Amandla Resource Development & Associates: Incorporating Zululand Centre for Sustainable Development [ZCSD] Section 21 co & “Ecosystems cc”. Biomass Potential & Feedstock Availability for: A. “Renewables” Power-plant B. Torrefied Wood-pellets for Export C. Combination Export Pellets + Co-Generation Realising Africa’s natural potential through renewable resource management Structure of this Presentation: Who are Amandla Resources, Ecosystems and ZCSD & Associates? Biomass Types and Sources Calorific values of biomass Biomass costs to harvest Power demand in Richards Bay (for example) Biomass harvesting- Timber stumps into chips Biomass harvesting- Timber Brush into bundles Biomass harvesting- Timber Brush into chips Biomass harvesting- Sugar cane into bales Biomass logistics systems and costs Conclusions The way forward: * Feasibility Planning Costs Professional Team ARDC Amandla Resource s Rainbow Millennium Power Co Golder Associates (EIA) Ingonyama Trust Board (Land) TJM Capital (Financial Planning) Envirovest (Bamboo-Biomass development) MHP Geospace (GIS Planning) Sivest (Development planning) Stefanutti Stocks (Civil Engineering) Basil Read Energy (Equity) IED (SMME support) NCT (Timber Biomass supply logistics) CACS * Others (EPC contractors) Ecosystems (Community Development) ZPA (Commercial & Rural Cane Growers) Amandla Resource & Associates’ Primary Objectives (1): To source sufficient biomass tonnage to fuel green power generation plants and for wood-pellet green-fuel production To identify the best and most cost effective harvesting and loading/ bundling or on-site chipping system To identify a cost effective transport system To secure long-term biomass supply commitments To identify possible sites for power plants Identify power take-off customers: (Eskom/ private?). ARDC Biomass Supply-chain ARDC Broadened supply-chain Bio-Based Energy products Amandla Resource & Associates’ Primary Objectives (2): To assemble coherent feasibility reports and business plans for committed investors and clients, BioMass growers & Suppliers. To provide project preparation and implementation capacity. To Manage and Implement approved BioMass –related projects. To provide for operational staffing up-skilling and mentoring capacity. In Addition: Project Finance. R & D support. Skills Development. Community Development support programs. Best –practice technical selection. Who are: ZCSD & “Ecosystems”? An AMANDLA RESOURCES consulting affiliate, this Section 21 NGO is focussed on Community development, based in Richards Bay, KZN Province: Community sustainable development projects Training and skills transfer Integrated waste management Effective Resource utilisation Organic agriculture promotion Eco-village development Business plan development SMME development / mentoring. Zululand Center for Sustainable Development [ZCSD]: A not for profit Section 21 company Specialising in sustainable community development Identifying job creation initiatives leading to SMME Encouraging support for community-based initiatives Integrating BEE and community job creation opportunities (longer-term), into larger commercial projects Who are “Amandla Resources”? Website: Click here ARD has been operating in SA since1999 (O’Kelly Consulting cc) Specialising in physical and human resource development. Developing sustainable New Business & job creation initiatives. Creating profitable partnerships between business and Rural communities / community-owned resources in association with ZCSD (implementing agency) and its development associates. Align investors and appropriate project financing options to ensure project viability towards implementation BIOMASS TYPES /SOURCES: TIMBER BIOMASS: (eucalyptus, wattle, pine, Casuarina). Tons per hectare – (140 to 220t/ha over 7 to 25 years) Root-wood (6%) Stump-wood (5%) Foliage (5.2%) Bark (13.5%) Branch-wood (5%) Stem-wood (burnt timber, coppice) (67.1%). Sugar Cane Trash (leaves, tops): about 20% of whole-stick harvest. Whole stick green: 60 to 140 tonne/ harvest. Bagasse: Fibrous waste after juice extraction (30%) Timber Yields and Growth Period Timber – Eucalyptus Timber- Wattle & Casuarina Yield - 140 to 280 tons per hectare (MAI 13 to 28) Growth period - 7 to 10 years Yield - 100 to 140 tons per hectare (MAI 8 to 13) Growth period - 7 to 10 years Timber –Pine Yield - 140 to 220 tons per hectare (MAI 13 to 16) Growth period – 20 to 22 years Cane Yields and Growth Period Cane yields: Yield - 60 to 140 tons per Ha ( green stick only) Yield - 14 to 20 tons per Ha (17% Trash and tops) Yield - 18 to 42 tons per hectare (30% bagasse). Growth period: 12 to 24 months Depending on soil and climate Depending on irrigation water Depending on Variety (High Fibre ..or High Sucrose)? Calorific values of biomass Cane Tops 16.4 Cane Trash 17.4 Bagasse 18.1 Coal Wood Brush 14.4 - 17.4 Wood Chips 16.5 - 18.5 Charcoal Pyrolysis Gas 15 - 27.5 29.6 20 - 22 Biomass costs to harvest Description of biomass Estimated R/ton cost to Harvest Estimated payment to supplier Sub Total Transport Sub Total 050 km Profit @ 15% or handling fee Estimated Landed price /Ton Margin Timber stumps (chips) 225.0 0.0 225.0 48.0 273.0 41.0 R 314 15% Timber brush (bundles) 217.0 25.0 242.0 38.0 280.0 42.0 R 322 15% Timber brush (chips) 144.0 25.0 169.0 48.0 217.0 32.6 R 250 15% RBM (Indigenous bush clear) 183.0 60.0 243.0 38.0 281.0 42.2 R 323 15% Other( pallets, sawdust, wood off-cuts for sawmills) 100.0 25.0 125.0 38.0 163.0 24.5 R 187 15% Sugar cane trash (bales) 161.0 75.0 236.0 38.0 274.0 41.1 R 315 15% Garden waste (chips) 120.0 0.0 120.0 18.0 138.0 20.7 R 159 15% Timber brush from Mbazwane Forests (chips) 119.0 25.0 144.0 175.0 319.0 47.9 R 367 15% Average price R 280 Total Biomass GE at ZCSD: April 2009 Power demand: Example in Richards Bay, KZN. Company MW BHP Billiton 200 BHP Billiton Expansion projects 250 Tata Steel 150 Pulp United 55 Foskor 32 Archean India 80 Mauri British Foods 10 Total Power Required 777 Our Customers (R’Bay Area) Eskom direct into grid and power wheeled. Umhlatuze Municipality direct Richards Bay Minerals & BHP direct. Direct to large commercial projects in the IDZ and Other Adjacent locations R’Bay. (1.5% wheeling fee). Biomass harvesting: Timber stumps into chips Tonnage available R’Bay Area 177,000 Source Mondi, Sappi, DAFF. Amalala Group. Form of biomass Chips; (Chipped on-site) Distance from site 0-50km Biomass harvesting:Timber Brush into bundles Tonnage available 81,000 R’Bay Area Source Sappi and Mondi Amalala Group DAFF + Others Form of biomass Bundles Distance from site 0-50km Biomass harvestingTimber Brush into chips Tonnage available R’Bay area 180,000 Source Sappi, RBM Form of biomass Chips Distance from site 0-50km Biomass harvesting – Other” (pallets, garden waste, sawmill waste into chips): Tonnage available R’Bay Area 20,000 Source Local Sawmills, factories, municipality Form of biomass Chips/ shredded Distance from site 0-50km Biomass harvestingSugar Cane Tops & Trash into Bales Tonnage available R’Bay Area 586,000 to 1m tonne or more Source Felixton and Umfolozi cane growers, Mtunzini, Noodsberg areas Form of biomass Bales of sun-dried cane tops and postharvest trash Distance from site 0-80km but less than 30km is optimum Biomass logistics systems and related costs: (2009 costs). Cost per ton (0- 50km) R38.00/ton Cost per ton ( 150-200km) R170.00/ton Form of biomass Chips & Logs Distance from site 0 - 200km Explanation of