
Malangbaba
Tole of ward
6, 47 HH
water
pipelines in
Manakamana
(Harijan) Tole
of ward 7 and
37 HH in
Namuna Tole
of ward 9
have now
access to
pipeline water
being
distributed by
ISTWSUC.
Total of 852
people were
directly
benefited
from HH
water points
connection of
153 Water
pipeline
connected
3 communal
hand pumps
were installed
in Kadmaha
6 HH water
pipelines in
Malangbaba
of ward 6,
47 HH water
pipelines in
Manakaman
a (Harijan)
Tole of ward
7 and 37
HH in
Namuna
Tole of ward
9 have now
access to
tap water
being
distributed
by
ISTWSUC.
Justificati
on of
Variance
Implement
ation of
graded
subsidy
approach
for HH
water
pipeline
connectio
ns saves
some
budget in
the
respective
heading.
The
communit
y on the
other hand
had high
demand of
HH water
pipelines
connectio
n. The
excess
budget
was
utilized to
fulfill the
communit
y demand.
Merged the
budget of 2
communal
hand
17
Installation of
1 new hand
pump in
institution
for the FY
2010/11
Installation of
1 new hand
pump in
institution
planned.
Tole of ward
7.
No demand
received from
the
community for
community
hand pump.
However, the
local school
(Shree
Saraswati
Satan Ma Vi)
from ward 7
requested for
the support to
enhance
water service
facility. As per
our study,
Shree
Saraswati
Satan Ma. Vi
located in
ward 7 had
only one
water tap
serving for
around 1000
students. Due
to the lack of
enough
number of
water points,
the huge
number of
students
hardly get
chance to
quench their
thirst during
the short
period of
break time.
Lumanti
Itahari with
consent from
head office
and decision
from PIC
planned to
install a 1000
Lt. water tank
with
from head
office and
decision
from PIC
planned to
install a
1000 Lt.
water tank
with
distributio
n channel
merging
the budget
of 2
communal
hand
pumps
and 1
institution
al hand
pump in
Shree
Saraswati
Satan Ma.
Vi of ward
7
pumps and
1
institutional
One 1000
hand pump
Lt. water
to install
tank with
1000 Lt
distribution
water tank
channels
with
was
distribution
installed in
channel in
Shree
Shree
Saraswati
Saraswati
Satan Ma.
Vi of ward 7. Satan Ma.
Vi. Around
Around
1000
1000
students
students
were
were
directed
directed
benefited
benefited
from the
from the
water tank.
water tank.
18
A report on
WQ test of all
the water
points
conducted
twice in a year
produced with
achievement
of promoted
household
treatment
options for
safe
consumption
of water when
found WQ
deviated from
the standard.
156 Water
points were
planned for
Water
Quality test
during FY
2010/11.
Training on
WSPs at the
community
level within 13
communities
of ward (7-9)
conducted
and all the
communities
of ward (6-9)
prepared
WSPs.
Conducted
monitoring of
implementatio
n of WSPs in
all the
communities
of ward (6-9).
Developed
WSP in all the
communities
and monitored
the
effectiveness
of
implemented
WSP in all the
WSP had
been initiated
in Nahar Tole
of ward no 6
as a pilot
project.
17 platforms
were
renovated to
prevent
ground water
contaminatio
n.
Community
people were
now aware
on safe
drinking
water. Some
households
had already
started
SODIS
technology
for water
purification.
WSP Team
which was
formed
distribution
channel.
WQT of 3
new hand
pumps in
Kadmaha and
20 hand
pumps in
Nahar (where
WSP initiated)
had been
performed.
Towards the
WQT of 153
household
water pipeline
connection in
Malangbaba,
Namuna and
Manakamana
Tole, 16 water
points had
been tested
sampling in
the ration of
1:10
WSP had
been initiated
in Nahar Tole
of ward no 6
as a pilot
project.
17 platforms
were
renovated to
prevent
ground water
contamination
.
Community
people were
now aware on
safe drinking
water. Some
households
had already
started
SODIS
technology for
water
purification.
WSP Team
which was
formed during
orientation
153 water
points
were
planned
for WQT
during Q4
WQT of 153
household
water
pipeline
connection
in
Malangbaba
, Namuna
and
Manakaman
a Tole, 16
water points
had been
tested
sampling in
the ration of
1:10
NA
NA
NA
NA
WSP had
been
initiated in
Nahar Tole
of ward no
6 as a pilot
project.
17
platforms
were
renovated
to prevent
ground
water
contaminati
on.
Community
people
were now
aware on
safe
drinking
water.
Some
households
had
already
started
SODIS
19
Sanitation
implemented
communities.
during
orientation
has been
monitoring of
WSP
implementati
on.
has been
monitoring of
WSP
implementatio
n.
Annual
progress
report
produced
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective.
200 HH
latrines
constructed/re
novated
Annual report
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective
One Annual
report
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective
produced
200 HH
latrines were
planned for
the FY
2010/11
Total of 206
HH latrines
covering
seven
communities
of ward 7 & 8
Annual
report
indicating
equity &
inclusion
status,
particularl
y the
beneficiari
es in
terms of
poor and
exclusion
perspectiv
e
Out of
total 200
HH
latrines,
128
latrines
One Annual
report
indicating
equity &
inclusion
status,
particularly
the
beneficiarie
s in terms of
poor and
exclusion
perspective
produced
Though the
72 HH
latrines
were
required
meet the
technology
for water
purification.
WSP Team
which was
formed
during
orientation
has been
monitoring
of WSP
implement
ation.
Though the
piloted
project
was
completed
but more
planning
and budget
was
required for
this to be
done other
communitie
s which
was the
constraint
so it was
has been
planned for
years to
come.
NA
Due to the
additional
demand of
HH latrines
in
Kadmaha
20
8
communities
declared ODF
8
communities
were planned
for ODF
declaration
during FY
2010/11
were
constructed
during the FY
2010/11. In
ward 7 of
Itahari
Municipality,
43 HH latrines
in Nahar, 17
HH latrines in
Manakamana,
50 HH latrines
in Kadmaha,
39 HH latrines
in Sahara and
29 HH latrines
in Tengra
Tole were
constructed.
Likewise, in
ward 8 of
Itahari
Municipality,
17 HH latrines
in Pashupati
(Mallik) Tole
and 11 HH
latrines in
Himala Tole
were
constructed.
Through this
service total
of 1036
people were
directed
benefited.
Total of 9
communities
namely
Balgram,
Miteri,
Malangbaba,
Dedhgaria &
Shiva Parvati
Tole of ward 6
and Nahar,
Kadmaha,
Sahara &
Manakamana
Tole of ward 7
were declared
ODF zone.
were
constructe
d by the
end of Q3.
annual
plan , due to
more
demand, 78
HH latrines
had been
constructed
during Q4
for the ODF.
Tole of
ward 7, 6
HH latrines
were
constructe
d owing to
ODF
despite the
budget
constraint.
8
communiti
es were
planned
for ODF
declaratio
n during
FY
2010/11
Total of 9
communitie
s namely
Balgram,
Miteri,
Malangbaba
, Dedhgaria
& Shiva
Parvati Tole
of ward 6
and Nahar,
Kadmaha,
Sahara &
Manakaman
a Tole of
ward 7 were
declared
ODF zone.
NA
21
Annual
progress
report
produced
indicating the
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective.
Household
solid waste
management
through suiro
& composting
programme
Annual report
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective
One Annual
report
indicating
equity &
inclusion
status,
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective
produced
Annual
report
indicating
equity &
inclusion
status,
particularl
y the
beneficiari
es in
terms of
poor and
exclusion
perspectiv
e
One Annual
report
indicating
equity &
inclusion
status,
particularly
the
beneficiarie
s in terms of
poor and
exclusion
perspective
produced
NA
Solid Waste
Management
option - suiro
was
promotion in
all
communities
of ward 7,8 &
9 was
planned in
FY
2010/2011
Solid Waste
Management
option - suiro
was promoted
in every
household of
the
communities
of ward 7, 8 &
9 along with
the orientation
on the use of
suiro and
plastic waste
management.
4 CHM and
15 CHV were
mobilized for
the program.
Some women
in the
community
were ready to
reuse waste
plastic for
webbing
baskets. Total
of 3584
people were
directly
benefited
through the
program.
Solid
Waste
Managem
ent option
- suiro
was
promotion
in all
communiti
es of ward
7,8 & 9
was
planned in
FY
2010/2011
Solid Waste NA
Managemen
t option suiro was
promoted in
every
household
of the
communitie
s of ward 7,
8 & 9 along
with the
orientation
on the use
of suiro and
plastic
waste
managemen
t. 4 CHM
and 15 CHV
were
mobilized
for the
program.
Some
women in
the
community
were ready
to reuse
waste
plastic for
webbing
baskets.
Total of
3584 people
were
directly
benefited
22
Construction
of 1 Waste
water
management/
treatment
plant
Contribution
amounting to
Rs. 150,000/was planned
for the
construction
of Biogas
plant as
recommende
d by Itahari
Municipality.
After some
series of
meetings with
Municipality, it
had identified
Local Market
place of
Janata Tole of
ward 5 for the
installation of
Bio gas plant
in the 2nd
week of
November.
Total
estimated
cost for the
construction
of the plant is
Rs.
649,000.00.
Lumanti has
contributed
Rs.
150,000.00
and
Municipality
had
contributed
Rs. 50000.00
for public
latrine to be
connected to
the Bio gas
plant. The
Users
Committee
had collected
Rs.
150,000.00
from SEAM-N
and Rs.
100,000.00
from District
Development
Committee
(DDC). The
UC was
lobbying with
different other
stakeholders
and
through the
program.
Contributi Till date
on
more than
amounting 80 percent
to Rs.
of the
150,000/- construction
was
work had
planned
been
for the
accomplishe
constructi d and the
on of
UC has
Biogas
expressed
plant as
their
recommen commitment
ded by
to operate
Itahari
the plan by
Municipalit the end of
y.
Baishak
(April-May
2011) if they
could
manage to
deficient
amount.
Total
estimated
cost for the
constructio
n of the
plant is Rs.
649,000.00
. Lumanti
had
contributed
Rs.
150,000.00
and
Municipalit
y had
contributed
Rs.
50000.00
for public
latrine to
be
connected
to the Bio
gas plant.
The Users
Committee
had
collected
Rs.
150,000.00
from
SEAM-N
and Rs.
100,000.00
from
District
Developme
nt
Committee
(DDC). The
UC was
lobbying
with
different
other
stakeholde
rs and
Municipalit
y for the
contributio
n for the
deficient
amount Rs.
23
Municipality
for the
contribution
for the
deficient
amount Rs.
200,000.00.
200,000.00
for the
completion
of the
project.
Till date more
than 80
percent of the
construction
work had
been
accomplished
and the UC
has
expressed
their
commitment
to operate the
plan by the
end of
Baishak
(April-May
2011) if they
could manage
to deficient
amount.
Mechanism
for collection
of Operation
and
Maintenance
fund was
developed in
the
community for
the
sustainability
of public
infrastructures
and the
collected fund
was well
managed and
Mechanism
for collection
of O&M fund
was planned
in every
communities
of ward 7 &
8.
Thus the
completion of
the plant as
committed by
the UC
members is
still a big
challenge.
Some
communities
had adopted
the system of
collecting
monthly fund
for O&M of
the
constructed
infrastructures
. Recently
registered
Sangini
Women S&C
Cooperative
Limited has
decided to
Mechanis
m for
collection
of O&M
fund was
planned in
every
communiti
es of ward
7 & 8.
Some
communitie
s had
adopted the
system of
collecting
monthly
fund for
O&M of the
constructed
infrastructur
es. Recently
registered
Sangini
Women
S&C
Cooperative
Operation
and
maintenan
ce of a
small scale
community
hand-pump
is very
challenging
as nobody
claims
responsibili
ty and
everyone
claims the
right for
using it.
24
transparent.
Hygiene
establish
Community
Development
Fund for the
sustainability
of the
constructed
infrastructures
.
Limited has
decided to
establish
Community
Developme
nt Fund for
the
sustainabilit
y of the
constructed
infrastructur
es.
Report
produced on
the
effectiveness
of hygiene
message in
the
community
and the
change
brought by the
education in
the
community
with case
studies.
One report
on the
effectiveness
of hygiene
message in
the
community
and the
change
brought by
the education
in the
community
with case
studies.
Report
produced on
the
effectiveness
of hygiene
message in
the
community
and the
change
brought by
the education
in the
community
with the case
study.
Report on
the
effectiven
ess of
hygiene
message
in the
communit
y and the
change
brought by
the
education
in the
communit
y
Mechanism
documented
on the
management
and
coordination
of CHVs for
the
sustainable
community
health
service.
Documentati
on of
management
and
coordination
of CHVs for
the
sustainable
community
health
service.
CHM and
CHVs were
mobilized as
developed
mechanism
Assessment
of sustained
Initiation of
CBME
CBME system
had been
Document
ation of
managem
ent and
coordinati
on of
CHVs for
the
sustainabl
e
communit
y health
service.
Initiation
of CBME
Apart from
that, there
is high risk
of theft of
hand pump
head and
other
accessorie
s during
night time.
Therefore,
the users
committee
themselves
also do not
show
interest for
installation
of
community
hand
pumps.
Report
produced on
the
effectivenes
s of hygiene
message in
the
community
and the
change
brought by
the
education in
the
community
with the
case study.
CHM and
CHVs were
mobilized as
developed
mechanism
CBME
system had
25
behavior
practices
through
CBME and
RCS survey
conducted
twice a year
annually.
system in all
seven
intervened
communities
of ward 7 & 8
and one RCS
Survey in
each quarter
in all
communities
of ward 7, 8
&9
initiated in all
communities
aimed at its
regular
practice and
followup.
Social
Mobilizers
and
Community
Development
Workers
conducted
orientation
programs to
all UCs to
initiate it in all
cluster.
Though
CBME had
been initiated
in all clusters
of ward 6, 7 &
8 the
community
has not
completely
implemented
the tools due
to its
complexity
owing to their
poor literacy.
However, the
system had
support the
UC members
to present
their
transparency
amongst the
community
people which
was
appreciated
during social
audit.
system in
all seven
intervened
communiti
es of ward
7 & 8 and
one RCS
Survey in
each
quarter in
all
communiti
es of ward
7, 8 & 9
been
initiated in
all
communitie
s aimed at
its regular
practice and
followup.
Social
Mobilizers
and
Community
Developme
nt Workers
conducted
orientation
programs to
all UCs to
initiate it in
all cluster.
Though
CBME had
been
initiated in
all clusters
of ward 6, 7
& 8 the
community
has not
completely
implemente
d the tools
due to its
complexity
owing to
their poor
literacy.
However,
the system
had support
the UC
members to
present their
transparenc
y amongst
the
community
people
which was
appreciated
during
social audit.
26
Document on
the
assessment
of hygiene
behavior
changes
conducted in
4 key areas
within the
communities
of selected
wards through
CBME & RCS
produced
annually.
Household
hygiene
monitoring
system had
been
implemented
in all 19
communities
of ward 6, 7,
8 &9 through
H&H
monitoring
chart. One
RCS Survey
each in every
quarter in all
communities
of ward 7, 8
& 9 had been
done
Cumulative
RCS report
produced.
The result
revealed that
the
communities
were much
aware on the
4 key hygiene
messages
and were
practicing
better
hygienic
behaviour
which can be
remarked by
increased
number in
practicing
hand washing
with cleaning
agents at
critical times,
consumption
of safe water
drinking,
covering
cooked food
and
maintaining
better
personal
hygiene.
Househol
d hygiene
monitoring
system
had been
implement
ed in all
19
communiti
es of ward
6, 7, 8 &9
through
H&H
monitoring
chart. One
RCS
Survey
each in
every
quarter in
all
communiti
es of ward
7, 8 & 9
had been
done
All the
community
people of the
target
communities
are provided
with 4 key
hygiene
education
annually
through
community
hygiene
education
Provide 4
key hygiene
educations
annually
through
community
hygiene
education
program to
the
community
people so
that they
adopt
The
communities
were much
aware on the
4 key hygiene
messages
and were
practicing
better
hygienic
behaviour
indicated by
increased
number in
Provide 4
key
hygiene
education
s annually
through
communit
y hygiene
education
program
to the
communit
y people
so that
Cumulative
RCS report
produced.
The result
revealed
that the
communitie
s are much
aware on
the 4 key
hygiene
messages
and are
practicing
better
hygienic
behaviour
which can
be
remarked by
increased
number in
practicing
hand
washing
with
cleaning
agents at
critical
times,
consumptio
n of safe
water
drinking,
covering
cooked food
and
maintaining
better
personal
hygiene.
The
NA
communitie
s were
much aware
on the 4 key
hygiene
messages
and were
practicing
better
hygienic
behaviour
indicated by
increased
27
program to
adopt
improved
hygiene
behavior
practice and
sustain them.
improved
hygiene
behavior
practice and
sustain them.
practicing
hand washing
with cleaning
agents at
critical times,
consumption
of safe water
drinking,
covering
cooked food
and
maintaining
better
personal
hygiene.
they adopt
improved
hygiene
behavior
practice
and
sustain
them.
Conducted
one 5 days
follow-up
training to
CHVs on
health and
hygiene
issues and to
use CBME/
RCS tools
and practice
the tools to
assess the
improvement
in hygiene
practice and
one refresher
training
annually.
5 days
follow-up
training to
CHVs on
health and
hygiene
issues and to
use CBME/
RCS tools
and practice
the tools
planned
4 CHMs and
15 CHVs are
provided with
5 days followup training on
health &
hygiene
issues and to
use
CBME/RCS
tools and
practice the
tools.
Household
hygiene
monitoring
system had
been
implemented
in all 19
communities
of ward 6, 7, 8
&9 through
H&H
monitoring
chart. One
RCS Survey
each in every
quarter in all
communities
of ward 7, 8 &
9 had been
done by
mobilizing all
trained CHM
NA
number in
practicing
hand
washing
with
cleaning
agents at
critical
times,
consumptio
n of safe
water
drinking,
covering
cooked food
and
maintaining
better
personal
hygiene.
NA
NA
28
& CHVs.
Hygiene
behavior
assessment
report
produced and
disseminated
to a wider
audience
annually.
NA
NA
Dissemina
tion RCS
report
amongst
the
communit
y people.
Reports
produced on
monitoring of
hygiene
behavioral
changes
through RCS
annually to
understand
the efficacy of
NA
NA
Dissemina
tion RCS
report
amongst
the
communit
y people.
RCS had
been
conducted
in all the
communitie
s of ward 69 and report
had been
produced
accordingly.
The overall
RCS report
has been
disseminate
d amongst
the
community
people
which
indicated
hygiene
behavior
had
improved
significantly
in almost all
the
communitie
s. People
had been
practicing
safe health
and hygiene
behavior.
The habit of
handwashing at
critical times
had
increased
significantly.
.
RCS had
been
conducted
in all the
communitie
s of ward 69 and report
had been
produced
accordingly.
29
approach and
messages
delivered /
communicate
d and the
reports are
disseminated
to concerned
stakeholders.
The overall
RCS report
has been
disseminate
d amongst
the
community
people
which
indicated
hygiene
behavior
had
improved
significantly
in almost all
the
communitie
s. People
had been
practicing
safe health
and hygiene
behavior.
The habit of
handwashing at
critical times
had
increased
significantly.
.
Capacity Building
Sectors
Water /
Sanitatio
n
Key
Deliverables
(As mentioned
in Project Plan)
13 caretakers
identified in
ward no 7 & 8
and trained on
technical
aspects,
particularly
O&M of the
system
Annual Total (Outputs)
Total Plan
Progress
To Date
Quarterly Output
Plan
Progress in
Q4
Justification
for Variance
Training for
identified 13
caretaker's of
all clusters of
ward 7 & 8
were
planned.
Training
for
identified
caretaker
s of all
clusters
of ward 7
& 8 were
planned.
NA
Identified
caretaker
s from all
clusters
of ward 7
& 8 were
trained
UCC to
effectively
operate
and
maintain
the
sanitation
infrastruct
Identified
caretakers
from all
clusters of
ward 7 & 8
were
trained
UCC to
effectively
operate
and
maintain
the
sanitation
infrastructu
30
ures
installed
for their
functionali
ty in the
long run
and
contribute
in
ensuring
ODF
status.
Their
contributi
on
towards
the
completio
n of super
structure
of HH
latrines
had result
the
declaratio
n of ODF
in 9
communit
ies of
ward 6 &
7. UCs
and
caretaker
s of some
communit
ies had
also
adopted
the
system of
collecting
monthly
fund for
O&M of
the
construct
ed
infrastruct
ures.
Recently
registered
Sangini
Women
S&C
Cooperati
res
installed for
their
functionalit
y in the
long run
and
contribute
in ensuring
ODF
status.
Their
contributio
n towards
the
completion
of super
structure of
HH latrines
had result
the
declaration
of ODF in 9
communitie
s of ward 6
& 7. UCs
and
caretakers
of some
communitie
s had also
adopted
the system
of
collecting
monthly
fund for
O&M of the
constructe
d
infrastructu
res.
Recently
registered
Sangini
Women
S&C
Cooperativ
e Limited
has
decided to
establish
Community
Developme
nt Fund for
31
4 trainings and
1 exposure
visit are
conducted for
Municipal level
sector
stakeholders
on different
technologies,
approaches,
practices and
models of
sanitation to
increase their
knowledge for
promoting
hygienic
sanitation
facility &
improved
neighborhood
environment
and replicated.
1 Leadership
& Group
Management
Training, 1
SWM
training, 1
CBME
Training &
several
exposure &
exchange
visit to
Bharatpur,
Biratnagar
and Dharan
were planned
for
Community
Users group
as well as the
municipal
staffs and
stakeholders.
ve
Limited
has
decided
to
establish
Communi
ty
Developm
ent Fund
for the
sustainabi
lity of the
construct
ed
infrastruct
ures.
Training
NA
on
Leadershi
p
Developm
ent &
group
Managem
ent, SWM
and
CBME
had been
conducte
d with
Communi
ty Users
group as
well as
the
municipal
staffs.
The
municipal
staffs
showed
interest in
this
managem
ent tool
where
communit
y can do
the
monitorin
g of the
work
progress
and
the
sustainabili
ty of the
constructe
d
infrastructu
res.
NA
NA
32
budget by
themselv
es. UC
and UCC
had
shown
greater
interest
as it will
make
everyone
in the
communit
y
transpare
nt on the
work
process
and the
budget
utilization.
A
househol
d level
CBME
chart had
been
develope
d by
Lumanti
was
distribute
d in each
communit
y for
everyone
to see.
From the
cross
learning
and
experienc
e sharing
during the
exposure
visit,
especially
the
communit
y people
found
highly
encourag
ed and
motivated
33
1 local cadre
developed in
each ward (7,
8 and 9) on
WQ
assessment at
community
level twice a
year and
disseminated
assessment
result to wider
audience on
WQ and safe
consumption of
Water.
1 local cadre
each in ward
7, 8 & 9 was
planned for
WQ test,
report
disseminatio
n
resulting
a
constructi
on of
drainage
by their
own effort
in Mallik
tole of
ward 8.
Good
interactio
n
between
Secretary
of Itahari
Small
Town and
President
of
Jakhadim
ai WSUC
had
definitely
support
for some
affirmativ
e change
towards
water
service
delivery.
1 each
local
cadet for
WQ test
had been
develope
d in ward
no 7, 8 &
9 at
communit
y /local
level.
CHM had
been
develope
d as a
local
cadet as
water
quality
was
directly
related to
NA
NA
NA
34
Report
produced each
year on the
initiative taken
in the
community for
the effective
collection and
utilization of
operation and
management
(O&M) fund
and how the
recovered fund
was being
revolved and
also used in
the community.
Initiation for
the effective
collection
and
utilization of
operation
and
management
(O&M) fund
public
health
and
hygiene
and also
people
are more
impresse
d when
the test
was done
by their
communit
y health
motivator.
Dissemin
ation of
WQ
results to
wider
audience
to ensure
awarenes
s on WQ
and safe
consumpt
ion of
water had
been
done
Some
communit
ies had
adopted
the
system of
collecting
monthly
fund for
O&M of
the
construct
ed
infrastruct
ures.
Recently
registered
Sangini
Women
S&C
Cooperati
ve
Limited
has
decided
Initiation
for the
effective
collection
and
utilization
of
operation
and
manage
ment
(O&M)
fund
Some
communitie
s had
adopted
the system
of
collecting
monthly
fund for
O&M of the
constructe
d
infrastructu
res.
Recently
registered
Sangini
Women
S&C
Cooperativ
e Limited
has
decided to
establish
Community
Operation and
maintenance
of a small
scale
community
hand-pump is
very
challenging
as nobody
claims
responsibility
and everyone
claims the
right for using
it. Apart from
that, there is
high risk of
theft of hand
pump head
and other
accessories
during night
time.
Therefore, the
users
35
to
establish
Communi
ty
Developm
ent Fund
for the
sustainabi
lity of the
construct
ed
infrastruct
ures.
Ward wise
UCCs
developed as
an effective
and vibrant
management
body in place
to sustain
installed
infrastructures,
institutionalize
to continue the
system
established by
2010/11
1 WSUCC
was planned
representing
WSUC of
ward 7 and 8
1
WSUCC
had been
formed in
ward no 7
&8
representi
ng five
WSUC of
ward 7
and 2
WSUC of
ward 8.
The
WSUC
and
WSUCC
had been
given
trainings
on pre
constructi
on, post
constructi
on and
operation
and
managem
ent of the
water
facilities
provided.
The
WSUC /
CT has
been
regularly
monitorin
g for the
Developme
nt Fund for
the
sustainabili
ty of the
constructe
d
infrastructu
res.
NA
NA
committee
themselves
also do not
show interest
for installation
of community
hand pumps.
Hence the
establishment
of S&C and
co-operatve
will ease this
situation
managing g
the O&M
fund.
NA
36
Documents on
best practices,
and learning
experiences of
WASH projects
and hygiene
behavioural
practices
produced in FY
2010/11
NA
CBME system
established
and
institutionalized
through its
regular
practice within
the working
communities
from 10/11
annually.
Initiation of
CBME was
planned in all
communities
of ward 6, 7
& 8.
operation
&
maintena
nce of
water &
sanitation
facilities
provided.
NA
CBME
system
had been
initiated in
all
communit
ies
through
its regular
practice.
Social
Mobilizers
and
Communi
ty
Developm
ent
Workers
are
conductin
g
orientatio
n
programs
to all UCs
to initiate
it in all
cluster.
Though
CBME
had been
initiated in
all
clusters
of ward 6,
7 & 8 the
Learning
experienc
e of
WASH
projects
and
hygiene
behaviou
ral
practices
NA
Learning
experience
of WASH
projects
and
hygiene
behavioura
l practices
(case
studies)
produced.
NA
NA
37
Hygiene
3 CHM’s and
15 CHV’s are
trained to
promote
hygiene
education
covering ward
no 7,8 and 9
Training
programs to
promote
hygiene
education for
CHM's and
CHV's are
planned.
communit
y has not
completel
y
implemen
ted the
tools due
to its
complexit
y.
3 CHMs
and 15
CHV’s
had been
identified
and
selected
in ward
no 7, 8 &
9. The
CHM and
CHV’s
were
working
actively in
the
communit
y to assist
in
Hygiene
Behavior
change of
the
people in
the
communit
y. The
communit
y people
are now
more
aware on
use of
hygienic
latrine
facilities
and safe
use of
water.
However,
more
hygiene
program
mes had
to be
NA
NA
NA
38
All the UCs
,CHM’s and
CHV’s
developed in
ward no 7,8
and 9 are
trained to use
CBME tools
and RCS tools
and practiced
the tools to
assess the
improvement in
hygiene
practices and
improvement in
health
Training on
CBME and
RCS tools
was planned
for CDW, UC
& UCC in the
FY 2010/11
focused
in Purba
Mushari,
Dina
Badri and
Tengra
communit
y for
hygiene
behavior
change of
the
people in
those
communit
y.
Training
tools on
CBME
and RCS
tools was
conducte
d for
CDW, UC
& UCC.
The CDW
has
implemen
ted the
CBME
system in
all the
communit
ies of
ward 7 &
8. The
UC &
UCC has
also tried
to adopt
the
system.
Social
Mobilizers
and
Communi
ty
Developm
ent
Workers
are
conductin
g
orientatio
n
NA
NA
NA
39
programs
to all UCs
to initiate
it in all
cluster.
Policy Influencing
Sector Key Deliverables
s
(As mentioned in
Project Plan)
Water / A report on annual
Sanitati review on the
on/
achievement in
Hygien addressing the
e
sector blockage
issues, progress
achievement of
WESI Plan and in
materializing the
recommendations
made by Report
Card Test results
through social
auditing / review
process annually
from 09/10 and
report produced
accordingly.
Annual Total (Outputs)
Total Plan
Progress To
Date
Municipal
The
level
municipality
Interaction
had
with all
produced a
stakeholders draft WASH
to review on coordinated
the
plan and
achievement planning for
in
municipal
addressing
level
the sector
workshop
blockage
with
issues,
stakeholder
progress
for
achievement suggestions
of WESI
& feedback
Plan and in
to finalize
materializing WASH
the
coordinated
recommend plan. The
ations made municipality
by Report
will explore
Card Test
other
results
stakeholders
for further
WASH
service to
declare
Itahari
Municipality
- an ODF
zone by
2015.
Quarterly Output
Plan
Progress in
Q4
Municipal
The
level
municipality
Interaction
had
with all
produced a
stakeholders draft WASH
to review on coordinated
the
plan and
achievement planning for
in
municipal
addressing
level
the sector
workshop
blockage
with
issues,
stakeholder
progress
for
achievement suggestions
of WESI
& feedback
Plan and in
to finalize
materializing WASH
the
coordinated
recommend plan. The
ations made municipality
by Report
will explore
Card Test
other
results
stakeholders
for further
WASH
service to
declare
Itahari
Municipality
- an ODF
zone by
2015.
Justificat
ion for
Variance
NA
40
An updated review
report on RCT
results/
recommendations by
incorporating the
identified new sector
blockage issues
related to WASH
produced along with
the recommended
plan of actions to be
addressed in next
year at municipal
level.
NA
NA
Review
report on
RCT results
Review on
RCT
hadbeen
accomplishe
d. Review
report is
being
prepared. As
per the draft
report
received 3335% of the
total
population of
Itahari is still
deprived
from the
piped water
supply as
still 60-65
km pipeline
need to be
extended for
total
coverage.
Besides,
extension of
pipeline in
the slum and
squatters
area of IM is
still a big
question as
the
municipality
and the
service
provider
hadnot yet
particularly
formulated
the policies
in such
regards.
However,
ISTWSUC
hadexpresse
d its
commitment
to develop
operational
policy for the
next FY
through the
learning
from the
piloting
program of
connection
of HH water
NA
41
Sector blockage
issues related to
WASH produced
along with the
recommended plan
of actions to be
addressed in next
year at municipal
level.
NA
NA
Review
report on
RCT results
Review on
RCT
hadbeen
accomplishe
d. Citizen
Forum
Itahari is
preparing a
review
report. As
per the draft
report
received 3335% of the
total
population of
Itahari is still
deprived
from the
piped water
supply as
still 60-65
km pipeline
need to be
extended for
total
coverage.
Besides,
extension of
pipeline in
the slum and
squatters
area of IM is
still a big
question as
the
municipality
and the
service
provider
hadnot yet
particularly
formulated
the policies
in such
regards.
However,
ISTWSUC
hadexpresse
d its
commitment
to develop
operational
policy for the
next FY
through the
learning
from the
piloting
program of
NA
42
Documents
produced by citizen
forum on the
activities
commenced to
influence sector
stakeholders
following the WASH
advocacy plan and
the outputs achieved
annually from FY
09/10 and compiled
document is
produced by March
2013.
Conducted trainings,
interactions and
workshops by
establishing linkages
with District Health
Institutions for
promoting hygiene
education within the
communities
annually from FY
09/10 and to raise its
importance within
the WASH sector
stakeholders at local
municipal level
NA
NA
Documentati
on on the
activities
commenced
to influence
sector
stakeholders
following the
WASH
advocacy
plan and the
outputs
achieved
annually
Publication
related to
activities on
WASH
issues
published.
Health &
hygiene
training for
CHM &
CHVs by
establishing
linkages with
District
Health
Institutions
for
promoting
hygiene
education
within the
communities
planned.
One Health
& hygiene
training for
CHM &
CHVs
conducted in
coordination
with DHO.
Resource
Person from
DHO was
one of the
resource
person for
the training.
NA
NA
NA
43
A budget tracking on
WASH sector at
Municipal level done
for 2 consecutive
years and conducted
lobby and review
meeting report
produced by
2010/11.
A budget
tracking on
WASH
sector at
Muncipal
level
planned,
A budget
tracking on
WASH
sector at
Municipal
level
conducted.
Citizen
Forum
Itahari
studied and
analysed the
budget of
the
Municipality
and
presented a
report on it.
The forum
also
presented
some
recommend
ations &
suggestion
to
Municipality.
A budget
tracking on
WASH
sector at
Muncipal
level
planned,
A budget
tracking on
WASH
sector at
Municipal
level
conducted.
Citizen
Forum
Itahari
studied and
analysed the
budget of
the
Municipality
and
presented a
report on it.
The forum
also
presented
some
recommend
ations &
suggestion
to
Municipality.
In the FY
2067/68, the
allocated
budget for
water sector
was Rs.
500,000/which was
0.49% of the
total budget.
In the
previous
year, the
municipality
hadnot
allocated
budget for
water sector.
Though the
allocation of
budget of
water sector
was too low,
the
municipality
hadstarted
allocating
from this
year which is
definitely a
positive sign.
In the FY
2067/68, the
44
Comprehensive
assessment report
produced on
municipality’s budget
allocation and its
utilization for 4
consecutive years in
WASH sector by end
of 2012/13.
A budget
tracking on
WASH
sector at
Muncipal
level
planned,
A budget
tracking on
WASH
sector at
Municipal
level
conducted.
Citizen
Forum
Itahari
studied and
analysed the
budget of
the
Municipality
and
presented a
report on it.
The forum
also
presented
some
recommend
ations &
suggestion
to
Municipality.
A budget
tracking on
WASH
sector at
Muncipal
level
planned,
A budget
tracking on
WASH
sector at
Municipal
level
conducted.
Citizen
Forum
Itahari
studied and
analysed the
budget of
the
Municipality
and
presented a
report on it.
The forum
also
presented
some
recommend
ations &
suggestion
to
Municipality.
In the FY
2067/68, the
allocated
budget for
water sector
was Rs.
500,000/which was
0.49% of the
total budget.
In the
previous
year, the
municipality
hadnot
allocated
budget for
water sector.
Though the
allocation of
budget of
water sector
this year
was too low,
the
municipality
hadstarted
allocating
from this
year which
was
definitely a
positive sign.
45
An evaluation report NA
produced on
Citizen’s Action
programme initiated
by Lumanti through
Citizen Forum in
Itahari to understand
the efficacy of the
CA programme and
improvement /
changes brought by
the project in
improving WASH
governance,
delivering improved
WASH
access/facilities and
in achieving
recommendations
made by RCT
through its thorough
review and
assessment by
2012/13 and
disseminated the
report within the
municipal sector
stakeholders. (This
needs to be carried
out by hiring external
consultant and ToRs
needs to be
developed in
consultation with
WAN colleagues and
this is a mandatory
activities for this FY
2012/13)
NA
NA
NA
NA
E. Partnership (refer to Project Plan – Sections 5)
A new partnership with District Health Office and Primary Health Centre for Community Health
focused activities has definitely helped in programme implementation and ownership. Technical
support during a health camp on Reproductive Health & Menstrual Hygiene by providing Senior
AHW has become beneficial for the community people. Further coordination for FREE SURGERY
through government quota, especially for poor and marginalized women, for identified third degree
prolapse in some women from the community is under process.
A community based organization (CBO) has been formed with the involvement of active members
of the UC, UCC and 4 CHMs as a local implementing partner. Lumanti Itahari team has been
gradually making their involvement in WASH activities.
46
Though members of Yuva Paailaa are partly engaged for hygiene promotion activities in the
community, their involvement is not as expected. It might be due to their domestic schedules. As
expected earlier they have not been able to allocate their time for WASH related activities.
A new partnership with Water & Sanitation Division Office, Itahari, Sunsari is initiated. The Division
office has assigned its staff for Lumanti's ODF campaign for the sanitation awareness activities.
Towards further WASH related activites, sanitation support from Water & Sanitation Division Office,
Itahari, Sunsari for the next fiscal year is expected. However, formal dialogue for the same is yet to
be done. Partnership with such government organizations definitely helps in programme
implementation and ownership; however, due to the slow and traditional working modality of the
government system, timely achievement of planned activities is very challenging.
A recently registered Sangini Women Saving & Credit Cooperative Limited could be one of the
better partners for WASH related activities in the community. Initial plan to incorporate the
Cooperative has been made and discussed with the executive members. Linkage of activities such
as financial support for community through soft loan for water and sanitation facilities, hygiene
monitoring through RCS & CBME and to conduct water quality test are initially planned. The
process to capacitate the members of the cooperative is planned.
F. Resources (refer to Project Plan – Sections 6 & 7):
- Changes to Human Resource plan
- Financial Summary of the project
Qtr.
Q1
Q2
Q3
Q4
TOTAL
-
Original Budget
(MPB)
773,485.00
1,178,720.00
1,658,132.00
1,178,664.00
4,789,000.00
Approved
Budget
773,485.00
1,178,720.00
1,658,132.00
1,178,664.00
4,789,000.00
Revised
Budget
560,154.00
1,185,668.00
1,914,741.00
1,128,437.00
4,789,000.00
Expenditure
560,153.33
1,185,667.93
1,304,227.46
1,700,401.43
4,750,450.15
%
Uti.
100%
100%
68%
151%
99%
Justifications for variances
Highlight status of donor reporting requirements
Highlight any issues related to financial compliance with any donor requirements
G Field visits and Monitoring (refer to Project Plan – Sections 9):
G.1 Completed Visits:
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
21-24
June
Puspa Joshi
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Support Visit, Citizen
Forum programme
planning
Key Feedbacks Received
(if any)
Citizen Forum should develop action
plan as developed with the support
from Lumanti, need to study in the
issues and need to follow the plan, so
that the service providers and LG's
started to trust when approached with
evidence.
47
Date
21-24
June
15 – 22
July
20 – 22
July
23 – 25
July
3–6
August
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Bishal Shrestha
Bishal Shrestha
and Puspa Joshi
Sama Vajra and
Naresh Man
Pradhan
Renu Lama
Surendra Shrestha
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Progress Monitoring,
Support visit
Monitoring visit of
Biratnagar and Itahari,
Agreement with Citizen
Forum/ Orientation to
Biratnagar and Itahari
Citizen Forum
Staff meeting and
programme supervision of
Biratnagar and Itahari
Data verification
Financial Monitoring
3–6
August
Sujata Bajracharya support for financial
management
3–4
Puspa Joshi
Interaction and skill
Key Feedbacks Received
(if any)
Citizen Forum requested technical
support for developing WaSH strategic
plan and also requested for the
guidelines.
CBME in communities must be initiated
in the initiation of the project.
Mechanism should be adopted to
make the CBME an obligatory process.
Social mobilization should be more
intensive.
Field staff should support the
community, UC’s for filling CBME form
until they felt easier to fill it.
CHV’s needs to give more support to
community people to improve H&H
condition. They need to provide the
actual information by doing RCS to
make them change their behavior.
Certain activites like public hearing on
water quality and management of
Mangad WSS needs revision, as there
has been substansive improvement
seen now.
Few activities need to be replanned
along with budget revision
Frequent communication and support
from MIS officer is needed to avoid
data mismatch.
A standard format should be
developed to make data entry easier.
More accounts keeping support is
needed in Biratnagar
Financial guidelines and policies
should be followed carefully during
financial transactions.
Financial system and vouchers were
checked and suggested for further
improvement. In Itahari financial
system found more systematic.
Further support for smooth function is
needed in both cities.
Orientation and more support seemed
48
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
August
3–4
August
Rabin Lal
Shrestha and
Shikha Shrestha
(WAN)
18 – 19
August
Lajana Manandhar
18 – 20
August
Sama Vajra
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
sharing of citizen forum
Biratnagar and Itahari
Interaction and skill
sharing of citizen forum
Biratnagar and Itahari
Key Feedbacks Received
(if any)
necessary to the members of Citizen
Concern Forum, Itahari from Lumanti
Central office for advocacy and
influencial work.
Working sub-committee could be
formed to carry out the work and the
current CF can support the subcommittee as an advisory.
Interaction with Citizen
forum, Itahari and meeting
with Biratnagar and Itahari
staffs
Meeting with Citizen
forum, Itahari and meeting
with Biratnagar and Itahari
staffs
Reports, documents should be
managed to provide evidence.
Citizen forum was found passive and
not clear in their role & responsibilities.
A meeting was planned to clarify and
develop clear Action Plan
Keeping in mind the commitment of
Citizen Concern Forums’ dedication in
influencing and the busy schedule,
some eligible executive members
should be added in the Forum for
active involvement in the programme.
For the implementation of the
programme, Citizen Concern Forum as
an advisory group should form its
subcommittee to implement the
programme.
Both Citizen Concern Forum and
Lumanti need more homework to be
done for the sustainability of Citizen
Forum after Lumanti’s programme
phase out.
Plan of action should be strictly
followed to complete the planned
activities within time frame.
The problems, issues should be solved
immediately and should share with
immediate line managers/coordinators,
if assistance is needed.
Harmony, team work and self respect
should be maintained between every
staffs for progress and satisfaction.
49
Date
18 – 20
August
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Shiva Gopal
Shrestha
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Field supervision visit of
Biratnagar and Itahari
Key Feedbacks Received
(if any)
During construction of the toilet, the
siphon should be fitted well such that,
the water inside it shields the bad odor.
The excreta should be flushed to avoid
the flies and bad odor.
The toilet should be cleaned regularly
along with its surrounding.
18 – 22
August
Renu Lama
15
Septemb
er
Kabir Sir
Puspa Joshi
15 – 18
Septemb
er
Kabir Sir (WAN)
Bijesh Shrestha
and Dibesh
Sayami (CIUD)
Data collection,
management &
verification
Meet LDO to sign the
agreement paper between
DDO and WAN on the
project being
implemented by Lumanti
in Itahari with support of
WAN.
Monitoring and support
visit
The tube wells shouldn’t be used for
about a week once it is fixed to avoid
losing the grip.
The data should be updated when
needed to avoid mismatch.
The data should be managed in the
standard format, such that it will be
easier for entry and understandable.
-
Mr. Dibesh Sayami, CIUD suggested
to go to community with a feeling, what
we can give to the community rather
not what we'll get from them. This
feeling will lead to the success of the
programme and helps gain trust
among the community people.
RCS should be applied to trigger the
community about the H&H situation.
CBME system should be followed by
every community for transparency,
accountability, to show the
responsibility and ultimately for the
sustainability. Lumanti staff should
seriously mobilize their staffs for
support and its functioning.
Partners should focus on project plan
and mainly on key deliverables part.
50
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
In case of the issue of pipeline
connection in Malangbaba, Small
Town office should also show some
softness with community people, so
that both party be in win-win situation.
With the learning from Malangbaba,
Small Town office should develop the
law and policy, such that such issues
can be dealt easily in the future.
Municipality should provide alternative
site for the waste water treatment
plant.
Municipality should also support the
amount agreed in the MoU for the
integrated project.
Citizen Forum should prepare three
year WaSH advocacy strategic paper.
The networking of Citizen Forum
(Advocacy & Influencing groups) could
be the next foot step to advocate and
influence the WaSH rights not only in
local level but also in city and national
level.
Citizen Forum can play a vital role to
boost up Local government to prepare
a detail plan of the municipality like
WESHI plan with full ownership, so
that the donor agencies and other
organizations can easily invest in the
development works.
Forming different subcommittee with
active members based on the area
occupied will be beneficial for easy
implementation of WSP.
22-26
Nov
Surendra Kumar
Shrestha
Financial Monitoring and
Supports
16-21
Dec
Bishal Shrestha,
Shiva Gopal
Shrestha,
Planning and Monitoring
workshop and Review
meeting
# Supports on Financial matters were
provided to the field team for timely
report submission
#The constructions in BiWASH project
at the end of the 3rd quarter was seen
lagging as per the plan of the project.
51
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
16-18
Dec
Lajana
Manandhar, Sama
Bajra
Puspa Joshi
17-19
Dec
3-7 Feb
28-31
March
Surendra Kumar
Shrestha
Vijay Singha
Shrestha and
Surendra Kumar
Shrestha
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Planning and Monitoring
workshop and Review
meeting
Planning and Monitoring
workshop and Review
meeting
Financial Monitoring and
Supports
Program monitoring and
evaluation
Key Feedbacks Received
(if any)
#the field teams were oriented on way
forwards for the coming years and joint
planning was done with the team.
#Introduction and Raport with the field
team as new WASH Manager was
hired
#Orientation on the monitoring and
evaluation for coming years as per
WAN CSP was shared
#All the financial matters were sorted
to finalize for this FY 2010/11.
G. 2 Upcoming Visits for coming Quarter- likely or confirmed
Time
Period
Visit by
(Project Team, PM&E staff, HQ, WAN
or external agencies)
Purpose
(supervision, progress monitoring,
support visit, process monitoring, guest
visit, case study, documentation etc)
G.3. Other Key PME Activities (as appropriate):
Involvement in Local government planning process and its key observations
Sunsari District is planning to declare Open Defecation Free Zone and for the same Water and
Sanitation Division Office at Itahari has been developing Sanitation Master Plan in coordination
with different stakeholders, I/NGOs, CBOs and local governing bodies in the municipalities and
VDCs. Lumanti, as one of the stakeholders working in the sector of water and sanitation in Itahari
Municipality has joined hands together for the development of Sanitation Master Plan as a
member of the sub-committee for the same.
Likewise, Itahari municipality is also developing a Coordinated Water, Environmental Sanitation
and Hygiene Improvement (WESHI) Plan. The municipality has conducted a workshop in huge
participation of all stakeholders, government agencies, I/NGOs and CBOs working in the sector of
water, sanitation and hygiene in Itahari where a committee has been formed to develop a
Coordinated WESHI Plan. Lumanti is one of the key members of the committee.
As decided in the said workshop, Itahari municipality has recently completed its household survey
with the support from Tole Lane Organizations. Revised data of Itahari Municipality along with the
coordinated WESHI Plan is expected at the earliest.
52
Community Base M&E and its key observations
CBME system has been established and institutionalized in some Users Committees of the
targeted 19 communities with the support from social mobilisers and community development
workers. The UCs is transparent in their working procedure. The system collection of quotations
and selection as per the financial merits and provision provided is in place. The major challenge
posed in this case, is sudden price hikes of the materials, in which the UCs have to be
accountable to the community. This might bring confusion in terms of agreement with the
contracted hardware and might bring dispute in working of the UCs.
Rapid Convenient Surveys or other tools, and their key observations
RCS of all targeted 19 communities has been conducted. The result shows improving picture of
health and hygiene attitudes. Most of the parameters of the RCS show improved results when
compared with the initial RCS report. People in the communities have raised consciousness
regarding the issue of personal sanitation. They have adopted 4 key health messages and the
percentage of the people using cleaning agents at critical times has increased in these days.
People of targeted communities of ward no 6, 7, 8 now own latrine and have habit of using such
latrines and keeping them clean. Some people in Purba Mushari, Dinabhadri and Tengra are
exceptional. More awareness campaigns and activities are felt necessary in these communities. A
constant follow-ups and monitoring should be done at the community level in. This requires
monitoring and follow-ups from the CHVs/CHMs. Also, the involvement of recently registered
Sangini Women Saving & Credit Cooperative Limited in monitoring of such monitoring process
can be beneficial.
H. Water Quality ( Not applicable for advocacy projects)
Constructed
(Water Sources
& Points)
New
Rehab
Tested
(Water Sources &
Points)
Exist.
New
Reha
b
Not Tested
(Water Sources &
Points)
Exist.
Ne
w
Remarks
Rehab
Previous
Year
Q1
Q2
3
17
3
17
WQT of 3 new
handpumps in
Kadmaha and
17 hand pumps
in Nahar (where
WSP initiated)
has been
performed.
Q3
Q4
153
TOTAL
156
WQT of 16 water
points distributed
by ISTWSUC
tested on the
sampling basis
in the ration of
1:10
16
17
19
17
Note: Detailed WQ findings should be submitted in Annual Report in the annex
 Highlight key water quality problems and challenges
53


