INS 332E - FOUNDATION ENGINEERING I DESIGN TERM PROJECT A housing estate in European Side of Istanbul is planned to be constructed. Figure 1 shows the project plan of the site layout. Each contractor is responsible for constructioning a building, a retaining structure and earthworks of a recreation area of a slope. According to the contract between the owner and the contractors, the contractor is only responsible for geotecnical design and construction of the foundation systems, in other words structural design of the foundation and the shoring system is out of the contractor’s responsibility. The contract value is 1500.000 TL and the contract duration is 30 days. The contractor should pay a penalty of 2.000 TL/day in the case of a delay. On the other hand, the contractor will receive an early finish bonus of 1.000 TL /day if the project is completed before the promised due date. Number of storeys and the superstructural loads for each building are given in Table 1. The unit prices are presented in Table 2. The productivity values of the activities are given in Table 3. Interaction of the adjacent buildings is ignored in scope of the design procedure. Analyze the project for two different engineering solutions. Discuss the alternatives according to the two criteria given; cost and time of construction. Choose the best alternative, explain the reasons for your choice and write a short method of statement in the discussion part of your report. Table 1: Number of Storeys and superstructural loads for the buildings Building Code B1 B2 B3 B4 B5 Properties 2B+G+19F 2B+G+19F 1B+G+19F 1B+G+19F 1B+G+19F Load per storey (kPa) 18 17 15 14 16 Table 2: Unit prices of the construction activities Activity ID Description Unit Unit Price (TL) 1 Bored Pile Φ65 cm* m 190 2 Bored Pile Φ80 cm* m 240 3 Bored Pile Φ100 cm* m 310 4 Raft Foundation (H=2m) ** m2 500 5 Jet Grout III Φ65 cm m 45 6 Stone Column Φ75 cm (Wet-Top) m 55 7 Dynamic Compaction m2 15 8 Reinforced concrete retaining structure m³ 200 9 Land acquisition m² 500 10 Excavation m³ 16 11 Earth fill m³ 14 *Regarding the unit prices of bored piles, drilling, installation of the reinforcement cage and pouring of concrete is included. **Regarding the unit price of raft foundation, preparation and installation of reinforcement and pouring of concrete is included. Table 3: Unit time of the construction activities Activity ID Description Unit Productivity 1 Bored Pile Φ65 cm* m/day 100 2 Bored Pile Φ80 cm* m/day 100 3 Bored Pile Φ100cm* m/day 100 4 Raft Foundation (H=1m) m2/day 150 5 Jet Grout III Φ65 cm m/day 150 6 Stone Column Φ75 cm (Wet-Top) m/day 300 7 Dynamic Compaction m2/day 400 8 Excavation m³ 150 m³/Day 9 Earth fill m³ 100 m³/Day 10 Reinforced concrete retaining structure m³ 40 m³/Day Report Content Week of Report Format Content 1. Introduction Write a description of the problem. delivery Draw a line on Figure 1 to show the place of your cross-section. 2. Soil profile Request the borehole data for the site from your instructor. Draw the layering of soil stratums, ground water elevation, etc. Analyze in-situ test data. Ask the instructors for necessary soil parameters Report all your findings, drawings and decisions (i.e. I decided to study 1st with BH1, BH2 and BH3 (borehole data and soil parameters..., etc Report because…). 3. Geotechnical Analyze stability of the slope given in the layout plan Engineering Perform stability checks of the retaining wall as will be shown in the plan Design (a) Report the calculations and drawings for the two acceptable engineering design (i.e. I choose …. as a draft design, but finally redesign by……….to achieve stability.) Write a method of statement for the two solutions 4. Geotechnical Decide two alternative engineering solutions for the foundation system. Engineering Analyze the amount of the settlement Design (b) Analyze the stability of the solutions Report the calculations and drawings for the two acceptable engineering design (i.e. I choose …. as a draft design, but finally redesign by……….to achieve stability.) Write a method of statement for the two solutions Final 5. Time Planning Determine the time required for each design. Report and Cost Determine the cost for each design. Accounting Discuss your solutions in terms of time and cost criteria 6. Conclusion Decide on a solution keeping the contract conditions in mind (i.e. According to the two criteria given, first cost was higher for …or according to 1st criteria, solution 1 is better or has less cost without paying any penalty. Therefore I choose…). 7. References Refer to all the guidelines, codes and standards used BH11 BH10 BH1 BH12 BH2 BH7 BH6 BH3 BH13 BH8 BH5 BH4 BH9 BH15 BH14 Figure 1. Layout Plan of the Construction Site