EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO-FINANCED BY THE EUROPEAN RETURN FUND (Report set out in Article 50(2) (a) of Decision No 575/2007/EC) 30 June 2010 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 1 EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO-FINANCED BY THE RETURN FUND (Report set out in Article 50(2) (a) of Decision No 575/2007/EC) Report submitted by the Responsible Authority of: Republic of Bulgaria International Projects Directorate at the Ministry of the Interior Responsible Authority for the European Return Fund Date: 30 June 2010 Name, Signature (authorised representative of the Responsible Authority): Ivan Sharenkov - Director of the International Projects Directorate and Head of the RA Name of the contact person (and contact details) for this report in the Member State: Ivan Sharenkov Ministry of the Interior 29 Shesti septemvri Str. Sofia, Bulgaria Tel.: +359 2 982 26 14 Fax: +359 2 982 28 18 e-mail: isharenkov.14@mvr.bg First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 2 GENERAL INFORMATION TO BE PROVIDED BY THE RESPONSIBLE AUTHORITY ON EVALUATION EXPERTISE AND ON METHODOLOGY - Did you have recourse to evaluation expertise to prepare this report? No. The report is prepared by the Responsible Authority for the European Return Fund. - Please explain what kind of evaluation expertise you had recourse to: NA First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 3 EVALUATION REPORT ON THE RESULTS AND IMPACTS OF ACTIONS CO-FINANCED BY THE EUROPEAN RETURN FUND CONTENTS 1. SUMMARY OF THE MULTIANNUAL PROGRAMME: ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE AND STRATEGY TO ACHIEVE THE OBJECTIVES 2. SUMMARY OF THE ANNUAL PROGRAMMES 2008 AND 2009 (EXCLUDING TECHNICAL ASSISTANCE MEASURES AND INFORMATION AND PUBLICITY) 3. IMPLEMENTATION OF THE PROGRAMMES IN THE “AWARDING BODY” METHOD 4. IMPLEMENTATION OF THE PROGRAMMES IN THE “EXECUTING BODY” METHOD 5. SUMMARY DESCRIPTION OF THE PROJECTS FUNDED IN THE “AWARDING BODY” METHOD AND IN THE “EXECUTING BODY” METHOD 6. TECHNICAL ASSISTANCE - INFORMATION AND PUBLICITY 7. ASSESSMENT OF THE IMPLEMENTATION OF THE ANNUAL PROGRAMMES 2008 AND 2009 8. OVERALL ASSESSMENT OF THE RESPONSIBLE AUTHORITY ON THE IMPLEMENTATION OF THE RF PROGRAMMES 2008 THROUGH 2009 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 4 Part I Summary of the Multiannual Programme 2008-2013 ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE AND STRATEGY TO ACHIEVE THE OBJECTIVES ANALYSIS OF REQUIREMENTS IN THE MEMBER STATE - The requirements in the Member State in relation to the baseline situation 1. In relation to the described situation in Bulgaria, the following requirements are identified: optimization of the measures for voluntary return of persons; optimization of the performed activities with vulnerable groups in compliance with their specific needs; reduction of the time for stay in Temporary Accommodation Centre for Third Country Nationals through more dynamic cooperation with the diplomatic representations and/or consular services, as well as strengthening the cooperation with other MS, local government authorities, and NGOs; expanding and increasing the methods of interaction and cooperation with international and national NGOs in the process of achieving an effective and sustainable return; expanding the activities related to persons subject of return; acceleration of the procedures on identifying foreigners and providing them with the necessary travel documents; - The operational objectives of the Member State designed to meet its requirements Objective 1: Support for the voluntary return of persons, who do not or no longer fulfill the conditions for stay in the Republic of Bulgaria, by providing assistance and conditions for the persons voluntary returned to their country of origin; Objective 2: Measures regarding the specific situation of vulnerable persons subject to return (minors, disabled persons, pregnant women, persons with mental disorder, persons who have been subjected to serious forms of psychological, physical or sexual harassment); Objective 3: Implementing procedures for forced return of illegally staying nationals of third countries with which the cooperation in the field of return is extremely difficult, in compliance with the national and international legislation; Objective 4: Implementing procedures for return of illegally staying third country nationals in cooperation with other Member States and, where appropriate, with the FRONTEX agency and other organizations; Objective 5: Informing and counseling persons subject to return about the situation in the country of origin or a safe third country; Objective 6: Development of the cooperation between the Bulgarian Authorities and the consular and diplomatic services in order to speed up the process of documenting the returnees. Objective 7: Strengthening the administrative capacity of the national stakeholders in the field of migration policy and improving the regulatory framework on national level. