Sanders Brothers Electric, Inc. Introduction: Sanders Brothers Electric, Inc. was founded in 1994 as Sanders Electric, and with the addition of partners in 1995, the name was changed to Sanders Brothers Electric, Inc. Structure: Sanders Brothers Electric, Inc. is a tightly held corporation with three stockholders to which all play a major role in our daily operations. With a staff of one estimators, One Electrical Construction Manager, three Project Managers one Purchasing/Tracking Agent, one CFO/Office Manager, one Accounts Payable Clerk, one Administrative Assistant/Receptionist, one Warehouse Man, and a total staff of 50 to 110 (varying with workload). We specialize in Commercial, Industrial, Fire Alarm, Health Care Facilities, Industrial Controls and Building HVAC Controls. We perform as Prime Contractor to State, City, County, U. S. Government and Private Enterprise. We perform as Subcontractor to General Contractors and to Subcontractors. Sanders Brothers Electric takes pride in each project that we have the opportunity to participate in. Our goal is customer satisfaction at the highest quality level possible. We offer a great product expedited in a timely manner at the most affordable price available. Sanders Brothers Electric, Inc. is licensed throughout the state of Florida, Alabama, Mississippi, and Georgia. The majority of our work is localized in the Northwest Florida area, as well as Southeast Alabama. Principles: Edward J. Sanders, President / Stock Holder Thomas G. Sanders, Vice President / Stock Holder Gary A. Garza, Secretary / Treasurer / Stock Holder Field of Expertise: Commercial, Industrial, Fire Alarm, Health Care Facilities, Industrial Controls, and Building HVAC Controls. About 30% of our work is HVAC Controls and Industrial Controls, 70% being Electrical (Division 16000) with 20% of Electrical being Health Care Institutions. Experience: Our Experience includes Design/Build and Competitive Bid Market. Projects range from $1,000.00 to excess of $3,000,000. We have 40 to 55 projects ongoing at any one time, with 25% being Military Projects. Project Types: Small Additions/Renovations, Large Plants, Commercial, Retail Stores, Health Care, Hospitality, Education, New Construction to Occupied Multi-Story. MISSION STATEMENT: “To do more than is expected for client, project and community” Purpose: Sanders Brothers Electric exist to provide our Customers with the best service while producing the highest quality of electrical installation possible. We deliver a level of service unparalled in the industry. We provide the measure of customer satisfaction that builds lasting relationships with our clients. For us exceeding customer expectations is more than a goal or philosophy; it is our daily way of life. Philosophy: To give our Customers the best value for their money and satisfy their needs. To cultivate new Customers by establishing a reputation for honesty and integrity. To recruit, develop and train a strong, knowledgeable employee base. To promote from within. To encourage innovation and creativity in the electrical construction industry. To create teamwork by treating all members of the company with the greates personal respect under all cercumstances. To keep the company closely held and to operate at a profit. Hyatt Place - Airport & 12th Pensacola, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 83,076 sq ft 127-room Hyatt Place Hotel Pensacola, FL. Which features convenient access to the Pensacola Gulf Coast Regional Airport. The 127 room Hyatt Place hotel is physically connected to the Airport. Hyatt Place brings the authentic hospitality for which Hyatt is known to the upscale select-service category. Inspired by multitasking travelers’ 24/7 lifestyle, Hyatt Place combines stylish design, practical amenities, forward-thinking technology and purposeful service so guests can remain connected and productive while traveling. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Robins & Morton Group in the construction of this facility. Sanders Brothers Final Contract: $824,141.60 General Contractors Project Cost: 11,758,394.00 Completion Date: March 2013 Holiday Inn Resort Hotel Destin West Fort Walton Beach, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. is the Electrical Contractor on this 152-room Holiday Inn Resort Hotel Destin West, Fort Walton Beach, FL. which features 16 family suites with kids rooms and gaming systems, supervised children’s programs, and an arcade. The Hotel lobby and Gulf front room balconies will offer expansive views of the emerald waters of the Gulf of Mexico. The hotel will also offer a Gulf front swimming pool outfitted with a lazy river and tiki bar as well as 2500 sq ft of meeting space. As the Electrical Contractor, the Sanders Brothers Electric team is working closely with the General Contractor dck North America, LLC. in the construction of this facility. Sanders Brothers Contract: $1,037,203.00 General Contractors Project Cost: $25 million Completion: Spring 2014 Hilton Garden Inn Pascagoula, MS General Scope of Construction Project: Sanders Brothers Electric, Inc. is the Electrical Contractor on this 119-room Hilton Garden Inn Pascagoula, MS. which features 119 rooms, an expansive lobby, and convention and meeting spaces. As the Electrical Contractor, the Sanders Brothers Electric team is working closely with the General Contractor Case Construction, LLC. in the construction of this facility. Sanders Brothers Contract: $905,969.00 Completion: December 2013 Hampton Inn & Suites Orange Beach, AL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 190,214 sq. ft. 160-room Hampton Inn & Suites Orange Beach, AL which features 118 gulf front rooms, an expansive lobby, a breakfast buffet and outdoor bar. The First floor features over 4,000 square-feet of meeting space, overlooking the pool and deck and the Gulf of Mexico. The second floor features a unique fitness center with a spectacular view of the ocean. The pool area includes an indoor/outdoor pool and hot tub. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Robins & Morton Group in the construction of this facility. Sanders Brothers Final Contract: $1,327,194 General Contractors Project Cost: $15,275,882 Completion: April, 2011 Holiday Inn Pensacola Beach, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 156,218 sq. ft. 206-room Holiday Inn Resort on Pensacola Beach which features 126 gulf front rooms, an expansive lobby, a restaurant, and outdoor dining patio. The second floor features over 10,000 square-feet of meeting space, including a large 3,000 square-foot balcony overlooking the pool deck and the Gulf of Mexico. The second floor also features a unique fitness center with a spectacular view of the ocean. The pool area includes a lazy river, waterfall, splash pad, pool bar, and hot tubs. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Robins & Morton Group in the construction of this facility. Sanders Brothers Final Contract: $1,952,010 General Contractors Project Cost: $21,000,000.00 Completion: February, 2011 Hilton Garden Inn, Pensacola Beach, FL. (17) Story Tower/Condominium Hotel Addition General Contractor: McCrory Building Company, Inc. Seawinds Condominiums, Orange Beach, AL. One (20) Twenty Story Condominium with (6) six story amenities building General Contractor: McCrory Building Company Hilton Garden Inn, Pensacola Beach, FL. Complete electrical installation of new 7-Story Hilton Hotel & Meeting Facility General Contractor: Greenhut Construction Co., Inc. Adagio Condominiums, Santa Rosa Beach, FL. Multi- Building Condominiums with Amenities Building General Contractor: Brasfield & Gorrie, LLC Cancer Center at Sacred Heart Pensacola, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 95,000 sq. ft. Medical Office and Cancer Treatment Spaces. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Greenhut Construction in the Design/Build of this facility. The new building is focused on the patient experience as well as operational efficiencies for medical staff and visitors. The ground floor has a large lobby, two linear accelerator vaults for radiation treatment, a CT scan room, and other medical spaces designed for cancer treatment. The second floor is comprised of medical treatment rooms, a large waiting area that overlooks the first floor lobby and a large infusion room for treatment of up to 38 people at one time. The third floor consists mostly of medical offices and conference rooms. The fourth floor is for physician suites. This building adjoins and compliments the adjacent Airport Medical Park facility. Sanders Brothers Final Contract: $1,910,800.15 General Contractors Project Cost: $16,828,336.00 Completion: December 2009 Sacred Heart on the Emerald Coast Birthing Center Sandestin, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 24,000 sq. ft. facility. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Greenhut Construction in the construction of this facility. The Birthing Center includes four labor and delivery suites, six postpartum rooms and two C-section surgical suites. Sanders Brothers Final Contract: $1,749,490.19 Completion: August 2007 Sacred Heart on the Gulf Port St. Joe, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 55,000 sq. ft. 19-Bed Hospital for Sacred Heart Health Systems. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Greenhut Construction in the construction of this facility. The new building is focused on the patient experience as well as operational efficiencies for medical staff and visitors. In addition to the 19 patient rooms, the facility includes two Trauma Resuscitation Rooms, and Operating Room, four Post Recover Acute Care Units, CT Scanner, X-Ray, Fluoroscopy, and lab and Pharmacy spaces. The hospital also includes a full service cafeteria and kitchen with commercial-grade appliances. In addition to the 55,000 sq. ft. hospital, this project also includes a 5,000 sq. ft. Central Energy Plant on site. Sanders Brothers Final Contract: $2,085,636 General Contractors Project Cost: $22,903,270.00 Completion: December 2009 UWF School of Science & Engineering Pensacola, FL. General Scope of Construction Project: Sanders Brothers Electric, Inc. was the Electrical Contractor on this 94,000 sq. ft. facility. As the Electrical Contractor, the Sanders Brothers Electric team worked closely with the General Contractor Greenhut Construction in the construction of this facility. Among the building’s features are classrooms designed for a global, technological society, with prototype robot fabrication and testing laboratories, laser and nano technology labs, the world’s largest 3D virtual reality simulator or “Holodeck”, and a glass-clad four-story Atrium that will place science on public display. The south stairwell was designed to receive photovoltaic glass panels which will produce 3,906 watts to power a robot that will give tours on the facility. Sanders Brothers Final Contract: $2,736,590.45 General Contractors Project Cost: $22,210,282.00 Completion: December 2009 SANDERS BROTHERS ELECTRIC, INC. LICENSE # QB0009051 INDUSTRIAL, COMMERCIAL, HEALTH-CARE, FIRE ALARM, ELECTRICAL SERVICE 8195 KIPLING STREET – PENSACOLA, FL, 32514 PHONE: (850) 857-0701 - FAX: (850) 484-6084 COMPANY PROFILE Company Name: Sander Brothers Electric, Inc. Street Address: 8195 Kipling Street Pensacola City Mailing Address: Phone: Contact/Title: Phone: Contact/Title: Phone: Website: Florida 32514 State Zip Same As Above 850-857-0701 Edward Sanders – President 850-857-0701 Eugene Cates - Estimator 850-857-0701 Fax: 850-484-6084 Email: eddie@sanderselectric.net Fax: 850-484-6084 Email: eugene@sanderselectric.net Fax: 850-484-6084 sanderselectric.net Bond / Insurance Bond Capacity: Single Bonds in excess of $4,000,000,.00 and total aggregate programs exceeding $10,000,000.00 General Liability Insurance Limits: General Aggregate: $2,000,000.00 Products – Comp/Op Agg: $2,000,000.00 Each Occurrence - $1,000,000.00 Personal & Adv. Injury - $1,000,000.00 Med. Exp. (any one person) - $10,000.00 Damage to Rented Premises (each occurrence) - $300,000.00 Umbrella Policy: Each Occurrence - $10,000,000.00 Aggregate - $10,000,000.00 Trades that this company is interested in Bidding: Electrical. Field of Expertise; commercial, industrial, Fire Alarm, Health Care Facilities, Industrial Controls and Building HVAC controls. Years In Business: 19 Type of Company: Corp. Sole Proprietor Joint Venture State of Incorporation: Florida Date of Incorporation: 01/1995 Contractor’s License No: EC0001735 State: FL Federal ID Number: Other Expiration: 08/31/2010 59-3345773 Company Officers A. Edward Sanders President B. Thomas Sanders Vice President C. Gary Garza Sec/Treasurer . Company Currently Employs: Office Staff: 13 Field Supervisory: 11 Temporary Labor: 8 Current Number of Employees: 76 Average Number of Employees for the last 3 years? 