Explain any mitigation action taken or planned
Achievement in mitigation on water quality (include in Annual Report)
54
I. Indicative Project Outcomes – Refer to Project Plan Section 2, 3 and 4. (SMR & APR only)
Note: Do not segregate Water, Sanitation and Hygiene in case of cross cutting projects, just put
WaSH objectives.
Service Delivery
Project
Objectives
Project Indicators
Water:
8,208 people of
19 communities
of 4 wards of the
Municipality have
improved access
to safe and
adequate water
by 2011/12
1
Achievements to date
Year – Year – 2
1
(FY: 2009/10)
(FY:
2008/0
9)
905 people from
the six
communities of
wards no.6 is
provided with
improved
access to water
facilities
75% of the
targeted
beneficiaries will
be from poor and
excluded groups.
90% of the
project
beneficiaries
are from the
poor and
excluded group.
100% of the water
points provided
have been tested
and achieved
minimum WQ
standards as
envisaged by
WaterAid Nepal’s
WQ protocol or
NDWQS1
All the water
points provided
is tested for its
safety. Health
and Hygiene
programme is
framed in the
programme to
address the
recommendatio
ns from the
water test result
in the
community.
1st Half of this
Year
(Q1 & Q2)
2nd Half of this Year
(Q3 & Q4)
39 people from
the Kadmaha
Tole of ward
no. 7 is
provided with
improved
access to
water facilities.
1852 people from
Malangbaba Tole of
ward 6, Manakamana
Tole of ward 7, Namuna
Tole of ward 9 including
1000 students from
Shree Saraswati Satan
Ma Vi is provided with
water pipeline access
distributed by ISTWSUC.
90% of the project
beneficiaries are from
the poor and excluded
group.
90% of the
project
beneficiaries
are from the
poor and
excluded
group.
All the water
points installed
(3 hand pumps
installed in
Kadmaha -7
and 20 hand
pump in Nahar
– 7) is tested
for its safety.
Health and
Hygiene
programme is
framed in the
programme to
address the
recommendati
ons from the
water test
result in the
community.
Water points connected
in Malangbaba Tole of
ward 6, Manakamana
Tole of ward 7, Namuna
Tole of ward are tested
on sampling basis in the
ration of 1:10. Health and
Hygiene programme is
framed in the programme
to address the
recommendations from
the water test result in
the community.
National Drinking Water Quality Standards of Nepal
55
Sanitation:
4,330 people in
19 communities
of 4 wards have
access to
hygienic latrine
facilities by
2011/12
973 people from
the six
communities of
wards no.6 is
provided with
access to
improved
sanitation
facilities in FY
09/10.
At least 60% of
the targeted 10
communities (12
communities)
have declared
Open Defecation
Free (ODF)
communities by
2011/12
All the 19
communities will
have community
management
system in place to
maintain and
sustain them their
neighborhood
environment
healthy.
The
communities
have adopted
the programme
positively.
CBME training
has been
provided to the
community
users group.
The
43 HH latrines
in Nahar and 7
HH latrines in
Manakamana
Harijan Tole
are under
construction.
Total of 291
people from
the two
communities
(nahar &
Manakamana)
of wards no.7
will be
provided with
access to
improved
sanitation
facilities in FY
10/11.
The
communities
have adopted
the programme
positively and
therefore three
out of six
communities of
ward no 6 are
already set to
be declared
ODF
community.
However,
massive
software
activities need
to be
supported in
these
communities
before they are
declared ODF.
The
communities
have adopted
the programme
positively.
CBME training
has been
provided to the
community
users group.
The
1192 people from six
communities of ward 7 &
8 are provided with
access to improved
sanitation facilities.
8 communities of ward 6
& 7 (Balgram,
Dedhgaria, Miteri, Shiva
Parbati & Malangbaba
Tole of ward 6 ) and
Nahar, Kadmaha,
Sahara & Manakamana
Tole of ward 7) are
declared Open
Defecation Free Zone.
The communities have
adopted the programme
positively. CBME training
has been provided to the
community users group.
The communities have
shown positive interest in
adopting the system.
CBME system has been
initiated in some
communities through its
56
communities
have shown
positive interest
in adopting the
system. CBME
system has
been initiated in
some
communities
through its
regular practice.
Social
Mobilizers and
Community
Development
Workers are
conducting
orientation
programs to all
UCs to initiate it
in all cluster.
80% of the
beneficiaries are
from poor and
excluded groups
and are delivered
sanitation
facilities are
maintained
properly
2,180 people of
the 19
communities of 4
wards have
improved
environmental
sanitation
facilities by
construction/reno
vation of 550
meter stormwater drainage, 1
wastewater
management
Plant and
initiation of solid
waste
management by
2011/12
90% of the
project
beneficiaries
are from the
poor and
excluded group.
Solid Waste
Management
option - suiro is
promoted in
every
household of
the
communities of
ward 6 along
with the solid
waste
management
training to UC,
and UCC of
ward 6. 1 CHM
and 5 CHV are
mobilized for
the program.
Some women in
the community
are ready to
reuse waste
plastic for
communities
have shown
positive
interest in
adopting the
system.
CBME system
has been
initiated in
some
communities
through its
regular
practice. Social
Mobilizers and
Community
Development
Workers are
conducting
orientation
programs to all
UCs to initiate
it in all cluster.
90% of the
project
beneficiaries
are from the
poor and
excluded
group.
regular practice. Social
Mobilizers and
Community Development
Workers are conducting
orientation programs to
all UCs to initiate it in all
cluster.
Watsan Users
Committees of
ward no.7 and
8 and
CHM/CHVs
have been
provided with
solid waste
management
training. The
Users
Committee and
the CHM/CHV
have started
their
awareness
campaign on
solid waste
management
within their
communities
Solid Waste
Management option suiro is promoted in
every household of the
communities of ward 7, 8
& 9 along with the
orientation on the use of
suiro and plastic waste
management. 3 CHM
and 11 CHV are
mobilized for the
program. Some women
in the community are
ready to reuse waste
plastic for webbing
baskets. Total of 4169
people are benefited
through the program.
90% of the project
beneficiaries are from
the poor and excluded
group.
57
70% of the target
HHs practice solid
waste
management by
2010/11 and
sustained the
waste
management
practices
80% of the
environmental
sanitation
facilities are well
maintained and
working properly
with well
managed
community
management
system in place to
maintain and
sustain their
neighborhood
environment
healthy.
Mechanism for
collection of
Operation and
Maintenance fund
is developed in
the community for
the sustainability
of public
infrastructures
and the collected
fund is well
managed and
transparent.
Hygiene:
All the
communities
(adult and
children) of 4
wards with 19
communities have
knowledge of at
webbing
baskets. Total
of 1671 people
are benefited
through the
program.
The community
has adapted
health
environmental
sanitation
practice.
The
community has
adapted health
environmental
sanitation
practice.
The community has
adapted health
environmental sanitation
practice.
Some communities have
adopted the system of
collecting monthly fund
for O&M of the
constructed
infrastructures. Recently
registered Sangini
Women S&C
Cooperative Limited has
decided to establish
Community Development
Fund for the
sustainability of the
constructed
infrastructures.
Hygienic latrine
facilities have
been
constructed and
accesses to
water point
have been
Mechanism for
collection of
Operation and
Maintenance
has been
taught during
Preconstruction
Training. The
UCs is
committed to
develop the
appropriate
mechanism
within the
community.
Massive health
and hygiene
programme
has been
launched in the
community
through
Hygienic latrine facilities
have been constructed
and accesses to water
point have been assured
to all the households in
the community. Apart
from this, massive health
58
least 5 key
hygiene
messages and
communicate
them at critical
times when asked
80% of the
beneficiaries
educated with 5
key hygiene
messages
adopted
improved and
sustained
hygiene
behaviour
practices at least
in the following 4
key areas by
2011/12
 Hand
washing in
critical times
 Management
assured to all
the households
in the
community.
Apart from this,
massive health
and hygiene
programme has
been launched
in the
community
through
community
health mobilizer
and community
health
volunteers. 60%
the community
people are now
aware on use of
hygienic latrine
facilities and
safe use of
water. However,
more hygiene
programmes
has to be
focused in
Purba Mushari
and Dina Badri
community for
hygiene
behavior
change of the
people in those
community.
Hygienic latrine
facilities have
been
constructed and
accesses to
water point
have been
assured to all
the households
in the
community.
Apart from this,
massive health
and hygiene
programme has
been launched
in the
community
through
community
health
mobilizer and
community
health
volunteers.
60% the
community
people are
now aware on
use of hygienic
latrine facilities
and safe use
of water.
However, more
hygiene
programmes
has to be
focused for
hygiene
behavior
change of the
people in the
community.
and hygiene programme
has been launched in the
community through
community health
mobilizer and community
health volunteers. 60%
the community people
are now aware on use of
hygienic latrine facilities
and safe use of water.
However, more hygiene
programmes has to be
focused in Tengra Tole
for hygiene behavior
change of the people in
those community.
Massive health
and hygiene
programme
has been
launched in the
community
through
community
health
mobilizer and
community
health
volunteers.
60% the
community
people are
now aware on
use of hygienic
latrine facilities
Massive health and
hygiene programme has
been launched in the
community through
community health
mobilizer and community
health volunteers. 60%
the community people
are now aware on use of
hygienic latrine facilities
and safe use of water.
Same percentage of the
people practice safe
hygiene behaviour at
least in 4 key areas.
However, safe storage of
water and hygiene PoU
treatments in most of the
communities is not well
59


