Department of Transport Annual Report 2013/14 1 1 Contents • • • • • • • • • • • Background DoT Overall Performance Performance per programme DoT Equity Statistics Adjusted Budget 2013/14 Expenditure in 2013/14 per Programme Expenditure in 2013/14 per Economic Classification Funds shifted in 2013/14 Under / (Over) expenditure in 2013/14 Expenditure Breakdown Rollovers to 2014/15 2 Key Focus Areas for the Report • Performance of the Transport Sector; • Link between non-financial and financial results; • DoT Organisational Health and Capability to deliver policy objectives; • Progress on issues raised by the Auditor-General. 3 Background • Report focuses on the progress made with the implementation of programmes & projects in 2013/14 • Focus was on optimal performance of deliverables in terms of the MTSF & MTEF • Targets were guided by the outcomes-based approach (Outcome 4, 6 and 7) • Implementation of programmes was directed by the NDP, NGP & PICC ( In particular SIP 4) 4 Performance Overview of the Transport Sector for the 2013/14 Financial Year • Transport Sector remains continental development; key to regional and • Strengthening position as gateway to Africa requires continuous maintenance, expansion and upgrading of transport infrastructure networks; • In this report, DoT reiterates the need for increased investments in public transport infrastructure, restructuring current subsidies to promote integrated settlements and transport infrastructure projects to improve access to opportunities for the urban and rural poor. 5 Performance Overview of the Transport Sector for the 2013/14 Financial Year Integrated Transport Planning • National Household Travel Survey 2013 and Statistical Bulletin 2011 completed in the period under review; • Objectives of the survey were to: – – – – Understand transport needs and behaviours of households; Ascertain cost of transport for households (level of affordability); Measure availability, ownership and use of motor cars; Assist in identifying disadvantaged regions and transport needs for investment in transport infrastructure. 6 Performance Overview of the Transport Sector for the 2013/14 Financial Year Rail Transport • PRASA projects implemented in the year under review – 598 railway coaches overhauled and upgraded; – Bridge City Rail Extension completed. The aim of these projects were to minimise train crashes and alleviate risks on the lives of train commuters posed by ageing infrastructure • Green Paper on Rail Transport Policy concluded. Once approved, the Policy will address areas of infrastructure investment and regulations in the Rail Transport Sector. 7 Performance Overview of the Transport Sector for the 2013/14 Financial Year Road Transport •S’hamba Sonke - DoT monitored rehabilitation and maintenance of roads, re-sealing and patching of surfaced roads, and blading and regravelling of gravel roads in provinces This ensured continued improvement of our road infrastructure and conditions, and enhancing road safety. •Over two (20) million driving licences were produced and distributed in the year under review 8 Performance Overview of the Transport Sector for the 2013/14 Financial Year Civil Aviation • SA re-elected to ICAO Council; • 542 schools visited across nine (9) provinces to promote aviation awareness amongst learners; • ICAN Conference and ICAD 2013 hosted in Durban and Bloemfontein respectively. 9 Performance Overview of the Transport Sector for the 2013/14 Financial Year Maritime Transport • Study on Maritime Transport Shipping conducted; • Position Paper on the global trends regarding port efficiencies, operations and management completed; • Port Facility Security Audit conducted; • Inlanf Waterway Strategy completed. 10 Performance Overview of the Transport Sector for the 2013/14 Financial Year Public Transport • National Land Transport Amendment Bill finalised and submitted to NEDLAC; • NLTA Regulations amended and consolidated; • Workshops for empowerment of small bus operators conducted in all provinces; • Twelve (12) municipalities completed operational, business and financial plans for IPTNs; • Network operations already started in Three (3) municipalities (Nelson Mandela Bay, Cape Town and Johannesburg 11 Department Of Transport (Overall) Total Number of targets = 329 % Achievement = 216 targets (66%) % Not Achieved = 113 targets (34%) 12 Department Of Transport (Overall) 13 Department Of Transport (Summary of performance per programme) Programme Total no of targets Achieved Not achieved No. % No. % ADMINISTRATION (ODG, CFO, COO, TIS) ITP 116 98 84% 18 16% 41 18 44% 23 56% RAIL 10 6 60% 4 40% ROAD 49 30 61% 19 39% CIVIL AVIATION 47 25 53% 22 47% MARITIME 42 22 52% 20 48% PUBLIC TRANSPORT 24 15 63% 9 37% DOT (OVERALL) 329 216 66% 113 34% 14 PERFORMANCE PER PROGRAMME 15 ITP: Key Notable Achievements • National Household Travel Survey (NHTS) 2013 and Statistical Bulletin 2011 completed; • Study on status of regional infrastructure completed; • Rural Accessibility/ Multi-deprivation index pilot survey completed; • Study on harmonisation of transport standards within SADC completed. 