the terms used Gum plantations [Saligna] Pine plantations [Mainly inland] Wattle [Mainly inland] Some (Coastal) Casuarina Plantations [RBM] Explanation of the terms used (contd): Coppice Brushwood Cane Trash Burnt Cane Equipment Used: Brush Bundler Equipment Used: Loaders & Forwarders Bell Timber Loader Bell Forwarder JD Forwarder Equipment Used: CBI Chipper Equipment Used: Cane /Maize stalk Baler Conclusions Post-harvest Biomass (underutilised) residues ,whole roundlog timber & some alien eradication materials are available locally. Smaller power plants of 20 MW to 50 MW are more viable. Electricity purchase agreements can now be concluded in all of SA (from National Grid/ Eskom and private enterprise). Other opportunities in Piet Retief area: (Mondi, Sappi & others = 200 000 Ha timber biomass to 1 Million tons available). Western , Eastern Cape & Mpumalanga Province also have under-utilised potential The Way Forward: Pre-feasibility funding required for: Require a time and motion study on the harvesting system needed for each type BioMass. Specialised Equipment available from Bell, CBI and John Deere also other suppliers Volvo etc Sign up biomass suppliers (contract) Conclude price of biomass supplied to site Conclude price paid to farmers/ plantation owners Select appropriate factory site to suit logistics / efficiency Conduct Scoping for Environmental Impact Assessment(EIA). Complete feasibility reports and Business plans. Secure adequate funding for initial assessment studies and plans for development clients Socio-Economic Benefits: 1 Type of Description Activity Per 12 & Opportunity (24) MWe Site Contracto Jobs per rs 12 MWe (24 MWe) EQUIP Cost Total (12 MWe) 51,000 Chainsaw contractors Labour Transport Biomass collection, loading and short haulage Chainsaw contractors cutting biomass into 2 & (4) small enough pieces for harvesting Tractor/Trailers for labour transport 2 6 & (12) 6 8,500 4 2 450,000 900,000 Loading biomass using tractor/trailer units 4 & (8) with own cranes. Moving 110 tons per day each to a central loading zone 80 & (160) 5 750,000 3,750,000 Biomass transhipping Loading the interlinks at the loading zones 3 & (6) and transporting the biomass to the power station; (6 units required) 6 & (12) 4 300,000 1,200,000 Long haul transportation Biomass chipping Hi-side Bulk Bin transporters (Horse & 3 &(6) Trailer) At some sites chipping will be required for 1 & (2) the reduction of bulk, prior to transporting to power plant 6 & (12) 3 1,500,000 4,500,000 12 & (24) 5 550,000 2,750,000 1 & (2) 4 & (8) 2 650,000 1,300,000 lot lot 1 3,250,000 3,250,000 2 700,000 Mechanics onsite for servicing and repairs Mechanics for machine repairs Administration Office infrastructure 4 & (8) Co-operative Planning Admin and Financial control, staff 1 & (2) Administration training and skills development Other Contingency 17 & Total Capex cost per job = R172 000 for 12 122 & Opportunities MWe 34 (24 MWe) 240 (24 MWe) 10% 12 MWe [24 MWe] 1,400,000 1,900,000 21,001,00 0 [42,000,000 ] Socio-Economic Benefits: 2 Core Renewable Energy (BTE) 12 MWe Power Plant: Category Function for 12 MWe Admin staff Office 2 3 Salaried staff plant Management 7 7 Skilled wage staff Shift supervisors & senior operators 20 24 Wage staff Plant operators 60 80 Total Direct Employees in Power Plant only Total excl raw material receiving, Preparation & storage 89 114 Add for Raw materials handling Supervision and operations 11 15 Safety & security Outsourced 7 9 TOTAL 12 MWe BTE Plant 117 138 For MWe 24 Socio-Economic Benefits: 3 Supply-side Logistics: In-field harvesting of Post-harvest residues 120,000 / 240,000 t.p.a. CATEGORY Explanation/ Description 12 MWe 24 MWe Administration Management 5 8 Field