of Human
Excreta
including
child excreta
Safe storage
of water and
hygienic PoU
treatments
Safe food
hygiene
practice
Reduction in
point prevalence
rate of diarrhea,
skin and typhoid
in the target
areas by 20%,
15% and 10%
respectively with
reference to the
collected
baseline data.
community
health mobilizer
and community
health
volunteers. 60%
the community
people are now
aware on use of
hygienic latrine
facilities and
safe use of
water. However,
more hygiene
programmes
has to be
focused in
Purba Mushari
and Dina Badri
community for
hygiene
behavior
change of the
people in those
community.
Hygienic latrine
facilities have
been
constructed and
accesses to
water point
have been
assured to all
the households
in the
community.
Apart from this,
massive health
and hygiene
programme has
been launched
in the
community
through
community
health mobilizer
and community
health
volunteers. 60%
the community
people are now
aware on use of
hygienic latrine
facilities and
safe use of
water. However,
and safe use
of water.
However, more
hygiene
programmes
has to be
focused for
hygiene
behavior
change of the
people in the
community.
adopted.
More hygiene
programmes has to be
focused, especially in
Tengra Tole for hygiene
behavior change of the
people in those
community.
Massive health and hygiene
programme
has been
launched in the
community
through
community
health
mobilizer and
community
health
volunteers.
60% the
community
people are
now aware on
use of hygienic
latrine facilities
and safe use
of water.
However, more
hygiene
programmes
has to be
focused for
hygiene
behavior
change of the
people in the
community.
60
more hygiene
programmes
has to be
focused in
Purba Mushari
and Dina Badri
community for
hygiene
behavior
change of the
people in those
community.
Capacity Building
Project
Objectiv
es
Water:
Project Indicators
Year –
1
(FY:
2008/0
9)
Achievements to date
Year – 2
1st Half of this
(FY: 2009/10)
Year
(Q1 & Q2)
4
WSUCCs/19
WSUCs have been
established
and
trained; and have
functional
management
and
operation system in
place with regular
collection of O&M
fund
to
sustain
water points for
delivering
water
facilities by 2011/12.
1 WSUCC have
been formed in
ward
no
6
representing
six
WSUC. The WSUC
and WSUCC have
been given trainings
on pre construction,
post
construction
and operation and
management of the
water
facilities
provided.
1 WSUCC have
been formed in
ward no 7 and 8
representing
seven
WSUC.
The WSUC and
WSUCC
have
been
given
trainings on pre
construction and
operation
and
management of
the
water
facilities
provided.
80% of the water
points
constructed/rehabilit
ated are functional,
managed and well
maintained.
100% of the water
points
constructed/rehabilit
ated are functional,
managed and well
maintained.
Developed 4 local
cadres (1 from each
ward)
on
WQ
assessment
at
community/local
level
and
A local cadet for
WQ test has been
developed in ward
no
6
at
community/local
level. CHM has
100%
of the
water
points
constructed/reha
bilitated
are
functional,
managed
and
well maintained.
3 local cadres for
WQ test has
been developed
in ward no 7, 8 &
9
at
community/local
2nd Half of this
Year
(Q3 & Q4)
1 WSUCC
have been
formed in ward
no 9
representing 6
WSUCs. No
construction
works have
been initiated
yet in ward 9
except health &
hygiene
promotional
programs.
However, water
pipeline
connection has
been done in
Namuna Tole
of ward 9.
NA
The
dissemination
of WQ results
to wider
audience to
ensure
61
disseminated
assessment results
twice a year to
wider audience to
ensure awareness
on WQ and safe
consumption
of
water.
been developed as
a local cadet as
water
quality
is
directly related to
public Health and
Hygiene and also
people are more
impressed when the
test is done by their
community
health
motivator.However,
dissemination
of
WQ results to wider
audience to ensure
awareness on WQ
and
safe
consumption
of
water has yet not
been done as water
point
construction
was ongoing till the
end
of
March.
However, the local
cadre has assured
Lumanti that he
shall
disseminate
the test results to
wider public in April
2010.
CBME
system
established
and
institutionalized
through its regular
practice by all the
Users Committees
of the targeted 19
communities
CBME system has
been initiated in all
the six community
of ward no 6
through its regular
practice by all the
Users Committees.
WSUCCs
and
WSUCs
have
respectively 6 and
12 meetings in a
year
to
review,
discuss challenges
& issues, and learn
good practices and
WSUCCs
and
WSUCs have been
conducting regular
meetings in the
community
and
within themselves to
review,
discuss,
challenges
&
level. CHM has
been developed
as a local cadet
as water quality
is directly related
to public Health
and Hygiene and
also people are
more impressed
when the test is
done by their
community
health motivator.
The
dissemination of
WQ results to
wider audience
to
ensure
awareness
on
WQ and safe
consumption of
water has been
done in Nahar
Tole. The local
cadre
has
already planned
to
disseminate
the test results in
rest
of
the
communities in
the
end
of
October.
CBME
system
has
been
initiated in some
communities
through
its
regular practice.
Social Mobilizers
and Community
Development
Workers
are
conducting
orientation
programs to all
UCs to initiate it
in all cluster.
WSUCCs
and
WSUCs
have
been conducting
regular meetings
in the community
and
within
themselves
to
review, discuss,
awareness on
WQ and safe
consumption of
water has been
done in all
communities of
ward 7, 8 & 9
where water
points have
been
connected and
installed.
Health &
Hygiene CBME
system has
been
implemented in
household
level. CHM &
CHVs are
mobilized for
regular
monitoring of
health &
hygiene status.
WSUCCs and
WSUCs have
been
conducting
regular
meetings in the
community and
within
62
approaches at local
level to enhance
their capacities to
manage the project
at
their
communities.
issues, and learn
good practices and
approaches at local
level to enhance
their capacities to
manage the project
at
their
communities.
challenges
&
issues, and learn
good
practices
and approaches
at local level to
enhance
their
capacities
to
manage
the
project at their
communities.
Innovations,
technologies,
learning and good
practices including
policy
strategies/approach
es are shared with
the
community
groups and local
stakeholders
at
municipal
level
through 4 trainings,
8 meeting and 2
workshops and 2
exposure
visits
annually.
The technologies,
leanings and good
practices have been
shared with the
community groups
and
local
stakeholders
at
municipal
level.
Operation
and
Maintenance
of
large infrastructures
where
many
households depend
is
practical.
However, operation
and maintenance of
a
small
scale
community
handpump
is
very
challenging
as
nobody
claims
responsibility
and
everyone claims the
right for using it.
Apart from that,
there is high risk of
theft of hand pump
head and other
accessories during
night
time.
Therefore, the users
committee
themselves also do
not show interest for
installation
of
community
hand
pumps. Based on
the sharing, the
municipality
and
local stakeholders
have shown interest
The
technologies,
learnings
and
good
practices
have
been
shared with the
community
groups and local
stakeholders at
municipal level.
Operation
and
Maintenance of
large
infrastructures
where
many
households
depend
is
practical.
However,
operation
and
maintenance of a
small
scale
community handpump is very
challenging
as
nobody
claims
responsibility and
everyone claims
the right for using
it. Apart from
that, there is high
risk of theft of
hand pump head
and
other
accessories
during night time.
Therefore,
the
users committee
themselves also
do not show
interest
for
themselves to
review,
discuss,
challenges
&
issues,
and
learn
good
practices and
approaches at
local level to
enhance their
capacities
to
manage
the
project at their
communities.
The
technologies,
learnings and
good practices
have been
shared with the
community
groups and
local
stakeholders at
municipal level.
Operation and
Maintenance of
large
infrastructures
where many
households
depend is
practical.
However,
operation and
maintenance of
a small scale
community
hand-pump is
very
challenging as
nobody claims
responsibility
and everyone
claims the right
for using it.
Apart from that,
there is high
risk of theft of
hand pump
head and other
accessories
during night
time.
Therefore, the
63
to
invest
in
extension
of
pipeline
water
wherever possible
and not promote
groundwater
extraction.
installation
of
community hand
pumps.
Based
on the sharing,
the municipality
and
local
stakeholders
have
shown
interest to invest
in extension of
pipeline
water
wherever
possible and not
promote
groundwater
extraction.
users
committee
themselves
also do not
show interest
for installation
of community
hand pumps.
Based on the
sharing, water
pipeline
extension and
household
connection of
water tap has
been initiated.
Total of 153
HH water
points have
been
connected as a
piloting
program
implementing
graded subsidy
approach in
coordination
with TLO,
community
people and
ISTWSUC.
Series of
meetings and
discussions
have been
done with the
Municipality
and ISTWSUC
for the
implementation
of the water
pipeline
extension and
HH water
points
connection
programs to
develop
policies to
enter in the
slum &
squatters area.
ISTWSUC shall
now develop a
policy through
64
2
trainings
are
provided annually to
6
persons
representing
municipal
level
stakeholders
&
community groups
from
09/10
on
CBME system for its
application
/replication in their
projects by 2012/13
and
provide
evidence of the
enhanced capacity
in this discipline of
monitoring
Training on CWRM
and CBME has
been
conducted
with
Community
Users group as well
as the municipal
staffs.
The
municipal
staffs
showed interest in
this
management
tool
where
community
can
monitoring the work
progress
and
budget
by
themselves. UC and
UCC have shown
greater interest as it
will make everyone
in the community
transparent on the
work process and
the
budget
utilization.
A
household
level
CBME chart has
been developed by
Lumanti which shall
be distributed in
each household to
hang it in their wall
for everyone to see.
Training
on
CBME has been
conducted with
Community
Users group as
well
as
the
municipal staffs.
The
municipal
staffs
showed
interest in this
management tool
where
community can
monitoring
the
work
progress
and budget by
themselves. UC
and UCC have
shown
greater
interest as it will
make everyone
in the community
transparent
on
the work process
and the budget
utilization.
A
household level
hygiene CBME
chart has been
developed
by
Lumanti
which
has
been
distributed
in
each household.
This chart has
been utilized and
monitored
by
CHVs / CHMs.
Trained Municipal
staff
and
other
sector
actors
including
service
providers on WSP
and initiated the
Municipal staff and
other sector actors
including
service
providers have been
oriented on Water
Safety Plan. Mr.
WSP initiated in
Nahar Tole, ward
no 7 of Itahari
Municipality as a
pilot project.
the learning
from the
piloting
program for the
next FY.
Training
on
CBME
has
been
conducted with
Community
Users group as
well as the
municipal
staffs.
The
municipal staffs
showed
interest in this
management
tool
where
community can
monitoring the
work progress
and budget by
themselves.
UC and UCC
have
shown
greater interest
as it will make
everyone in the
community
transparent on
the
work
process
and
the
budget
utilization.
A
household level
hygiene CBME
chart has been
developed by
Lumanti which
has
been
distributed
in
each
household.
This chart has
been
utilized
and monitored
by CHVs
/
CHMs.
65
implementation of
WSP as pilot activity
by
2011/12
to
ensure safe delivery
of water
Knowledge of 6
persons
representing
from
municipality /TLOs
and other sector
actors on CWRM
enhanced through 2
trainings conducted
annually
Sanitatio
n:
Documented
the
best practices and
learning
experiences
gathered from the
project within 3
years in relation to
water sector and
disseminated to the
wider audience by
March 2012
Innovations,
technologies,
learning and good
practices including
policy
strategies/approach
Makhan Maharjan
from ENPHO was
the focal person in
the
orientation
porgramme. Itahari
Municipality
and
Itahari Small Town
Water Supply and
Sanitation
Users
Corporation
have
shown
interest
towards
the
application
and
piloting the water
safety plan.
Municipal staff and
other sector actors
including
service
providers have been
oriented on CWRM
and also on Water
Safety Plan. Mr.
Makhan Maharjan
from ENPHO was
the focal person in
the
orientation
porgramme. Itahari
Municipality
and
Itahari Small Town
Water Supply and
Sanitation
Users
Corporation
have
shown
interest
towards
the
application
and
piloting the water
safety plan.
NA
The technologies,
leanings and good
practices have been
shared with the
community groups
and
local
Achieved
and
Reported in last
year reporting.
NA
NA
The
technologies,
leanings
and
good
practices
have
been
shared with the
The
technologies,
leanings and
good practices
have been
shared with the
66
es are shared with
the
community
groups and local
stakeholders
at
municipal
level
through 4 trainings,
8
meetings,
2
workshops and 2
exposure
visits
annually from 09/10
Developed at least
1
community
caretaker in each
community
to
effectively operate
and maintain the
sanitation
infrastructures
installed for their
functional in the
long
run
and
contribute
in
ensuring
ODF
status
(wherever
declared) sustained
by 2011/12
stakeholders
at
municipal
level.
Based
on
the
sharing,
the
municipality
and
local stakeholders
have shown interest
to invest in the
construction of a bio
gas plant for waste
water
treatment.
Also,
new
technology of pit
latrine
with
connection to septic
tank
shall
be
piloted. Also, the
concept of latrine
with a common
septic tank is also
being floated in the
meeting.
The
municipality, water
supply
division
office and TLO are
positive towards this
idea and therefore,
this concept shall
also be piloted in
the
community
wherever practical.
1
community
caretakers
have
been developed in
ward no.6. Mr.
Ruben Chaudhary
of
Dianbadri
community
have
been identified as
community
caretaker and shall
work under the
guidance
of
UC/UCC
to
effectively operate
and maintain the
sanitation
infrastructures
installed for their
functional in the
long
run
and
contribute
in
ensuring
ODF
status
community
groups and local
stakeholders at
municipal level.
Based on the
sharing,
the
municipality
is
looking for an
appropriate
space for the
construction
of
waste
water
treatment / bio
gas plant.
community
groups and
local
stakeholders at
municipal level.
Based on the
sharing, the
municipality
has proposed a
site for the
construction of
bio gas plant
with public
latrines to be
connected to it.
More than 80%
of the Bio gas
plan
construction
works have
been
accomplished.
7
community
caretakers have
been developed
in
seven
communities of
ward no.7 and 8.
Mr.
Farendra
Karki of Nahar
Tole,
Ms.
Bhagoti Sardar
of
Kadmaha
Tole, Mr. Dilip
Sada of Tengra
Tole,
Ms.
Kalpana Harijan
of Manakamana
Tole, Ms. Manu
Pradhan of Shiva
parvati Tole, Mr.
Mahendra
Dhakal
of
Himalaya
Tole
and Ms. Sita
Mochi
of
With the joint
effort of
community
caretakers, UC,
UCC, CHM &
CHVs, 9
communities of
ward 6 & 7 are
declared ODF
zone. The
caretakers, UC,
UCC, and CHM
& CHVs are
regularly
monitoring the
sanitation
status of the
community for
the
sustainability of
ODF status
and
constructed
infrastructure.
67
2
trainings
are
provided annually to
at least local 4
persons
from
municipal
level
stakeholders
&
community groups
from
09/10
on
CBME and hygiene
behaviour
assessment
tools
(e.g. RCS) system
for
its
application/replicatio
n in their projects by
2011/12
and
provide evidence of
the
enhanced
capacity
in
this
discipline of hygiene
monitoring.
Training on CWRM
and CBME has
been conducted to
Community Users
group as well as the
municipal
staffs.
The municipal staffs
showed interest in
this
management
tool
where
community
can
monitoring the work
progress
and
budget
by
themselves. UC and
UCC have shown
greater interest as it
will make everyone
in the community
transparent on the
work process and
the
budget
utilization.
A
household
level
CBME chart has
been developed by
Lumanti which shall
be distributed in
each household to
hang it in their wall
for everyone to see.
Pashupati Nagar
(Mallik
Vasti)
have
been
identified
as
community
caretaker
and
shall work under
the guidance of
UC/UCC
to
effectively
operate
and
maintain
the
sanitation
infrastructures
installed for their
functional in the
long run and
contribute
in
ensuring
ODF
status
Training
on
CBME has been
conducted
to
Community
Users group as
well
as
the
municipal staffs.
The
municipal
staffs
showed
interest in this
management tool
where
community can
monitoring
the
work
progress
and budget by
themselves. UC
and UCC have
shown
greater
interest as it will
make everyone
in the community
transparent
on
the work process
and the budget
utilization.
A
household level
hygiene CBME
chart has been
developed
by
Lumanti
which
has
been
distributed
in
each household.
This chart has
Training
on
CBME
has
been
conducted
to
Community
Users group as
well as the
municipal
staffs.
The
municipal staffs
showed
interest in this
management
tool
where
community can
monitoring the
work progress
and budget by
themselves.
UC and UCC
have
shown
greater interest
as it will make
everyone in the
community
transparent on
the
work
process
and
the
budget
utilization.
A
household level
hygiene CBME
chart has been
developed by
Lumanti which
68
Trained Municipal
staff
and
other
sector
actors
including
service
providers on the
importance
of
hygienic sanitation
facility and initiated
the
delivery
of
hygienic
public
sanitation facility
Review outputs of
the training in every
subsequent years to
document
the
capacity
enhancement
of
municipal
level
stakeholders
&
community groups
on
sanitation
promotion and its
sustainability
Municipal
staffs,
UCC,
UC
and
CHM/V
were
oriented
on
importance
of
hygienic sanitation
facility.
Municipality, Water
Supply
and
Sanitation Division
Office,
Itahari
Small Town Water
Supply
and
Sanitation
Users
Corporation
and
Lumanti
has
agreed
on
the
construction
of
hygienic sanitation
facilities with easy
access to water.
NA
been utilized and has
been
monitored
by distributed
in
CHVs / CHMs.
each
household.
This chart has
been
utilized
and monitored
by CHVs
/
CHMs.
Municipal staffs, Municipal
UCC, UC and staffs,
UCC,
CHM/V
were UC and CHM/V
oriented
on were oriented
importance
of on importance
hygienic
of
hygienic
sanitation facility. sanitation
Municipality,
facility.
Water
Supply Municipality,
and
Sanitation Water Supply
Division Office, and Sanitation
Itahari
Small Division Office,
Town
Water Itahari
Small
Supply
and Town
Water
Sanitation Users Supply
and
Corporation and Sanitation
Lumanti
has Users
agreed on the Corporation
construction of and
Lumanti
hygienic
has agreed on
sanitation
the
facilities
with construction of
easy access to hygienic
water.
sanitation
facilities
with
easy access to
water.
NA
The
technologies,
learnings and
good practices
have been
shared with the
community
groups and
local
stakeholders at
municipal level.
Operation and
Maintenance of
large
infrastructures
where many
households
depend is
practical.
69
However,
operation and
maintenance of
a small scale
community
hand-pump is
very
challenging as
nobody claims
responsibility
and everyone
claims the right
for using it.
Apart from that,
there is high
risk of theft of
hand pump
head and other
accessories
during night
time.
Therefore, the
users
committee
themselves
also do not
show interest
for installation
of community
hand pumps.
Based on the
sharing, water
pipeline
extension and
household
connection of
water tap has
been initiated.
Total of 153
HH water
points have
been
connected as a
piloting
program
implementing
graded subsidy
approach in
coordination
with TLO,
community
people and
ISTWSUC.
Series of
meetings and
70
discussions
have been
done with the
Municipality
and ISTWSUC
for the
implementation
of the water
pipeline
extension and
HH water
points
connection
programs to
develop
policies to
enter in the
slum &
squatters area.
ISTWSUC shall
now develop a
policy through
the learning
from the
piloting
program for the
next FY.
Training on
CBME has
been
conducted with
Community
Users group as
well as the
municipal
staffs. The
municipal staffs
showed
interest in this
management
tool where
community can
monitoring the
work progress
and budget by
themselves.
UC and UCC
have shown
greater interest
as it will make
everyone in the
community
transparent on
the work
71
process and
the budget
utilization. A
household level
hygiene CBME
chart has been
developed by
Lumanti which
has been
distributed in
each
household.
This chart has
been utilized
and monitored
by CHVs /
CHMs.
Documented
the
best practices and
learning
experiences
gathered from the
project within 3
years in relation to
sanitation
sector
and disseminated to
the wider audience
NA
NA
Municipal
staffs, UCC,
UC and CHM/V
were oriented
on importance
of hygienic
sanitation
facility.
Municipality,
Water Supply
and Sanitation
Division Office,
Itahari Small
Town Water
Supply and
Sanitation
Users
Corporation
and Lumanti
has agreed on
the
construction of
hygienic
sanitation
facilities with
easy access to
water.
NA
72
by March 2012
Hygiene: Documented
learning and best
practices including
related
policy
strategies/approach
es developed are
shared with the
community groups
and
local
stakeholders
at
municipal
level
through 4 trainings,
8
meetings,
2
workshops and 2
exposure
visits
annually from 09/10
The leanings and
good practices have
been shared with
the
community
groups and local
stakeholders
at
municipal level.
District
Health
Office has shown
interest towards the
work of Lumanti and
has
assured
to
provide support in
the
programme
wherever required.
However,
more
coordination has to
be practiced with
other stakeholders
as well.
The leanings and
good
practices
have
been
shared with the
community
groups and local
stakeholders at
municipal level.
The
leanings
and
good
practices have
been
shared
with
the
community
groups
and
local
stakeholders at
District
Health municipal level.
Office has shown
interest towards District Health
the
work
of Office
has
Lumanti and has supported for
assured
to Health Camp
provide support focusing
on
in
the Reproductive
programme
Health
&
wherever
Menstrual
required.
Hygiene. The
However, more camp
was
coordination has conducted
in
to be practiced coordination
with
other with
District
stakeholders as Health Office
well.
(DHO)
and
Primary Health
Center.
65
women
from
ward 6, 7, 8 &
9 had their
check up. Out
of 65 women 2
women
are
found with third
degree
prolapse and 1
with
first
degree
prolapse. All 3
women
are
suggested for
urgent
thorough check
up
in
Birat
Nursing Home
as
it
is
providing free
check up for
reproductive
health
in
coordination
with DHO.
73
Water
&
Sanitation
Division Office
Sunsari
has
shown
affirmative sign
to support for
sanitation
promotion from
the next FY. It
has
also
supported
during
the
declaration of
ODF this year.
Conducted an
exposure visit
to Bharatpur for
Municipality,
ISTWSUC, UC,
CF, UCC, &
other
sector
stakeholders
where
an
interactive
program with
local
community
people
of
Bharatpur was
conducted.
From the cross
learning
and
experience
sharing during
the exposure
visit, especially
the community
people found
highly
encouraged
and motivated
resulting
a
construction of
drainage
by
their own effort
in Mallik tole of
ward 8. Good
interaction
between
Secretary
of
Itahari
Small
Town
and
74
Documented
the
best practices and
learning
experiences
gathered from the
project within 3
years in relation to
sanitation
sector
and disseminated to
the wider audience
by March 2012
4 Community Health
Motivators (CHMs)
are trained and
remain active in the
selected wards by
11/12
60% of the 15
Community Health
Volunteers (CHVs)
trained by CHMs
remain active in
selected 4 wards of
municipality
by
11/12
NA
NA
President
of
Jakhadimai
WSUC
has
definitely
support
for
some
affirmative
change
towards water
service
delivery.
NA
1 CHM and 5 CHV’s
have been identified
and selected in
ward no 6. The
CHM and CHV’s are
working actively in
the community to
assist in Hygiene
Behavior change of
the people in the
community.
The
community people
are
now
more
aware on use of
hygienic
latrine
facilities and safe
use
of
water.
However,
more
hygiene
programmes has to
be focused in Purba
Mushari and Dina
Badri community for
hygiene
behavior
change
of
the
people in those
community.
3 CHM and 10
CHV’s
have
been
identified
and selected in
ward no 7, 8 & 9.
The CHM and
CHV’s
are
working actively
in the community
to
assist
in
Hygiene
Behavior change
of the people in
the community.
The community
people are now
more aware on
use of hygienic
latrine facilities
and safe use of
water. However,
more
hygiene
programmes has
to be focused in
community
for
hygiene behavior
change of the
people in those
community. CHM
& CHVs from
ward no 6 are
also
actively
working in the
Identified
CHMs
and
CHV’s
are
working
actively in the
community to
assist
in
Hygiene
Behavior
change of the
people in the
community.
The community
people are now
more aware on
use of hygienic
latrine facilities
and safe use of
water.
However, more
hygiene
program has to
be focused in
community for
hygiene
behavior
change of the
people in those
communities.
CHM & CHVs
from ward no 6
are
also
actively
75
community.
Educated
community people
of 4 wards by
delivering at least 5
key
hygiene
messages
with
innovative means of
communicating
hygiene messages.
Project
Objectives
Water:
Project Indicators
Review of WESI
plans conducted
annually to
understand the
achievement
and
contributions
made by the
sector actors at
the Municipal
level and also
provide
evidence of
adopting WESI
plan as a
coordinated
plan.
Regular
Orientations,
trainings and visual
aids have been
provided
to
the
people of all six
communities
in
ward no.6 through
CHV and CHM.
Achievements to date
Year – 1 Year – 2
(FY:
(FY: 2009/10)
2008/09)
MoU with the
municipality has
been signed to
implement the
WASH project in
Itahari based on
the WESHI plan
developed by
Lumanti in
partnership with
the municipality.
The programme
has been officially
launched in the
municipality. ED
of the municipality
Mr. Ganesh
Dahal expressed
his gratitude
towards WAN,
UNH and Lumanti
for selecting
Itahari for
programme
implementation
and wished all the
success and
support in the
programme.
Regarding the
adaptation of
WESI plan by the
municipality and
integrating it into
the municipality’s
planning porcess,
Regular
Orientations,
trainings
and
visual aids have
been provided to
the people of all
19 communities
in ward no. 6,7,8
& 9 through CHV
and CHM.
1st Half of this
Year
(Q1 & Q2)
Citizen Forum
has conducted
an interaction
program in
participation of
all
stakeholders.
Municipality as
well has
collected and
reviewed the
household data
and it is under
digital
processing.
working in the
community.
Regular
Orientations,
trainings
and
visual
aids
have
been
provided to the
people of all 19
communities in
ward no. 6,7,8
& 9 through
CHV and CHM.
2nd Half of this
Year
(Q3 & Q4)
The municipality
has produced a
draft WASH
coordinated plan
and planning for
municipal level
workshop with
stakeholder for
suggestions &
feedback to
finalize WASH
coordinated plan.
The municipality
will explore other
stakeholders for
further WASH
service to declare
Itahari
Municipality - an
ODF zone by
2015.
76
municipality
organized a one
day coordination
workshop in
partnership with
Lumanti with
support of Citizen
Forum, with all
the sector
stakeholders of
the municipality.
From the
workshop, a
committee is
formed in the
leadership of
municipality to
coordinate the
water and
sanitation
activities of
different agencies
including
government and
non government
organizations.
The committee
will also explore
funding
opportunities to
meet the resource
gap to achieve
the goal providing
access to
household toilets
and water points
to all the families
in Itahari. The
municipality has
reflected the
annual plan and
budget of Lumanti
in its annual plan
document.
Project
Management
Committee (PMC)
is formed
representing EO
of IM, ED of
Lumanti, CR of
WAN, EO of
Water Supply
Division Office,
UN-HABITAT and
77
Voices of
Citizen’s forum
are
acknowledged by
local WASH
stakeholders
adopting WESI
Plan as a
coordinated plan
and integrating it
into
Municipality’s
planning process
The financial
resources are
allocated in water
sector in an
increasing trend
Chairperson of
TLO, Project
Implementation
Committee (PIC)
formed
representing focal
person of IM for
Lumanti
WATSAN
programme,
Project
Coordinator of
Lumanti,
representation
from UCC,
Representation
from Itahari Small
Town Water
Supply and
Sanitation Users
Corporation,
Representation
from TLO
Municipality
contributes 10% of
the overall budget
in Lumanti WASH
programme as
Lumanti is
implementing the
programme in
partnership with
the municipality.
Therefore, the
municipality had to
get formal
approval from the
Municpal Council
meeting and
political parties
before signing the
MoU which
resulted in the
delay in
implementation of
service delivery
process in field
(especiallyhardware
activities).
NA
Citizen Forum
has conducted
an interaction
program in
participation of
all
stakeholders.
Municipality has
shown its
commitment for
the
development of
WESHI Plan.
Acknowledging
the voice of
Citizen Form,
Municipality has
produced a draft
WASH
coordinated plan
and planning for
municipal level
workshop with
stakeholder for
suggestions &
feedback to
finalize WASH
coordinated plan.
The municipality
will explore other
stakeholders for
further WASH
service to declare
Itahari
Municipality - an
ODF zone by
2015.
Citizen Forum
has studied
and analysed
the budget and
submitted the
In the FY
2067/68, the
allocated budget
for water sector is
Rs. 500,000/-
78
at the Municipal
Level providing
evidence of
actions of
Municipality
and/or other
sector
stakeholders in
adopting WESHI
plan as a
coordinated plan
for WASH
programme.
Sanitation:
Review of key
WASH sector
blockage issues
annually from
09/10 and
documented
them to
understand how
much
improvement in
WASH
governance,
particularly in
delivering
sanitation
facilities is
achieved and
sector blockage
issues are
addressed
draft report.
Delay in
agreement with
Itahari Municiality
delayed the
formation of
Citizen Forum.
Citizen Firum in
Itahari was formed
only in the forth
quarter. Therefore,
Citizen forum thus
formed did not
have enough time
to review the key
WASH sector
blockage issues
this year.
Prior to the
formation of
Citizen Forum
Itahari, Citizen
Forum
Biratnagar has
conducted and
reported RCT
result on Feb
2010. RCT
review
workshop will
be conducted
by Citizen
Forum Itahari
on 3rd quarter.
which is 0.49% of
the total budget.
In the previous
year, the
municipality has
not allocated
budget for water
sector. Though
the allocation of
budget of water
sector this year is
too low, the
municipality has
started allocating
from this year
which is definitely
a positive sign.
Review on RCT
has been
accomplished.
Citizen Forum
Itahari is
preparing a
review report. As
per the draft
report received
33-35% of the
total population of
Itahari is still
deprived from the
piped water
supply as still 6065 km pipeline
need to be
extended for total
coverage.
Besides,
extension of
pipeline in the
slum and
squatters area of
IM is still a big
question as the
municipality and
the service
provider has not
yet particularly
formulated the
policies in such
regards.
However,
ISTWSUC has
expressed its
commitment to
develop
79
Review of WESI
plans conducted
annually to
understand the
achievement and
contributions
made by the
sector actors on
sanitation sector
at the Municipal
level provide
evidence of
adopting WESI
plan as a
MoU with the
municipality has
been signed to
implement the
WASH project in
Itahari based on
the WESHI plan
developed by
Lumanti in
partnership with
the municipality.
The programme
has been officially
launched in the
Based on the
decision made
at the one day
coordination
workshop
conducted by
Itahari
Muncipality in
partnership with
Lumanti with
support of
Citizen Forum,
with all the
sector
operational policy
for the next FY
through the
learning from the
piloting program
of connection of
HH water pipeline
in partnership
with with Lumanti
and the extension
of water pipeline
for the same.
Moreover,
ISTWSUC has
not fully
implemented
WSP. Thus the
quality of water
cannot be
ensured. On the
other hand, IM
has not yet
produced WESHI
plan as an
integrated WASH
Coordinated plan.
On the basis of
which IM is
planning to
declare the
municipality an
ODF zone by
2015. In this
scenario,
municipality's
plan to declare
the whole
municipality
region an ODF
zone seems over
ambitious.
Municipality has
produced a draft
WASH
coordinated plan
and planning for
municipal level
workshop with
stakeholder for
suggestions &
feedback to
finalize WASH
coordinated plan.
The municipality
will explore other
80
coordinated plan
by the sector
stakeholders
including
Municipality.
municipality. ED of
the municipality
Mr. Ganesh Dahal
expressed his
gratitude towards
WAN, UNH and
Lumanti for
selecting Itahari for
programme
implementation
and wished all the
success and
support in the
programme.
Regarding the
adaptation of
WESI plan by the
municipality and
integrating it into
the municipality’s
planning process,
municipality
organized a one
day coordination
workshop in
partnership with
Lumanti with
support of Citizen
Forum, with all the
sector
stakeholders of the
municipality. From
the workshop, a
committee is
formed in the
leadership of
municipality to
coordinate the
water and
sanitation activities
of different
agencies including
government and
non government
organizations.
The committee will
also explore
funding
opportunities to
meet the resource
gap to achieve the
goal providing
access to
household toilets
and water points to
stakeholders of
the municipality
has conducted
household data
and it is uner
processing for
the
development of
WASH
coordinated
plan.
stakeholders for
further WASH
service to declare
Itahari
Municipality - an
ODF zone by
2015.
81
Voices of
Citizen’s forum
are
acknowledged by
local WASH
stakeholders
adopting WESI
Plan as a
coordinated plan
and integrated it
into
Municipality’s
planning process
to deliver
sanitation (incl.
Environmental)
sanitation
services
all the families in
Itahari. The
municipality has
reflected the
annual plan and
budget of Lumanti
in its annual plan
document.
Municipality
contributes 10% of
the overall budget
in Lumanti WASH
programme as
Lumanti is
implementing the
programme in
partnership with
the municipality.
The municipality
had to get formal
approval from the
Municipal Council
meeting and
political parties
before signing the
MoU which
resulted in the
delay in
implementation of
service delivery
process in field
(especiallyhardware
activities).
Based on the
decision made
at the one day
coordination
workshop
conducted by
Itahari
Muncipality in
partnership with
Lumanti with
support of
Citizen Forum,
with all the
sector
stakeholders of
the municipality
has conducted
household data
and it is uner
processing for
the
development of
WASH
coordinated
plan.
Acknowledging
the voice of
Citizen Form,
Municipality has
produced a draft
WASH
coordinated plan
and planning for
municipal level
workshop with
stakeholder for
suggestions &
feedback to
finalize WASH
coordinated plan.
The municipality
will explore other
stakeholders for
further WASH
service to declare
Itahari
Municipality - an
ODF zone by
2015.
Project
Management
Committee (PMC)
is formed
representing EO of
IM, ED of Lumanti,
CR of WAN, EO of
Water Supply
Division Office,
UN-HABITAT and
Chairperson of
TLO
Project
Implementation
Committee (PIC)
formed
representing focal
person of IM for
Lumanti WATSAN
82
Additional
financial
resources are
increased in this
sanitation sector
in an increasing
trend at the
Municipal Level
from 09/10
provide evidence
of actions of
sector
stakeholders at
Municipal level in
adopting WESI
plan as a
coordinated plan
for WASH
programme for
improved
sanitation.
Hygiene:
Service providers
act by increasing
their financial
investment to
address the
identified issues
by 11/12
programme,
Project
Coordinator of
Lumanti,
representation
from UCC,
Representation
from Itahari Small
Town Water
Supply and
Sanitation Users
Corporation,
Representation
from TLO
Delay in
agreement with
Itahari Municiality
delayed the
formation of
Citizen Forum.
Citizen Firum in
Itahari was formed
only in the forth
quarter. Therefore,
Citizen forum thus
formed did not
have enough time
to review the key
WASH sector
blockage issues
this year.
NA
Budget tracking
of Muncipality
has been done
by the Citizen
Forum Itahari
and has
submitted a
draft report.
NA
In the FY
2067/68, the
allocated budget
for sanitation
sector is Rs. 54,
50,000/- which is
5.41% of the total
budget. This is
relatively higher
than the previous
year. In the
previous year, the
allocation of the
budget in
sanitation sector
is Rs. 37,
00,000/- which is
4.73% of the total
budget. The
municipality has
invested Rs.
34,83,063/- for
sanitation sector.
The allocated
budget for
hygiene
promotion for the
FY 2067/68 is Rs.
9,70,000/- which
is 0.96% of the
total budget.
Allocation of the
budget this year
is lower than the
previous year. In
the previous year,
the allocation is
Rs. 8,80,000/which is 1.25% of
the total budget.
Out of the total
83
Promoted
hygiene
education
through CHVs &
CHMs with
increased priority
at local municipal
level with
technical
supports from
District health
institutions (E.g.
DPHO) and
Lumanti
Local sector
stakeholders
have integrated
hygiene
education in the
WASH
programme with
priority
Policy Influencing
1 CHM and 5
CHV’s have been
identified and
selected in ward
no 6. The CHM
and CHV’s are
working actively in
the community to
assist in Hygiene
Behavior change
of the people in
the community.
The community
people are now
more aware on
use of hygienic
latrine facilities
and safe use of
water. However,
more hygiene
programmes has
to be focused in
Purba Mushari
and Dina Badri
community for
hygiene behavior
change of the
people in those
community.
NA
3 CHM and 10
CHV’s have
been identified
and selected in
ward no 7, 8 &
9. The CHM
and CHV’s are
working actively
in the
community to
assist in
Hygiene
Behavior
change of the
people in the
community. The
community
people are now
more aware on
use of hygienic
latrine facilities
and safe use of
water.
However, more
hygiene
programmes
has to be
focused in
community for
hygiene
behavior
change of the
people in those
community.
CHM & CHVs
from ward no 6
are also actively
working in the
community.
NA
budget in the
previous year, the
investment is Rs.
8,13,227/-, 1.10%
of the total
budget.
All identified CHM
and CHV’s are
working actively
in the community
to assist in
Hygiene Behavior
change of the
people in the
community. The
community
people are now
more aware on
use of hygienic
latrine facilities
and safe use of
water. However,
more hygiene
programme has
to be focused in
community for
hygiene behavior
change of the
people in those
communities.
CHM & CHVs
from ward no 6
are also actively
working in the
community.
NA
84
Sectors
Water /
Sanitati
on/
Hygiene
Key Deliverables
(As mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress
To Date
 Public
hearing on
water tariff
and its use,
water
distribution
system from
Mangadh
WSS.
 Coordinati
on meeting
and
interaction
with
different
sector
stakeholder
#An updated review
s
report on RCT
results/recommend  Link with
ations by
DHO
incorporating the
 IEC
identified new
materials
Sector blockage
and annual
issues related to
newsletter
WASH produced
 Media
along with the
recommended plan
mobilization
of actions to be
 WATSAN
addressed in next
information
year at municipal
board
level.
 RCT
reviewed
#Documents
produced by citizen
and
forum on the
disseminate
activities
d
commenced to
 Publication
influence sector
of WASH
stakeholders
following the WASH issues by
advocacy plan and
CF
the outputs
 Review
achieved annually
and
from FY 09/10 and
analysis of
compiled document
WASH
is produced by
#A report on annual
review on the
achievement in
addressing the
sector blockage
issues, progress
achievement of
WESI Plan and in
materializing the
recommendations
made by Report
Card Test results
through social
auditing / review
process annually
from 09/10 and
report produced
accordingly.
Public
hearing on
water tarrif
and its
use, water
distribution
system
from
Mangadh
was done
twice.
Owing to
continuous
lobby with
the
Municipalit
y and the
NWSC
developme
nt has
been seen
in
governanc
e and
delivery of
water
services in
BSMC.
The
NWSC
has
installed a
two-phase
power
lines in
order to
supply
water
during the
loadshedding
(Before
due to
increased
loadshedding
the
distribution
of water
Quarterly Output
Plan
Progress
in Q4
 RCT
reviewed
and
disseminate
d
Review and
analysis of
WASH
policy/guideli
nes at
Municipal
level to
identify the
gaps and
support
required.
Justificati
on for
Variance
The
Report
Card Test
conducted
in previous
year was
reviewed
and the
results
were
disseminat
ed. Mr
Suresh
Adhikari,
CDO
Morang
attended
the
programm
e as the
Chief
Guest.
A
publication
of
activities
and
achieveme
nts of CF
in
Biratnagar
is
produced
85
March 2012.
policy/guide
lines at
Municipal
level to
identify the
gaps and
support
required.
was
lowered
which has
been a
blockage
issue in
supplying
of water.)
Also, the
municipalit
y has
provided
supports
to
community
based
water
supply
system of
Jatuwa
and that of
Mangadh
(Nrs 0.3
million for
each
supply
system)
Coordinati
on
meetings
and
interaction
s with
different
sector
stakeholde
rs was
done
twice.
Media
interaction
was
organized
IEC
materials
and
brochure
of citizen
forum was
produced.
WATSAN
informatio
86
n Boards
installed in
ward 18
The
Report
Card Test
conducted
in previous
year was
reviewed
and the
results
were
disseminat
ed. Mr
Suresh
Adhikari,
CDO
Morang
attended
the
programm
e as the
Chief
Guest.
A
publication
of
activities
and
achieveme
nts of CF
in
Biratnagar
is
produced
Conducted
trainings,
interactions and
workshops by
establishing
linkages with
District Health
Institutions for
promoting hygiene
education within the
communities
annually from FY
09/10 and to raise
its importance
within the WASH
sector stakeholders
at local municipal
87
level
A budget tracking
on WASH sector at
Municipal level
done for 3
consecutive years
(including 08/09)
and conducted
lobby and review
meeting report
produced by
2010/11.
Assessment report
produced on
municipality’s
budget allocation
and its utilization in
WASH sector by
end of 2012/13.
88
J. Beneficiaries (Annual Report only – unless completed in Q1 or Q2 when it should be included in
Six month Report)
Note: This section not applicable for influencing projects.
Planned (10/11)
Achieved (10/11)
Variance(in %)
Water
Sanitation
Water
Sanitation
Water
Sanitation
4300
1200
1984
1483
-54 %
24%
Justifications:
Water:Earlier during the time of planning ,the benificiary from the Water Safety Plan was termed
Direct Benificiaries but Later the definition of Direct Benificiaries was strictly defined to be the one
with access through Service Delivery,Hence Such Benificiary planned couldnot be achieved
Sanitation:
Additional 6 toilets were constructed to address the community demand for ODF and hence 206
toilets were constructed which resulted higher number of benificiary
One public latrine was installed at the Shiva Parvati temple in Shiva Parvati tole in Ward to support
ODF which had 300 benificiary
One institutional latrine was constructed TLO Building of Balgram Tole in Ward 6
to support ODF
as it is the only institutional latrine in this area
89
Project No. : 643UD Biratnagar Integrated Water, Sanitation, Hygiene Project
A. Project Information:
- Project Name: Biratnagar Integrated water, sanitation, hygiene project
- Names of Sub-Projects (if applicable): Urban Terai
- Project Period: 20010-2011
- Name of Partner Organization: UC, Citizens Forum, Cooperative, TLO, Municipality,
Integrated Community Development Forum ( ICDF)
- Partner Organization Number:
B. Executive Summary:
Biratnagar Sub-Metropolitan City is selected as the programme area as the municipality has very less
sanitation coverage with more than 40% of the selected HH practicing open defecation. Although the
water coverage of the selected communities are quite high with more than 70% HH having their
private hand-pumps to extract groundwater, the quality of groundwater being extracted and hygiene
is not up to standard. As the situation of water, sanitation and hygiene is very poor in the selected
communities, people of these communities are highly prone to water borne, water based and water
washed diseases.
In this year (20010/11) project is being implemented in 10 poor and excluded slum & squatters of
wards 18 and 22. The integrated WASH project was implemented in the following communities:
Ward 18
S.N Cluster
Tole
1 Mahato ‘Ka’
Mahato
2 Mahato “Kha”
Mahato
3 Katkuppa
Nayatole
Nayatole
4 Ghoga
Hansamukhi
5 Shiva
Ghoga
Hansamukhi
Ghoga (Shiva
tole)
Swayambhu
Tole
Kabir Tole
Bishnu Tole
6 Swayambhu
7 Kabir
8 Bishnu Tole
Ward 22
1 Gafur
2 Parti
Ward 16
1 Laxmi Narayan
Gafur
Parti/Jahir
Laxmi
No
of
water
facilities
installed/rehab
58 rehab and 2
new
57 rehab and 2
new
63 rehab and 3
new
No of HH Remarks
Latrines
constructed
71
49 rehab and 3
new
28 rehab and 2
new
29 rehab only
65
7 rehab only
36 rehab and 2
new
7
50
45 rehab and 1
new
29 rehab and 3
new
60
13 rehab only
37
1
institutional
water point and 1
institutional latrine
at Madrasa
34
20
1
institutional
water point and 1
institutional latrine
at Bishnu Primary
School
52
9
For ODF
90
Narayan
Total
414 rehab and 18
new
405
In this year of intervention, 396 HH latrines were constructed in 10 clusters of the 2 wards and 9
latrines were constructed in Laxmi Narayan tole of ward 16. 4 clusters were declared as ODF zones:
Laxmi Narayan Tole (ward 16), Basta (Ward 5), Swayambhu Tole and Shiva Tole (ward 18). Also, in
this year new technology was introduced by construction of school latrine with incinerator which is a
step towards piloting in menstrual hygiene at school level. Also, other 2 school latrines were
constructed and 1 school latrine was renovated in this year.
Concept of Water Safety Plan (WSP) in stand-alone water points was piloted. The WSP included
rehabilitation of water points and orientation to users regarding safeguarding water at all levels: from
source to point of use. However, the WSP could not be effectively institutionalized at the community
level. In this year, 414 water points were rehabilitated and 18 new water points were installed.
This year also saw some newer approaches in programme intervention: formation of Sanitation
Groups, Graded subsidy in service delivery, provision of collecting O&M fund in construction of public
water structures, link of caretaker to S&C groups through UCs for access to O&M fund are some to
name.
Also, in the sector of Citizen’s Action remarkable achievements were seen in this year. In this fiscal
year the governance and service delivery of sector stakeholders have comparatively improved than in
the previous years. The Municipality has drafted policies on supporting community based Water
Supply Schemes and improving School Sanitation- addressing the gaps as identified and lobbied by
the Citizen’s Action Forum in Biratnagar.
C. Project Approach
The project is designed based on the following approaches.