16 ITP: Notable nonachievements • NATMAP not approved due to a resolution by Parliament for further consultations on the plan with the PICC. Consultations with PICC will be prioritised for 2014/15 and the Plan will be re-submitted to Parliament accordingly; • Private Sector Participation Strategy could not be completed as targeted due to capacity constraints. The completion of the strategy will be carried over to the next cycle (2014/15); • Appointment of BBBEE Charter Council members was delayed due to a request for more clarity by the Executive Authority. Clarity was duly provided and the appointments will be facilitated in 2014/15 17 Rail Transport: Key Notable Achievements • 598 railway coaches overhauled and upgraded; (Objective to minimise train crashes and alleviate risks on the lives of commuters) • Green Paper on Rail Transport Policy concluded and presented to Cabinet; (Once approved, the policy will address areas of infrastructure investment and regulations in the rail transport sector.) • Bridge City Extension completed; • Infill of bricks and ancillary works in the Gauteng Train Control Nerve Centre completed. 18 Rail Transport: Notable nonachievements • Acquisition of new rolling stock by PRASA delayed by process of securing government guarantee by National Treasury. • MoU between DoT and DPE not signed thus delaying establishment of the Interim Rail Economic Regulatory Capacity; • MoU between DoT and City of Tshwane not signed thus delaying progress of the Greenview – Pienaarspoort Rail Extension 19 Road Transport: Key Notable Achievements • S’hamba Sonke Programme – rehabilitation and maintenance of roads, re-sealing and patching of surfaced roads, blading and re-graveling of gravel roads. (Objective is to ensure continued improvement of road infrastructure and conditions) • 33 365 full time employment created. • Road Infrastructure Safety Framework developed; 20 Road Transport: Key Notable Achievements • 2 422 268 driving licence cards produced and distributed • Road Incident Management System developed. (System will assist to regulate accident investigations and incident management) 22 Road Transport: Notable nonachievements • Approval of the amendment of the National Road Traffic Act (incorporating safety requirements in motor vehicles) by the Traffic Legislation Technical Committee delayed progress; • Review of current legislative framework on fraud and corruption within testing stations still pending thus holding up development of legislation to implement periodic motor vehicle testing (every 24 months) for vehicles 10 years and older; • Full implementation of the Transfer Management Plan for the Driving Licence Production Facility prohibited by 23 ongoing litigation processes. Civil Aviation: Key Notable Challenges • SA re-elected to ICAO Council at 38th Assembly; • ICAN Conference successfully hosted in Durban (2013). • 542 schools visited across 9 provinces to promote aviation awareness (Approximately 33 945 learners reached) – comprehensive list of schools attached as Annexure 1 24 Civil Aviation: Notable nonachievements • Delays in amending the Civil Aviation Act prohibited the establishment of the Aircraft Accident and Incident Investigating Body; • Non-establishment of a Regional Search and Rescue Working Group delayed the standardisation of search and rescue regulations for SADC; • Process of developing the Airfreight Strategy not completed due to financial constraints; 25 Maritime Transport: Key Notable Achievements • Maritime Transport Shipping Study conducted; • Position Paper on status quo global trends regarding port efficiency, operations and management completed; • CLC and IOPC Bills approved by the National assembly; • Port Facility Security Audit conducted • Inland Waterway Strategy completed. 