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 5 2. STRATEGY TO ACHIEVE THE OBJECTIVES Priority 1: Support for the development of a strategic approach to return management by Member States Objective 1: Support for the voluntary return of persons, who do not or no longer fulfill the conditions for stay in the Republic of Bulgaria, by providing assistance for the persons voluntarily returned to their country of origin. (Specific Priority 1.1“Assisted voluntary return programmes”) Key actions: - Campaigns for encouragement of voluntary return of third country nationals with respect of the humanitarian principles and with respect of their dignity; - special programmes of the Migration Directorate, in co-operation with other interested organizations experienced in voluntary return for the assistance of dignified and sustainable return; - Elaboration of programmes, in accordance to the needs of the returnees whose aim is voluntary/sustainable return. Objective 2: Measures regarding the specific situation of vulnerable persons subject to return (minors, disabled persons, pregnant women, persons with mental disorder, persons who have been subjected to serious forms of psychological, physical or sexual harassment); ( Specific priority 1.2 “Cash incentives and measures to address the specific situation of vulnerable returnees”). Key actions: - Specialized programmes for assisting vulnerable persons; - consulting and counseling in order to encourage the voluntary return of that category of persons; joint activities with NGOs such as further qualification or training of officials on work with vulnerable persons subject to return; assistance to vulnerable persons (counseling, legal advice, etc.) during return, including reintegration measures; - providing suitable conditions and specialized consultation services for vulnerable persons; - organizing seminars for training of officials working with this category of persons. Objective 3: Implementing procedures for forced return of illegally staying nationals of third countries with which the cooperation in the field of return is extremely difficult, in compliance with the national and international legislation. (Specific priority 1.3 “Integrated return plans supporting the return of third-country nationals or stateless persons not covered under Community readmission agreements or national bilateral readmission agreements to countries of origin, former residence or transit with which cooperation in the field of return is particularly difficult”). Key actions: - executing the imposed compulsory administrative measures, as well as escorting to the country of origin, when necessary; - optimizing the procedures for the gathering of information necessary to prove the identity and the nationality of the migrant, including the cooperation with third country migration and consular services; - optimizing the procedures for the return of persons who do not fall into the groups under the different agreements on readmission; - enhancing the cooperation between national authorities and their third country counterparts responsible for the speeding up of the return procedures; - Seminars directed to all levels of national, regional, local and other public authorities. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 6 Priority 2: Support for the cooperation between Member States in return management Objective 4: Implementing procedures for forcible return of third country nationals who do not or no longer fulfil the conditions for stay, in cooperation with other Member States and where appropriate with the FRONTEX agency and other organizations. (“Integrated return plans which have been designed and will also be implemented in cooperation with other Member States, and, where appropriate, with the Frontex Agency, non-governmental organisations and/or international organisations, with the aim of pooling the different skills, experiences and resources of the authorities of the Member States and where appropriate the other organisations involved”). Key actions: - Establishment of a cooperation network with the returnees centers in the countries of origin with a view to obtain travel documents for the return of third-country nationals; - Exchange of information among the Member States, on the one hand, and between the Member States and third-country authorities, on the other, for speeding up the return process; - Joint programmes with Member States for exchange of best practices related to particular countries or regions of origin, former residence or transit; - Joint operations between the Member States and other relevant organizations with a view to ensuring speedy and successful removals. Priority 3: Assistance for specific innovative national/international tools for return management Objective 5: Informing and consulting people subject to return in respect of the situation of their country of origin or safe third country. (“Projects which propose particularly innovative ways and means of informing and counselling potential returnees about the situation in the countries of return and/or other innovative incentives for increasing the number of voluntary returnees based on respect for the dignity of the individuals concerned”) Key actions: - Informing campaigns for third-country nationals in accordance with the humanitarian principles and with respect for their dignity. - Cooperation with international and national governmental and nongovernmental organisations for gathering and providing personalised information about the current situation in the country, the region and the place of origin. Objective 6: Development of the cooperation between Bulgarian Authorities and the consular and diplomatic services in order to speed up the process of documenting