Coordinated Plan (WESI Plan): Currently, the challenge in urban areas is to increase the
accessibility of water and environmental sanitation facilities through a holistic concept of
integrated planning for enhancing access to poor and vulnerable urban communities to safe
water, affordable sanitation, improved neighborhood environment coupled with hygiene
education and increased understanding of community to ensure usage and sustained hygiene
behavior. In addressing the above mentioned issues, a comprehensive “WESI plan” approach
has been adopted for addressing the WASH sector issues and challenges. In addition this
plan aims to deliver the services in a coordinated way under the need base concept within the
municipality. This plan is normally prepared in consultation with the local sector stakeholders
including municipality with an involvement of excluded and deprived community in terms of
economic as well as WASH facilities aspect. Once WESI plan is prepared, it is promoted as a
municipality plan with their ownership so that all the sector players at local municipal level will
be aligned and mainstreamed gradually to work as guided by the WESI plan. It is expected
that municipality will include the WESI plan issues in its planning process and gradually
adopted it as a component of municipality's multiyear WASH project. This WESI plan helps to
guide and mainstream all the actors and service providers within WASH sector in Municipal
level. The WESI Plan focuses on integrated approach of service delivery and capacity building
under holistic concept within water and sanitation sector; and to have cross-sector linkage by
linking cross cutting issues of development.

Equity (social inclusion) and Gender: Equity and gender are incorporated in this project.
This in practice focus on empowerment of marginalized women along with men for getting
access in water, sanitation, hygiene and livelihoods. Socially marginalized groups especially
women, as well as differently able groups views are given due consideration in the planning an
91
implementation of the project. This in practice includes women and differently able people in
UC (Users committee). The approach ensures that women and members of the excluded
groups are proportionally represented in all community institutions and they also represent in
decision making positions.
Similarly in delivering services, equity and inclusion is
incorporated.

Mobilization of saving & Credit groups: Groups of women will be mobilized with minimal
support to help them to contribute in the WASH sector by mobilizing loan for households within
the community to speed up WaSH activities of the projects. A cooperative will be established
mobilizing the saving and credit groups in the municipality. The cooperative/s thus established
will then flow loans in minimum interest rates to the poor and marginalized people in the
community for improving their livelihood. The WASH project will provide technical supports to
the cooperative by building up their capacity and directing them on linking the cooperative with
livelihood with special focus on WASH. The established cooperative will develop its linkage
with the municipality and other cooperatives to generate fund for the cooperative to flow loan.

Focus on Health, Hygiene and Sanitation: Health and Hygiene education in each ward will
be looked over by the Health and Hygiene coordinator of Lumanti. The locally recruited and
trained CHM and CHV’s will be responsible to promote health and hygiene behavior at the
community level. Linkage with the sector stakeholders such as GO and I/NGO or other will be
given emphasis in the programme wherever possible.
Apart from training and orientations, various different activities will be adopted to spread the
hygiene message effectively in the community. Activities will include education sessions,
cultural activities like street drama and cleanup campaign, mass awareness rally, art
competition, health camps, wall paintings, visibility boards with key message etc. Behavior
change will be the major focus of health and hygiene education activities. Sanitation will be
promoted with total sanitation concept with focus on community sanitation outcomes i.e.
initiations to achieve total sanitation by declaring open defecation communities. Health and
Hygiene activities will be integrated with water and sanitation programme to maximize the
benefits. Attention will be given on special sanitation need of adolescent girls, women and
other differently able people within the communities.

Collaborative Approach: Lumanti is working in partnership with the municipality (local self
government) and the community. In addition, Lumanti works in close coordination with TLO,
political representatives, service providers, district offices of sector agencies, civil societies etc
at the municipal and district level. These stakeholders are included in different discussion
forum/meeting/activities for sharing and finding the better way out in providing access to water
and sanitation. All the development activities carried in the communities through Lumanti are
endorsed by Project Management Committee (representation of municipality, political
representatives and concerned stakeholders) and PIC (Programme Implementation
Committee). Field level issues are shared and decisions are made by building common
consensus through PIC. This committee includes municipality, TLO, Lumanti and Users
coordination committee (UCC), NWSC and sector stakeholders. Lumanti works in partnership
with the municipality (local self government), and communities. Similarly, Lumanti also works
in close coordination with TLO, political representatives, service providers, district offices of
sector agencies, civil societies etc at the municipal and district level to better plan water and
sanitation to address WASH needs of the poor and vulnerable communities within the
municipality.
92

Advocacy and Influencing: Citizen’s Action for making the citizens to understand their water
and sanitation situation to make them engaged to make service providers and government
agencies more responsible and accountable towards their service delivery mechanisms.
Lumanti believes that, Citizen Forum in a period of time will have developed their skills,
knowledge and powers to influence the policies and practices.
The programme also aims on minimizing the sector blockage issues and WATSAN
governance issues by materializing the WESI Plan as well as recommendations made by
RCT 2 under Citizen’s Action programme for influencing the sector agencies at local level,
particularly at municipal level through this approach.
The approach will promote WESI plan by making efforts to mainstream the plan into the
Municipal level planning process as a sector plan of the Municipality.
The programme also aims to lobby local government bodies and service providers to influence
the change in governance. Lumanti will support Citizen’s Forum to develop good functional
relationships with these actors for its influencing activities by building trust among Lumanti and
its allies and the responsible institution and officials to understand the issue from the
perspective of people suffering from it.


Linking with slum upgrading: In the few poor communities in BSMC, Lumanti and BSMC
has signed an agreement to introduce ACCA slum upgrading project in the leadership of the
community leaders. This project highlights on housing and small scale infrastructure projects
of the communities' choice, which ultimately turn out to be sanitation and environmental
sanitation. The WASH project will make link with ACCA project to support and share learning
and experience. ACCA is conducting slum up-gradation project in one urban poor community
of ward no 15 and five urban poor communities of ward no. 1. The project will be implemented
through Integrated Community Development Forum (ICDF) with support of cooperatives
(Samjhana cooperative and Samridhi cooperative) established by Lumanti in support of WAN.
As the financial aspect of the ACCA project will be handled by Cooperative, the cooperatives
will be more strengthened financially as well as technically and hence loan flow in WATSAN
infrastructure will be more effective. Also, as ICDF will be solely the implementing partner of
Lumanti in conducting ACCA project, the capacity of ICDF will also be strengthened which will
ultimately help WATSAN programme in monitoring phase.
Sustainability Approach:
To contribute to the sustainability of the project, a number of approaches will be adopted during
and after the project implementation to ensure that the target communities benefit from the
project.
i. Community Mobilization: The engagement of the community in the programme activities is
one of the major approaches of Lumanti to implement WASH programme. This will ensure
strong participation and ownership of community in the hardware and software part of WASH
project. The community is mobilized by helping them forming different groups such as Users
Committee, Users Coordination Committee, Child Groups and Saving & Credit Groups and
Cooperatives. Capacity building of the community leaders, raising awareness and improving
education of the community representatives is one of the major parts of the WASH intervention.
The CLTS approach followed by Lumanti will not only focus on construction of toilet facility but
on achieving and sustaining No Open Defecation (NOD) environment in the community. In this
connection, Lumanti will also mobilize its programme encouraging the community members for
implementing the programme from the community.
2
Report Card Testing
93
ii. Community Based Management and Evaluation: Water Aid and Lumanti have developed
community based management and evaluation tools which enable the community to monitor the
progress towards project objectives and targets set. Engagement of the community in the
process ensures that community takes increased responsibility for the achievement of these
actions, as well as increasing the transparency and accountability of the UC. This is achieved by
completing a number of charts which can be displayed and completed at community meetings.
The chart contains information on financial status of the project, outputs achieved and
community members’ satisfaction with the project progress.
iii. Operation and Maintenance: To support the O&M of water and sanitation facilities constructed
in the project, the UCC and UC will receive trainings on O&M approaches. The UC will also be
trained to collect and use the collected O&M fund as revolving loan fund in a cost recovery basis
for WATSAN infrastructure construction and maintenance or livelihood support of the community
people.
iv. Follow-up Support: Lumanti will provide support to the community institutions for two years
after the completion of the project implementation period. The follow up support is to ensure the
smooth operation of the system.
v. Cost Sharing approach: Lumanti will make efforts to mobilize local contribution from
beneficiaries as well as other stakeholders and partners (including the local government) to
ensure ownership of the outputs and the process by the community. The amount of local
contribution and mechanisms for collecting and utilizing this contribution will be determined
thorough consultation. This will develop the ownership of local bodies towards the project during
and after the completion of the project as well thereby reducing their dependency on donors.
vi. Demand Based Approach: Lumanti adopts demand driven approaches for improved efficiency
and equity of WASH services while ensuring benefits for those who are currently deprived of
water and sanitation. Similarly, the programme gives high priority to the ability and willingness of
the community and the local people to contribute for the effective implementation of the project
and its operation and maintenance for its long term sustainability.
D. Progress against key deliverables
D. Progress against key planned Activities (Refer to Key Deliverables in Project Plan Section 4
and Plan of action/Output Plan of the project):
Service Delivery
Sector Key
s
Deliverables
(As mentioned
in Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Quarterly Output
Plan
Progress
in Q4
Justifica
tion of
Variance
94
Water
Project
implemented
in 13 cluster
communities
of ward no. 18
and 22 serving
4,000 people
through :
 20 hand
pumps
installation
 350 water
points
rehabilitatio
n
 370 points
water
quality
tests(half
yearly)
 A report on
WQ test of
all the
water
points
conducted
twice in a
year,
achieveme
nt of
promoted
household
treatment
options for
safe
consumptio
n of water
when found
WQ
deviated
from the
standard.
 Developme
nt of Water
Safety Plan
in all the
communitie
s and
monitored
the
effectivene
ss of
implemente
d
#20 hand
pumps
Installation
#350 water
points
rehabilitate
#370 points
water quality
tests(twice)
#18 new
hand pumps
were
installed, 4
water points
were installed
in Ward 22
and 14 in
Ward 18.
(Cluster wise
details of
installation of
water points
is given in
Annex)
#404
household
and 10 public
water points
rehabilitated,
74 water
points were
rehabilitated
in ward 22,
327
rehabilitated
in ward 18
and 13 in
ward 16.
(Cluster wise
details of
installation of
water points
is given in
Annex)
#414 water
points tested
(and 53 water
points tested
twice)
#3489 people
from 10 poor
and excluded
communities
served from
the delivery of
the above
mentioned
water
structures.
#Annual
Remaining 79
water points
rehabilitated,
11 remaining
new water
points are
installed,
90 water points
are tested
143 water
points
rehabilitat
ed: 15 in
ward 22
and 128 in
ward 18
#11 new
water
points
installed:
3 new
water
points
installed
in ward 18
and 8 in
ward 22
#173
water
points
tested,
#1801
people
benefited
in the
quarter
owing to
the
access of
the above
mentioned
water
infrastruct
ures.
Addition
al water
structure
s have
been
rehabilit
ated
than the
planned
number
owing to
the
provision
of
graded
subsidy
in
commun
ities.
The
planned
numbers
of new
water
points
have not
been
installed
owing to
failure of
UCs to
raise
genuine
demand
s from
the
commun
ity. (It is
practice
d that to
install a
new
water
point,
the
water
point
should
be used
by at
least 5
househo
lds, but
the
95

communitie
s.
Annual
progress
report
produced
indicating
equity and
inclusion
Sanitat Project
 400 HH
ion
implemented in
latrines & 1
13 cluster
institutional
communities of
latrine
ward no. 18
constructed/r
and 22 serving
enovated
2200 people
4
through:
communities
 400 HH
declared
latrines & 1
ODF
institutional
communities
latrine
constructed/r  1,000
enovated
environmenta
4
l Sanitation
communities
beneficiary
declared
served
ODF
through
communities
household
 1,000
solid waste
environmenta
management
l Sanitation
through Suiro
beneficiary
programme
served
through
household
solid waste
management
through Suiro
and
composting
programme
 Annual
progress
report
produced
indicating
equity &
inclusion
status,
report on
equity and
inclusion
addressed by
service
delivery
produced
(See attached
report)
 405
Individual
latrines
constructed.
(9 in ward
16, 112 in
ward 22 and
284 in ward
18)
(Cluster wise
construction
details of
latrines
attached in
Annex)
 3
Institutional
Latrines
constructed.
1 incinerator
joined
latrine, in
Adarsha
Balika
Secondar
School,
Ward 10, 1
school latrine
in Bishnu
Primary
School,
Ward 18 and
1 latrine in
Madrasa,
Ward 18.
 IEC
materials on
Solid waste
management
were
planned
2 handpumps
were to
be used
by only 3
househo
lds each
if
installed)
#Remaining
210 HH latrines
constructed.
#One
institutional
latrine
constructed/ren
ovated
#2
communities
declared as
ODF
communities.
#215 HH
latrines
constructe
d, 67
latrines
constructe
d in ward
22 and
148 in
ward 18.
#3
institution
al latrines
constructe
d. 1
incinerator
joined
latrine, in
Adarsha
Balika
Secondar
y School,
Ward 10,
and 1
school
latrine in
Bishnu
Primary
School,
Ward 18
and 1
latrine in
Madrasa,
Ward 18.
Additiona
l latrines
have
been
construct
ed than
the
planned
number
owing to
the
provision
of graded
subsidy
in
communit
ies
#Swayam
bhu tole,
Kabir tole
and Shiva
tole of
96
particularly
the
beneficiaries
in terms of
poor and
exclusion
perspective.
Hygien  Conducted
e
one 5 days
follow-up
training to
CHVs on
health and
hygiene
issues and to
use
CBME/RCS
tools and
practice the
tools to
assess the
improvement
in hygiene
practice and
one refresher
training
annually from
2010/11
 RCS survey
conducted
quarterly from
2010/11
 All the
community
people of the
target
communities
are provided
produced.
 Suiro
Option was
oriented in
Basta (Ward
5) and
Laxminaraya
n tole (Ward
16). 190
suiros were
distributed ,
100 in Basta
and 90 in
Laxmi
Narayan
tole.
 1 Disable
friendly
toilet was
built in ward
19
 RCS survey
conducted
 Door to door
visit
 Interpersonal
communicatio
n/
interactions
(child club
support)
 1 Street
Drama
 1 Teachers
Orientation &
school health
education
 1 Health
Camp
organized
 One full
day
training
was
conducted
for 2 times
with
resource
person
from
DHO,
municipalit
y and
Lumanti
for
Sanitation
groups,
CHMs and
some
members
of UC
from 6
communiti
es
 Door to
Door visit
in wards
18 and
22,
conducte
ward 18
declared
as ODF
communiti
es.
#RCS survey
conducted
#Door to door
visit
#Interpersonal
communication
/ interaction
#1 street
Drama
conducted
#1 Health
Camp
organized
#RCS
survey
conducted
in 8
clusters of
ward 18
and 2
clusters of
ward 22.
There has
been
substantiv
e
developm
ent in (at
most
90%) in 4
adoptions
of 4 key
hygiene
messages
.
#Door to
door visits
and
interperso
nal
communic
ation has
been
97
with 4 key
hygiene
education
annually from
2009/10
through
community
hygiene
education
program to
adopt
improved
hygiene
behavior
practice and
sustain them.
 Document on
the
assessment
of hygiene
behavioural
changes
conducted in
4 key areas
within the
communities
of selected
wards
through
CBME & RCS
produced
annually from
09/10 and
disseminated
within the
working
communities
of the
selected
wards and
municipal
stakeholders
annually from
2010/11
 Hygiene
behavioral
assessment
report
produced and
disseminated
to a wider
audience
annually from
FY 2009/10
d
routinely,
to
dissemin
ate 5 key
message
s by
CHM and
Sanitatio
n Groups
 Sanitatio
n groups,
Child
groups
and CHM
conducted
proper
hand
washing
programm
e in each
communiti
es on
routine
basis.
 1 street
Drama
presented
in ward 18
by child
groups.
And, 1
street
drama
performed
during
ODF
declaratio
n on
Swayamb
hu tole,
ward 18.
 Teacher
s
Orientatio
n on
hygiene
education
at school
was
conducted
in Janta
Primary
School at
conducted
in all
communiti
es of ward
18 and 22.
One to
one and
group
health and
hygiene
messages
were
shared in
the
communiti
es.
#1 street
drama
was
performed
in ward 18
during the
ODF
programm
e.
#1 health
campaign
was
organized
in
coordinati
on among
Lumanti,
Cooperati
ves of
ward 7
and 19,
DHO and
Birat
Hospital.
The health
camp
focused
on women
specific
health
issues
and was
attended
by 72
women.
98
 Report
produced on
the
effectiveness
of hygiene
message in
the
communities
regarding
their hygiene
behavior
practices and
the change
brought by
the education
within the
communities
with case
studies.
 Mechanism
documented
on the
management
and
coordination
of CHVs for
the
sustainable
community
health
service
Nayatole ,
ward 18
 Mass
Awarenes
s/Rally
was
conducted
in Basta,
ward 5
and
Laxinaray
an tole,
ward 16
for
declaratio
n of ODF
communiti
es
 Child
clubs
interaction
programm
e was
conducted
in ward 18
and 22
 1 health
campaign
was
organized
in
coordinati
on among
Lumanti,
Cooperati
ves of
ward 7
and 19,
DHO and
Birat
Hospital.
The health
camp
focused
on women
specific
health
issues
and was
attended
by 72
women.
99
Capacity Building
Sectors Key
Deliverables
(As mentioned
in Project Plan)
Water /
 Developed a
Sanitatio
policy strategy
n
/ approach of
Lumanti in
delivering
Sanitation and
environmental
sanitation
facilities/servic
es by 2010/11
and shared
with the
stakeholders
in BSMC
 4 trainings and
2 exposure
visits are
conducted for
Municipal level
sector
stakeholders
on different
technologies,
approaches,
practices and
models of
sanitation to
increase their
knowledge for
promoting
hygienic
sanitation
facility &
improved
neighborhood
environment
and replicated.
 Post WSUC
and
Caretakers
training
provided to
ensure the
Annual Total (Outputs)
Total Plan
Progress To
Date
Quarterly Output
Plan
Progress in
Q4
 Pre
construction
Trainings (1
in each
cluster)
 Caretaker
selection (1
in each
ward)
 Caretaker/S
M training
 Training on
Water
Safety Plan
to the
UC/UCC
and
municipal
staffs.
 Post
Constructio
n Trainings
conducted
(1 in each
cluster)
 Municipality,
VDC, DDC
& other
sector
stakeholder
s Training,
W/S &
Exchange
Visit
Post
 Post
Constructio constructio
n Training
n training
conducted
was
provided to
Refresher
UCs, of all
Caretaker’s clusters
Training
and local
conducted
masons
regarding
the
measures
to be
adopted for
sustaining
the Water
structures
(platforms
and handpumps)
and proper
usage and
cleanliness
of
sanitation
structures
(latrines).
(Detail
report
attached )
 Pre
constructio
n trainings
were
conducted
in all
communiti
es and
especially
the Users’
Committee
was
oriented
on proper
standards
of
platforms
and
latrines.
Also, the
UCs were
oriented
on
procedure
s of
collection
of
quotations
and
procureme
nts of
materials
required
for
constructio
n.
 Caretaker’
s Training
and
refresher
Caretaker’
s Training
conducted
Justificatio
n for
Variance
A refresher
caretaker’s
training
was
provided to
13
caretakers,
10
caretakers
from 10
project
implemente
100
sustain of
constructions
annually from
2010/11
 Training
activities
conducted for
skills and
capacity
enhancement
are reviewed
annually to
understand
their efficacy
and practice
adopted
in wards
18 and 22.
There are
13
(including
3 from
ICDF)
caretakers
and O/M
fund is
establishe
d in all
working
clusters.
Tools
required
for
maintenan
ce of the
handpumps
were
distributed
to the
appointed
caretakers
.A
provision
has been
formed for
caretakers
to access
O&M fund
through
the
respective
UCs.
.
 Training
on water
safety
plan was
conducted
to UC,
UCC,
sanitation
groups,
ICDF and
CDW.
 Water
quality
training
was
conducted
d clusters
and 3
caretakers
appointed
from ICDF
were
provided
with
caretaker’s
training
and with 1
set of
maintenanc
e tools.
(Detail
Report
Attached)
101
for UC,
ICDF, CHM
and
sanitation
groups
 Post
constructio
n training
was
provided to
UCs and
local
masons
regarding
the
measures
to be
adopted for
sustaining
the Water
structures
(platforms
and handpumps)
and proper
usage and
cleanliness
of
sanitation
structures
(latrines).
 Exposure
visit was
organized
for
municipal
staffs and
sectors
stakeholder
s and
partners.
They were
taken to
Birgunj.
Hygiene
 Developed a
policy
strategy/appro
ach of
Lumanti for
hygiene
 Municipalit
y, VDC, DDC
& other
sector
stakeholders
Training,
 3 CHMs
and 45
CHVs
(sanitation
groups)
from 10
CHMS
and CHVs
(that
included
Sanitation
Groups)
102
education and
W/S &
its promotion
Exchange
by 2010/11
visit (visit for
and shared
municipality
with the
staffs, DHO
stakeholders
staffs and
in BSMC
related
including
stakeholders
district health
staffs in
institutions
working
areas
 2 CHM’s and
45 CHV’s are
 CHV and
trained to
other
promote
trainings
hygiene
education
covering ward
no 18 and 22.
 13UCs, 2
CHM’s and 45
CHV’s are
trained to use
CBME and
RCS tools and
practiced them
to assess
improvement
in hygiene
practices and
improvement
in health.
Policy Influencing
Sectors Key
Deliverables
(As mentioned
in Project Plan)
Water /
#A report on
Sanitatio annual review
n/
on the
Hygiene achievement in
addressing the
sector blockage
issues, progress
achievement of
WESI Plan and
in materializing
the
recommendatio
ns made by
Report Card
Test results
through social
auditing / review
communiti
es of ward
18 and 22
are trained
to promote
hygiene
education.
 10 UCs (8
from ward
18 and 2
from ward
22) and
CHVs/CH
Ms and
sanitations
groups
and CDWs
are trained
to use
CBME and
RCS tools.
were
routinely
orientated
on
hygiene
messages
through
monthly
sharing
meetings
(3 times)
Annual Total (Outputs)
Total Plan
Progress To
Date
Quarterly Output
Plan
Progress in
Q4
 Public
hearing on
water tariff
and its use,
water
distribution
system from
Mangadh
WSS.
 Coordinatio
n meeting
and
interaction
with different
sector
 RCT
reviewed
and
disseminat
ed
Public
hearing on
water tarrif
and its use,
water
distribution
system from
Mangadh
was done
twice. Owing
to continuous
lobby with
the
Municipality
and the
NWSC
development
Review and
analysis of
WASH
policy/guide
lines at
Municipal
level to
identify the
gaps and
support
required.
Justificati
on for
Variance
The Report
Card Test
conducted
in previous
year was
reviewed
and the
results were
disseminate
d. Mr
Suresh
Adhikari,
CDO
Morang
attended
the
programme
103
process
annually from
09/10 and report
produced
accordingly.
stakeholders
 Link with
DHO
 IEC
materials
and annual
#An updated
review report on
newsletter
RCT
 Media
results/recomme mobilization
ndations by
 WATSAN
incorporating
information
the identified
board
new
Sector blockage  RCT
issues related to reviewed
WASH
and
produced along
disseminate
with the
d
recommended
 Publication
plan of actions
to be addressed
of WASH
in next year at
issues by
municipal level.
CF
 Review and
#Documents
analysis of
produced by
WASH
citizen forum on
the activities
policy/guideli
commenced to
nes at
influence sector
Municipal
stakeholders
level to
following the
identify the
WASH
gaps and
advocacy plan
support
and the outputs
achieved
required.
annually from
FY 09/10 and
compiled
document is
produced by
March 2012.
has been
seen in
governance
and delivery
of water
services in
BSMC. The
NWSC has
installed a
two-phase
power lines
in order to
supply water
during the
loadshedding
(Before due
to increased
loadshedding the
distribution of
water was
lowered
which has
been a
blockage
issue in
supplying of
water.) Also,
the
municipality
has provided
supports to
community
based water
supply
system of
Jatuwa and
that of
Mangadh
(Nrs 0.3
million for
each supply
system)
as the Chief
Guest.
A
publication
of activities
and
achievemen
ts of CF in
Biratnagar
is produced
Coordination
meetings and
interactions
with different
sector
stakeholders
was done
twice.
Media
104
interaction
was
organized
IEC materials
and brochure
of citizen
forum was
produced.
WATSAN
information
Boards
installed in
ward 18
The Report
Card Test
conducted in
previous year
was reviewed
and the
results were
disseminated
. Mr Suresh
Adhikari,
CDO Morang
attended the
programme
as the Chief
Guest.
A publication
of activities
and
achievement
s of CF in
Biratnagar is
produced
Conducted
trainings,
interactions and
workshops by
establishing
linkages with
District Health
Institutions for
promoting
hygiene
education within
the communities
annually from
FY 09/10 and to
raise its
importance
within the
105
WASH sector
stakeholders at
local municipal
level
A budget
tracking on
WASH sector at
Municipal level
done for 3
consecutive
years (including
08/09) and
conducted lobby
and review
meeting report
produced by
2010/11.
Assessment
report produced
on municipality’s
budget
allocation and
its utilization in
WASH sector by
end of 2012/13.
E. Partnership
i) Changes to existing key stakeholders and their roles
Lumanti always seeks participation and support from diverse stakeholders’ participation. In Bi WaSH
project, diverse stakeholders are actively participating. Mainly, Municipality (social, environment and
health department), Cooperatives, Citizen Forum, ICDF and users committees are actively
participating. Roles, responsibilities and participation of ICDF and Cooperatives are more intensified.
Now, ICDF are not limited to water quality check only, they are involved in every activities, meetings
and decision makings. ICDF is also implementing small scale programme under Asian coalition for
community action (ACCA) programme. This small scale programme includes WASH programme
through community participation. From the beginning of the fiscal year 2010/11, they are involved in
the programme. Similarly, Cooperatives are also involved from the beginning of the project. They are
also not limited to financial transaction. Lumanti and Cooperatives have signed agreement to conduct
series of activities.
ii) New collaborations, partnerships or stakeholders
Collaboration has been sought with District Health Office. Similarly effort has been made to work in
collaboration with Seam-n, NWSC, and other relevant stakeholders as required. DHO is now actively
participating in trainings and programmes.
iii) Challenges to partnerships
Diverse interest, approach and limitations of the stakeholders make the partnership not as strong as
envisioned. There is an opportunity to play role to bring all the partners into one basket with one
approach and goal. However, there is opportunity for lobbying, networking to strengthen the
partnership.
106
F. Resources (refer to Project Plan – Sections 6 & 7):
- Changes to Human Resource plan
- Financial Summary of the project
Original Budget
Approved
Revised
Qtr.
(MPB)
Budget
Budget
Q1
1,121,195
1,121,195
991,336.00
Q2
2,063,073
2,063,073
1,878,553.00
Q3
1,990,667
1,990,667
2,315,905.00
Q4
2,446,495
2,446,495
2,550,359.00
TOTAL
7,621,432
7,621,432
7,736,153.00
Expenditure
991,335.77
1,878,552.17
1,420,199.62
3,299,879.38
7,589,966.94
%
Uti.
100%
100%
61%
129%
98%
107
G Field visits and monitoring
G.1 Completed Visits
Date
Purpose
(supervision, progress
monitoring, support visit,
process monitoring,
guest visit, case study,
documentation etc)
Reporting Quarter: Q1+Q2+Q3+Q4
15 – 22
Bishal Shrestha
Monitoring visit of
July
and Puspa Joshi
Biratnagar and Itahari,
Agreement with Citizen
Forum/ Orientation to
Biratnagar and Itahari
Citizen Forum
20 – 22
July
23 – 25
July
3–6
August
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Sama Vajra and
Naresh Man
Pradhan
Renu Lama
Surendra
Shrestha
Staff meeting and
programme supervision
of Biratnagar and Itahari
Data verification
Financial Monitoring
3–6
August
Sujata
Bajracharya
support for financial
management
3–4
August
Puspa Joshi
3–4
August
Rabin Lal
Shrestha and
Shikha Shrestha
(WAN)
Interaction and skill
sharing of citizen forum
Biratnagar and Itahari
Interaction and skill
sharing of citizen forum
Biratnagar and Itahari
Key Feedbacks Received
(if any)
Field staff should support the
community, UC’s for filling CBME form
until they felt easier to fill it.
CHV’s needs to give more support to
community people to improve H&H
condition. They need to provide the
actual information by doing RCS to
make them change their behavior.
Certain activites like public hearing on
water quality and management of
Mangad WSS needs revision, as there
has been substansive improvement
seen now.
Few activities need to be replanned
along with budget revision
Frequent communication and support
from MIS officer is needed to avoid data
mismatch.
A standard format should be developed
to make data entry easier.
More accounts keeping support is
needed in Biratnagar
Financial guidelines and policies should
be followed carefully during financial
transactions.
Financial system and vouchers were
checked and suggested for further
improvement. In Itahari financial system
found more systematic. Further support
for smooth function is needed in both
cities.
Orientation and more support seemed
necessary to the members of Citizen
Concern Forum, Itahari from Lumanti
Central office for advocacy and
influencial work.
Working sub-committee could be formed
108
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring,
guest visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
to carry out the work and the current CF
can support the sub-committee as an
advisory.
18 – 19
August
Lajana
Manandhar
18 – 20
August
Sama Vajra
Interaction with Citizen
forum, Itahari and
meeting with Biratnagar
and Itahari staffs
Meeting with Citizen
forum, Itahari and
meeting with Biratnagar
and Itahari staffs
Reports, documents should be managed
to provide evidence.
Citizen forum was found passive and not
clear in their role & responsibilities. A
meeting was planned to clarify and
develop clear Action Plan
Keeping in mind the commitment of
Citizen Concern Forums’ dedication in
influencing and the busy schedule,
some eligible executive members should
be added in the Forum for active
involvement in the programme.
For the implementation of the
programme, Citizen Concern Forum as
an advisory group should form its
subcommittee to implement the
programme.
Both Citizen Concern Forum and
Lumanti need more homework to be
done for the sustainability of Citizen
Forum after Lumanti’s programme
phase out.
Plan of action should be strictly followed
to complete the planned activities within
time frame.
The problems, issues should be solved
immediately and should share with
immediate line managers/coordinators, if
assistance is needed.
18 – 20
August
Shiva Gopal
Shrestha
Field supervision visit of
Biratnagar and Itahari
Harmony, team work and self respect
should be maintained between every
staffs for progress and satisfaction.
During construction of the toilet, the
siphon should be fitted well such that,
the water inside it shields the bad odor.
The excreta should be flushed to avoid
the flies and bad odor.
109
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring,
guest visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
The toilet should be cleaned regularly
along with its surrounding.
18 – 22
August
Renu Lama
6
Puspa Joshi
September
Data collection,
management &
verification
Take a session on water
quality, its standard and
water quality test on
WSP training organized
by BSMC Lumanti
Office.
To provide some
technical and theoretical
knowledge on WQ
The tube wells shouldn’t be used for
about a week once it is fixed to avoid
losing the grip.
The data should be updated when
needed to avoid mismatch.
The data should be managed in the
standard format, such that it will be
easier for entry and understandable.
Water should be tested at least two
times every year to be assured on the
quality of the water being consumed as
it directly deals with health of the
consumer.
Purification options like SODIS, filter,
chlorination etc. should bring into
practice for safety.
If principle HR contaminant such as
microbiological contamination, arsenic,
nitrate and flouride was found out of
national standard, purification method
should be applied otherwise avoided
immediately for drinking purpose.
Information dissemination, record
keeping and reporting is essential to
become updated in the condition of the
drinking water.
13
Kabir Sir
September Puspa Joshi
To support Citizen
Forum, Biratnagar on
WaSH advocacy and
influencing work.
To get update on Citizen
Forum's advocacy and
influencing work status
Ms. Rashmi Kiran Shrestha, Lumanti
Biratnagar suggested that applying WSP
in the water source will help prevent
contamination of the drinkable water
source.
Citizen Forum should prepare three year
WaSH advocacy strategic paper.
The networking of Citizen Forum
(Advocacy & Influencing groups) could
be the next foot step to advocate and
influence the WaSH rights not only in
local level but also in city and national
110
Date
Visited by
(Project Team,
PM&E staff, HQ,
WAN or external
agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring,
guest visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
level.
21-24
June
21-24
June
22-26 Nov
16-21 Dec
Puspa Joshi
Bishal Shrestha
Surendra Kumar
Shrestha
Bishal Shrestha,
Shiva Gopal
Shrestha,
Support Visit, Citizen
Forum programme
planning
Progress Monitoring,
Support visit
Financial Monitoring and
Supports
Planning and Monitoring
workshop and Review
meeting
Citizen Forum should develop action
plan as developed with the support from
Lumanti, need to study in the issues and
need to follow the plan, so that the
service providers and LG's started to
trust when approached with evidence.
Citizen Forum requested technical
support for developing WASH strategic
plan and also requested for the
guidelines.
CBME in communities must be initiated
in the initiation of the project.
Mechanism should be adopted to make
the CBME an obligatory process.
Social mobilization should be more
intensive.
Financial Monitoring and Supports
provided
#The constructions in BiWASH project
at the end of the 3rd quarter was seen
lagging as per the plan of the project.
#the field teams were oriented on way
forwards for the coming years and joint
planning was done with the team.
16-18 Dec
17-19 Dec
Lajana
Manandhar,
Sama Bajra
Planning and Monitoring
workshop and Review
meeting
Puspa Joshi
Planning and Monitoring
workshop and Review
meeting
3-7 Feb
Surendra Kumar
Shrestha
Financial Monitoring and
Supports
28-31
March
Vijay Singha
Shrestha and
Surendra Kumar
Shrestha
Program monitoring and
evaluation
#the field teams were oriented on way
forwards for the coming years and joint
planning was done with the team
#the field teams were oriented on way
forwards for the coming years and joint
planning was done with the team
# Supports on Financial matters were
provided to the field team for timely
report submission
#Introduction and Raport with the field
team as new WASH Manager was hired
#Orientation on the monitoring and
evaluation for coming years as per WAN
CSP was shared
#All the financial matters were sorted to
finalize for this FY 2010/11.
111
G.2 Upcoming Visits
Time
Visit by
Period
(Project Team, PM&E staff, HQ, WAN
or external agencies)
Purpose
(supervision, progress monitoring,
support visit, process monitoring, guest
visit, case study, documentation etc)
G.3 Other PME Activities
 Project/Sub – project detail surveys and its key observations
a) Graded Subsidy and its implication
This fiscal year (2010/11), a new approach ‘graded subsidy’ in water was introduced in wards 18
and 22. In this approach families are divided into 3 categories Poorest, poor and medium and
subsidy is different for each category. For the effective implementation of the approach,
agreement was done among Municipality, Lumanti and UC of each community. UC actively
involved in implementing the approach. Owing to the implementation of graded subsidy in the
communities there has been increase in financial contribution in the communities and as a result
the numbers of water and sanitation structures constructed exceeded the planned numbers. The
implication of graded subsidy has aided in extending the access of the water and sanitation
facilities beyond the budget of the project.
b) Community Based Monitoring and Evaluation (CBME)
This year CBME chart was modified so that it was easy to hang on the wall of community. Six sets
of CBME charts are filled up very well by the UC and CHMs. CBME training was conducted before
the construction and software programmes. Now CBME charts of each community, where
programme has commenced, have been filled and followed up very well. In the case of CBME
also, continuous follow up and help from Lumanti team has been helpful to UCs.
c) Water Safety Plan in the community
Water Safety plan has been initiated in four communities. UCs, CHM and CHVs were trained in
developing water safety plan. They were provided ample time to make their own water safety plan
for each community. UCs from each community presented water safety plan. The important part is
community has understood the importance of water safety plan..
d) WASH information Center in the communities
This fiscal year, we introduced the concept of information center in each community so that
everyone in the community have access to WASH information. Information center includes CBME
chart, Water Safety Plan and educational charts on clean drinking water, proper sanitation and
hygiene messages.
This center has brought community people together to learn on WASH issues. Moreover, CHM
and CHV find it easy to disseminate key messages on proper sanitation and hygiene.
e) Child club and hygiene promotion
Child Clubs from Mahato (ward 18), Ghoga Hansamukhi(ward 18), Siv tole (ward 18) and Gafur
tole(ward 22) are proactive. They have developed plans and proposal to improve their
communities. They organize meetings every Saturday and do the cleaning with the leadership of
CHM. In every 15 days, child club organize hand washing and nail cutting programme in the
community. They show drama collectively. There is good coordination between child clubs of
different communities.
112
f) Emerging role of Integrated Community Development Forum (ICDF)
In the beginning of second quarter, there has been agreement between ICDF and Lumanti
Biratngar for better partnership and involvement for effective implementation of WASH project in
Biratnagar. From second quarter, certain activities are handed over to ICDF such as post
monitoring of 08/09 and 09/10 wards, initiation of water safety plan, institutionalizing CBME in the
community and water quality test with dissemination.
After ICDF's intervention, 97 superstructures have been completed in ward 19, 7, 5 and 16. The
ICDF has been active in assessing the condition of water and sanitation structures and providing
supports where required.
g) Water Quality test and dissemination
From this fiscal year, report card has been prepared for each water point tested. Report card is
distributed to each household in the community. Water Quality test result was disseminated to the
communities who showed concern to the substandard water quality of their water points. Water
quality test result has done wonders in raising awareness among community people. Test was
done in front of community people; they were really surprised to know sub standard quality of their
water.
h) Role of Citizen Forum in promoting WASH issues in municipal level
Citizen forum has been successful in getting recognition by the local government and sector
stakeholders. Sectors stakeholders, local government (Municipality and DDC) and media actively
and continuously participate in the interaction programmes organized by citizen forum.
Municipality has allocated more budgets in sanitation and water than last fiscal year.
Lumanti's intervention in Biratnagar Sub Metropolitan city has succeeded in raising awareness on
health and hygiene, community people have felt the need for toilets and continuously approaching
local government for access to sanitation.
i) Operation and Maintenance activities
O/M fund has been institutionalized and altogether caretakers in coordination with cooperative
maintained and repaired five hand pumps constructed in 08/09 and 09/10 fiscal years using this
fund.
H. Water Quality
Constructed
(Water Sources
& Points)
New
Rehab
Previous
Year
Q1
Q2
Q3
Q4
TOTAL
I.
Tested
(Water Sources &
Points)
Exist. New Reha
b
84
143
414
Remarks
22
180
187
7
11
18
Not Tested
(Water Sources &
Points)
Exist.
Ne Rehab
w
7
11
18
84
163
449
Indicative Project Outcomes
113
Sector
Objective
Indicators

Enhanced access
of 21 communities
of 4 wards of the
Municipality as per
Service
developed WESI
Delivery
Plan to access to
safe and adequate
drinking water by
March 2012.