26 Maritime Transport: Notable non-achievements • Finalisation of the Maritime Transport Policy delayed by prolonged consultation process; • Business case on ship acquisition and operations not completed due to capacity constraints; • Framework for the review of the National Ports Act not developed as targeted due to non-finalisation of the Maritime Transport Policy; 27 Public Transport: Key Notable Achievements • Draft National Land Transport Amendment Bill finalised and submitted to NEDLAC; • NLTA Regulations amended and consolidated; • Workshops for empowerment of small bus operators conducted in all provinces; 28 Public Transport: Key Notable Achievements •12 municipalities completed operational, business and financial plans for IPTNs – A Comprehensive list attached as Annexure 2 •Network operations started in three municipalities (Nelson Mandela Bay, Cape Town and Johannesburg); •Average week-day bus rapid transit passengers – 35 000 pax/day in Cape Town and 35 000 – 40 000 pax/day in Johannesburg. 29 Public Transport: Notable non-achievements • National Learner Transport Policy not completed. Policy needs to be discussed with the Department of Basic Education before submission to Parliament; • Cooperatives Strategy for the Taxi Industry not finalised due to extended consultations; • Less number of old taxi vehicles scrapped as a result of lack of affordability of new taxi vehicles by operators. There is a need to review the Taxi Recapitalisation Programme. 30 Challenges faced during the period under review • Lack of funding model for infrastructure projects; • Delays experienced in policy consultative processes; • Time delays as a result of inter-governmental relation issues (MoUs, etc); • Capacity constraints (Human Resource , Supply Chain Management, etc). 31 Recruitment Vacancy Rate •119 positions filled during 2013/14; •Vacancy rate decreased from 26,7% to 25,4% (target – 19%) •Target not met due to 49 additional posts added to establishment & terminations. 32 Capacity Development • 876 students registered in different transport related disciplines in 13 universities (Centres of Development); • Transport Research Activity Centre (TRAC) reached out to 462 984 learners through 29 laboratories. 1145 learners registered at various tertiary institutions; • 47 interns recruited in DoT; • 1 037 learners currently registered in FET colleges; (List of colleges attached as Annexure 3) • 6 (out of 13) students who studied in Prague (International Scholarship Programme) completed their studies and were successfully placed in the DoT, 33 PRASA and Metrorail for internship. Employment Equity Statistics Race •African - 89.4% (target – 79.5%) •Coloured - 2.12% (target – 9%) •Indian - 2.28% (target – 2.5%) •White - 6.2% (target – 9%) 34 Employment Equity Statistics Gender •Male – 273 (45%) target = 48% •Female – 340 (55%) target = 52% 35 Employment Equity Statistics SMS •Male – 71 (62%) •Female – 44 (38%) Target is to achieve 50% female representation in SMS. 36 Employment Equity Statistics Disability •Male – 3 (target – 8) •Female – 9 (target – 5) •DoT Disability Status – 1.8% 37 Lessons learnt • Ensure realistic number of indicators and targets are set; • Define indicators as required by the Treasury Framework; • Revise targets to meet the SMART criteria; • Institutionalize production of admissible evidence on all reported performance information. 38 GOVERNANCE 39 Risk Management • Risk register for strategic and operational risks compiled; • Risk Management Plan (key controls and mitigation strategies) developed and implemented; • Risk assessments conducted quarterly; • Progress reported Committees; quarterly to EXCO and Audit 40 Fraud and Corruption • DoT Fraud Prevention Strategy premised on four (4) pillars – Fraud Prevention – Fraud Detection – Fraud Response – Remediation 41 Minimising Conflict of Interest • Financial Disclosure Framework – All SMS members sensitised to disclose financial interest so as to identify conflict of interest; • Declaration of interest for all procurement as a measure to minimise conflict of interest in SCM (SBD 4 Form and SBD 9 Form) 42 Code of Conduct • New appointees inducted on Code of Conduct • SMS members trained on disciplinary matters related to violation of Code of Conduct. 43 Internal Control • Administration of AG queries through development of action plans; • Monitoring of implementation of action plans on a quarterly basis; • Compliance reviews on the PFMA, Regulations, DoRA, Financial Policies, SCM. Treasury 44 Internal Audit and Audit Committees • Reviews undertaken by Internal Audit (Assurance, Performance and IT) – – – – – – – – – – – – Governance review; Performance Info and Quarterly Reporting review; DoRA review; Change Management review; Annual Financial Statement review; IT Governance review; NLTIS review; Payroll management follow-up; SCM follow-up; HRM Recruitment follow-up; Management of debtors follow-up; MPAT review. 