DUE GlobBiomass Progress Report – month/year Prepared by: WP 1000: User Requirement Engineering WP Start date: KO WP End date: KO+3 (15.04.20015, defined at KO 26/03/2015) Deliverables D1: User Requirements Document (URD) D2: Product Specification Document (PSD) Status per deliverable at start of reporting period: In progress This month executed: A B C Progress towards Objectives / Achievements made: This quarter executed: (for quarterly report only) Please write a short summary about the whole activities in the first quater. Partners involved name Input of partner A B C Deviations : Corrective Actions : Actions for next month : A B C Percentage of WP completion: X% 1.1. Critical Issues GlobBiomass Vol. 0.1 Page 2/2 Uni Jena – Dept. Earth Observation Monthly Report January 2015 Date 8-Feb-16 PROJECT: GLOBBIOMASS PHASES: 1-3 WP REF: 1000 WP Title: User Requirement Engineering Sheet of Contractor: WU Issue Ref WP Manager: Martin Herold Issue Date Contributing Partners: Uni Jena, Uni Sheffield, IIASA Start event: KO Planned Date: K0 End event: K+3 Planned Date: K0+3 Objectives: Provide critical analysis and consolidation of preliminary User Requirements (Annex 2) taken into account needs of stakeholders, capacity of new remote sensing instruments and technologies, and current knowledge on forest ecosystems’ structure Harmonize the major definitions and classification schemes to be used in the global and regional products Develop a solid and consistent description of the RS products to be implemented during the project life time Outline the prospective research needs for further developments of integrated methodologies for remote sensing assessment of major ecological indicators of ecosystems (biomass, NPP etc.) Inputs: - Statement of Work Results of preliminary User Requirements (Annex 2) Technical proposal of the Globbiomass project Properties of existing and perspective RS instruments Model Knowledge of research results on forest biomass structure in different biomes Tasks: o Provision of commonly accepted Glossary, Definition of Terms and Classification schemes related to the objectives of the Project o Systems analysis, harmonization, grouping and standardization of the requirements of the user groups o Specification of reliability and accuracy requirements o Description of biomass estimation products to be developed o Case-study for Russian forests on advanced future development of RS methodology of biomass assessment (partitioning of biomass in components, assessment of NPP) Outputs: Results of the above tasks will be presented in Deliverables - User Requirements Document - Product Specification Document - Perspective problems of future research on integrated biomass assessment Planned effort in man-hours: 346