workers for windrowing 6/ Ha 21 Ha/ day 126 252 Machine Operators Collecting and bundling m/c operators 10 20 Machine Operators In-field chippers tractor-mounted with operators 5 *3 15 24 Delivery Transport Transportation rigs 7 with Driver and conductor each Operators 14 28 Service mechanics mobile workshops 2 *3 6 10 Labour transport for up to 200 personnel 5 units 5 8 Total Including Administration & Management 181 350 Socio-Economic Benefits: 4 DIRECT PERMANENT EMPLOYMENT [Future Bamboo Plantation]. Category Function Administration Senior planning/Management incl. horticulturalist Wage-staff Office Admin Plant Nursery Seedling Nursery Planting & Development Planting Teams 5 * 10 M/C Operators Land Preparation 5 * 2 Plant and Horticultural Maintenance Field staff 5 teams each 12 members teams Herbiciding, weed-control and Firebreaks 5 teams x 6 each Irrigation Installation and Maintenance 10 sets 5 each staff Maintenance workshops (Central) Lot 7 total Field workshops and maintenance 3 teams each 3 persons Harvesting M/C Operators 5 Ha/ day [5 teams] (with chain saws) Recovery & Loading of harvested logs 5 teams each with timber–loader drivers & Support crews Transport Rig operators 7 Rigs Other General workers TOTAL DEVELOPMENT, OPERATIONS & MANAGEMENT OF FUTURE “OWN”BIO-MASS PLANTATION FOR ARDC BTE POWER PLANT FEEDSTOCK SUPPLY Employees 3 5 24 50 10 60 30 50 7 9 15 15 14 10 302 Socio-Economic Benefits: 5 Job-creation summary [from “Amandla” BTE Projects]: Category Per 12 MWe CAPEX R’m 117 328 Cost/ new job R’000 2,800 Per 24 MWe CAPEX R’m 138 647 Cost/ new job R’000 4,688 Supply Side Logistics & harvesting Biomass Plantation 1200 ha 181 21 116 350 42 120 302 89 295 604 175 290 Total Direct Jobs 600 438 730 1092 864 791 Add Indirect Jobs (Source TH/CSIR)* Total Jobs per BTE 600 1092 1200 2184 Total ARDC Jobs (2X12 & 2X 24MWe) All BTEs - 2400 plus 4368 = 6768 Cost per Job 2400 4368 SMME / BEE Opportunities 12 24 SMME / BEE Jobs 112 224 BTE Plant Operation Projected Costs to complete Feasibility Planning reports Consortium at risk development Costs Labour Activities Detail see Annexure 12 Proposed PDA Budget (Development Phase REFIT) M/days Sub-Total 348 M/days R 2,505,600 281 Proposed PDA Budget (Post REFIT Decision Phase) M/days R 2,023,200 281 Total PDA Budget to SEP Selection M/days R 2,023,200 562 R 4,046,400 Other Direct Costs Subsistence & Travel Local Travel for ARD Consortium Members Overseas travel Printing & related, etc Sub-Total R64,400 R174,000 R96,400 R270,400 R0 R190,000 R190,000 R380,000 R20,000 R60,000 R60,000 R120,000 R 84,400 R 424,000 R346,400 R770,400 R600 R200,000 R200,600 R800,000 R800,000 Subcontracts 1 Golder - EIA Scoping 2 Golder EIA & Decision making 3 Legal advisor R100,000 R500,000 R600,000 4 Financial and SEP Advisor R200,000 R500,000 R700,000 5 Indian Bamboo Fuel Specialist R100,000 R50,000 R150,000 6 Technology and EPC Advisor R100,000 R50,000 R150,000 R200,000 R200,000 R250,000 R350,000 7 Grid connectivity - RT 8 Water Supply Consultant R100,000 9 Geotechnical drilling & report Sub-Total R 600,600 R300,000 R300,000 R 2,850,000 R 3,450,600 Other Pr and Marketing Sub-Total Accumulated Total Project Development fund Audit 3% Contingency 5% 15% EIA Contingency DF Study Grand TOTAL EXCL Vat R20,000 R40,000 R40,000 R80,000 R 20,000 R 40,000 R 40,000 R 80,000 R 2,610,000 R 3,087,800 R 5,259,600 R 8,347,400 R 92,634 R 157,788 5% R 154,390 15% R 2,610,000 5% R 262,980 R 8,347,400 5% R 417,370 R 90 R 120,000 R 237,384 R 3,242,280 R 5,642,580 R 9,002,154 ARD Consortium request to IDC FOR Development funding up to SEP Selection : 50% R 4,501,077 The End www.amandlaresources.com Original data / graphics by Gavin Eichler : General Manager ZCSD 2009