WSUCCs (ward
wise) and WSUCs
(community wise)
have improved
Capacity capacity to
Building manage, operate
and sustain their
water
systems/points by
March 2012



3
8,220
people
of
21
communities of 4 wards of
the
Municipality
have
improved access to safe
and adequate water by
2011/12
75% of the targeted
beneficiaries will be from
poor and excluded groups.
100% of the water points
provided have been tested
and achieved minimum WQ
standards as envisaged by
WaterAid
Nepal’s
WQ
3
protocol or NDWQS
6 WSUCCs (including of
08/09 for 2 wards) and 21
WSUCs
have
been
established and trained;
have
functional
management and operation
system in place with regular
collection of O&M fund to
sustain water points for
delivering water facilities
80% of the water points
constructed/rehabilitated
are functional, managed
and well maintained by the
community
by
March
2012/13.
Developed 6 local cadres
(at least 1 from each ward)
on WQ assessment at
community/local level and
disseminated assessment
results twice a year to wider
audience
to
ensure
awareness on WQ and safe
consumption of water.
Developed at least 1
community caretaker in
each
community
to
effectively operate and
maintain the water points
installed for their functional
in the long run by 2011/12
CBME system established
and
institutionalized
through its regular practice
Achievements 2010/11
 3764
people
of
four
communities of ward 18 (8
clusters) and ward 22 (2
cluters) have improved access
to safe water
 100% of the targeted
beneficiaries are from poor and
excluded groups.
 100% of water points
provided have been tested
before providing the service.
 1 WSUCC each in ward 18
and 22 has been established
and trained. Similarly 10
WSUC (8 in ward 18 and 2 in
ward 22) have been formed
and trained. O&M fund has
been
collected
and
is
functional in 3 wards (18, 5
and 19). The Cooperatives of
ward 5 and 19 has been
collecting and storing the
O&M fund. Five hand pumps
were renovated from the help
caretaker in use of the
collected O/M fund.
 Follow-ups of the previous
wards has being done by
ICDF,
which
has
been
appointed to carry out post
monitoring and follow-ups
activities. Required supports
have been provided in post
project areas as from the
report provided from the ICDF.
 Water quality report has been
disseminated in communities.
 13 caretakers have been
trained and appointed in this
fiscal year. 10 caretakers are
from the communities of
wards 18 and 22 and 3
caretakers are from ICDF.
Caretakers
have
been
provided with tools required
for maintenance of the hand-
National Drinking Water Quality Standards of Nepal
114
Sector
Objective
Indicators


Knowledge and
capacity of
municipal level
stakeholders and
community groups
enhanced by
March 2012 on
CBME, WQ, WSP
and WRM


Achievements 2010/11
by
all
the
Users
pumps.
Committees of the targeted  CBME system has been used
21 communities,
by all UCs of this fiscal year.
WSUCCs and WSUCs
In this year, CBME charts are
have respectively 6 & 12
put in a community place an d
meetings in a year to
filled by the UCs in presence
review, discuss challenges
of the other users.
& issues, and learn good  WSUCs had 8 trainings
practices and approaches
regarding
financial,
at local level to enhance
construction, O/M fund and
their capacities to manage
CBME system.
project
at
their  Members
of
ICDF
at
communities.
community level of all working
wards (in this fiscal year as
well as communities from
other fiscal years) are trained
for conducting water quality
tests. They act as local cadres
for conducting water quality
tests and in disseminating the
test results in coordination
with Lumanti (CDWs and
CHMs).
Innovations, technologies,
learning and good practices
including
policy  10 users committees and
strategies/approaches are
sanitation groups and local
shared with the community
partner (ICDF) are trained
groups
and
local
on WSP and CBME.
stakeholders at municipal  A
review
workshop
level through 4 trainings, 8
programme conducted at
meeting, 2 workshops and
the end of the project in
2 exposure visits annually
March 2011, which had
from 09/10.
participation from sector
2
trainings
provided
stakeholders:
the
annually to at least local 6
Municipality, Citizen Forum
persons
representing
and media personnel. The
municipal
level
participants
were
stakeholders & community
acknowledged
on
groups from 09/10 on
achievements of 3-years
CBME system for its
WASH project and lessons
application/replication
in
learnt. The programme was
their projects by 2011/12
broadcasted by Makalu TV.
provide evidence of the
enhanced capacity in this
discipline of monitoring
Trained Municipal staff and
other
sector
actors
including service providers
and community groups on
WSP and initiated the
implementation of WSP as
115
Sector
Objective
Indicators





WESI plan
developed for 6
wards of BSMC
addresses key
WASH sector
Advocacy blockage issues
identified at local
level and
recommendations
made by Report
Card Test .
Achievements 2010/11
a pilot activity by 2011/12 to
ensure safe delivery of
water
Knowledge of 10 persons
representing
from
BSMC/TLOs and other
sector actors including
community
groups
on
CWRM enhanced through
2
trainings
conducted
annually from 09/10
Review outputs of the
training
in
every
subsequent
years
to
document the capacity
enhancement of municipal
level
stakeholders
&
community groups on WQ,
WSP and WRM, enhanced
from this
Documented
the
best
practices
and
learning
experiences gathered from
the project within 3 years in
relation to water sector and
disseminated to the wider
audience by March 2012
Document
the
best
practices
and
learning
experience gathered from
the project within 3 years in
relation to water sector and
disseminated to the wider
audience by March 2012/13
Review of report card test
results/recommendations
conducted
09/10
and
documented
them
to
understand
how
improvement in WASH
governance is achieved
and sector blockage issues
are addressed.
The process of report card
test has been important to
make
the
sector
stakeholders and service
providers more accountable
and
to
track
the
improvement in status of
good governance. Some
instances are formation of
Public Hearing Section by
the Biratnagar Municipality,
allocation of fund to water
supply systems, installation
of additional transformer by
NWSSC for supplying water
even in load shedding.
(More details in publication
of citizen Forum)
116
Sector
Objective
Indicators

WESI Plan is
adopted as a
coordinated plan
by Municipality &
local stakeholders
and acted upon it
gradually.


Sector
Review of WESI plans 
conducted annually to
understand
the
achievement
and
contributions made by the
sector actors at the
Municipal level on it (in 
addition to the contribution
made by this WASH
project) provide evidence
of adopting WESI plan as 
a coordinated plan by the
sector
stakeholders
including Municipality.
Voices of Citizen’s forum
are acknowledged by local
WASH
stakeholders
adopting WESI Plan as a
coordinated
plan
and
integrated
it
into
Municipality’s
planning
process
The financial resources
allocated in water sector in
an increasing trend at the
Municipal
Level
from
09/10 provide evidence of
actions of Municipality and
sector stakeholders in
adopting WESI plan as a
coordinated
plan
for
WASH programme.
Objective

At least of 60% of the
targeted
21 
communities
are
Service declared
Open
Delivery Defecation
Free
communities
and
sustain ODF status by
March 2012
Achievements 2010/11
Voice of citizen forum has
been
recognized
by
municipality
and
other
service
providers
by
regularly participating in all
programmes.
WESI plan has been
recognized and incorporated
by municipality in their
yearly plan.
The
financial
resource
allocated in WASH sector by
local government is in
increasing trend in this fiscal
year.
Indicators
Achievements 10/11
5,710
number
of  3402 number of people from 10
people in the 21
communities of ward 18 and
communities of 4
22, and ODF community from
wards have access to
ward 16 have access to latrine
hygienic
latrine
facilities from 405 HH latrines
facilities by 2011/12
and 3 institutional latrines: 1
incinerator joint latrine at
At least 60% of the
Adharsha Balika Secondary
targeted
21
School, 1 school latrine at
communities
(12
Bishnu Primary School,ward 18
communities)
have
and 1 school latrine at
declared
Open
Madrasa, ward 18.
Defecation
Free
(ODF)
communities  4 communities are declared as
by 2011/12 and will
ODF zones: Laxmi Narayan
have
community
Tole (ward 16), Basta (ward
management system
5), Swayambhu Tole and Shiva
in place to maintain
Tole (ward 18) are the ODF
and sustain them their
declared communities.
117



Environmental
Sanitation status of all
the
21
targeted
communities improved 
by March 2012

neighborhood
 100% of the beneficiaries are
environment healthy.
from poor and excluded
80%
of
the
groups.
beneficiaries are from
poor and excluded
groups
and
are
delivered
sanitation
facilities
are
maintained properly
1,950 people of the 21  The status of previously ODF
communities of 4
declared communities are
wards have access to
sustained till 2010/11 with
improved
effective
community
environmental
management system in close
sanitation facilities by
coordination with TLOs. The
construction/renovatio
latrines are used and kept
n of 530 meter stormclean.
water drainage, 1 bio  More than 93% of the HH
gas
plant
for
sanitation
structures
are
wastewater
sustained and are in use.
management
and
initiation
of
solid
waste
management
by 2011/12
70% of the target HHs
practice solid waste
management
by
2010/11
and
sustained the waste
management
practices
80%
of
the
environmental
sanitation facilities are
well maintained and
working properly with
well
managed
community
management system
in place to maintain
and
sustain
their
neighborhood
environment healthy.
Mechanism
for
collection of Operation
and Maintenance fund
is developed in the
community for the
sustainability of public
infrastructures and the
collected fund is well
managed
and
transparent.
118


Knowledge
and
capacity
of
WSUCC/WSUCs,
municipal
level
stakeholders
and
community groups on
community
based
sanitation
models,
Capacity technologies
and
Building approaches
on

promoting
hygienic
latrines are enhanced
to
manage
and
sustain them; and
promote them within
municipal
stakeholders by March
2012.

Innovations,
technologies, learning  The technologies, learning and
and good practices
good practices of Lumanti
including
policy
adopted in other project areas
strategies/approaches
such as community managed
are shared with the
WSS at Jakhadimai WSS,
community
groups
community managed bio-gas
and local stakeholders
plant, RCS process, has been
at municipal level
shared through trainings ,
through 4 trainings, 8
workshops and exposure visit.
meetings,
2
As a result of which a
workshops and 2
community managed WSS
exposure
visits
system- a replication of
annually from 09/10.
Jakhadimai WSS, has been
constructed at Jatuwa, Ward
Developed at least 1
18 of BSMC, a bio-gas plant
community caretaker
installed at Bus-park and
in each community to
replication of which is done at
effectively
operate
Gudri Market of BSMC. RCS
and
maintain
the
has been acknowledged as
sanitation
monitoring,
planning
and
infrastructures
survey
tool
by
the
installed
for
their
Municipality.
functional in the long
run and contribute in
ensuring ODF status
(wherever declared)
sustained by 2011/12
2
trainings
are
provided annually to
at least local 6
persons
from
municipal
level
stakeholders
&
community
groups
from 09/10 on CBME
and
hygiene
behaviour
assessment
tools
(e.g. RCS) system for
its
application/replication
in their projects by
2011/12 and provide
evidence
of
the
enhanced capacity in
this
discipline
of
hygiene monitoring
Trained
Municipal
staff and other sector
actors
including
service providers on
the importance of
hygienic
sanitation
119



WESI plan developed
for 6 wards of BSMC
addresses key WASH
sector
blockage
Advocacy issues identified at
local
level
and
recommendations
made by Report Card
Test .

WESI Plan is adopted
as a coordinated plan
by Municipality & local
stakeholders
and
acted
upon
it
gradually.

facility and initiated
the
delivery
of
hygienic
public
sanitation facility
Review outputs of the
training
in
every
subsequent years to
document
the
capacity
enhancement
of
municipal
level
stakeholders
&
community groups on
sanitation promotion
and its sustainability
Documented the best
practices and learning
experiences gathered
from the project within
3 years in relation to
sanitation sector and
disseminated to the
wider audience by
March 2012/13
Review of report card
test
results/recommendati
ons
conducted
annually from 09/10 to
understand
how
improvement
in
WASH governance,
particularly
in
delivering sanitation
facilities is achieved
and sector blockage
issues are addressed
The municipality has agreed
to invest in Mahato Ka and
Nayatole, of ward 18, for
construction of additional
latrines that are seen deprived
of
sanitation
facilities
according to the developed
WESI plan. Also, municipality
has invested in construction of
drainage in Gafur tole of ward
22. Also, investment has been
done in bio-gas plant at Gudri
Market.
Review of WESI plans  Voice of citizen forum has been
conducted annually to recognized by municipality and
understand
the other service providers by
achievement
and regularly participating in all
contributions made by programmes.
the sector actors on  WESI
plan
has
been
sanitation sector at recognized and incorporated by
the Municipal level municipality in their yearly plan.
provide evidence of  From the advocacy of Citizen
adopting WESI plan Action Forum, the municipality
as a coordinated plan has incorporated in its policy to
by
the
sector advocate and invest in child
stakeholders including friendly latrines at schools. And,
Municipality.
has invested in renovating of
Voices of Citizen’s public latrine at Biratnagar-
120

Sector
Objective
Improved
health
status of the people
living in at least 6
selected wards (i.e.
(5, 7, 16, 18, 19, 22)
with 30 communities
(including of those
Service i.e. 7 & 19 intervened
Delivery in 08/09) of BSMC by
adopting
sustained
hygiene
behavior
with an evidence of
improved
health
status in 3 key water
related
diseases
practices by 2011/12
forum
are Jogbani border, ward 18.
acknowledged
by  The
financial
resources
local
WASH allocation
from
the
local
stakeholders adopting government is in increasing trend
WESI Plan as a in this fiscal year.
coordinated plan and
integrated
it
into
Municipality’s
planning process to
deliver sanitation (incl.
Environmental)
sanitation services
Additional
financial
resources
are
increased
in
this
sanitation sector in an
increasing trend at the
Municipal Level from
09/10
provide
evidence of actions of
sector stakeholders at
Municipal level in
adopting WESI plan
as a coordinated plan
for WASH programme
for
improved
sanitation.
Indicators
Achievement 10/11
 All the communities
 10 communities of ward 18 and
(adult and children) of 6
22 have knowledge of at least
wards with 30
5 key hygiene messages.
communities (including
Remarkable development has
of those intervened in
been seen in hygiene behavior
08/09) have knowledge
of the people in the project
of at least 5 key hygiene
intervened communities. There
messages and
have been positive changes in
communicate/practice
adaptation of 4 key hygiene
them at critical times
behaviors, more than 80% of
the people are found to be
 80% of the beneficiaries
following the hygiene
educated with 5 key
behaviors.
hygiene messages
adopted improved and
 Point prevalence rates of
sustained hygiene
diseases are decreased to the
behavior practices at least
targeted levels with rare and at
in the following 4 key
some places zero occurrence
areas by 2011/12
of WASH diseases.
i. Hand washing in
 90 % of the beneficiaries were
critical times
educated with hygiene
ii. Management of
messages through CHM and
Human Excreta
CHV (Sanitation groups)
including child
excreta
121
Sector
Objective
Indicators
Safe storage of
water and hygienic
PoU treatments
iv. Safe food hygiene
practice
 Reduction in point
prevalence rate of
diarrhoea, skin and
typhoid in the target
areas by 20%, 15% and
10% respectively with
reference to the
collected baseline data.
Achievement 10/11
iii.
Understanding,
knowledge & skills of
WSUCC 4 /WSUC,
municipal
level
stakeholders
and
community groups on
hygiene
education
and its promotion
enhanced
Capacity
Building
Community level
Health and Sanitation
motivators and
volunteers support
ongoing changes in
hygiene practices
4
 Documented learning

and best practices
including related policy
strategies/approaches
developed are shared
with the community
groups and local
stakeholders at
municipal level through
4 trainings, 8 meetings,
2 workshops and 2
exposure visits annually
from 09/10.
 Documented the best
practices and learning
experiences gathered
from the project within 3
years in relation to
Hygiene sector and
disseminate to the wider
audience by 2012/13
 6 Community Health

Motivators (CHMs) are
trained and remain
active in the selected
wards by 11/12
 60% of the 75
Community Health
Volunteers (CHVs)
trained by CHMs remain
active in selected 6
wards of municipality by
11/12
 Educated
community
people of 6 wards by
delivering at least 5 key
hygiene messages with
At community level, there has
been 6 trainings for UCC/UC
and 3 trainings for sanitation
groups. At municipal level
there has been 4 stakeholder
interaction and 1 exposure
visit.
6 CHMs and 45 CHVs (that
includes Sanitation groups)
are trained and capacitated in
delivering hygiene messages
in the communities. As
because the CHVs are local
residents of the community,
they are aware of the local
context and hence shape
messages in local context and
local language for effective
communication. CHVs and
CHMS in supervision of
Lumanti are actively
participating in hygiene
promotion.
Water and Sanitation Users’ Coordination Committee
122
Sector
Objective
Linkage of Municipal
stakeholders with
District health
institutions (E.g.
Advocac
DPHO5) established
y
with increased
priority provide
evidence of cross
sector linkage
Indicators
innovative means of 
communicating hygiene
messages.