the returnees. (Projects which test new working methods to speed up the process of documenting returnees in cooperation with consular authorities and immigration services of third countries”) Key actions: - Meetings with representatives of diplomatic missions in Bulgaria for exchange of information; - Speeding up of the procedures for the identification of persons and the issuing of travel documents; First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 7 Priority 4: Support for developing Community standards and best practices on return management Objective 7: Strengthening the administrative capacity of the national stakeholders in the field of migration policy and improving the regulatory framework on national level (Specific priority 4.2 Measures taken at national level to ensure a fair and effective implementation of common standards on return, as established under Community legislation on return including the training of practitioners.) Key actions: - Organising training seminars for national, regional and local authorities on relevant international human rights standards on return; - Organising training seminars, workshops, expert meetings for migration authorities on Community legislation in the area of return; - Conducting assessments, in cooperation with international organisations and NGOs, on the regulatory framework and the administrative practical constraints at national level leading to recommendations for potential amendments to the legal framework to facilitate more efficient and sustainable returns. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 8 Finally, list the most important indicators set out in Part 3 of the multiannual programme 2008-2013 and the corresponding quantified/qualitative targets, broken down by Priority: Priority 1: Increased number of: - Voluntary returnees; - Assisted persons under the relevant programmes; - Returned vulnerable persons; - Successfully conducted training seminars; - Meetings conducted between the institutions involved and contacts with competent authorities; Priority 2: Indicators - Increased number of partner centres for returnees; - Increased number of information documents exchanged with other MS and third countries regarding the return procedures; - Number of joint operations conducted; - Number of programmes with MS for implementation of best practices. Priority 3: Indicators Increased number of: - Informed persons - third countries’ nationals; - Informative campaigns carried out; - Meetings with the consular services; - Issued travel documents; Priority 4: - Number and type of training seminars held; - Number of officials and type of authorities trained; - Number and type of topics covered; - Number of assessments conducted; - Number of recommendations for amendments of the national legislation put forward; ---------------------------- First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 9 Part II SUMMARY OF THE ANNUAL PROGRAMMES 2008 AND 2009 (excluding Technical Assistance measures and Information and Publicity) 1. Summary of actions under Priority 1 in the annual programmes, 2008 and 2009 Actions to be implemented under the “awarding body” method AP 2008 Not applicable AP 2009 Action 1 – Specialised (target oriented) programmes of Migration Directorate, non-governmental and/or international organisations experienced in voluntary return Action 3 – Development of a programme for voluntary return of vulnerable persons and measures for assisting returnees in response to their specific needs Actions to be implemented under the “executing body” method AP 2008 Action 1 - Additional equipment for 2 selected premises of the Temporary Accommodation Centre for Third-Country Nationals in Busmantsi, necessary to provide appropriate conditions for specialized consultative work with vulnerable persons Action 2 - Specialised interpretation services connected with the consultative work for assisting vulnerable persons Action 3 – Supply of motor vehicles for implementation of compulsory administrative measures on nationals of third countries with which the cooperation in the sphere of return is especially difficult Action 4 – Expenditures on the implementation of compulsory administrative measures against nationals of third countries with which the cooperation in the field of return is especially difficult Action 5 – Elaboration of comprehensive assessment (analysis) of the situation in the Republic of Bulgaria, other member states and countries of origin in relation with the migration processes, as a precondition for the development of Integrated Return Management Strategy AP 2009 Action 2 – Specialised interpretation services connected with the consultative work for assisting vulnerable persons Action 4 – Expenditures on the implementation of compulsory administrative measures against nationals of third countries with which the cooperation in the field of return is especially difficult First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 10 2. Summary of actions under Priority 2 in the annual programmes, 2008 and 2009 Actions to be implemented under the “awarding body” method Not applicable Actions to be implemented under the “executing body” method AP 2008 Action 6 - Establishing network for cooperation with the reception centres in the countries of origin through interaction with NGOs and other MS Action 7 –Joint programme with MS for implementation of best practices regarding particular states or regions of origin and/or former stay AP 2009 Action 5 – Development of an integrated return plan in cooperation with other Member States Action 6 - Implementation of joint return operations - joint flights or joint removals by land in cooperation with other MS, and where appropriate, the FRONTEX Agency. 