88 This company has never petitioned for bankruptcy, failed in business, defaulted or been terminated on any contract awarded. No Owners, Officers or Major Stockholders of this company are currently, nor has ever been involved in any arbitration or litigation. This company has never failed to meet warranty obligations. There are no outstanding claims or judgments or claims against this company. Workers Compensation Experienced Mod Rate for the Past Three Years: 2010: .90 2011: .90 2012: .81 Sanders Brothers Electric, Inc, is a Drug Free Workplace Sanders Brothers Electric, Inc. is committed to providing a safe working environment, with a written safety plan, and monthly safety incentives. Average Volume of work the last three years: A. 2010: $ 6 Mil B. 2011: $ 6.1 Mil C. 2012: $ 4.8 Mil Please see attachments of: Partial List of Work in Progress Partial List of Past Performance Pre-Construction Team: David A. Deriemacker – Electrical Construction Manager Responsible for managing the project from beginning to end; RFI process, evaluation response and submittal, including site survey and assessments, develop project scopes and cost estimates. Requisitions, regular reporting and status meeting, change order process; including negotiation and ongoing management of impact of proposed changes on cost, schedule and deliverables. Ensures all compliance with all procedures, rules, building codes, regulations, ordinances, and laws related to construction project. Thomas Sanders – General Superintendent/Safety Director Oversees Quality Control – plans and execute project, as well as site supervision. Acquiring resources and coordinating efforts of team members third-party contractors or consultants in order to deliver project according to plan. Edward Sanders – General Superintendent Responsible for direct day to day management of crew and electrical tradesman – schedule work assignments, monitor progress, order inventory materials, and complete all reporting to clients and Project Managers. Ronald Utley – Project Manager Under direct supervision of Electrical Project Manager – communication/coordination with General Contractor, interaction with site personnel, organization and control of documents, labor & material tracking, submittals, assist with budget process, review electrical layouts, price change orders, and attend job meetings. Thomas Burkart – Project Manager Under direct supervision of Electrical Construction Manager communication/coordination with General Contractor, interaction with site personnel, organization and control of documents, labor & material tracking. Review electrical layouts, price change orders, and attend job meetings. For more detailed information of our Preconstruction Team please refer to the attached résumé’s in the SBE Prequalification Package. General Contractor Reference List: Greenhut Construction Co., Inc. 23 South “A” Street Pensacola, FL. 32504 (850) 433-5421 Mickelson Construction Services, Inc. P O Box 17046 Pensacola, FL. 32522 (850) 432-9954 Robins & Morton Group 400 Shades Creek Parkway Birmingham, AL. 35209 (205) 870-1000 Total Construction Co. P O Box 6398 Pensacola, FL. 32503 (850) 478-4761 Comfort Systems USA (SE), Inc. P O Box 30529 Pensacola, FL. 32529 (850) 484-4999 Case Construction, LLC 56 Midtown Park West, Suite A Mobile, AL. 36606 (251) 338-2400 Dck Worldwide One PPG Place 27th Floor Pittsburgh, PA. 15222 (414) 384-1444 SBE Pre-Construction Team David A. Deriemacker – Electrical Construction Manager Responsible for managing the project from beginning to end; RFI process, evaluation response and submittal, including site survey and assessments develop project scopes and cost estimates. Requisitions, regular reporting and status meeting, change order process; including negotiation and ongoing management of impact of proposed changes on cost, schedule and deliverables. Ensures all compliance with all procedures, rules, building codes, regulations, ordinances, and laws related to construction project. 