 Service providers
increase their financial
investment to address
the identified issues by
11/12.
 Promoted hygiene
education through
CHVs & CHMs with
increased priority at
local municipal level
with technical supports
from District health
institutions (E.g. DPHO)
 Local sector
stakeholders have
integrated prioritized
hygiene education in the
WASH programme by
12/13.
J. Beneficiaries
Planned (10/11)
Achievement 10/11
CHVs formed in every
communities are active
5 key messages have been
delivered to 6 communities by
CHVs and CHM. The health
messages are developed in
local languages and tailored
as per the local context and
traditions. The mobilization of
local CHVs and Sanitation
groups has been effective in
delivering health messages at
community level.
Development in practice of
better health behaviors, as
evident from RCS, has been
seen in all groups- children,
women, men and elderly in
communities.
 Stronger cross sector linkages
and coordination has been
established with hygiene
sector stakeholders. The
DPHO provides their
manpower, routinely, to health
camps organized by Lumanti.
Also, workshops and sharing
meeting is conducted routinely
to discuss on health issues
like menstrual hygiene,
reproductive health, WASH
related health problems and
such.
 Also, coordination has been
established with educational
institutes to cross cut the
issues of WASH and WASH
specific health issues at
school.
Achieved
Variance
water
sanitation
Water
Sanitation
Water
Sanitation
4000
2200
3764
3402
-6%
55%
Justifications:
Water: Due to graded subsidy the total number of water points rehabiliated at the communities were
414 against planned 350.
5
District Public Health Office
123
Sanitaition: In case of Sanitation the achieved number of beneficiaries exceeds the planned as because
3 institutional latrines were constructed against 1 planned.
124
Project No.: 643VB Advocacy and Post Monitoring and Project Supports in Urban
Hill
A. Project Information:
- Project Name: Advocacy and Post Monitoring and Project Supports in Urban Hill
- Names of Sub-Projects (if applicable): Urban Hill
- Project Period:
- Name of Partner Organization: Lumanti Support Group for Shelter
- Partner Organization Number:
B. Executive Summary:
The advocacy, post monitoring and project supports in Urban Hill, in the year of 2010/11, focused on
providing project supports to previously intervened project areas of Kathmandu valley, subsequently
post monitoring supports and sustainability studies were carried out in Thecho, Khadipakha,
Narayantole, Kritipur and Madhyapur Thimi. In Madhyapur Thimi, advocacy programme was
implemented in partnership with Lyaymha Pucha.
The post monitoring of the Urban Hill in above mentioned project areas ensured that the Water and
Sanitation infrastructures sustained and improved hygiene behavior of the people persisted. In
Narayantole and Khadipakha, by assessing the behavior of people to manage human excreta and
persistence in adoption of improved hygiene behavior, the two communities were declared as ODF
zones in initiation of communities themselves. Also, in Narayantole, the waste water treatment plant
functions effectively as shown by the recent BOD and COD test. In Thecho, the women’s cooperative
carried out the programme by making follow-ups in construction of latrines and routinely conducting
orientation on better health and hygiene behavior. In Thecho, a public space has been constructed in
the space where open defecation was practiced earlier; this has helped in eradicating the behavior of
people in defecating at that place and also the risk of contaminating the nearby water source has
been minimized. Also, the number of people taking loans from the cooperative for construction of
household latrines is increasing; in this year 35 additional people have taken loans for the
construction of latrines.
C. Changes in Project Background, Design & Risk Management
N/A
D. Progress against key planned Activities
D.1 Service Delivery (Post Monitoring)
Sector Key Deliverables
Annual Total (Outputs)
s
(As mentioned in
Total Plan
Progress
Project Plan)
To Date
Water
Report produced
2 Water
Water
on water quality
Quality Tests
Quality
test conducted in (Thimi and
Test has
Naikap, Narayan
Thecho) and
been done
tole, Khadipakha. Post
twice in 2
Thecho and
monitoring
wells in
Tokha and
support
Thimi and
actions
sustaining
1 water
recommended
Water
source of
are gradually
Facilities in the Thecho 8
acted upon on the previously
points in
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
Water Quality
Water
tests in Thimi,
Quality Test
Thecho,
has been
Narayantole and done in 2
Khadipakha
wells in
Thimi and 1
water
source of
Thecho 8
points in
Narayantole
Justificatio
n for
Variance
125
Sector
s
Key Deliverables
(As mentioned in
Project Plan)
basis of the
findings by
2010/11
Produced report
on 2 Post
monitoring
studies along with
the
recommendation
for further
improvement/reh
abilitation for their
sustenance of the
projects.
Produced report
on 3 sustainability
studies (this
indicate 90% of
WASH facilities
are sustained
with effective
management
system in place
for smooth
functioning)
along with the
recommendation
for better
implementation in
the future projects
Sanitat
ion
At least 2
institutional/public
toilets
rehabilitated/impr
oved annually by
service providers
including
municipality from
2010/11 provide
evidence of the
Annual Total (Outputs)
Total Plan
Progress
To Date
completed
Narayanto
projects (e.g.
le and 3
Naikap,
points in
Naryan Tole
Khadipakh
etc
a
Wastewater
treatment
/management
system
BOD- and
(e.g. CW, STCOD test
UFB, BioGas,
was
USASB etc. ) - carried out
bio gas plant
in waste
at Godavari;
water
Kirtipur
treatment
housing; and
plant
of
effluent quality Narayanto
observation
le.
both at Kirtipur
(RBT) and
Naryan Tole
Sustainabi
lity Study
conducted
and report
produced.
Also,
sectors
have been
Sustainable
identified
studies of all
for
project areas
providing
of previous
post
years
project
supports
and action
plan has
been
developed
for the
same.
At least 2
A school
institutional/pu latrine
blic toilets
rehabilitat
rehabilitated/i
ed
in
mproved
Thimi
annually by
Municipalit
service
y with the
providers
effort
of
including
Lyaymha
municipality
Pucha.
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
and 3 points
in
Khadipakha
Wastewater
treatment
/management
system
(e.g. CW, STUFB,
BioGas,
USASB etc. ) bio gas plant at
Godavari;
Kirtipur housing;
and
effluent
quality
observation both
at Kirtipur (RBT)
and Naryan Tole
Justificatio
n for
Variance
BOD- and
COD test
was carried
out in waste
water
treatment
plant of
Narayantole
.
NA
NA
At
least
2
institutional/publi
c
toilets
rehabilitated/imp
roved annually
by
service
providers
including
municipality
A
school
latrine
rehabilitated
in
Thimi
Municipality
with
the
effort
of
Lyaymha
Pucha.
126
Sector
s
Key Deliverables
(As mentioned in
Project Plan)
project’s
influencing role
At least 3 out of
10 local public
schools
(assessed in
08/09 for their
sanitation status)
will have
improved
sanitation
facilities with the
support of the
local government
and other sector
stakeholders at
municipal level
including service
providers
annually from
2010/11
All the 4 project
areas (mentioned
above) identified
for post
monitoring will be
declared ODF by
2010/11.
Annual Total (Outputs)
Total Plan
Progress
To Date
At least 3 out
of 10 local
public schools
(assessed in
08/09 for their
sanitation
status) will
have improved
sanitation
facilities with
the support of
the local
government
and other
sector
stakeholders
at municipal
level including
service
providers
ODF
declaration in
Narayantole
and
Khadipakha.
New
Public
Toilet
Constructi
on
in
Sankhadh
ar Chowk,
Thimi. The
facility is
used
by
about 550
daily users
A school
latrine, in
Adarsha
Higher
Secondary
School
rehabilitat
ed
in
Thimi
Municipalit
y with the
effort
of
Lyaymha
Pucha
benefiting
1070
students
and
67
teachers
ODF
declared
in
Narayanto
le and
Khadipakh
a. In
Thecho,
awarenes
s on ODF
has been
initiated in
partnershi
p with the
cooperativ
e and
VDC. A
park is
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
New Public
Toilet
Constructio
n in
Sankhadhar
Chowk,
Thimi. The
facility is
used by
about 550
daily users
At least 3 out of
10 local public
schools
(assessed in
08/09 for their
sanitation
status) will have
improved
sanitation
facilities with the
support of the
local
government and
other sector
stakeholders at
municipal level
including service
providers
A
school
latrine,
in
Adarsha
Higher
Secondary
School
rehabilitated
in
Thimi
Municipality
with
the
effort
of
Lyaymha
Pucha
benefiting
1070
students
and
67
teachers.
ODF declaration
in Narayantole,
Khadipakha and
Thecho,Thimi
ODF
declared in
Narayantole
and
Khadipakha
. In Thecho,
awareness
on ODF has
been
initiated in
partnership
with the
cooperative
and VDC. A
park is
under
construction
near the
Justificatio
n for
Variance
In Thimi
and
Thecho ,OD
F support
programs
and
workshops
had been
completed
and both
the local
and other
stakeholder
s are highly
influence for
this.Howeve
r,since the
project area
127
Sector
s
Key Deliverables
(As mentioned in
Project Plan)
Hygien
e
Efficacy of CHMs/
CHV’s current
functioning in
promoting
hygiene
education existed
even after
withdrawal of
Lumanti’s support
to the project.
A comprehensive
and detailed
assessment
report on hygiene
behavioural
change is
(prepared through
RCS method)
Annual Total (Outputs)
Total Plan
Progress
To Date
under
constructi
on near
the open
defecating
area to
demotivat
e OD.
Some
older
people
have habit
of open
defecation
. (they
defied the
toilet
facility).Als
o, S&C
have
helped
demotivat
e OD
though
soft loans
for toilet
constructi
on. ?? HH
took the
loan for
toilet
constuctio
n.
CHV and
Others
Training
RCS survey to
understand the
hygiene status;
improvement
required; Its
dissemination
(6 monthly
basis)
RCS
Survey of
Thecho
and
Narayanto
le
conducted
.
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
open
defecating
area to
demotivate
OD. Some
older
people have
habit of
open
defecation.
(they defied
the toilet
facility) .Als
o, S&C
have helped
demotivate
OD though
soft loans
for toilet
construction
. ?? HH
took the
loan for
toilet
constuction.
Justificatio
n for
Variance
is large,it
would take
sometime
for ODF to
be
declared.
-
RCS survey to
understand the
hygiene status;
improvement
required; Its
dissemination
(6 monthly
basis)
RCS
Survey of
Thecho and
Narayantole
conducted.
128
Sector
s
Key Deliverables
(As mentioned in
Project Plan)
produced and
disseminated to
concerned
stakeholders
Annual Total (Outputs)
Total Plan
Progress
To Date
D.2 Capacity Building (Post Monitoring)
Sector Key Deliverables
Annual Total (Outputs)
s
(As mentioned in
Total Plan
Progress
Project Plan)
To Date
Water/ CBME system
Training for
In Thecho,
Sanitat are established
establishment/ the
ion
and
institutionalizat women’s
institutionalized
ion of CBME
cooperativ
among UCs of
system and
e routinely
the respective
understand the undertake
project areas by
efficacy of
s
the
2011/12 provide
CBME system CBME.
evidence of the
within the
Also,
in
enhanced
completed
Narayanto
capacity in this
project
le and in
discipline of
areas/commun Khadipakh
monitoring
ities
a
the
system is
being
followed.
Produced report
Produced
Sustainabi
on 3 sustainability report on 3
lity study
studies (this
sustainability
has been
indicate 90% of
studies
conducted
WASH facilities
in Thimi,
are sustained
Anamnag
with effective
ar
and
management
Palpakot.
system in place
A
report
for smooth
with
functioning)
recommen
along with the
dations is
recommendation
produced.
for better
implementation in
the future projects
Produced report
Produced
A post
on 2 Post
report on 2
monitoring
monitoring
Post
study is
studies along with monitoring
done in
the
studies
Thecho,
recommendation
Naikap
for further
and
improvement/reh
Tokha.
abilitation for their
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
Justificatio
n for
Variance
Reporting Quarter Q4
Plan in Q4
Progress in
Q4
Justificatio
n for
Variance
Sustainabilit
y study has
been
conducted
in Thimi,
Anamnagar
and
Palpakot. A
report with
recommend
ations is
produced.
A post
monitoring
study is
done in
Thecho,
Naikap and
Tokha.
The
study
129
sustenance of the
projects.
The study
shows that
in Thecho
the water
sources
installed/r
ehabilitate
d in the
project
period are
in use. In
one water
source, a
risk
of
contamina
tion owing
to
open
defecation
was seen
which has
been
addressed
by
initiating
constructi
on of a
public
space, a
small
park,
to
discourag
e
open
defecation
.
In
Naikap,
the study
showed
that
the
water
supply
system
installed
previously
requires
upgrading
owing to
increased
demand.
Efforts
were
made to
coordinate
with
the
VDC and
the Users
shows that
in Thecho
the
water
sources
installed/reh
abilitated in
the project
period are
in use. In
one water
source,
a
risk
of
contaminati
on owing to
open
defecation
was
seen
which has
been
addressed
by initiating
construction
of a public
space,
a
small park,
to
discourage
open
defecation.
In Naikap,
the
study
showed that
the
water
supply
system
installed
previously
requires
upgrading
owing
to
increased
demand.
Efforts were
made
to
coordinate
with
the
VDC
and
the Users
for
assessing
their
contribution
for
the
upgrading
the system
130
A report produced
on the
implementation of
Sanitation
improvement plan
of Thecho
for
assessing
their
contributio
n for the
upgrading
the
system
system
but
no
achievem
ents were
made due
to lack of
interest in
UCs.
In
Tokha, the
an
Isolated
Water
Supply
System
has been
initiated in
coordinati
on among
UNHabitat,
Lumanti,
KUKL and
VDC.
In Thecho,
the VDC
has
implement
ed some
activities
as per the
recommen
Review of
dations
Sanitation
made
in
Improvement
the
Plan of Thecho
Sanitation
and support for
Improvem
its
ent Plan.
implementatio
As per the
n together with
plan, the
stakeholders
VDC has
intervened
in
improving
environme
ntal
sanitation
of
the
system but
no
achievemen
ts
were
made due
to lack of
interest in
UCs.
In
Tokha, the
an Isolated
Water
Supply
System has
been
initiated in
coordination
among UNHabitat,
Lumanti,
KUKL and
VDC.
Review
of
Sanitation
Improvement
Plan of Thecho
and support for
its
implementation
together
with
stakeholders
In Thecho,
the
VDC
has
implemente
d
some
activities as
per
the
recommend
ations made
in
the
Sanitation
Improveme
nt Plan. As
per
the
plan,
the
VDC
has
intervened
in improving
environmen
tal
sanitation of
the VDC by
paving
roads and
-
131
Hygien
e
1
training
to 1 CHVs and
CHVs on the others training.
burning
health
issues
in
the
communities
to
strengthen their
capacity
A report prepared
on UCs and
CHVs’ improved
link with DHO
contributing in
hygiene behavior
sustenance.
VDC
by
paving
roads and
maintainin
g drainage
systems.
Also, the
VDC has
contribute
d
in
developin
g of a
small park
in
defecating
area
of
Thecho to
aid
in
developin
g the area
as
no
open
defecating
area.
2 CHVs
1 CHVs and
from
others training.
Khadipakh
a and
Narayanto
le and 2
from
Thecho
were
trained on
disseminat
ing
hygiene
messages
and use of
CBME
charts
Linkages
have been
extended
with health
sector
stakehold
ers and
that with
DHO in
conductin
g various
hygiene
related
activities.
maintaining
drainage
systems.
Also,
the
VDC
has
contributed
in
developing
of a small
park
in
defecating
area
of
Thecho to
aid
in
developing
the area as
no
open
defecating
area
2 CHVs
from
Khadipakha
and
Narayantole
and 2 from
Thecho
were
trained on
disseminati
ng hygiene
messages
and use of
CBME
charts
132
In Thecho
a health
camp was
organized
in
coordinati
on with
health
posts and
in link with
DHO.
133
D.3 Policy Influencing (Advocacy)
Sectors
Key
Annual Total (Outputs)
Deliverables
Total Plan
Progress To
(As
Date
mentioned in
Project Plan)
Water/
WASH
Preparation First phase
Sanitatio advocacy
of a
workshop on
n/
strategy of
strategic
preparing
Hygiene
Lumanti is
document of strategic paper
prepared
WASH
of Lumanti is
completed in 1st
of March and
preparation of
the strategic
document is in
process.
Quarterly
reports
including
monitoring to
understand
the progress
on the
activities of
this project
on
influencing
the local
municipal
levels sectors
stakeholders.
4 Follow up,
support
and
monitoring
visit per
year
Lyaymha Pucha
reported that
the budget
allocation of
Thimi
Municipality in
WASH sector
for the fiscal
year 2067/68 is
influential. The
Thimi
Municipality has
allocated NRS
1.5 million and
NRS 1 million
for conservation
of wells, stone
spouts, ponds
and other water
resources
existed in Thimi
Municipality and
extension of
water
distribution
pipelines,
respectively.
Also, the
municipality has
allocated NRS
Reporting Quarter Q4
Plan
Progress
in Quarter
Preparation
of a
strategic
document of
WASH
1 follow up
and
monitoring
visit to know
the situation
of budget
disbursemen
t and
utlization
completed
First
phase
workshop
on
preparing
strategic
paper of
Lumanti is
completed
in 1st of
March and
preparatio
n of the
strategic
document
is in
process.
Municipalit
y assured
to
disburse
and utlize
the
allocated
budget for
this
2066/67
FY in the
WASH
sector
based on
the
demand of
local
communit
y by
mobilizing
and
consulting
with
CBO’s
and
WASH
stakehold
er’s.
However
Lyaymha
Justificati
on for
Variance
NA
NA
134
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
Pucha,
civil
society
organizati
ons and
media
persons
demanded
for
maximum
utilization
of the
WASH
budget
and to
participate
them in
the
periodic
meetings
of the
municipalit
y, so that
timely
suggestio
ns, plans
and
decisions
can be
made
during the
meetings.
Sharing
on WAN’s
CSP was
done
among the
represent
atives of
Lyaymha
Pucha
and other
Citizen
Forum
members
during
Participato
ry Review
and
Reflection
Wash
advocacy
plan
document
of the
partner
organizati
on will be
prepared
after
conductin
g the
capacity
building
workshop
on
strategy
paper
3.3 million on
sanitation.
The Thimi
Municipality has
put on its
attention in
WASH sector
indicated by
reformed
policies
regarding
WASH sector.
3 yrs WASH
advocacy
plan of
Lyaymha
Pucha
/Citizen’s
Forum
prepared in
2010/11 to
influence to
address the
WASH
issues at the
local
municipal
level.
Preparation
1 advocacy
plan
document of
the partner
organization
Informal
meetings and
orientations to
the members of
Lyaymha Pucha
for preparing
the document
was done.
Preparation
1 advocacy
plan
document of
the partner
organization
135
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
At least 3
action points
related to
WASH sector
acted upon
as per RCT
recommenda
tions and as
agreed by
civil societies
and service
providers.
Annual Total (Outputs)
Total Plan
Progress To
Date
Conduct 1
RCT review
workshop
and
disseminate
the report
among the
stakeholder
s
Follow
up/interactio
n meetings
Lyaymha Pucha
in support of
municipality
acted in
completing the
budget tracking
and its analysis
of two
consecutive
years,
preparing
sanitation
improvement
plan of
municipality and
review and
analysis of
WASH policy
and guidelines
of municipality
as
recommended
by RCT review.
The budget
tracking shows,
the budget
allocated in
WASH sector in
FY 2066/67 is
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
Process
(PRRP)
programm
e on
March 29
by WAN
represent
ative. All
the
participate
d
represent
atives
agreed to
prepare
the WASH
advocacy
plan in the
coming
FY.
Based on
the
recommen
dations
made by
the RCT
review on
previous
year,
municipalit
y has
increased
the budget
in WASH
sector.
developm
ent and
the final
strategic
document
of Lumanti
will be
produced
in next
FY.
Conduct 1
RCT review
workshop
and
disseminate
the report
among the
stakeholders
Follow
up/interactio
n meetings
NA
The pipe
lines are
being
extended
in the un
served
area of
the
municipalit
y and
given
verbal
commitme
nt to work
136
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
as follows;
Water - Rs. 1
lakhs
Sanitation – Rs.
29 lakhs 70
thousand
Health and
Hygiene –
Rs.20 lakhs 50
thousands
The budget
allocated in
WASH sector in
FY 2067/68 is
as follows;
Water – 25
lakhs
Sanitation – 33
lakhs
Health and
Hygiene – 30
lakhs 75
thousands
The above
allocated
budget for the
two consecutive
years shows
the remarkable
increment of the
budget in
WASH sector
compared to FY
2066/67
However,
municipality
disbursed and
utilized about 5
times more
budget in water
sector than
allocated and in
case of
sanitation only
abou 50% of
the budget was
utilized and in
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
together
with civil
society
and KUKL
for
pipeline
extension
and invest
the budget
as
required
during the
meeting
and
workshop
s.
The action
plan was
developed
to support
municipalit
y’s
sanitation
improvem
ent plan
segregatin
g action
points that
needs to
be
intervened
immediate
ly and
action
points that
can be
intervened
in the
future.
The
review
and
analysis of
the WASH
policy and
guidelines
concluded
that, the
137
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
health sector
about 86% of
the allocated
budget was
utlized in FY
2066/67
according to the
report.
Whilst in FY
2067/68 till
now, no
allocated
budget in the
water sector
was utilized but
in sanitation
and Health
sector about
36% and 64%
of the allocated
budget has
already been
utilized
respectively.
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
policy
followed
by Thimi
municipalit
y on
WASH
sector
was found
effective
and
practical.
Some of
the points
on
policies of
WASH
improvem
ent of
Thimi
municipalit
y is as
follows;
 Coordin
ation
will be
done
with
donor
agencie
s and
CBO’s
to raise
awaren
ess and
to
maintai
n the
water
quality
 Drinkin
g water
pipeline
extensi
on and
its
operati
on and
mainten
ance
138
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
work on
differen
t parts
of the
city will
be
done by
investin
g
collectiv
e fund
in
coordin
ation
and
partner
ship
with
local
users
and
KUKL,
Thimi
unit.
 Prepare
inventor
y profile
of
natural
water
resourc
es
 Identify
possibl
e
transfer
station
and
landfill
sites for
solid
waste
manag
ement
 Priority
will be
given
for
producti
139
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
on of
alternati
ve
energy
from
agricult
ural
waste
 Continu
ation
will be
given in
the
constru
ction
and
improve
ment of
public
and
private
toilets
to
declare
municip
ality
ODF
 Progra
mmes
on
materni
ty
health
and
women
s health
will be
given
priority
 Commu
nity
health
centres
will be
mobiliz
ed as
per
deman
d
140
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
A report on
the
compilation
of media
highlights on
sector
advocacy as
an evidence
of the output
of the
advocacy of
this project
Annual Total (Outputs)
Total Plan
Progress To
Date
Produce 1
report on
media
highlights of
the
advocacy
and
influencing
work
A compiled
report produced
on media
highlights.
Madhyapur
Post printed the
media report on
RCT review
workshop,
report on
monitoring and
followup of
sanitation
situation of
Adarsha Higher
Secondary
school and
Siddhikali
secondary
school. The
news on RCT
review
workshop and
monitoring and
followup of
sanitation
situation of the
schools was
also printed in
Thimi Times. It
also printed the
news on review
and analysis of
WASH policy of
the municipality.
Reporting Quarter Q4
Plan
Progress
in Quarter
Produce 1
report on
media
highlights of
the advocacy
and
influencing
work
Justificati
on for
Variance
 Continu
ous
support
will be
provide
d on
minimiz
ing
HIV/AI
DS,
cancer
and
tubercul
osis
A
NA
compiled
report
produced
on media
highlights.
Madhyapu
r Post
printed the
media
report on
RCT
review
workshop,
report on
monitoring
and
followup
of
sanitation
situation
of
Adarsha
Higher
Secondar
y school
and
Siddhikali
secondary
school.
The news
on RCT
review
workshop
and
141
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
The
issue
based WASH
news
printed
and highlighted
by the local
news
paper
helped citizens
to know the
issues
that
needs to be
addressed by
service
providers. The
news
also
made citizen’s
contributed in
raising
awareness on
the
WASH
issues of the
city
and
enabling them
to raise the
voice
with
evidence with
service
providers
for
their rights.
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
monitoring
and
followup
of
sanitation
situation
of the
schools
was also
printed in
Thimi
Times. It
also
printed the
news on
review
and
analysis of
WASH
policy of
the
municipalit
y.
The issue
based
WASH
news
printed
and
highlighte
d by the
local news
paper
helped
citizens to
know the
issues
that needs
to be
addressed
by service
providers.
The news
also made
citizen’s
contribute
d in
raising
awarenes
142
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
A report on
annual
review on the
achievement
in addressing
the sector
blockage
issues at
municipal
level and in
materializing
the
recommenda
tions made
by Report
Card Test
results.
Annual Total (Outputs)
Total Plan
Progress To
Date
Conduct
social audit
and submit
RCT review
report to the
concerned
WASH
stakeholder
s
Social audit of
Lyaymha Pucha
was completed
jointly in RCT
review
report
dissemination
programme.
The income and
expenditure,
activities
performed
on
WASH
and
changes
brought in the
municipality
was presented
transparently
among
the
stakeholders.
The
review
report of RCT
was
also
submitted to the
concerned
stakeholders to
act and to make
improvements
on the issues
and
recommendatio
ns made.
Reporting Quarter Q4
Plan
Progress
in Quarter
Conduct
social audit
and submit
RCT review
report to the
concerned
WASH
stakeholders
Justificati
on for
Variance
s on the
WASH
issues of
the city
and
enabling
them to
raise the
voice with
evidence
with
service
providers
for their
rights.
Social
NA
audit
of
Lyaymha
Pucha
was
completed
jointly in
RCT
review
report
dissemina
tion
programm
e.
The
income
and
expenditur
e,
activities
performed
on WASH
and
changes
brought in
the
municipalit
y
was
presented
transpare
ntly
among the
stakehold
ers. The
review
report of
143
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
An updated
review report
on RCT
results/recom
mendations
by
incorporating
the identified
new sector
blockage
issues
related to
WASH
produced
along with
the
recommende
d plan of
actions to be
addressed in
next year at
municipal
level.
Annual Total (Outputs)
Total Plan
Progress To
Date
Conduct 1
RCT review
workshop
and
disseminatio
n workshop.
The RCT
review report
shows
municipality and
KUKL, Thimi
branch is
improving its
good
governance
indicators.
Comparing the
grade with
previous years
RCT report,
municipality has
improved its
grade in two
indicators
concensus
orientation and
equity. Likewise
KUKL, Thimi
branch has
improved its
grade in three
indicators
consensus
orientation,
accountability
and strategic
vision.
Reporting Quarter Q4
Plan
Progress
in Quarter
Conduct 1
RCT review
workshop
and
disseminatio
n workshop.
RCT was
also
submitted
to
the
concerned
stakehold
ers to act
and
to
make
improvem
ents
on
the issues
and
recommen
dations
made.
The RCT
review
report
shows
municipalit
y
and
KUKL,
Thimi
branch is
improving
its
good
governanc
e
indicators.
Comparin
g
the
grade with
previous
years
RCT
report,
municipalit
y
has
improved
its grade
in
two
indicators
consensu
s
orientation
and
equity.
Likewise
KUKL,
Justificati
on for
Variance
NA
For details
see RCT
review
report
144
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Assessment
on budget
tracking on
WASH sector
at Municipal
level (Thimi)
conducted for
2
consecutive
years and
report with
critical
analysis on
municipality’s
budget
allocation
produced by
2010/11.
Annual Total (Outputs)
Total Plan
Progress To
Date
Conduct 1
assessment
on budget
tracking
every year
The budget
tracking shows,
the budget
allocated in
WASH sector in
FY 2066/67 is
as follows;
Water - Rs. 1
lakhs
Sanitation – Rs.
29 lakhs 70
thousand
Health and
Hygiene –
Rs.20 lakhs 50
thousands
The budget
allocated in
WASH sector in
FY 2067/68 is
as follows;
Water – 25
lakhs
Sanitation – 33
lakhs
Health and
Hygiene – 30
lakhs 75
thousands
The above
allocated
budget for the
two consecutive
Reporting Quarter Q4
Plan
Progress
in Quarter
1 Budget
tracking
assessment
and prepare
analytical
report.
Disseminatio
n of budget
tracking
report to the
stakeholders.
Thimi
branch
has
improved
its grade
in
three
indicators
consensu
s
orientation
,
accountab
ility
and
strategic
vision.
The
Budget
tracking
report was
produced
and
dissemina
ted among
the
stakehold
ers.
Justificati
on for
Variance
NA
For details
see
Budget
tracking
and
analysis
report
The
budget
tracking
shows,
the budget
allocated
in WASH
sector in
FY
2066/67 is
as follows;
Water
Rs.
1
lakhs
Sanitation
– Rs. 29
lakhs 70
thousand
Health
and
Hygiene –
Rs.20
lakhs 50
145
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
years shows
the remarkable
increment of the
budget in
WASH sector
compared to FY
2066/67
However,
municipality
disbursed and
utilized about 5
times more
budget in water
sector than
allocated and in
case of
sanitation only
abou 50% of
the budget was
utilized and in
health sector
about 86% of
the allocated
budget was
utlized in FY
2066/67
according to the
report.
Whilst in FY
2067/68 till
now, no
allocated
budget in the
water sector
was utilized but
in sanitation
and Health
sector about
36% and 64%
of the allocated
budget has
already been
utilized
respectively
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
thousands
The
budget
allocated
in WASH
sector in
FY
2067/68 is
as follows;
Water
–
25 lakhs
Sanitation
– 33 lakhs
Health
and
Hygiene –
30 lakhs
75
thousands
The above
allocated
budget for
the
two
consecutiv
e
years
shows the
remarkabl
e
increment
of
the
budget in
WASH
sector
compared
to
FY
2066/67
However,
municipalit
y
disbursed
and
utilized
about
5
times
more
budget in
water
146
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Reporting Quarter Q4
Plan
Progress
in Quarter
Justificati
on for
Variance
sector
than
allocated
and
in
case
of
sanitation
only abou
50%
of
the budget
was
utilized
and
in
health
sector
about
86%
of
the
allocated
budget
was
utlized in
FY
2066/67
according
to
the
report.
Whilst in
FY
2067/68
till now, no
allocated
budget in
the water
sector
was
utilized
but
in
sanitation
and
Health
sector
about
36% and
64%
of
the
allocated
budget
has
already
147
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Annual Total (Outputs)
Total Plan
Progress To
Date
Documents
produced by
Lyamha
Pucha/Citize
n Forum on
the activities
commenced
to influence
sector
stakeholders
following the
WASH
advocacy
plan and the
outputs
achieved.
Produce 1
document
by partner
organization
at the end
of the FY.
The yearly
news “Jankari
Patra”
documenting
the advocacy
and influencing
activities is
published. The
news covered
in the
publication are
handover of
sanitation
improvement
plan to the
municipality,
result of RCT
workshop,
WASH policy
and guidelines
review and
analysis and
photo news etc.
Report on
WQ test of
the water
facilities
delivered by
service
providers will
be produced
annually.
Produce 1
report on
the WQ
standard of
the natural
resources,
wells etc.
rehabilitated
by Lyaymha
Pucha in
Report
produced on
water quality
test conducted
in 2 wells at
Thimi and 1
water source of
Thecho 8 points
at Narayantole
and 3 points at
Reporting Quarter Q4
Plan
Progress
in Quarter
been
utilized
respective
ly
Produce 1
The yearly
document by news
partner
“Jankari
organization Patra”
at the end of documenti
the FY.
ng the
advocacy
and
influencin
g activities
is
published.
The news
covered in
the
publicatio
n are
handover
of
sanitation
improvem
ent plan to
the
municipalit
y, result of
RCT
workshop,
WASH
policy and
guidelines
review
and
analysis
and photo
news etc.
Produce 1
Report
report on the produced
WQ standard on water
of the natural quality
resources,
test
wells etc.
conducted
rehabilitated in 2 wells
by Lyaymha
at Thimi
Pucha in
and 1
coordination water
Justificati
on for
Variance
NA
Attach
Jankari
Patra
148
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Fact sheets,
calls and
other
advocacy
related IEC
materials are
prepared
Rehabilitated
at least one
institutional/p
ublic latrine
by
Municipality
in 2010/11
upon the
lobby of
citizen’s
forum
Annual Total (Outputs)
Total Plan
Progress To
Date
Reporting Quarter Q4
Plan
Progress
in Quarter
coordination
with
municipality
Kha
with
municipality
Print 1 IEC
materials as
appropriate
for
generating
awareness
targeting
world water
day
campaign
Rehabilitate
1
institutional/
public
latrine
1 IEC materials
was printed for
generating
awareness
targeting world
water day
campaign
Print 1 IEC
materials as
appropriate
for
generating
awareness
targeting
world water
day
campaign
Rehabilitate
1
institutional/p
ublic latrine
The budget has
been released
for Sri Adarsha
Higher
Secondary
School to
construct a new
latrine as there
was high
demand for the
latrine in the
densely
populated
school.The
construction is
under process
with the school
lobbying for
more funds in
municipality and
DOE for the
construction of
latrine.
source of
Thecho 8
points at
Narayanto
le and 3
points at
Khadipakh
a
1 IEC
materials
was
printed for
generating
awarenes
s targeting
world
water day
campaign
The
budget
has been
released
for Sri
Adarsha
Higher
Secondar
y School
to
construct
a new
latrine as
there was
high
demand
for the
latrine in
the
densely
populated
school.Th
e
constructi
on is
under
process
with the
school
lobbying
for more
Justificati
on for
Variance
NA
Photo of
IEC
materials
or copy of
IEC
materials
-
149
Sectors
Key
Deliverables
(As
mentioned in
Project Plan)
Assessment
on functional
linkages
established
with LGs and
other sector
stakeholders
at municipal
level in
mobilizing
their
resources in
WASH sector
conducted to
understand
raising voices
of citizens’
and Citizen
Forum’s
advocacy
work for
access to
improved
WASH
facilities and
report
produced
after critically
reviewed by
peers within
2010/11
Annual Total (Outputs)
Total Plan
Progress To
Date
Conduct 1
assessment
and
produce
report
Participatory
Review and
Reflection
(PRRP) report
produced and
review and
evaluation of
citizen action
programme in
Thimi was
completed.
Reporting Quarter Q4
Plan
Progress
in Quarter
Conduct 1
assessment
and produce
report
funds in
municipalit
y and
DOE for
the
constructi
on of
latrine.
Participato
ry Review
and
Reflection
(PRRP)
report
produced
and
review
and
evaluation
of citizen
action
programm
e in Thimi
was
completed
.
Justificati
on for
Variance
Review
and
evaluation
draft
report is
at the
verge of
completio
n and it
will be
presented
to Lumanti
and WAN
before
finalizatio
n.
E. Partnership (refer to Project Plan – Sections 5)
- Changes to existing key stakeholders and their roles
- New collaborations, partnerships or stakeholders
- Effectiveness, challenges, opportunity relating to partnerships
F. Resources (refer to Project Plan – Sections 6 & 7):
150
- Changes to Human Resource plan
- Financial Summary of the project
Qtr.
Original Budget
Approved
(MPB)
Budget
Q1
317,114
317,114
Q2
370,996
370,996
Q3
459,314
459,314
Q4
305,914
305,914
TOTAL
1,453,338
1,453,338
Revised
Budget
182,650.00
381,144.00
548,057.00
286,735.00
1,398,586.00
Expenditure
182,650.15
381,094.74
394,412.39
316,362.31
1,274,519.59
%
Uti.
100%
100%
72%
110%
91%
G Field visits and Monitoring (refer to Project Plan – Sections 9):
G.1 Completed Visits:
Date
Visited by
(Project Team, PM&E
staff, HQ, WAN or
external agencies etc)
Reporting Quarter: Q1+Q2
17 May
Puspa Joshi
July 9
July 14
Puspa Joshi
Puspa Joshi
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Support Visit, Lyaymha
Pucha programme
planning
Monitoring and support
visit
Orientation to Lyaymha
Pucha and Developing
Action Plan
Key Feedbacks Received
(if any)
Lyaymha Pucha should develop
action plan as developed with the
support from Lumanti, need to
study in the issues and need to
follow the plan, so that the service
providers and LG's started to trust
when approached with evidence.
Lyaymha Pucha requested
technical support for developing
WaSH strategic plan and also
requested for the guidelines.
Operation and maintenance fund
should be managed for the
sustenance of the constructed
natural resources.
Continuous lobby and follow up
with service providers should be
done to make them involve in the
programme.
Lyaymha Pucha should develop
its WaSH advocacy plan, so that
it can broaden in working area
and explore more funding
agencies in the future.
The developed action plan should
be strongly followed to complete
151
Date
July 26
August 9
Visited by
(Project Team, PM&E
staff, HQ, WAN or
external agencies etc)
Puspa Joshi
Bishal Shrestha and
Shiva Gopal Shrestha
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Follow up visit
Monitoring Visit at
Khadipakha/ Narayantole
16th
Bishal Shrestha and
September Umesh Rupakheti
Monitoring Visit to
Thecho
19th
Bishal Shrestha and
Septmeber Umesh Rupakheti
Monitoring Visit at Kritipur
19 – 26
Puspa Joshi
September
To attend Exploring ways
for raising urgency of
WaSH: Knowledge
sharing and capitalization
on advocacy and
influencing
Key Feedbacks Received
(if any)
the programmes in time.
Although the work division was
done in Lyaymha Pucha, the
members are not providing the
time because of busy schedule.
Focal person of Lyaymha Pucha
should once brief the planned
programme to the members in
detail to make them enroll
actively.
#Residents of Narayantole
reported that the slab built over
the Samakhusi river has avoided
the bad smells of the river and
made the area spacious.
#All the toilets in the community
are in use and well maintained.
#The UCs of the Thehco was
supported to fill in the CBME
charts.
They reported that the sections
related to Construction details in
CBME charts were not much
relevant now. It was suggested
that, the UC fill the construction
part on filling details of the new
loans taken for construction of
toilets.
#The cooperative in Thecho
shared their plan of declaring
ODF in Thecho. They plan to
build idols of Gods in defecating
areas to discourage people from
defecating.
#There is problem in the septic
tank which has affected the RBTS
system. Meeting has been held
with the contractor, Astra
Construction, regarding the
problems seen in the system.
> Mr. Ashutosh Tiwari, WAN
suggested the need of urgency in
WaSH sector to bring bigger
change.
> Mr. Narottam Aryal, Gyankuti
suggested to explore private
sector engagement in raising
152
Date
Visited by
(Project Team, PM&E
staff, HQ, WAN or
external agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
urgency of WaSH through
Corporate Social Responsibilities
(CSR).
> Mr. Rabin Lal Shrestha, WAN
suggested partners to explore the
advocacy change basics.
Advocacy groups should always
be ready for change and should
have the capability to analyze and
think for the expected change.
> He also suggested that
evidence based programmes like
public hearing and creating
emotions can make people
believe our ideas.
> Mr. Ashutosh Tiwari, WAN
suggested person who advocates
should think from other people's
brain as it is a brain science.
> Making a sticky mesage means,
it should be understoodable,
remembered, action oriented,
changeable and result showing.
> The crafted message should be
simple, unexpected, concrete,
credible, emotional and story
driven (SUCCES).
> It is not necessary to give all the
information in advocacy.
> Hon. MP Sapana Malla
Pradhan suggested documenting
the negative arguments and
hitting it with positive arguments
to gain creadibility in advocacy.
She also suggested to make a
step with strategy in hand to be
successful in gaining credibility.
> Should prepare on the
respective topic being interviewed
in advance before approaching
the media.
G.2 Upcoming Visits
N/A
153
G.3 Other PME Activities
NA
H. Water Quality
Annual Plan
(Water Sources & Points)
New
Exist
Rehab
Q1
Q2
Q3
Q4
TOTAL
Tested
(Water Sources & Points)
Exist.
New
Rehab
15
15
15
30
15
30
Remarks
I. Indicative Project Outcomes – Refer to Project Plan Section 2, 3 and 4. (SMR & APR only)
Note: Do not segregate Water, Sanitation and Hygiene in case of cross cutting projects, just put
WaSH objectives.
I.1 Service Delivery
Project
Objectives
Water:
Project Indicators
Achievements of the FY 2010/11
3 sustainable studies conducted in 3
selected project areas completed
past 4 years ago in 04/05 by FY
2010/11
Sustainability study has been conducted in
Thimi, Anamnagar and Palpakot. A report with
recommendations is produced.
2 post monitoring studies in selected
6 peri urban areas are conducted
annually from 2010/11
A post monitoring study is done in Thecho,
Naikap and Tokha.
The study shows that in Thecho the water
sources installed/rehabilitated in the project
period are in use. In one water source, a risk of
contamination owing to open defecation was
seen which has been addressed by initiating
construction of a public space, a small park, to
discourage open defecation. In Naikap, the study
showed that the water supply system installed
previously requires upgrading owing to increased
demand. Efforts were made to coordinate with
the VDC and the Users for assessing their
contribution for the upgrading the system system
but no achievements were made due to lack of
interest in UCs. In Tokha, the an Isolated Water
Supply System has been initiated in coordination
among UN-Habitat, Lumanti, KUKL and VDC.
Identified Physical infrastructures The water sources at Thecho are routinely
constructed by Lumanti in previous rehabilitated by the users themselves. Support
154
Project
Objectives
Project Indicators
Achievements of the FY 2010/11
years
that
require has been provided to one water source at
improvement/rehabilitation and are Thecho that had risk of being contaminated
rehabilitated by 2010/11
owing to practice of open defecation nearby the
source.
Effective community level
management system is in place for
their sustained function in all the periurban areas where sustainable
studies and post monitoring studies
are conducted by 2010/11.
At least 90% of the constructed water
facilities in the past project areas are
sustained by 2010/11
Community are aware of Water
Quality and all the water points will
have tested for its water quality by
2010/11 regularly as per WAN’s WQ
protocol
Sanitation: 3 sustainable studies conducted in 3
selected project areas completed
past 4 years ago in 09/10
2 post monitoring studies in selected
6 peri urban areas and 3 are
conducted annually from 2009/10
Identified Physical infrastructures
constructed by Lumanti in previous
years
that
require
improvement/rehabilitation
are
rehabilitated by 2010/11 and acted
upon them by Dec. 2011.
In Naikap, the water supply system required
upgrading to meet the increased demands but
no achievements were made.
In Thecho, the cooperative has been active in
undertaking the responsibility of sustaining the
WASH infrastructures in Thecho. In Narayantole
and Khadipakha, the UC is equally active and
has been managing the water facilities properly.
In Naryantole the UC has been active in properly
operating and managing the Waste water
treatment plant.
The water facilities in past project areas are
sustained and are in proper use under better
community management system. In Naikap,
however, the WSS requires up-grading to meet
the increased demands.
WQ test done and results disseminated to the
communities. The communities are aware on
using safe drinking water and are using water
purification method before drinking.
Sustainability study has been conducted in
Thimi, Anamnagar and Palpakot. A report with
recommendations is produced.
A post monitoring study is done in Thecho,
Naikap, Kritipur and Tokha.
The RBT system at Kritipur required
rehabilitation. A series of meetings were made
with the residents of Kritpur housing at with the
Astra Consultants regarding the rehabilitation of
the RBT system. The rehabilitation could not be
undertaken in failure to collect any financial
support from the residents.
In Thecho, follow-ups were done by the CHVs
and members of the cooperatives to bring the
latrines in use and to rehabilitate the required
ones.
Effective management system are in
place for their sustained function in
all the peri urban areas where
In Narayantole, the waste water treatment plant
is functioning properly.
In Thecho, the cooperative has been active in
undertaking the responsibility of sustaining the
WASH infrastructures in Thecho. In Narayantole
155
Project
Objectives
Project Indicators
Achievements of the FY 2010/11
sustainable studies and post
monitoring studies are conducted by
2010/11
and Khadipakha, the UC is equally active and
has been managing the sanitation facilities
properly. In Naryantole the UC has been active
in properly operating and managing the Waste
water treatment plant
One school latrines have been rehabilitated in
Thimi benefiting 1070 students and 67 teachers.
Additional 525 people are further
benefited from the rehabilitation
works in sanitation facilities by
2010/11
At least 90% of the construction
works are sustained in the post
program areas by Dec 2011
Sanitation improvement plan of
Thecho Reviewed and acted upon by
the stakeholders on it with an
achievement of 25% annually to
achieve at least 75% of the plan
implemented by Dec. 2011
Hygiene:
Narayan Tole and Khadikhapkha will
be declared ODF and have
community management system in
place to sustain the ODF status by
2010/11
80% of community (adult and
children) beneficiaries of all the
selected 6 peri urban areas
(communities) have knowledge of at
least 4 key hygiene messages and
communicate them at critical times
when asked by 2010/11.
Reduction in point prevalence rate of
diarrhoea, skin and typhoid in the
target areas by 20%, 15% and 10%
respectively with reference to the
collected baseline data by Dec. 2011
I.2 Capacity Building
Project
Project Indicators
Objectives
Water:
CBME system by the local users
committees (UCs) in their respective
areas is institutionalized through its
regular practice by 2010/11 provide
evidence of enhanced capacity in
community monitoring
The sanitation structures constructed in the
project period are sustained and are in proper
use.
Owing to the implementation of the Sanitation
Improvement Plan prepared for Thecho, the
VDC has invested in improving the
environmental sanitation of Thecho. The VDC
has invested in paving of roads and maintenance
of the drainages. Also, the VDC has contributed
in construction of public place in the open
defecating area in order to make the area no
open defecating zone.
Narayantole and Khaidpakha have been
declared as ODF zone in initiation of the
community. The community has formed ODF
guidelines and agreed upon adhering on thus
formed guideline.
The RCS report shows that communities have
sound knowledge of 4 key hygiene messages
and have been adopting the safe hygiene
behaviors.
The point prevalence rates of the mentioned
diseases are below the targeted levels.
Achievements of the FY 2010/11
The UCs in Thecho, Narayantole and in
Khadipakha practice CBME. The practice of
CBME in the post monitoring period has helped
to assess the status of the structures that need
rehabilitation and act immediately. The
communities also became aware on importance
of O&M fund, and rehabilitation of the
infrastructures.
156
Project
Objectives
Project Indicators
Community/ UCs remain active to
effectively operate and maintain the
water points installed for their
functional in the long run by 2010/11.
Mechanism
for
collection
&
management of Operation and
Maintenance fund is sustained in the
community for the sustainability of
water infrastructures by 2010/11
Documented the best practices and
learning experiences gathered from
this project within 3 years in relation
to water and disseminated by March
2012
Sanitation: CBME system by the local users
committees (UCs) in their respective
areas is institutionalized through its
regular practice by Users
Committees of the selected 6 peri
urban areas by 2010/11 provide
evidence of enhanced capacity in
community monitoring
Mechanism for collection and
management of Operation and
Maintenance fund is sustained in the
community for the sustainability of
WASH infrastructures facilities even
after withdrawal of supports from
Lumanti by 2010/11
Hygiene:
Achievements of the FY 2010/11
The water facilities in past project areas are
sustained and are in proper use under better
community management system.
O&M fund is not collected regular but
communities collect money when rehabilitation of
structures is required.
A draft learning document produced.
The UCs in Thecho, Narayantole and in
Khadipakha practice CBME. The practice of
CBME in the post monitoring period has helped
to assess the status of the structures that need
rehabilitation and act. The communities also
become aware on importance of O&M fund, and
in rehabilitation of the infrastructures.
The initiation CBME system made the UC
transparent towards the community and gain
belief. It also helped UC’s in the social audit to
show their transparency and accountability.
O&M fund is not collected regular but
communities collect money when rehabilitation of
structures is required
Documented the best practices and
learning experiences gathered from
this project within 2 years in relation
to WASH and disseminated by March
2012
80% of beneficiaries practice
hygienic behavior and practice the
following 4 key hygiene messages by
2010/11:
i) Hand washing at critical times
ii)Management of human excreta
including child excreta
iii) Safe storage of water &
hygiene PoU treatments
iv) Safe food hygiene practice
- A draft learning document produced.
Community Health Motivators/
Volunteers (CHMs/ CHVs) assigned
The CHVs in communities are trained for
effectively delivering hygiene messages. The
The communities know and adopt safe hygiene
behavior.
The result of RCS shows that all the 4 key
hygiene messages are followed by more than
80% of the residents of the communities.
157
Project
Objectives
Project Indicators
Achievements of the FY 2010/11
in each project areas under post
monitoring assessment & project
support are trained and remain active
in all the selected project areas by
2010/11.
Hygiene behavioral assessment
conducted annually from 2010/11
using RCS tools in conjunction with
CBME tools.
CHVs have remained throughout the year in
communities for assessing the hygiene situation,
planning and implementing hygiene promotion in
communities.
Documented the findings of the
assessment on improved and
sustained hygiene behavioural
practices, learning experiences etc.
in a report annually from 2010/11 by
March 2012
RCS has been adopted as a strong and effective
tool for assessment of hygiene behavioral
changes. The RCS helped the CHVs to
understand existing health and hygiene status of
the community and develop a more realistic plan.
A draft learning report produced.
I3. Policy Influencing
Project Objectives
Project Indicators
Enhance
organizational
capacity of
Lyaymha Pucha
(local advocacy
partner of Lumanti)
to advocate for the
rights of water
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
Lyamha Pucha/Citizen
Orientation provided on
Sharing on WAN’s
Forum's WASH advocacy
WASH advocacy plan to the
CSP was done among
plan prepared in 2009/10 is members of Lyaymha Pucha
the representatives of
updated for coming 3 years in an informal meeting.
Lyaymha Pucha and
with its annual review by the Lyaymha Pucha has started
other Citizen Forum
forum members by 2010/11 drafting the plan and assured
members during
to discuss on the draft with in
Participatory Review
Q3.
and Reflection
Procress (PRRP)
programme on March
29 by WAN
representative. All the
participated
representatives
agreed to prepare the
WASH advocacy plan
in the coming FY.
Establishing functional
The budget tracking report of
The action plan was
linkages with LGs and other two consecutive years and the developed to support
sector stakeholders at
presentation made by the
municipality’s
municipal level through
municipality during social audit sanitation
improved coordination and
showed the increment of the
improvement plan
for their resource
budget in the WASH sector.
segregating action
mobilization in WASH sector These resources are
points that needs to
for improved WASH
mobilized in WASH sector
be intervened
facilities by 2010/11
according to the demand
immediately and
made by the citizens through
action points that can
Lyaymha Pucha’s advocacy.
be intervened in the
For eg; in the previous year
future.
only municipality invested
about NRs. 8.5 million in water The review of WASH
158
Project Objectives
Project Indicators
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
resource
policy and guidelines
conservation/rehabilitation in
was also completed in
coordination with Lyaymha
coordination with
Pucha and other sector
municipality and
stakeholders.
concerned
stakeholder’s.
Municipality assured
to gradually update its
WASH policy as per
the suggestions
provided.
Lobby local government on
Lyaymha Pucha has lobbied
The WASH policy of
conservation and
with local government to
Thimi Municipality
rehabilitation of traditional
conserve/rehabilitate the
ensures the
water resources and for
traditional water resources
conservation and
delivery of safe water
preserving its traditional looks rehabilitation of
ensuring NDWQS by the
ensuring the NDWQS as
traditional water
service providers and
tourism year 2011 is
resources. For the
Municipality in by 2010/11
approaching nearer. Lyaymha conservation and
provide evidence of
Pucha has provided the detail rehabilitation
enhanced capacity of
report to the stakeholders on
municipality separates
forum’s advocacy work
existed traditional water
the budget every year.
resources of Thimi
municipality prepared in
coordination with Lumanti and
NGO Forum previous year.
Based on the findings of the
report, in coordination with
sector stakeholders
Municipality has assured to
rehabilitate/conserve some of
the stone spouts, where
network of drinking water new
pipeline was not possible this
year, if the demand was made
from the citizens.
Effective mobilization of
Lyaymha Pucha is celebrating The sanitation
citizens to lobby local
its silver jubilee programme
improvement plan has
government on rehabilitation this year, so as a part of the
been updated and
of institutional and public
programme, they are
handover to the
water and latrines facilities
massively mobilizing women’s municipality for
and for promotion of
group and youth group
immediate action.
sanitation improvement by
voluntarily on different
2010/11
activities including WASH
The WASH policy and
activities.
guidelines was also
reviewed and
Beside these, Lyaymha Pucha analysed and
and Municipality in joint
suggestions provided.
coordination has agreed to
Eg;
revise/update the sanitation