45 Internal Audit and Audit Committees • Seven (7) meetings of the Audit Committee during period under review. 46 FINANCIAL STATEMENTS 47 Adjusted Budget 2013/14 Details Original budget for 2013/14 Funds rolled over from the previous year: R’000 42 275 340 104 762 R104.762 million was rolled over for the refurbishment of the Mthatha Airport Other Adjustments: 1. Declared unspent funds: (20 000) An amount of R20 million in unspent funds has been declared on the taxi recapitalisation project as fewer than expected taxis have been scrapped 2. Expenditure earmarked in the 2013 budget Speech for future allocation: 41 565 An additional R41.565 million has been allocated to the Provincial Roads Maintenance Grant for disaster relief to repair flood damage in Kwa-Zulu-Natal, Limpopo, Mpumalanga and Western Cape Total Adjusted Budget 48 42 401 667 Expenditure for 2013/14 per Programme Per Programme 1. Administration Budget Expenditure Variance % R'000 R'000 R'000 Spent 333 440 315 578 17 862 95% 74 913 66 373 8 540 89% 3. Rail Transport 11 232 843 11 232 840 3 100% 4. Road Transport 19 897 209 20 665 564 (768 355) 104% 5. Civil Aviation 245 515 148 602 96 913 61% 6. Maritime Transport 103 557 102 271 1 286 99% 7. Public Transport 10 514 190 10 505 616 8 574 100% TOTAL 42 401 667 43 036 844 (635 177) 101% 2. Integrated Transport Planning Note: The over expenditure of Road Transport of R768.355 million was declared as unauthorised expenditure. 49 Expenditure for 2013/14 per Economic Classification Per Economic Classification Budget Expenditure Variance % R'000 R'000 R'000 Spent Compensation of Employees 304 459 304 359 100 100% Goods and Services 970 564 1 692 167 (721 603) 174% Provinces and Municipalities 18 892 482 18 892 482 0 100% Departmental Agencies and Accounts 10 783 518 10 700 044 83 474 99% Universities and Technikons 10 179 10 179 0 100% Foreign Governments and International Organisations 9 525 7 900 1 625 83% 11 159 113 11 159 113 0 100% 18 880 18 880 0 100% 231 784 231 778 6 100% 3 3 0 100% 8 200 8 197 3 100% 12 960 11 662 1 298 90% 0 80 (80) ERR 42 401 667 43 036 844 (635 177) 101% 50 Public Corporations and Private Enterprises Non-profit Institutions Households Gifts and donations Buildings and fixed structures Machinery and Equipment Payment for financial assets TOTAL Summary of Virements after Adjusted Budget Programme Compensation of employees Goods and services Administration (6 450) (22 544) (28 994) Integrated Transport Planning (1 055) (3 082) (4 137) Rail Transport (5 029) (1 976) (7 005) 316 742 316 742 1 577 688 2 265 (36) (772) (808) (1 585) (33 417) (243 061) (278 063) (12 578) 255 639 (243 061) 0 Road Transport Civil Aviation Maritime Transport Public Transport Total Households Total 51 Under / (Over) Expenditure per Programme and Classification Programme Classification Compensation Goods & Services Transfers Capital (Amounts in R’000) 1 2 3 4 5 6 7 Total 87 2 2 2 2 2 3 100 17 270 8 213 3 (852 216) 96 563 8 564 (721 603) 83 475 344 1 283 1 85 105 386 4 1 6 1 301 2 574 330 ( 71) ( 5) ( 2) ( 2) Totals 17 862 8 540 3 (768 355) 96 913 1 286 8 574 (635 177) Rollovers requested 10,000 8,209 0 0 42,000 0 8,561 68,770 Fin transactions ( 80) Major under / over expenditure: P1: Under spent R10 million on marketing and advertising and saved R5.8 million on accommodation P2: Under spent R8.2 million on a number of projects P4: Over spent R852.2 million on eNaTIS, and under spent R83.5 million because transfer payments were not paid to the RTMC P5: Saved R96.6 million that was over budgeted for the Mthatha airport refurbishment P7: Under spent R8.6 million on a number of projects 52 Expenditure Breakdown for 2013/14 12000000 Total 99.29% 10000000 8000000 6000000 4000000 2000000 0 PRASA SANRAL Provincial Road Maintenance Grant Public Trans port Infras tructure & Sys tem s Public Trans port Operations Goods and Services Taxi recapitalis ation Buildings and fixed s tructures Com pens ation of Employees 53 Expenditure Breakdown for 2013/14 (Continued) 250000 Total 0.71% 200000 150000 100000 50000 0 Other agencies Rural Grant Non Profit Ins titutions Univers ities Foreign m em bers hips Machinery and equipm ent Financial trans actions Leave gratuity and s pons ors hips 54 Expenditure Breakdown for 2013/14 (Continued) Description Amount (R'000) PRASA 11 159 113 SANRAL 10 497 184 