75% of time is dedicated to project. Thomas Sanders – VP/General Superintendent/Safety Director Oversees Quality Control – plans and execute project, as well as site supervision. Acquiring resources and coordinating efforts of team members third-party contractors or consultants in order to deliver project according to plan. 100% of time is dedicated to project. Edward Sanders – President / General Superintendent Responsible for direct day to day management of crew and electrical tradesman – schedule work assignments, Monitor progress, order inventory materials, and complete all reporting to clients and Project Managers. 100% of time is dedicated to project. Ronald Utley – Project Manager Under direct supervision of Electrical Project Manager – communication/coordination with General Contractor, interaction with site personnel, organization and control of documents, labor & material tracking, submittals, assist with budget process, review electrical layouts, price change orders, and attend job meetings. 75% of time is dedicated to project. Thomas Burkart – Project Manager Under direct supervision of Electrical Construction Manager – communication/coordination with General Contractor, interaction with site personnel, organization and control of documents, labor & material tracking. Review electrical layouts, price change orders, and attend job meetings. 75% of time is dedicated to project 5926 Independence Drive Milton, FL 32570 (850) 857-0701 Work (850) 484-6084 Fax Eugene P. Cates Summary of Qualifications Extensive experience in electrical estimations including but not limited to Government Contracts as well as Private Industry with estimations done on jobs in excess of 1million dollars. Analyze blueprints, specifications, proposals, and other documentation. Prepare time, cost and labor estimates for products, projects or services. Applying knowledge of specialized methodologies, techniques, and principle processes. Review data to determine material and labor requirements and prepare itemized lists: Compute cost factors and prepare estimate management purposes such as planning, organizing and scheduling when preparing bids, selecting vendors or subcontractors and determining other effectiveness. Conduct special studies to develop and establish standard cost and related cost data or effect cost reductions (scope of work). Consult with clients, vendors or other individuals to discuss and formulate estimates and resolve issues specific to the work according to particular service performed, type of product manufactured, or phase of work involved, such as tool and fixture cost, production costs, construction costs, or material cost. Experienced in Design and Build, Photographic Imaging, Construction Management, IAS Inspection, Engineering Electrical, Mechanical, Plumbing, Structural, Painting and writes contracts for the government. Widest estimation program, use of RS Means to determine cost estimates. Maximo program and legacy numbers, CITRIX, Microsoft, Excel, AutoCAD, NEC, ASHRAE, SMACNA, ASTM, NAVFAC, Safety, EPA, DEP and Corps of Engineer Specs. Professional Experience 12 Years Estimator / Purchasing Agent / Project Manager / Engineering Tech , 4 years sales, 5 years filed work Jan. 2004 -Hill/Griffin Joint Venture – Planner / Estimator –/ NAS Pensacola, FL Oct. 2002 – Dec. 2003 - Prime Electrical Company – Planner/ Est. Bayminette, AL Oct. 1998-Sept. 1998 - Armstrong Electric,- Estm/Project Manager Pensacola, FL Jan. 1994 – Sept 1998- WESCO Distribution, Inc.-Sales Contractor Pensacola, FL Feb 1991 – Dec 1993 – Hardy Electric – Estimator/Project Pensacola, FL C 8190 Kipling Street Pensacola, FL. 32514 (850) 476-3642 Home (850) 857-0701 Work (850) 484-6084 Fax David A. Deriemacker Summary of Qualifications Project Manager / Superintendent with 38 + years of electrical experience. Background in Heavy Industrial work, Hospitals, Commercial, and Government Jobs. Professional Experience 09/1999 – Present Sanders Brothers Electric, Inc. Sr. Project Manager / Electrical Construction Manager 08/1966 – 09/1999 Baroco Electric Const. Company Senior Project Manager Pensacola, FL Pensacola, FL Completed Projects Orange Park General Hospital, Orange Park, FL - Estimated $2 Million Maintenance & Repair Facility, Jacksonville, Naval Air Station, FL. $500,000.00 Armament Facility, Eglin Air Force Base, FL - Estimated 1.5 Million Eglin Office Facility, Eglin Air Force Base, FL – Estimated $650,000.00 Winn Dixie, Gulf Breeze, FL – Estimated $150,000.00 Winn Dixie, Innerarity Point, FL – Estimated $175,000.00 Winn Dixie, Cantonment, FL – Estimated $200,000.00 K-Mart, Gulf Breeze, FL – Estimated $250,000.00 Separation Plant, Delisle, MS – Estimated $200,000.00 Greyhound Park, Pensacola, FL. – Estimated $125,000.00 Stone Container, Cantonment, FL - $300,000.00 Coast Guard Station, Destin, FL - $275,000.00 Central Energy Plant , SHH, Pensacola, FL – Estimated $1.1 Million Electrical Seawinds Condominiums, Orange Beach, AL. – Estimated $1.9 Million Electrical Adagio Condominiums, Blue Mountain Beach, FL Estimated 2.8 Million New Hilton Garden Inn Hotel, Pensacola Beach, FL – Estimated $1.4 Million Inn at Summerwind Phase I, II, & III, Navarre Beach, FL – Estimated 1.8 Million Forest General Hospital, Hattisburg, MS – Estimated $2 Million Jones County Hospital, Laurel, MS – Estimated $2 Million Wayne General Hospital, Waynesboro, MS – Estimated $2.5 Million Ambulatory Care, Brookwood, AL. – Estimated $1.5 Million St. Vincent Hospital Phase II, Birmingham, AL. – Estimated $3 Million Children’s Hospital Addition, Birmingham, AL. – Estimated $2 Million East End Hospital, Birmingham, AL. – Estimated $3 Million Walker County Medical Center, Jasper, AL. – Estimated $3 Million York Hospital, York, PN – Estimated $8 Million Augusta Medical Center, Fisherville, SC – Estimated $5 Million Valley Baptist Medical Center, Harlington, TX – Estimated $3.5 Million Self Memorial Hospital, Greenwood, SC – Estimated $3 Million Perry Elementary School, Perry, FL – Estimated $500,000.00 Maintenance & Repair Sea-Bee Base, Gulf port, MS – Estimated $750,000.00 Saraland Manor, Gulfport, MS – Estimated $300,000.00 SHH Exterior Landscaping / Building Lighting Upgrade, Pensacola, FL. Estimated $1.3 Million Oceanography Building, NASA, MS – Estimated $440,000.00 Gayfer Remodel, Biloxi, MS Estimated $225,000.00 & Gayfer Home Store – Estimated $150,000.00 Escambia County Sheriff’s Office Renovations, Pensacola, FL Gulf Breeze United Methodist Church, Gulf Breeze, FL Juvenile Justice Center, Pensacola, FL Mechanical & Electrical / IDIQ NASP Surrounding Naval Installations – Ongoing – Estimated $5 – $ 15 Million Hilton Garden Inn, Pensacola Beach – Estimated $1.25 Million Sacred Heart New Birthing Center, Santa Rosa Beach, FL – Estimated $1.5 Million J. C. Penney Remodel, Mobile, AL. J. C. Penney, Brunswick, GA. J. C. Penney, Jacksonville, NC J. C. Penney, Albany, GA J. C. Penney, Dothan, AL. Aiken Mall: Belk Store, Sears, J. C. Penney, Brendles, Phar-Moor, Aiken, SC. Silverbluff Commons, BiLo Supermarket, Aiken, SC Flight Simulator, Columbus, MS Biloxi Regional Medical Center, Biloxi, MS Out Patient Clinic, VA Hospital, Biloxi, MS Mount Royal Towers, Brookwood, AL Publix Dist. Warehouse, Boynton Beach, FL Bruno Freezer Addition, Birmingham, AL Orangeburg Regional Medical Center, Orangeburg, SC Products Mart, Birmingham, AL J. C. Penney, Chattanooga, TN Bellview Middle School Retrofit, Pensacola, FL Myrtle Grove School Retrofit, Pensacola, FL. Pensacola Christian College H-6 Academic Bldg., Pensacola, FL Eastridge Mall Expansion, Gastonia, NC Wal-Mart, Aberdeen, NC Armstrong Industries ultima Line Addition, Pensacola, FL Gulf Power Crist Steam Plant Warehouse, Pensacola, FL J. C. Penney, Gastonia, NC ILS Prep. Sherman Field, NAS Pensacola, FL Wal-Mart, Simpsonville, SC 1202 Brad Thomas Drive Gulf Breeze, FL. 32561 (850) 934-5903 Home (850) 857-0701 Work (850) 484-6084 Fax Edward J Sanders Summary of Qualifications Project Manager / Superintendent with 28 + years of electrical experience. Background in Heavy Industrial work, Hospitals, Commercial, and Government Jobs. Professional Experience 04/1995 – Present Sanders Brothers Electric, Inc. Co-Owner / President / Project Manager 02/1976 – 04/1995 Baroco Electric Const. Company Project Superintendent Pensacola, FL Pensacola, FL Completed Projects York Hospital, York, PN – Estimated $8 Million Electrical Orangeburg Hospital, Orangeburg, SC – Estimated $2 Million Electrical Northrop Manufacturing, Perry, GA. Estimated $10 Million Electrical Fort Jackson, Columbus, SC – Estimated $2.5 Million Electrical Fort Rucker Armey Base, Enterprise, AL. – Estimated $1.5 Million Electrical Mt. Royal Towers, Birmingham, AL. – Estimated $2.5 Million Electrical 101 Unit Nursing Home, Gulf Port, MS. – Estimated $5 Million Electrical Laurel Hospital, Laurel, MS NASA Base, Bay St. Louis, MS Ft. McClellan Army Base, Anniston, AL. Central Energy Plant , SHH, Pensacola, FL – Estimated $1.1 Million Electrical Seawinds Condominiums, Orange Beach, AL. – Estimated $1.9 Million Electrical FL Alarm System Agent Certification 5240 Crystal Creek Drive Pace, FL. 32571 (850) 994-4941 Home (850) 857-0701 Work (850) 484-6084 Fax Thomas G. Sanders Summary of Qualifications Project Manager / Estimator with 20+ years of electrical experience. Background in Industrial, Healthcare, Commercial, Medium Voltage, and Project Supervision. Professional Experience 10/95–Present Sanders Brothers Electric, Inc. Co-Owner / Vice President / Project Manager / Estimator Pensacola, FL. 05/93-10/95 Baroco Electric Const. Company Electrician / Electrical Superintendent Pensacola, FL Parisians Department Flagship Store Galleria Mall, Birmingham, AL. Estimated $3 Million Electrical 07//91–05/93 Williams Electric Medium Voltage Terminator / Electrician Fort Walton Beach, FL. Lewisburg Maximum Security Prison, Lewisburg, PA. Estimated $4 Million Electrical 02/91–07/91 United Rigging Electrical Foreman Beltsville, MD. Savona River Nuclear Site D.O.E. (Dept. of Energy), Barnwell, SC. Electrical for 67 Million Dollar Crane Estimated $2 Million Electrical 07/90-02/91 Lead Electrician W B Moore Co., Dallas, TX. VA Medical Center, Augusta, GA. Estimated $4 Million Electrical 07/87-07/90 Lead Electrician Baroco Electric Const. Company Pensacola, FL. Sears Department Store, Aiken, SC. Estimated $1 Million Electrical 05/83-07/87 Apprentice Baroco Electric Const. Company VA Hospital, Biloxi, MS. Education 1979–1983 WJ Woodham High School High School Diploma Pensacola Junior College Master Electrician Seminar Certifications and Licenses FL Alarm System Agent Certification 02/97 Pensacola, FL. 26199 Ponderosa Farm Road Robertsdale, AL .6567 (850) 232-8538 Home (850) 857-0701 Work (850) 484-6084 Fax Ronald Utley Summary of Qualifications Superintendent for Baroco Electric Background in Hospitals and Office Buildings Held Journeyman’s License and Masters License in City of Pensacola 09/06/2005 – Present Project Manager Sanders Brothers Electric, Inc. – Pensacola, FL 1995 - 2005 Superintendent Baroco Electric – Pensacola, FL Professional Experience 1989 – 1995 Electrician Ken’s Electric – Pensacola, FL 1987 – 1989 Electrician Sunrise Electric – FT. Myers FL 1977 - 1987 - Sarasota, Bradenton, Restaurant Manager Partial List of Complete Projects West Palm Beach, FL Critical Care Area of Women and Children’s – Sacred Heart Hosp. VA Nursing Home – Panama City Administration Area Sacred Heart Hospital Champion Paper Administration and Greenhouses Nemours Children’s Clinic Six Story MOB – Sacred Heart Hosp. Flight Simulator Facilities – Whiting Field Renal Care Center – Sacred Heart San Destin Emergency Room Expansion – Sacred Heart San Destin Chiller Plant Expansion – Sacred Heart San Destin MTI – Two Story Office Building - Destin 5955 Quintette Road , Pace FL. 32571 (850) 995-9702 Home - (850) 232-8497 Cell Thomas E. Burkart Summary of Superintendent with 17 + years of electrical experience. Background in Qualifications Commercial, Industrial, and Healthcare; Fire Alarm, Low voltage controls, High voltage controls, design built contracts and operating small equipment. Professional 10/99-Present Experience Project Manager 08/95-10/99 Sanders Brothers Electric, Inc. Pensacola, FL. Mike Hush Electric Pickerington, OH Owens Corning Newark, OH Dave Randle Electric Westerville, OH Certified Electronics Columbus, OH Krieger Ford Columbus, OH Kroger Newark, OH Northridge High School Johnstown, OH Electrician 05/98-04/99 Crewperson 12/94-7/94 Electrician Helper 01/94-12/94 Installer 11/91-02/93 Driver 06/89-10/94 Non-Food Clerk Education 08/87-06/91 College Prep Courses High School Diploma