The
improvement plan of the
objectives, policies
159
Project Objectives
To sensitize the
service providers
on the rights and
needs and of the
urban poor for
improved and
reliable WaSH
facilities for
sustained practices
Project Indicators
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
municipality, so that it will be
and strategies on
easier to place the agendas,
waste management
implement and approve the
should be SMART
plan during the periodic

Beside
meetings.
physical and
financial support
municipality should
manage social,
environmental and
human resource
support for waste
management and for
this quantitative and
qualitative change is
needed.
Organize debates,
To ensure the supply of safe
Municipality assured
coordination and interaction drinking water, during
to disburse and utlize
meetings for enhancing
coordination meeting, Bode
the allocated budget
improved safe water
Water Purification Centre
for the FY in the
facilities in collaboration with agreed to test the quality of
WASH sector based
local government, sector
water it supplies in the city at
on the demand of
stakeholders, sector actors
least 2 times per year.
local community by
including service providers
mobilizing and
at least at municipal level by Addressing the issues raised
consulting with CBO’s
2010/11
in RCT on coordination
and WASH
between the different
stakeholder’s.
government bodies, in this
However Lyaymha
particular year municipality,
Pucha, civil society
Bode Water Purification
organizations and
Center, Department of Road
media persons
and other concerned
demanded for
stakeholders are working
maximum utilization of
together. For eg; to lay the
the WASH budget and
drinking water pipelines in the to participate them in
municipality, KUKL has
the periodic meetings
planned to extend the
of the municipality, so
pipelines before department of that timely
road starts black topping the
suggestions, plans
roads. The plan was agreed in and decisions can be
the coordination meeting and
made during the
acted in coordination with
meetings.
municipality and department
of road.
The action plan was
developed to support
municipality’s
sanitation
improvement plan
segregating action
points that needs to
be intervened
immediately and
160
Project Objectives
Project Indicators
Local government prioritize
activity to receive increased
sector funding from National
government and gradually
increases WASH sector
spending with plan of action
at hand with reference to
RCT recommendations and
existing water sector
blockage issues by 2010/11
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
action points that can
be intervened in the
future.
For this year Thimi
municipality has increased
50% investment in water
sector and about 18%
increment in sanitation sector
after lobby, coordination and
RCT recommendation shared
and made realized to the
municipality.
The budget tracking
shows, the budget
allocated in WASH
sector in FY 2066/67
is as follows;
Water - Rs. 1 lakhs
Sanitation – Rs. 29
lakhs 70 thousand
Health and Hygiene –
Rs.20 lakhs 50
thousands
The budget allocated
in WASH sector in FY
2067/68 is as follows;
Water – 25 lakhs
Sanitation – 33 lakhs
Health and Hygiene –
30 lakhs 75
thousands
Ensure update of
Report Card Test
(RCT)
recommendations
and their effective
implementation
At least two (2) action points
related to water sector
agreed by civil societies and
service providers acted
upon by the service
providers annually from
2010/11 and update RCT
recommendations by with
new WASH blockage issues
to be addressed by service
providers by 2010/11
Based on the
recommendations made by
the RCT review on previous
year, municipality acted in
budget increment in WASH
sector, accountability shown
to work together with civil
society and KUKL on
investment and providing
support for pipeline extension
and also stepped towards
policy reformation.
Better services provided by
2010/11 when reviewed
Establishment of help desk in
the municipality, 24 hour
The above allocated
budget for the two
consecutive years
shows the remarkable
increment of the
budget in WASH
sector compared to
FY 2066/67
Based on the
recommendations
made by the RCT
review on previous
year, municipality
acted in budget
increment in WASH
sector, accountability
shown to work
together with civil
society and KUKL on
investment and
providing support for
pipeline extension and
also stepped towards
policy reformation.
The improvement
shown from RCT
161
Project Objectives
Ensure increased
access to improved
water facilities
Project Indicators
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
from the situation of service power supply in Bode Water
review in the good
facilities during FY 2006/07
Purification Centre, closure of governance indicators
Manohara sand purification
like consensus
centre, pipeline extension in
orientation, equity,
ward 15, 16 and 17, increment accountability and
in drinking water production,
strategic vision
better coordination between
provides evidence of
sector stakeholders, presence service delivery
of key persons from LGs in
organizations
the meetings called by civil
accountability towards
society organizations etc,
providing better
shows that, the services
services.
provided is being better
compared to the previous
years.
Identify new sector blockage The recommendations made
The new sector
issues related to water and
after the RCT review are
blockage issues
sanitation by reviewing RCT gradually being addressed by identified by RCT
result/recommendations and the LG’s.
review are;
update RCT by

Unequitable
incorporating identified
drinking water
WASH sector blockage
distribution
issues by 2010/11.

No access of
NDWQS drinking
water in all the wards
of Thimi Municipality

Concerned
stakeholder’s should
act immediately to
stop water leakage

No strong
monitoring unit to
manage and update
the WASH situation
of the city

No long term
plans and strategy
developed on WASH

No programme
designed to
discourage the open
dumping of waste in
the municipality
Allocation of budget by the
For this year Thimi
The budget tracking
local government is
municipality has increased
shows, the budget
increased in an incremental 50% investment in water
allocated in WASH
trend in WASH sector
sector and about 18%
sector in FY 2066/67
increment in sanitation sector
is as follows;
after lobby, coordination and
Water - Rs. 1 lakhs
RCT recommendation shared Sanitation – Rs. 29
and made realized to the
lakhs 70 thousand
162
Project Objectives
Project Indicators
Achievements to date
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
municipality.
Health and Hygiene –
Rs.20 lakhs 50
thousands
The budget allocated
in WASH sector in FY
2067/68 is as follows;
Water – 25 lakhs
Sanitation – 33 lakhs
Health and Hygiene –
30 lakhs 75
thousands
Water services/facilities
delivered by service
providers showed gradual
improvement in quality of
water as per NDWQS WQ
protocol compared to their
past services
Evaluation of citizen’s action
programme in Thimi
Municipality through
Lyamha Pucha to
understand the efficacy of
CF and the project in
improving WASH
governance, delivering
improved WASH
access/facilities,
establishing functional
linkages with LGs and other
sector stakeholders at
municipal level and in
achieving recommendations
made by RCT through its
thorough review and
assessment by March 2012
The above allocated
budget for the two
consecutive years
shows the remarkable
increment of the
budget in WASH
sector compared to
FY 2066/67
The water supplied by
the KUKL, Thimi
Branch at Bode is
found as per the
NDWQS WQ protocol.
The water supplied by the
Bode Water Purification
Center is found as per the
NDWQS WQ protocol and the
conserved traditional water
spouts WQ are being tested
through Lyaymha Pucha and it
will be compared by doing
second test in Q3 to find the
improvement in the WQ.
Review and
evaluation draft
report is in process of
completion and it will
be presented to
Lumanti and WAN
before finalization.
163
. Beneficiaries
Planned (10/11)
Achieved
Variance
water
sanitation
Water
Sanitation
Water
Sanitation
-
525
-
1137
-
114%
164
Project No.: 643UF Advocacy and Post Monitoring and Project Supports in Urban Terai
A. Project Information:
- Project Name: Advocacy and Post Monitoring and Project Supports in Urban Terai
- Names of Sub-Projects (if applicable): Urban Terai
- Project Period:
- Name of Partner Organization: Lumanti Support Group for Shelter
- Partner Organization Number:
Sector
s
Water
Key
Deliverables
(As
mentioned in
Project Plan)
Produced
report on 2
Post
monitoring
studies
conducted in
12
communities
in Bharatpur
Project along
with
the
recommenda
tion
for
further
improvement/
rehabilitation
for
their
sustenance
of
the
projects.
Annual Total (Outputs)
Annual Progress
Total Plan
Annual
Progress
Plan in Q4
Progress in
Quarter
Post
Monitoring
support
for
sustenance
of
the
systems
through
Rehabilitation
and support
to Jakadimai
water supply
system;
water
systems
extended
with support
from NWSC
in Lumanti's
working
communities
and
Water
supply
system
in
Ram Nagar
and installd
RWH
systems etc.
Post
monitoring
and followups of 12
project
intervened
communitie
s has been
conducted
and report
produced.
The report
shows that
the
more
than 80% of
the
water
structures in
the
communitie
s
have
sustained.
Post
Monitoring
support for
sustenance
of
the
systems
through
Rehabilitati
on
and
support to
Jakadimai
water
supply
system;
In case of
Jakhadimai
WSS,
financial,
technical and
administrativ
e
supports
have
been
provided to
the
Jakhadimai
WSS for its
sustenance.
The
WSS
system has
extended its
service
to
125 HHs and
now
is
extending the
pipelines to
cover more
50
households.
The
WSS
has
been
linked to the
municipality
and
the
municipality
has agreed
to
provide
further
financial and
technical
support
to
the WSS.
In case of
Jakhadimai
WSS,
financial,
technical
and
administrati
ve supports
have been
provided to
the
Jakhadimai
WSS for its
sustenance.
The WSS
Justification
for Variance
165
system has
extended its
service to
125
HHs
and now is
extending
the
pipelines to
cover more
50
households.
The WSS
has
been
linked to the
municipality
and
the
municipality
has agreed
to provide
further
financial
and
technical
support to
the WSS.
Produced
report on
efficacy study
of O&M
(managemen
t system)
along with
the
recommenda
A water
safety plan
has been
initiated in
Jakhadimai
WSS in
technical
support from
ENPHO.
Also,
ENPHO has
implemente
d
water
safety plan
in
the
Jakhadimai
WSS
and
has
built
boundary
walls in the
system. The
ENPHO has
also
committed
to provide
required
technical
service
in
the system.
A post
monitoring
study of the
communitie
s has been
prepared.
and plan of
action
developed
166
Sanitati
on
tion for better
implementati
on in the
future
projects
Produced
report on 2
Post
monitoring
studies
conducted in
12
communities
in Bharatpur
Project along
with the
recommenda
tion for
further
improvement/
rehabilitation
for their
sustenance
of the
projects.
to address
the
shortcoming
s
Post
Monitoring
Support for
maintaining
and
sustaining
the sanitation
facilities
provided in
previous
years and
declaring
ODF status
in remaining
communities
&
maintaining
ODF status
in already
declared
communities
(in working
communities
of WASH
programme)
As per the
post
monitoring
study of the
Sanitation
sector, the
communitie
s, the
sanitation
situation at
the first six
months of
the fiscal
year,
required
improveme
nt. It was
recommend
ed that
required
latrines
should be
constructed
in the
communitie
s for proper
manageme
nt of
excreta and
to attain
better
sanitation
status.
Post
Monitoring
Support for
maintaining
and
sustaining
the
sanitation
facilities
provided in
previous
years and
declaring
ODF status
in remaining
communitie
s&
maintaining
ODF status
in already
declared
communitie
s (in
working
communitie
s of WASH
programme)
As per the
study of the
working
communities
in Bharatpur,
a total of 67
additional
household
latrines were
constructed
in Ward 11,
(57 in
Ganeshthan
and 10 in
Lama tole).
The
previously
declared
ODF
communities
sustain the
status. But,
no new
communities
were
declared as
ODF in this
fiscal year.
The declaration
of ODF in
remaining
communities
was not done.
The Bharatpur
Municipality had
planned to
declare the
whole
municipality as
ODF on January
2011, which
was later
postponed, the
declaration of
remaining
communities as
ODF was
planned along
with the plan of
the Municipality
and had to be
postponed.
A city-wide
survey was
done, in
coordination
among
Lumanti,
Bharatpur
Municipality
and
ENPHO.
The survey
that was
done at
ward-level
showed that
700 HH
167
Rehabilitation
and support
for Lankhu
bio-gas plant
latrines
were
required at
Bharatpur
Municipality
. Among,
the 700
latrines, 100
latrines
were
required to
be
constructed
in Lumanti’s
project
areas.
In Lankhu,
NA
the UC has
started to
collect a
monthly
charge of
NRs 200
from the
households
using gas
and
additional
NRs 50 as
operation
and
maintenanc
e fund. The
collected
O&M fund
is handed to
the Saving
Group.
NA
Also, the
public
latrine in
Lankhu is
being
rehabilitated
in support
from the
municipality
. It is
planned
that the
pipeline
from the
public
latrine
168
Produced
report on
sustainability
studies of the
project
completed
before 4
years along
with the
recommenda
tion for better
implementati
on in the
future
projects
At least 2
institutional/p
ublic toilets
rehabilitated/i
mproved
annually by
service
providers
including
municipality
would be
connected
to the biogas plant.
The design
of the public
latrine has
been
developed.
A
NA
sustainabilit
y report
produced.
As per the
emphasis
from the
study the
Saving
groups and
Cooperative
s were
assigned
with new
responsibilit
ies to look
after and
ensure
sustained
use of
Water and
Sanitation
facilities in
Bharatpur.
O&M fund
institutionali
zing. And
linkages of
Jakhadimai
WSS and
Lankhu biogas
extended
with the
municipality
.
3 Public
NA
Toilets have
been
rehabilitated
/improved in
Bhartpur
Municipality
. 1 at
Balkumari
Sabjimandi
NA
NA
169
from 2010/11
provide
evidence of
the project’s
influencing
role
Four (4)
communities
will be
declared
ODF and
mechanism
established
for sustaining
ODF status
in the ODF
declared
communities
and action
plan
prepared to
maintain
ODF status
in the
communities
accordingly.
Hygien
e
used, in
daily
average, by
300 people,
1
Public Toilet
of
Lilachowk
used in
daily
average by
250 people
and
1 public
toilet at
Lion's
Chowk
used, in
daily
average by
450 people
Post
Monitoring
Support for
maintaining
and
sustaining
the sanitation
facilities
provided in
previous
years and
declaring
ODF status
in remaining
communities
&
maintaining
ODF status
in already
declared
communities
(in working
communities
of WESH
programme
Mass
Awareness /
Mobilization /
Rally documentary
show
No
NA
additional
communitie
s have been
declared
ODF.
NA
A short teleserial on
sanitation
and ODF,
named
“Khoji
Ujwalyo Ko”
has been
NA
NA
The declaration
of ODF in
remaining
communities
was not done.
The Bharatpur
Municipality had
planned to
declare the
whole
municipality as
ODF on January
2011, which
was later
postponed, the
declaration of
remaining
communities as
ODF was
planned along
with the plan of
the Municipality
and had to be
postponed.
170
Health &
Hygiene
Campaign &
Hygiene
Competition
Award etc.
produced
and
broadcaste
d on local
TV
channels.
A
health
and hygiene
campaign
was
organized in
occasion of
World
HandWashing
Day and a
hygiene
competition
was
organized
(Inter
community
Hygiene
promotion
song
Competition
).
The
programme
was
conducted
in
joint
coordination
among
Lumanti,
ENPHO,
Municipality
and
DWWSS.
Health
&
Hygiene
Campaign
& Hygiene
Competition
Award etc.
A health and
hygiene
campaign
was
organized in
occasion of
World HandWashing Day
and
a
hygiene
competition
was
organized
(Inter
community
Hygiene
promotion
song
Competition).
The
programme
was
conducted in
joint
coordination
among
Lumanti,
ENPHO,
Municipality
and
DWWSS.
B. Executive Summary:
N/A
C. Changes in Project Background, Design & Risk Management (refer to Project Plan – Sections
1, 4 & 8):
N/A
D. Progress against key planned Activities
D.1 Service Delivery (Post Monitoring)
D.2 Capacity Building (Post Monitoring)
Sectors
Key
Annual Total (Outputs)
Annual Progress
Justificati
171
Water/S
anitation
Deliverables
(As mentioned
in Project
Plan)
Training
provided
as
per
the
recommendati
on of the study
to
build
capacities of
the community
people that will
ensure
sustainability
of the projects.
Total Plan
Annual
Progress
Post
WSUC/ CT
Training
1 training
has been
provided
to
caretakers
of
Jakhadim
ai WSS
and
Lankhu
bio-gas
plant to
enhance
their
knowledge
and
ensure
smooth
functionin
g of the
infrastruct
ures.
Caretaker's
/ SM
Training Lankhu and
Jakadimai
Plan for Q4
Progress in
Q4
NA
NA
on for
Variance
Training
has been
provided
to users of
Lankhu
bio-gas
regarding
the
maintenan
ce and
proper
operation
of the biogas. Also,
through a
health
training,
representa
tives of all
12
communiti
es were
trained on
proper
usage of
latrines.
172
Sectors
Key
Annual Total (Outputs)
Deliverables
Total Plan
Annual
(As mentioned
Progress
in Project
Plan)
Operation and The WSS
management
has
mechanism or
institutiona
system
of
lized the
Jakhadimai
operation
water supply
and
system
managem
institutionalize
ent
d along with
mechanis
fixation
of
m and
community
implement
based tariff. A
ed a fixed
report
is
tariff
produced on
system (of
this.
RS 50 per
month).
The UC of
the WSS
has also
levied a
fine for
delayed
payment
of the
monthly
charges.
Report
A report
produced on
produced
water quality
on WQ
test conducted
tests.
in 12
communities of
Bharatpur
project and
actions
recommended
are gradually
acted upon on
the basis of
the findings by
2010/11.
Operation and
Training
management
has been
mechanism or
provided
system of
to users of
Lanku biogas
Lankhu
system
bio-gas
institutionalize
regarding
d within the
the
Annual Progress
Plan for Q4 Progress in
Q4
NA
Justificati
on for
Variance
NA
173
Sectors
Key
Deliverables
(As mentioned
in Project
Plan)
UCs and
community
beneficiaries
with effective
management
system in
place.
CBME system
are
established
and
institutionalize
d among UCs
of the
respective
project areas
by 2011/12
provide
evidence of
the enhanced
capacity in this
discipline of
monitoring.
Annual Total (Outputs)
Total Plan
Annual
Progress
Annual Progress
Plan for Q4 Progress in
Q4
Justificati
on for
Variance
maintenan
ce and
proper
operation
of the biogas.
A monthly
charges of
Rs 250 is
collected
for usage
of gas
from the
plant.
Training
on CBME
tools has
been
conducted
for 12
communiti
es. CBME
is
conducted
in
communiti
es in
facilitation
of CHVs.
CBME in
post
monitoring
areas has
helped to
identify
the
infrastruct
ures that
need
rehabilitati
on and
also the
CBME has
helped in
realizing
the need
of O&M
fund.
NA
NA
174
Sectors
Key
Deliverables
(As mentioned
in Project
Plan)
Annual Total (Outputs)
Total Plan
Annual
Progress
Annual Progress
Plan for Q4 Progress in
Q4
Justificati
on for
Variance
Hygiene
A
report
prepared
on
UCs
and
CHVs’
improved link
with
DHO
contributing in
hygiene
behavior
sustenance.
2 trainings to
CHV and
CHVs on the
Others
burning health Training
issues in the
communities to
strengthen
their capacity
The CHVs
along with
women
saving
groups
and
women
cooperativ
e have
extended
linkages
with health
sector
stakehold
es. The
CHVs and
members
from
cooperativ
e are often
appointed
by the
municipalit
y and by
DHO for
health and
hygiene
promotion
programm
e, in
vaccinatio
n
programm
e and
communit
y health
programm
es.
A
Communit
y Health
and
Hygiene
training
was
provided
to CHVs
NA
NA
175
Sectors
Key
Deliverables
(As mentioned
in Project
Plan)
RCS survey to
understand the
hygiene status;
improvement
required; Its
dissimination
(6 monthly
basis)
Annual Total (Outputs)
Total Plan
Annual
Progress
RCS survey
of 12
communitie
s performed
and
representa
tives of
communiti
es. The
training
was
facilitated
by Ms
Srijana
Shrestha,
Health
Support
Officer of
PSI.
RCS
Survey
conducted
in all
target
communiti
es
conducted
twice. The
result
showed
that the
communit
y follows
the 4 key
hygiene
messages
and
prevalenc
e rate has
decreased
to the
targeted
level.
Annual Progress
Plan for Q4 Progress in
Q4
RCS survey
of all 12
communitie
s
performed.
Justificati
on for
Variance
The RCS
was
conducted
in this
quarter in
all 12
communitie
s followed
by the RCS
conducted
in the
second
quarter. The
RCS shows
that the
adoption of
4 key
hygiene
messages,
in average
in all
communitie
s, is above
85%. The
behavior of
handwashing in
critical
times is
above 90%
in all
communitie
s. The
behavior of
manageme
176
Sectors
Key
Deliverables
(As mentioned
in Project
Plan)
Annual Total (Outputs)
Total Plan
Annual
Progress
Annual Progress
Plan for Q4 Progress in
Q4
Justificati
on for
Variance
nt of human
excreta or
usage of
latrines in
all
communitie
s is above
95%. The
habit of
purifying
drinking
water is
more than
95%, the
SODIS
method
widely
preferred
communitie
s in
Bharatpur
along with
filtration and
chlorination.
D.3 Policy Influencing (Advocacy)
Sectors
Key
Annual Total (Outputs)
Deliverable
Total
Progress To Date
s
Plan
(As
mentioned
in Project
Plan)
Water/
Quarterly
4 Follow Citizen Forum in
Sanitatio reports
up,
coordination of
n/
including
support
UC’s had
Hygiene
monitoring
and
developed a
to
monitori documentary on
understand
ng visit
ODF to influence
the progress was
the stakeholders
on the
complet and service
activities of
ed
providers for their
this project
support on ODF in
on
the remaining
influencing
communities.
the local
municipal
After the
levels
continuous lobby
Reporting Quarter (Q4)
Plan
Progress in
Quarter
1
monitori
ng and
support
visits in
Q4
complet
ed
After the
continuous lobby
and follow up from
Citizen Froum, the
public toilets in
Balkumari
Sabjimandi and
Lilachowk toilet
near Narayani
river came in
operation.
Justification for
Variance
NA
Likewise the toilet
in Lion’s chowk
was rehabilitated
177
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
sectors
stakeholder
s.
Annual Total (Outputs)
Total
Progress To Date
Plan
and follow up from
Citizen Froum, the
public toilets in
Balkumari
Sabjimandi and
Lilachowk toilet
near Narayani river
came in operation.
Likewise the toilet
in Lion’s chowk
was rehabilitated
by municipality
after the pressure
from Citizen Forum.
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
succeeded in
implementing the
schedule for
garbage collection
in the municipality.
Succeeded in
forming separate
environment desk
in Bharatpur
Municipality, which
helped citizens to
deal on sanitation
issues in the
municipality easily.
Showing different
administrative and
financial problems,
the service
providers of Rose
Garden WSS and
Prembasti WSS are
not continuing their
projects despite the
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Justification for
Variance
by municipality
after the pressure
from Citizen
Forum.
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
succeeded in
implementing the
schedule for
garbage collection
in the municipality.
Succeeded in
forming separate
environment desk
in Bharatpur
Municipality, which
helped citizens to
deal on sanitation
issues in the
municipality easily.
Showing different
administrative and
financial problems,
the service
providers of Rose
Garden WSS and
Prembasti WSS
are not continuing
their projects
despite the time
boundary of the
project was
already passed.
After the pressure
and lobbying on
the issues from
Citizen Forum,
Rose Garden
WSS is extending
about 5Kms of
178
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Annual Total (Outputs)
Total
Progress To Date
Plan
Citizen
Forum's
WASH
advocacy
plan (for
10/11)
prepared to
influence to
address the
WASH
issues at
the local
municipal
level.
Prepare
1
advocac
y plan
docume
nt of the
partner
organiza
tion
Fact sheets,
calls and
other
advocacy
related IEC
materials
are
prepared
Print 1
IEC
material
s as
appropri
ate for
generati
ng
time boundary of
the project was
already passed.
After the pressure
and lobbying on the
issues from Citizen
Forum, Rose
Garden WSS is
extending about
5Kms of pipeline in
its catchment area
of ward 13 and 14
benefitting about
150 HH and the 1st
phase work of
Prembasti WSS
had already
started.
Informal meeting
and orientation to
the members of
Citizen Forum for
preparing the
document was
done.
Prepared 1 set of
ODF declaration
video document
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Justification for
Variance
pipeline in its
catchment area of
ward 13 and 14
benefitting about
150 HH and the 1st
phase work of
Prembasti WSS
had already
started.
Prepare
1
advocac
y plan
docume
nt of the
partner
organiza
tion
Prepare
1 video
docume
nt
Sharing on WAN’s
CSP was done
among the
representatives of
Lyaymha Pucha
and other Citizen
Forum members
during
Participatory
Review and
Reflection
Procress (PRRP)
programme on
March 29 by WAN
representative. All
the participated
representatives
agreed to prepare
the WASH
advocacy plan in
the coming FY.
Documentary
prepared on ODF
to influence the
stakeholders and
service providers
for their support on
ODF process in
the remaining
Wash advocay
plan document of
the partner
organization will
be prepared after
conducting the
capacity building
workshop on
strategy paper
development and
after the final
strategic
document of
Lumanti is
produced
NA
179
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Rehabilitate
d at least
one
institutional/
public
latrine by
Municipality
in 2010/11
upon the
lobby of
citizen’s
forum
Annual Total (Outputs)
Total
Progress To Date
Plan
awarene
ss and
influenci
ng LGs
and
concern
ed
stakehol
ders to
address
WASH
issues
targeting
ODF
and
world
water
day
campaig
n
Rehabilit
ate 1
institutio
nal/publi
c latrine
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Justification for
Variance
communities.
Citizen Forum is
lobbying with
municipality to
invest the budget
separated for
sanitation sector on
rehabilitating public
toilets, as the study
of the public
latrines in previous
year showed poor
condition of the
toilets.
Rehabilit
ate 1
institutio
nal/publi
c latrine
The public toilet
situated in Lion’s
Chowk was
rehabilitated by
Municipality
benefitting about
450 users daily.
The public toilet
was rehabilitated
based on the
situation analysis
report provided by
Citizen Forum
Bharatpur in
previous year.
Municipality had
mobilized the
caretaker to clean
the public toilets
after the request
from citizen forum.
Municipality had
separated NRs. 1.5
million for the
public toilet
rehabilitation.
The Public toilet
180
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Organize
debates,
coordination
and
interaction
meetings for
enhancing
improved
WaSH
facilities in
collaboratio
n with local
government,
sector
stakeholder
s, sector
actors
including
service
providers at
least at
municipal
level in by
2010/11
Annual Total (Outputs)
Total
Progress To Date
Plan
Organiz
e4
meeting
s (1 in
each
quarter)
among
the
stakehol
ders.
situated in Lion’s
Chowk was
rehabilitated by
Municipality
benefitting about
450 users daily.
Municipality has
separated NRs. 1
lakhs this year also
for natural resource
conservation.
As per the RCT
recommendation
Bharatpur
Municipality has
already developed
the primary action
plan for the
construction of
dumping site. The
site verification for
the dumping site
has completed and
waiting for the
approval from the
ministry.
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Conduct
1
coordina
tion
meeting
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
succeeded in
implementing the
schedule for
garbage collection
in the municipality.
Justification for
Variance
NA
Succeeded in
forming separate
environment desk
in Bharatpur
Municipality, which
helped citizens to
deal on sanitation
issues in the
municipality easily.
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
succeeded in
implementing the
schedule for
garbage collection
in the municipality.
Succeeded in
forming separate
environment desk
in Bharatpur
Municipality, which
helped citizens to
deal on sanitation
181
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Annual Total (Outputs)
Total
Progress To Date
Plan
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Justification for
Variance
issues in the
municipality easily.
At least 2
action
points
related to
WASH
sector acted
upon as per
RCT
recommend
ations and
as agreed
by civil
societies
and service
providers
A report on
the
compilation
Conduct
1 RCT
review
worksho
p and
dissemi
nate the
report
among
the
stakehol
ders
Follow
up
/interacti
on
meeting
s
Produce
1 report
on
As per RCT
recommendation
and Citizen
Forum’s continuous
lobby and follow up
municipality started
to separate Rs. 1
Lakhs budget for
natural resource
conservation every
year.
Municipality started
site verification for
the construction of
land fill site.
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
municipality
implemented the
schedule for
garbage collection
in the municipality
as recommended
by Citizen Forum.
Separate
environment help
desk had been
established in
Bharatpur
Municipality to help
citizens to deal on
sanitation issues in
the municipality
easily
Report compiling
the news cuttings
of WASH issues
Conduct
1 RCT
review
worksho
p and
dissemi
nate the
report
among
the
stakehol
ders
Follow
up
/interacti
on
meeting
s
Produce
1 report
on
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk)
was stopped and
municipality
implemented the
schedule for
garbage collection
in the municipality
as recommended
by Citizen Forum.
NA
Separate
environment help
desk had been
established in
Bharatpur
Municipality to
help citizens to
deal on sanitation
issues in the
municipality easily
Report compiling
the news cuttings
of WASH issues
182
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
of media
highlights
on sector
advocacy as
an evidence
of the output
of the
advocacy of
this project
A report on
annual
review on
the
achievemen
t in
addressing
the sector
blockage
issues at
municipal
level and in
materializin
g the
recommend
ations made
by Report
Card Test
results.
An updated
review
report on
RCT
results/reco
mmendation
s by
incorporatin
g the
identified
Annual Total (Outputs)
Total
Progress To Date
Plan
Reporting Quarter (Q4)
Plan
Progress in
Quarter
media
highlight
s of the
advocac
y and
influenci
ng work
and audio
programs produced
media
highlight
s of the
advocac
y and
influenci
ng work
and audio
programs
produced
Conduct
social
audit
and
submit
RCT
review
report to
the
concern
ed
WASH
stakehol
ders
Social audit of
Citizen Forum was
completed jointly in
RCT review report
dissemination
program. The
income and
expenditure,
activities performed
on WASH and
changes brought in
the municipality
was presented
transparently
among the
stakeholders. The
review report of
RCT was also
submitted to the
concerned
stakeholders to act
and to make
improvements on
the issues and
recommendations
made.
Conduct
social
audit
and
submit
RCT
review
report to
the
concern
ed
WASH
stakehol
ders
Conduct
1 RCT
review
worksho
p and
dissemi
nation
worksho
p.
The review report
of the RCT this
year showed poor
progress of both
the municipality
and NWSC.
Though
municipality had
addressed the
separation of
-
Social audit of
Citizen Forum was
completed jointly
in RCT review
report
dissemination
program. The
income and
expenditure,
activities
performed on
WASH and
changes brought
in the municipality
was presented
transparently
among the
stakeholders. The
review report of
RCT was also
submitted to the
concerned
stakeholders to act
and to make
improvements on
the issues and
recommendations
made.
-
Justification for
Variance
NA
NA
183
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
new sector
blockage
issues
related to
WASH
produced
along with
the
recommend
ed plan of
actions to
be
addressed
in next year
at municipal
level.
Assessment
on budget
tracking on
WASH
sector
conducted
for 2
consecutive
years and
report with
critical
analysis on
municipality’
s budget
allocation
produced by
2010/11.
Annual Total (Outputs)
Total
Progress To Date
Plan
Conduct
1
assess
ment on
budget
tracking
every
year
budget for resource
conservation and
rehabilitation of
public toilets in
some places as
recommended by
previous RCT,
citizens are not
satisfied with some
of the issues like
transparency
during budget
preparation,
provide access of
water to slums and
squatters, include
women in decision
making process,
should develop
long term policies
and strategies on
water, should
provide news on
water and
sanitation to
citizens through
local news papers
and FM regularly
etc…
The budget
analysis of two
consecutive years
2065/66 and
2066/67from the
budget tracking
report showed that,
the allocation had
increased in WASH
Sector.
The budget
separated in the FY
2065/66 are as
follows;
Water: 10 lakhs
Sanitation and
Health: 38 lakhs
Reporting Quarter (Q4)
Plan
Progress in
Quarter
-
The budget
analysis of two
consecutive years
2065/66 and
2066/67from the
budget tracking
report showed
that, the allocation
had increased in
WASH Sector.
Justification for
Variance
NA
The budget
separated in the
FY 2065/66 are as
follows;
Water: 10 lakhs
Sanitation and
Health: 38 lakhs
184
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Documents
produced by
citizen
forum on
the activities
commenced
to influence
sector
stakeholder
s following
the WASH
advocacy
plan and the
outputs
achieved.
Annual Total (Outputs)
Total
Progress To Date
Plan
Produce
1
docume
nt by
partner
organiza
tion at
the end
of the
FY.
Reporting Quarter (Q4)
Plan
Progress in
Quarter
The budget
allocated in the FY
2066/68 are as
follows;
Water: 3 lakhs
Sanitation and
Health: 1 crore 32
lakhs 50 thousand
The budget
allocated in the FY
2066/68 are as
follows;
Water: 3 lakhs
Sanitation and
Health: 1 crore 32
lakhs 50 thousand
The proposed
budget for the FY
2067/68 are as
follows;
Water: 49 lakhs 90
thousand
Sanitation and
Health: 1 crore 44
Lakhs
The proposed
budget for the FY
2067/68 are as
follows;
Water: 49 lakhs 90
thousand
Sanitation and
Health: 1 crore 44
Lakhs
Out of the total
budget allocated
municipality
disbursed and
utlilized about 40
lakhs in the FY
2065/66 whereas in
the FY 2066/67
nearly about 1
crore75 lakhs
budget had been
utilized.
The yearly news
“Swachcha Pani
(Clean Water)”
documenting the
advocacy and
influencing
activities is
published. The
news covered in
the publication are
some case studies,
news on water
quality of Nepal
and Nepal drinking
water quality
standard 2062 and
the news on the
Out of the total
budget allocated
municipality
disbursed and
utlilized about 40
lakhs in the FY
2065/66 whereas
in the FY 2066/67
nearly about 1
crore75 lakhs
budget had been
utilized.
The yearly news
“Swachcha Pani
(Clean Water)”
documenting the
advocacy and
influencing
activities is
published. The
news covered in
the publication are
some case
studies, news on
water quality of
Nepal and Nepal
drinking water
quality standard
2062 and the
Produce
1
docume
nt by
partner
organiza
tion at
the end
of the
FY.
Justification for
Variance
NA
185
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Annual Total (Outputs)
Total
Progress To Date
Plan
Reporting Quarter (Q4)
Plan
Progress in
Quarter
activities by Citizen
Forum Bharatpur.
Assessment
on
functional
linkages
established
with LGs
and other
sector
stakeholder
s at
municipal
level in
mobilizing
their
resources in
WASH
sector
conducted
to
understand
raising
voices of
citizens’ and
Citizen
Forum’s
advocacy
work for
access to
improved
WASH
facilities and
report
produced
after
critically
reviewed by
peers within
2010/11
An
evaluation
report
produced on
Citizen’s
Conduct
1
assess
ment
and
produce
report
Participatory
Review and
Reflection (PRRP)
report produced
and review and
evaluation of citizen
action program in
Bharatpur was
completed.
Conduct
1
assess
ment
and
produce
report
The PRRP program
was organized with
an objective to
learn and share the
good practices of
advocacy and
influencing groups
from different cities
and to document
the functional
linkages
established with
LGs and sector
stakeholders for
improved WASH
facilities.
Conduct
1
evaluati
on of the
Citizen
Review and
evaluation of citizen
action program in
Bharatpur was
completed.
news on the
activities by
Citizen Forum
Bharatpur.
Participatory
Review and
Reflection (PRRP)
report produced
and review and
evaluation of
citizen action
program in
Bharatpur was
completed.
Justification for
Variance
NA
The PRRP
program was
organized with an
objective to learn
and share the
good practices of
advocacy and
influencing groups
from different
cities and to
document the
functional linkages
established with
LGs and sector
stakeholders for
improved WASH
facilities.
Conduct
1
evaluati
on of the
Citizen
Review and
evaluation of
citizen action
program in
Bharatpur was
Review and
evaluation draft
report is in
process of
completion and it
186
Sectors
Key
Deliverable
s
(As
mentioned
in Project
Plan)
Action
programme
initiated by
Citizen
Forum in
Bharatpur
with
Lumanti’s
support to
understand
the efficacy
of the CA
programme
and
improvemen
t / changes
brought by
the project
in improving
WASH
governance,
delivering
improved
WASH
access/facili
ties and in
achieving
recommend
ations made
by RCT
through its
thorough
review and
assessment
by 2010/11
and
disseminate
d the report
within the
municipal
sector
stakeholder
s.
Annual Total (Outputs)
Total
Progress To Date
Plan
Action
program
by the
end of
this FY.
Reporting Quarter (Q4)
Plan
Progress in
Quarter
Action
program
by the
end of
this FY.
completed.
Justification for
Variance
will be presented
to Lumanti and
WAN before
finalization.
187
Indicative Project Outcomes – Refer to Project Plan Section 2, 3 and 4. (SMR & APR
only)
Note: Do not segregate Water, Sanitation and Hygiene in case of cross cutting projects, just put
WaSH objectives.
I.
Policy Influencing
Project
Project Indicators
Objectives
To strengthen
Citizen Forum
to
institutionalize
WASH
advocacy work
at both the
community and
city level
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
Citizen Forum’s
WASH advocacy
plan prepared in
2009/10 is updated
for coming 3 years
with its annual
review by the forum
members
Orientation provided
on WASH advocacy
plan to the members of
Citizen Forum in an
informal meeting.
Citizen Forum has
started drafting the
plan and assured to
discuss on the draft
with in Q3.
Establishing
functional linkages
with LGs and other
sector stakeholders
at municipal level
through improved
coordination and for
their resource
mobilization in
WASH sector for
improved WASH
facilities by 2010/11
The budget tracking
report of two
consecutive years
showed the increment
of the budget in the
WASH sector. These
resources are
mobilized in WASH
sector according to the
demand made by the
citizens. For eg; from
the FY 2010/11
Bharatpur municipality
2nd Half of this
Year
(Q3 & Q4)
Sharing on
WAN’s CSP
was done
among the
representative
s of Lyaymha
Pucha and
other Citizen
Forum
members
during
Participatory
Review and
Reflection
Procress
(PRRP)
programme
on March 29
by WAN
representative
. All the
participated
representative
s agreed to
prepare the
WASH
advocacy
plan in the
coming FY.
No such
definite action
plan on
sanitation
improvement
was found in
the
municipality.
Citizen Forum
had
demanded to
make
sanitation
188
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
started to separate Rs.
1 Lakh budget for the
conservation/rehabilitat
ion of natural water
resources in
coordination with
Citizen Forum and
other sector
stakeholders. It has
also started to
rehabilitate the public
toilets in the
municipality based on
RCT recommendations
and report submitted to
municipality on
situation of public toilet
of the municipality.
2nd Half of this
Year
(Q3 & Q4)
improvement
plan
segregating
action points
that needs to
be intervened
immediately
and action
points that
can be
intervened in
the future.
The review of
WASH policy
and
guidelines
was also
completed in
coordination
with
municipality
and
concerned
stakeholder’s.
No proper
documented
WASH policy
and
guidelines
was
presented in
the Meeting.
Municipality
together with
concerned
stakeholders
assured to
make proper
WASH policy
and to
gradually
update its
WASH policy
as per the
suggestions
provided.
However
189
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
2nd Half of this
Year
(Q3 & Q4)
municipality
had proposed
some
policy/strategi
es and
programs on
WASH. Eg:

Coordi
nation will be
done among
the I/NGOs,
TLOs and
chamber of
commerce
for the
management
of waste in
the core
areas of the
city.

Strate
gies to
declare no
open wastes
will be
applied in
certain areas
of the city.

Name
s will be
publicized
through local
FMs and
news
papers, who
throw wastes
in the public
places.

TLOs
will be
mobilized
actively to
declare
municipality
ODF and for
this
municipality
will
190
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Lobby local
government on
rehabilitation of
public sanitation
facilities by
Municipality in
2011/11 provide
evidence of
enhanced capacity of
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
Based on the situation
of public toilet report
submitted to
municipality by Citizen
Forum in previous
year, municipality has
started to rehabilitate
and reopen the public
toilets.
2nd Half of this
Year
(Q3 & Q4)
rehabilitate
remaining
public toilets
and the
management
and
operation will
be handover
under PPP
concept.
Municipality
will mobilize
mobile toilets
wherever
rehabilitation
of toilets
seemed
impossible
and the
place with
less area of
land.

For
the scientific
disposal of
waste
generated in
the
municipality,
land fill site
is proposed
to the
government
of Nepal
(Open place
in Jaldevi
Forest, Ward
no.11,
Bharatpur)
With the
continuous
lobby and
follow up from
Citizen
Forum,
Muncipality
had
rehabilitated
191
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
forum’s advocacy
work
2nd Half of this
Year
(Q3 & Q4)
the public
toilet situated
in Lion’s
Chowk
benefitting
about 450
users daily.
Similarly,
separate
environment
desk in
Bharatpur
Municipality
was
established,
which helped
citizens to
deal on
sanitation
issues in the
municipality
easily.
The
unmanaged
garbage
collection
centre at the
core centre of
the city
(Lion’s Chowk
and Shahid
Chowk) was
stopped and
municipality
implemented
the schedule
for garbage
collection in
the
municipality
as
recommende
d by Citizen
Forum.
To sensitize the Better services
Municipality and
Municipality
192
Project
Objectives
Project Indicators
service
providers on
the rights and
needs and of
the urban poor
for improved
and reliable
WaSH facilities
for sustained
practices
provided by 2010/11
when reviewed from
the situation of
service facilities
during FY 2006/07
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
NWSC are gradually
investing to address
the issues raised by
the citizens on WASH.
To declare municipality
ODF, Municipality has
assured citizen forum
to start rehabilitation of
public toilets soon. The
drinking water pipe
lines will also be
extended to provide
access to the un
served urban poor.
2nd Half of this
Year
(Q3 & Q4)
assured to
disburse and
utilize the
allocated
budget for the
FY in the
WASH sector
based on the
demand of
local
community by
mobilizing
and
consulting
with CBO’s
and WASH
stakeholders.
However
Citizen
Forum, civil
society
organizations
and media
persons
demanded for
maximum
utilization of
the WASH
budget and to
participate
them in the
periodic
meetings of
the
municipality,
so that timely
suggestions,
plans and
decisions can
be made
during the
meetings.
Municipality
had started to
collect the
garbage as
per the
schedule
193
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
2nd Half of this
Year
(Q3 & Q4)
developed in
coordination
with citizen
forum.
The public
toilets in
Balkumari
Sabjimandi
and Lilachowk
toilet near
Narayani river
came in
operation.
Likewise the
toilet in Lion’s
chowk was
rehabilitated
by
municipality
Established
separate
environment
desk in
Bharatpur
Municipality,
which helped
citizens to
deal on
sanitation
issues in the
municipality
easily.
Showing
different
administrative
and financial
problems, the
service
providers of
Rose Garden
WSS and
Prembasti
WSS are not
continuing
their projects
194
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
At least 2 action
points related to
WASH sector agreed
by civil societies and
service providers as
per RCT
recommendations
are acted upon
annually from
2010/11
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
2nd Half of this
Year
(Q3 & Q4)
despite the
time boundary
of the project
was already
passed. After
the pressure
and lobbying
on the issues
from Citizen
Forum, Rose
Garden WSS
is extending
about 5Kms
of pipeline in
its catchment
area of ward
13 and 14
benefitting
about 150 HH
and the 1st
phase work of
Prembasti
WSS had
already
started.
Bharatpur Municipality The
had started to separate unmanaged
the budget for natural
garbage
water resource
collection
conservation
centre at the
core centre of
the city
(Lion’s Chowk
and Shahid
Chowk) was
stopped and
municipality
implemented
the schedule
for garbage
collection in
the
municipality
as
recommende
d by Citizen
Forum.
195
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Update the RCT
result/recommendati
ons by reviewing
them and identifying
new WASH blockage
issues to be
addressed by service
providers
Ensure
effective
implementation
Based on the current
status of 4 key good
governance
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
The review report of
the RCT this year
showed poor progress
of both the municipality
and NWSC. Though
municipality had
addressed the
separation of budget
for resource
conservation and
rehabilitation of public
toilets in some places
as recommended by
previous RCT, citizens
are not satisfied with
some of the issues like
transparency during
budget preparation,
provide access of
water to slums and
squatters, include
women in decision
making process,
should develop long
term policies and
strategies on water,
should provide news
on water and
sanitation to citizens
through local news
papers and FM
regularly et
Though the progress
on good governance
principle was poor this
2nd Half of this
Year
(Q3 & Q4)
Separate
environment
help desk had
been
established in
Bharatpur
Municipality to
help citizens
to deal on
sanitation
issues in the
municipality
easily
-
Though the
progress on
good
196
Project
Objectives
Project Indicators
and
institutionalizati
on of 4 key
good
governance
principles at
municipality
and NWSC.
principles at
municipality and
NWSC, followings
are ensured by
2010/11:
 Good governance
principle
acknowledged by
service providers
 Increased
accountability of
service providers
by addressing
citizen’s concerns
on water issues.
 Increased
transparency
shown through
improved
communication of
service provider’s
plans and budgets.
 Increased
participation of
service providers in
community
activities.
Better services
provided by 2010/11
when reviewed from
the situation of
service facilities
during FY 2006/07
Ensure
increased
access to
improved water
facilities
Year –
1
(FY:
2008/0
9)
Allocation of budget
by the local
government is
increased in an
incremental trend in
WASH sector
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
year compared to
previous year,
Municipality had
acknowledged it and
established separate
environment desk to
deal on sanitation
issues.
Budget separated for
natural resources
conservation and
rehabilitation of public
toilets has been
started.
Similarly pipeline
extension and water
works in un served
areas has been started
2nd Half of this
Year
(Q3 & Q4)
governance
principle was
poor this year
compared to
previous year,
Municipality
had
acknowledge
d it and
established
separate
environment
desk to deal
on sanitation
issues.
Budget
separated for
natural
resources
conservation
and
rehabilitation
of public
toilets has
been started.
Similarly
pipeline
extension and
water works
in un served
areas has
been started
The budget
analysis of
two
consecutive
years 2065/66
and
2066/67from
the budget
tracking
report showed
that, the
allocation had
increased in
WASH
197
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Year –
2
(FY:
2009/1
0)
Achievements to date
1st Half of this Year
(Q1 & Q2)
2nd Half of this
Year
(Q3 & Q4)
Sector.
The budget
separated in
the FY
2065/66 are
as follows;
Water: 10
lakhs
Sanitation
and Health:
38 lakhs
The budget
allocated in
the FY
2066/68 are
as follows;
Water: 3
lakhs
Sanitation
and Health: 1
crore 32 lakhs
50 thousand
The proposed
budget for
the FY
2067/68 are
as follows;
Water: 49
lakhs 90
thousand
Sanitation
and Health: 1
crore 44
Lakhs
Out of the
total budget
allocated
municipality
disbursed and
utlilized about
40 lakhs in
the FY
2065/66
whereas in
the FY
198
Project
Objectives
Project Indicators
Year –
1
(FY:
2008/0
9)
Evaluation of
citizen’s action
program in Bharatpur
Municipality through
Citizen Forum to
understand the
efficacy of CF and
the project in
improving WASH
governance,
delivering improved
WASH
access/facilities and
in achieving
recommendations
made by RCT
through its thorough
review and
assessment by
2010/11
-
Year –
2
(FY:
2009/1
0)
-
Achievements to date
1st Half of this Year
(Q1 & Q2)
-
2nd Half of this
Year
(Q3 & Q4)
2066/67
nearly about 1
crore75 lakhs
budget had
been utilized.
Review and
evaluation
draft report is
in process of
completion
and it will be
presented to
Lumanti and
WAN before
finalization.
199
E. Partnership (refer to Project Plan – Sections 5)
-
Changes to existing key stakeholders and their roles
New collaborations, partnerships or stakeholders
Effectiveness, challenges, opportunity relating to partnerships
F. Resources (refer to Project Plan – Sections 6 & 7):
- Changes to Human Resource plan
- Financial Summary of the project
Qtr.
Original Budget
Approved
Revised
(MPB)
Budget
Budget
Q1
317,114
317,114
182,650.00
Q2
370,996
370,996
381,144.00
Q3
459,314
459,314
548,057.00
Q4
305,914
305,914
286,735.00
TOTAL
1,453,338
1,453,338
1,398,586.00
Expenditure
182,650.15
381,094.74
394,412.39
316,362.31
1,274,519.59
%
Uti.
100%
100%
72%
110%
91%
G. Field visits and Monitoring (refer to Project Plan – Sections 9):
G.1 Completed Visits:
Date
Visited by
(Project Team, PM&E
staff, HQ, WAN or
external agencies etc)
Purpose
(supervision, progress
monitoring, support visit,
process monitoring, guest
visit, case study,
documentation etc)
Key Feedbacks Received
(if any)
Reporting Quarter: Q1+Q2
21 – 24
June
Puspa Joshi
26 -29
June
Bishal Shrestha
Orientation on WaSH
programme & WaSH
Advocacy Plan, Action Plan
Sharing
Post Monitoring Visit and
CBME training
> Citizen Forum recommended
for a need of capacity building
training on preparing WaSH
advocacy plan.
> Citizen Forum should involve
in influencing local governments
for the smooth operation of
Jakhadimai WSS and Lanku
Bio-gas.
> UC’s should also proactively
explore the possible way out for
the constructed infrastructures
(Jakhadimai WSS) sustainability
and operation.
> Filling the CBME chart helps
UC’s and community to become
transparent and can gain
credibility in the work
200
accomplished.
August 9
-11
Bishal Shrestha
Post monitoring visit and
CHVs training
9th-11th
Septmeb
er
Bishal Shrestha, Sama
Bajra and Kabir
Rajbhandari
Joint monitoring visit with
WAN
17th –
20th
March
2011
Bishal Shrestha
Project Supports and Followups
> Media mobilization to highlight
the issues is an effective tool to
generate awareness among the
service providers and users.
Filling the hygiene monitoring
form is useful for CHV’s to keep
the records of H&H condition of
the community.
RCS shows the H&H situation
immediately, so it is useful to
gain trust and make community
change the behavior.
-
The Jakhadimai WSS has been
linked to the Municipality and the
later has agreed upon providing
financial supports for extending
pipelines of the system. The
WSS has planned to extend it
coverage to additional 50 HHs.
G. 2 Upcoming Visits for coming Quarter- likely or confirmed
N/A
G.3 Other PME Activities
NA
H. Water Quality
Annual Plan
(Water Sources & Points)
New
Exist
Rehab
Q1
Q2
Q3
Q4
TOTAL
12
12
Tested
(Water Sources & Points)
Exist.
New
Rehab
Remarks
12
12
I. Indicative Project Outcomes.
201
I.1 Service Delivery
Project
Project Indicators
Achievements for the FY 2010/11
Objectives
Water:
 At least 90% of the constructed More than 90% water structures in the 12
water facilities in the past project project intervened areas of Bharatpur
Municipality are sustained and in effective
areas are sustained
use.
 Community are aware of Water Communities in Bharatpur are aware
Quality and all the water points about the quality of drinking water and are
will have tested for its water adopting water purification method to
quality by 2010/11 regularly as purify the drinking water. Aaptari has been
declared as “Safe Drinking Water zones”.
per WAN’s WQ protocol.
WQ test result is disseminated and
communities are made aware on
purification of water at POU. Sensitization
and orientation on different methods for
purification of water is organized in
communities, wall paintings are done and
posters are distributed for raising
awareness on purification of drinking
water.
Sanitation:

Additional 10% people are further
benefited from the previous
construction works.

1 source conservation piloted

2 post monitoring studies in 12
communities
of
Bharatpur
Municipality
are
conducted
annually from 2009/10
 Identified Physical infrastructures
constructed by Lumanti in previous
years that require
improvement/rehabilitation and are
rehabilitated by 2010/11
A Water Safety Plan has been initiated in
Jakhadimai WSS in technical support from
ENPHO.
The Jakhadimai WSS has extended its
service to 125 HHs and is extending the
coverage to more 50 HHs in support from
the Municipality.
A piloting of conservation of natural water
source namely Tin Dhara was done by the
Municipality. The locals of the community
showed enthusiasm in the conservation
project and committed upon looking after
the conservation work. The municipality
has also agreed in allocating budget in
conservation of such water sources.
A post monitoring study of all 12
communities has been done and report
produced. Based on the recommendations
made, action plans is developed and work
in progress as per the plan.
All the HH latrines constructed in the
project period are in use.
Effective management system is in The saving groups in all 12 project
place for their sustained function in all intervened communities of Bharatpur have
the communities where sustainable been transformed with responsibility to
202
Project
Objectives
Hygiene:
Project Indicators
studies and post monitoring studies look after the sustained use of Water and
are conducted by 2010/11.
Sanitation structures installed in
communities during the project period.
The saving groups and cooperatives were
assigned with the new role owing to the
gaps posed by passive UC in most of the
communities. The new role of saving
groups and cooperatives was assigned as
per the recommendations from the
sustainability and post monitoring studies.
 At least 90% of the construction The sanitation facilities in all communities
works are sustained in the post are well used.
program areas by 2010/11.
Agreement has been signed with
 4 remaining communities are
Municipality to declare ODF communities.
declared ODF and have
Municipality is partnering with Lumanti to
community management system
in place to sustain the ODF status implement Municipality plan to declare
Bharatpur ODF City.
More than 80% of the residents of the
 80% of community (adult and
community have sound knowledge of 4
children) beneficiaries of all the
key hygiene messages and are found to
selected 12 communities have
be practicing The child clubs, women
knowledge of at least 4 key
savings group and youths of the
hygiene messages and
communicate them at critical times communities are active in disseminating
the hygiene messages.
when asked.
 Reduction in point prevalence rate
of diarrhea, skin and typhoid in
the target areas by 20%, 15% and
10% respectively with reference to
the collected baseline data
I.2 Capacity Building
Project
Project Indicators
Objectives
Water/Sanitati
on
Achievements for the FY 2010/11
The RCS results show that the point
prevalence rate of the diseases is below
the targeted rates.
Achievements in the FY 2010/11

Linkages developed with sector The Jakhadimai WSS has extended linkages with
stakeholders for sustainability the municipality. The municipality has agreed upon
supporting the system for the extension of its
of water supply system.
coverage.
 CBME system by the local users The Community has been practicing the concept of
committees
(UCs)
in
their CBME, yet the system could not be brought in
respective
areas
is institutionalized use as per the lack of active
institutionalized
through
its institution. The CBME has been carried out in
regular practice by 2011/12 communities in facilitation and supervision of CHVs.
provide evidence of enhanced The CHVs called meeting in presence of members
capacity in community monitoring of UCs and conducted the CBME process..
 Mechanism for collection of The mechanism of collecting and storing of O&M
Operation and Maintenance fund fund is regularized by the saving’s group and
is sustained in the community for cooperatives. The Amardeep Cooperative has
203
Project
Objectives
Project Indicators
the sustainability of WASH
infrastructures facilities even after
withdrawal of supports from
Lumanti by 2011/12
Achievements in the FY 2010/11
formed a policy to allocate Nrs 10 thousand annually
as O&M fund for that can be used for operation and
maintenance of Water and Sanitation structures in
the communities. The fund can be accessed by all
12 project implemented communities of Lumanti.
In Lankhu monthly Nrs 50 is collected from all
households (adding to Rs 200 for usage of bio-gas)
as ) O&M fund.

Hygiene:
Documented the best practices
and learning experiences
gathered from this project
within 2 years in relation to
water and sanitation by
2010/11.
 80% of beneficiaries practice
hygienic behaviour and practice
the following 4 key hygiene
messages:
i) Hand washing at critical times
ii)Management of human excreta
including child excreta
iii) Safe storage of water &
hygiene PoU treatments
iv) Safe food hygiene practice
practices, learning experiences etc.
in a report by 2010/11
 Community Health Volunteers
(CHVs) assigned under post
monitoring assessment & project
support are trained and remain
active in all the selected project
areas by 2010/11.
And, in Jakhidimai WSS monthly Nrs5 (adding to
monthly charge of Nrs 50) is collected as O&M fund.
Best practices and learning reports of the Bharatpur
is compiled and due in process to be completed.
The result of RCS shows that more than 80% of the
beneficiaries practice hygienic behavior and have
adopted 4 key hygiene messages. Due to which the
point prevalence rate of hygiene related diseases
has dropped. The personal hygiene as well as
environmental sanitation of the communities has
improved.
CHVs are active in spreading messages on safe
hygiene practices to communities.
 Hygiene behavioral assessment
was conducted annually using
RCS tools in conjunction with
CBME tools by CHVs with
technical support from Lumanti’s
PME officer and Health
Coordinator by 2010/11
RCS is being adopted by CHVs to assess hygiene
behavior.

A draft learning report has been produced.
Documented the findings of the
assessment on improved and
sustained hygiene behavioral
practices, learning experiences
etc. in a report by 2010/11
204
Policy Influencing
Project Objectives
To strengthen
Citizen Forum to
institutionalize
WASH advocacy
work at both the
community and city
level
Project Indicators
Citizen Forum’s WASH
advocacy plan prepared in
2009/10 is updated for
coming 3 years with its
annual review by the
forum members
Establishing functional
linkages with LGs and
other sector stakeholders
at municipal level through
improved coordination
and for their resource
mobilization in WASH
sector for improved
WASH facilities by
2010/11
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
Orientation provided on
Sharing on WAN’s
WASH advocacy plan to
CSP was done among
the members of Citizen
the representatives of
Forum in an informal
Lyaymha Pucha and
meeting. Citizen Forum
other Citizen Forum
has started drafting the
members during
plan and assured to
Participatory Review
discuss on the draft with
and Reflection
in Q3.
Procress (PRRP)
programme on March
29 by WAN
representative. All the
participated
representatives
agreed to prepare the
WASH advocacy plan
in the coming FY.
The budget tracking
No such definite
report of two consecutive action plan on
years showed the
sanitation
increment of the budget in improvement was
the WASH sector. These
found in the
resources are mobilized
municipality. Citizen
in WASH sector
Forum had demanded
according to the demand
to make sanitation
made by the citizens. For improvement plan
eg; from the FY 2010/11
segregating action
Bharatpur municipality
points that needs to
started to separate Rs. 1
be intervened
Lakh budget for the
immediately and
conservation/rehabilitation action points that can
of natural water resources be intervened in the
in coordination with
future.
Citizen Forum and other
sector stakeholders. It
The review of WASH
has also started to
policy and guidelines
rehabilitate the public
was also completed in
toilets in the municipality
coordination with
based on RCT
municipality and
recommendations and
concerned
report submitted to
stakeholder’s. No
municipality on situation
proper documented
of public toilet of the
WASH policy and
municipality.
guidelines was
presented in the
Meeting. Municipality
together with
concerned
stakeholders assured
205
Project Objectives
Project Indicators
Lobby local government
on rehabilitation of public
sanitation facilities by
Municipality in 2011/11
provide evidence of
enhanced capacity of
forum’s advocacy work
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
to make proper
WASH policy and to
gradually update its
WASH policy as per
the suggestions
provided.
Based on the situation of
With the continuous
public toilet report
lobby and follow up
submitted to municipality
from Citizen Forum,
by Citizen Forum in
Muncipality had
previous year,
rehabilitated the
municipality has started to public toilet situated in
rehabilitate and reopen
Lion’s Chowk
the public toilets.
benefitting about 450
users daily.
Similarly, separate
environment desk in
Bharatpur Municipality
was established,
which helped citizens
to deal on sanitation
issues in the
municipality easily.
The unmanaged
garbage collection
centre at the core
centre of the city
(Lion’s Chowk and
Shahid Chowk) was
stopped and
municipality
implemented the
schedule for garbage
collection in the
municipality as
recommended by
Citizen Forum.
To sensitize the
service providers
on the rights and
needs and of the
urban poor for
improved and
reliable WaSH
facilities for
sustained practices
Better services provided
by 2010/11 when
reviewed from the
situation of service
facilities during FY
2006/07
Municipality and NWSC
are gradually investing to
address the issues raised
by the citizens on WASH.
To declare municipality
ODF, Municipality has
assured citizen forum to
start rehabilitation of
public toilets soon. The
drinking water pipe lines
will also be extended to
Municipality assured
to disburse and utlize
the allocated budget
for the FY in the
WASH sector based
on the demand of
local community by
mobilizing and
consulting with CBO’s
and WASH
stakeholders.
206
Project Objectives
Project Indicators
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
provide access to the un
However
served urban poor.
Citizen Forum, civil
society organizations
and media persons
demanded for
maximum utilization of
the WASH budget and
to participate them in
the periodic meetings
of the municipality, so
that timely
suggestions, plans
and decisions can be
made during the
meetings.
Municipality had
started to collect the
garbage as per the
schedule developed in
coordination with
citizen forum.
The public toilets in
Balkumari Sabjimandi
and Lilachowk toilet
near Narayani river
came in operation.
Likewise the toilet in
Lion’s chowk was
rehabilitated by
municipality
Established separate
environment desk in
Bharatpur
Municipality, which
helped citizens to deal
on sanitation issues in
the municipality
easily.
Showing different
administrative and
financial problems,
the service providers
of Rose Garden WSS
and Prembasti WSS
are not continuing
their projects despite
the time boundary of
207
Project Objectives
Project Indicators
At least 2 action points
related to WASH sector
agreed by civil societies
and service providers as
per RCT
recommendations are
acted upon annually from
2010/11
Update the RCT
result/recommendations
by reviewing them and
identifying new WASH
blockage issues to be
addressed by service
providers
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
the project was
already passed. After
the pressure and
lobbying on the issues
from Citizen Forum,
Rose Garden WSS is
extending about 5Kms
of pipeline in its
catchment area of
ward 13 and 14
benefitting about 150
HH and the 1st phase
work of Prembasti
WSS had already
started.
Bharatpur Municipality
The unmanaged
had started to separate
garbage collection
the budget for natural
centre at the core
water resource
centre of the city
conservation
(Lion’s Chowk and
Shahid Chowk) was
stopped and
municipality
implemented the
schedule for garbage
collection in the
municipality as
recommended by
Citizen Forum.
The review report of the
RCT this year showed
poor progress of both the
municipality and NWSC.
Though municipality had
addressed the separation
of budget for resource
conservation and
rehabilitation of public
toilets in some places as
recommended by
previous RCT, citizens
are not satisfied with
some of the issues like
Separate environment
help desk had been
established in
Bharatpur Municipality
to help citizens to deal
on sanitation issues in
the municipality easily
-
208
Project Objectives
Project Indicators
Ensure effective
Based on the current
implementation and status of 4 key good
institutionalization
governance principles at
of 4 key good
municipality and NWSC,
governance
followings are ensured by
principles at
2010/11:
municipality and
 Good governance
NWSC.
principle acknowledged
by service providers
 Increased accountability
of service providers by
addressing citizen’s
concerns on water
issues.
 Increased transparency
shown through improved
communication of
service provider’s plans
and budgets.
 Increased participation
of service providers in
community activities.
Better services provided
by 2010/11 when
reviewed from the
situation of service
facilities during FY
2006/07
Ensure increased
Allocation of budget by
access to improved the local government is
water facilities
increased in an
incremental trend in
WASH sector
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
transparency during
budget preparation,
provide access of water to
slums and squatters,
include women in
decision making process,
should develop long term
policies and strategies on
water, should provide
news on water and
sanitation to citizens
through local news
papers and FM regularly
etc…
Though the progress on
Though the progress
good governance
on good governance
principle was poor this
principle was poor this
year compared to
year compared to
previous year,
previous year,
Municipality had
Municipality had
acknowledged it and
acknowledged it and
established separate
established separate
environment desk to deal environment desk to
on sanitation issues.
deal on sanitation
issues.
Budget separated for
natural resources
Budget separated for
conservation and
natural resources
rehabilitation of public
conservation and
toilets has been started.
rehabilitation of public
toilets has been
Similarly pipeline
started.
extension and water
works in un served areas Similarly pipeline
has been started
extension and water
works in un served
areas has been
started
The budget tracking
report of two consecutive
years showed the
increment of the budget in
the WASH sector. These
resources are mobilized
in WASH sector
according to the demand
made by the citizens. For
-
209
Project Objectives
Project Indicators
Evaluation of citizen’s
action program in
Bharatpur Municipality
through Citizen Forum to
understand the efficacy of
CF and the project in
improving WASH
governance, delivering
improved WASH
access/facilities and in
achieving
recommendations made
by RCT through its
thorough review and
assessment by 2010/11
Achievements in the FY 2010/11
1st Half of this Year
2nd Half of this Year
(Q1 & Q2)
(Q3 & Q4)
eg; from the FY 2010/11
Bharatpur municipality
started to separate Rs. 1
Lakh budget for the
conservation/rehabilitation
of natural water resources
in coordination with
Citizen Forum and other
sector stakeholders. It
has also started to
rehabilitate the public
toilets in the municipality
based on RCT
recommendations and
report submitted to
municipality on situation
of public toilet of the
municipality.
Review and
evaluation draft report
is in process of
completion and it will
be presented to
Lumanti and WAN
before finalization.
210