Provincial Road Maintenance Grant 8 737 775 Public Transport Infrastructure & Networks 5 549 981 Public Transport Operations 4 552 521 Goods and Services 1 692 167 Taxi recapitalisation 230 897 Buildings and fixed structures 8 197 Compensation of Employees 304 359 Other agencies 202 860 Rural Grant 52 205 Non Profit Institutions 18 880 Universities 10 179 Foreign memberships Machinery and equipment Financial transactions Leave gratuity and sponsorships Total expenditure 7 900 11 662 80 884 43 036 844 55 Expenditure per Project vs Final Budgets (Goods and Services) Administration Spent Budget Variance Communications 25,584 35,584 10,000 Corporate Services 60,483 60,528 45 Management 17,628 17,631 3 Ministry 16,668 18,047 1,379 Office Accomodation 33,925 39,767 5,842 Administration Total 154,288 171,557 17,269 Rollover 10,000 10,000 55 55 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Integrated Transport Planning BEE Charter Council Spent Budget Variance 1,085 1,085 0 105 105 0 Develop Transport Greenhouse Gas Inventory 49 1,375 1,326 Durban Free State Gauteng Corridor 4,545 4,545 0 Energy Consumption Framework 329 2,029 1,700 Feasibity Decongestion Maseru Border Post 536 536 0 1,133 1,134 1 422 3,347 2,925 1,844 1,844 0 500 500 0 1,714 1,773 59 Car Ownership Model Harmonization Road Traffic Safety In SADC Impact of Freight Accidents on SA Roads Integrated Transport Sector BBBEE Annual Survey Land National Transport Strategic Framework National Transport Planning Forum Rollover 1,326 1,700 2,925 59 56 56 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Integrated Transport Planning Spent Budget Variance Rollover (Continued) NHTS: Project Support & Secretariat 2,111 2,111 0 10,766 10,769 3 Road Freight Strategy 499 499 0 Rural Accessibility 378 1,530 1,152 SANWIT Women Empowerment 438 438 0 Study on Global Competiveness 231 1,279 1,048 Study Status Regional Transport Infrastructure 789 789 0 Transport Planning Database 1,534 1,535 1 Transport Sector Economic Regulator 4,807 4,807 0 Integrated Transport Planning Total 33,815 42,030 8,215 No Projects / Administration 1,152 1,047 8,209 57 57 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Rail Transport Feasibility Study Moloto Corridor Industry Development No Projects / Administration Rail Policy and Act Service Level Agreement Institutional Reform Rail Transport Total Spent Budget Variance 10,200 10,203 3 5 5 0 1,575 1,575 0 700 700 0 1,133 1,133 0 13,613 13,616 3 Rollover 0 58 58 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Road Transport Decade Of Action For Road Safety Develop Road Engineering Standrds Enatis Spent Budget Variance 5,979 5,979 0 175 175 0 1,182,991 330,775 (852,216) Inspectorate 9,558 9,558 0 Investgate Driving Licence & Road Worthy Certificates 5,413 5,413 0 98 98 0 No Projects / Administration 3,175 3,175 0 Research And Development 10 10 0 235 235 0 27,051 27,051 0 NMT Facility Guideline Manual Road Infrastructure Policy S'Hamba Sonke Road Transport Total 1,234,685 Rollover 382,469 (852,216) 0 59 59 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Civil Aviation Spent Budget Variance Committees 3,177 3,177 0 International Civil Aviation Negotiation Conference 5,282 5,282 0 12,848 12,848 0 0 96,562 96,562 396 396 0 6 6 0 195 195 0 Watchkeeping Services 52,586 52,586 0 Civil Aviation Total 74,490 171,052 96,562 No Projects / Administration Refurbishment of Mthatha Airport Regulating Committee Research And Development Review Airlift Strategy Rollover 42,000 42,000 60 60 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Maritime Transport Investigate SAMSA Spent Budget Variance 302 302 0 34 34 0 Maritime Transport Policy & Legislation 495 495 0 No Projects / Administration 9,628 9,628 0 Oil Pollution Prevention 52,065 52,066 1 Maritime Transport Total 62,524 62,525 1 Lloyd's List Rollover 0 61 61 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Public Transport Spent Budget Variance Rollover Committees 250 250 0 Develop Norms & Standards For Scholar Transport 194 194 0 Develop Rural Public Transport Networks 0 789 789 454 454 0 Establishment Of National Public Transport Regulator 43 43 0 Finalise Scholar Transport Policy 0 391 391 391 Implement Shova Kalula Bicycle Programme 0 2,000 2,000 2,000 2,724 3,572 848 848 National Guidelines for Development of Rural Transport 182 182 0 National Land Transport Act 738 4,738 4,000 Develop Scholar Transport Framework Legal Advice Limpopo Intervention 789 4,000 62 62 Expenditure per Project vs Final Budgets (Goods and Services) – Continued Public Transport No Projects / Administration Public Transport Grant Research And Development Review & Update Rural Transport Strategy Study On Alternatives To Regulating Public Transport Taxi Scrapping Administrator Tr3 2020 Transport Appeals Tribunal Public Transport Total Grand Total Spent Budget Variance Rollover 11,667 11,669 2 801 801 0 5 5 0 59 592 533 381 381 0 99,462 99,462 0 1,348 1,348 0 444 444 0 118,752 127,315 8,563 8,561 1,692,167 970,564 (721,603) 68,770 533 63 63 Rollovers to 2014/15 Details (R’000) Requested Approved Programme 1: Administration Marketing and advertising 10 000 - Green House Gas Inventory for the Transport Sector. 1 326 - Transport Energy Consumption Study and Reduction Strategy 1 700 - Global Competitiveness by Reducing Transport Costs on Rail and Pipelines 1 047 - 59 - Rural Accessibility / Multi-deprivation index 1 152 - Impact of Freight Accidents in South Africa 2 925 - 42 000 - Programme 2: Integrated Transport planning National Transport Planning Forum Programme 5: Civil Aviation (deviation from Mthatha Airport) Expenditure incurred on the provision of transport services during the funeral of the late President Nelson Mandela Programme 7: Public Transport Shova Kalula Bicycle Project 2 000 Scholar Transport Policy 391 - Review of Rural Transport Strategy 533 - National Guiding Framework for Network Development 789 Limpopo Intervention legal advice 848 National Land Transport Act Amendment Bill Total 4 000 68,770 - 65 - AG ISSUES ON PERFORMANCE INFORMATION 66 AG Findings on Performance Information 2013/14 1. Approval of an incomplete Annual Performance Plan 2013/14 Progress: APP completed as recommended. All highlighted gaps filled. APP re-submitted to Executive Authority and approved accordingly. Result: Finding resolved. 67 AG Findings on Performance Information 2013/14 2. Performance Indicators in the 2013/14 APP not well defined (Technical Indicator Description tables not filled) Progress: Technical Indicator Description tables completed for every indicator in the Revised 2014/15 APP as required by the Framework for Strategic Plans and Annual Performance Plans. Revised APP approved by Executive Authority. Result: Improvement acknowledged by AG. 68 AG Findings on Performance Information 2013/14 3. Performance targets in the 2013/14 APP not SMART Progress: Targets revised in the Revised 2014/15 APP as recommended. Revised APP assessed by the Office of the Auditor-General. Revised APP approved by Executive Authority Result: Improvement acknowledged by AG. 69 AG Findings on Performance Information 2013/14 4. Reasons for over/under-achievement of targets not stated Progress: Management provided on-going support to programmes with regard to compliance with the Framework. Reasons for deviation provided for all reported variances in the 1st and 2nd Quarter Performance Reports for 2014/15. Result: Improvement acknowledged by Internal Audit. 70 AG Findings on Performance Information 2013/14 5. No standard operating procedures for predetermined objectives for the 2013/14 financial year Progress: DoT Planning, Monitoring and Reporting Guidelines compiled and approved by EXCO in May 2014. Guidelines circulated to all programmes to ensure institutionalisation of standard operating procedures for the functions of planning, monitoring and reporting in the DoT. Result: Improvement acknowledged by Internal Audit. 71 AG Findings on Performance Information 2013/14 6. Inappropriate design of internal controls relating to pre-determined objectives Progress: DoT Planning, Monitoring and Reporting Guidelines compiled and approved by EXCO in May 2014. Through the guidelines, controls for verification of reported information to confirm the validity, accuracy and completeness of reports and actual performance will be enhanced. Result: Improvement acknowledged by Internal Audit. 72 Abbreviations Abbreviation Meaning eNaTIS Electronic National Traffic Information System PRASA Passenger Rail Agency of South Africa Ltd. RSR Railway Safety Regulator SANRAL South African National Roads Agency SOC Ltd. RTMC Road Traffic Management Corporation CBRTA Cross Border Road Transport Agency RTIA Road Traffic Infringements Agency RAF Road Accident Fund ACSA Airports Company of South Africa Ltd. ATNS Air Traffic and Navigation Services Company Ltd. SACAA South African Civil Aviation Authority SAMSA South African Maritime Safety Authority PR Ports Regulator of South Africa AARTO Administrative Adjudication of Road Traffic Offences ICAO International Civil Aviation Organisation 73 Thank you 74