3. Summary of actions under Priority 3 in the annual programmes, 2008 and 2009 Actions to be implemented under the “awarding body” method AP 2008 Action 8 – Information campaigns for third-country nationals while observing the humanitarian principles and respecting their human dignity AP 2009 Action 7 – Setting up a counseling and reintegration programme aided by a network of public authorities, NGOs and/or internationals organizations created for this purpose. Actions to be implemented under the “executing body” method AP 2008 Action 9 – Creation of new and more effective methods of work with representatives of diplomatic missions in Bulgaria while exchanging information regarding return AP2009 Action 8 – Support of the identification procedures for nationals from Iran, Afghanistan, Palestine, Lebanon, Nigeria. 4. Summary of actions under Priority 4 in the annual programmes 2008 and 2009 Actions to be implemented under the “awarding body” method Action 10 – Organizing training seminars for national, regional and local authorities on relevant international human rights standards on return First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 11 Actions to be implemented under the “executing body” method Action 9 – Development of Integrated Return Management Strategy aiming at introduction of regulatory framework changes and overcoming the administrative practical constraints at national level in cooperation with international organizations and NGOs 5. Any significant change to the actions of the programmes concerned (revisions of annual programmes and revisions of the financial breakdown lower than 10%) No revisions were undertaken First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 12 Part III IMPLEMENTATION OF THE PROGRAMMES IN THE “AWARDING BODY” METHOD Did you implement the 2008 and 2009 programmes in the “awarding body” method (as defined in Article 7 (2) of Commission Decision 2008/458/EC of 5.3.2008 - the Return Fund Implementing Rules), at least for part of the programmes? Yes/No: Yes Action 8 under the AP 2008 has been implemented in the “awarding body” method. Following call for proposals and evaluation of the applications received two project proposals have been selected for funding. The projects aim at conducting information campaigns for third-country nationals while observing the humanitarian principles and respecting their human dignity. If No, do not fill in Part III and go to Part IV (Implementation of the programmes in the executing body method). First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 13 III.1 Share of the overall EU contribution to the programmes granted in the “awarding body” method in 2008 and 2009 For each programme year (2008 and 2009), enter the share of the overall EU contribution to the programme (excluding the EU contribution for technical assistance) which was granted in the “awarding body” method (in percentage, no decimal) - Programme 2008: 20 % of the EU contribution to the programme (excluding the EU contribution for technical assistance) - Programme 2009: not started yet III.2 Calls for proposals For each programme year (2008 and 2009), please provide the number and calls for proposals organised for the implementation of the annual programmes in the “awarding body” method - Programme 2008: 1 call for proposal hеld - Programme 2009: 4 call for proposals programmed but not started yet First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 14 III.3 Proposals received, selected and funded after calls for proposals Number of Proposals received Projects selected Projects funded Programme 2008 2 2 Programme 2009 - TOTAL 2008-2009 2 2 2 - 2 Have all projects selected for funding after calls for proposals been funded? Yes/No: Yes. All project proposals selected for funding after calls for proposals have been funded. - If No, explain why: N/A First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 15 III.4 Projects funded in the “awarding body” method without a call for proposals Projects funded in the “awarding body” method without a call for proposals Number III.5 Programme 2008 Programme 2009 TOTAL 2008-2009 0 0 0 Total number of projects funded in the “awarding body” method in the programmes 2008 and 2009 Number of … Projects funded after calls for proposals (see table III.3) Projects funded without a call for proposals (see table III.4) TOTAL Projects funded in the “awarding body” method Programme 2008 Programme 2009 TOTAL 2008-2009 2 0 2 0 0 0 2 0 2 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 16 Part IV IMPLEMENTATION OF THE PROGRAMMES IN THE “EXECUTING BODY” METHOD Did you implement the 2008 and 2009 programmes in the “executing body” method (as defined in Article 8 of Commission Decision 2008/458/EC of 5.3.2008 - the Return Fund Implementing Rules), at least for part of the programmes? Yes/No: Yes After examination and assessment according to internal procedure for selection of projects the RA has funded 6 projects under the AP 2008 in the “executing body” method. The projects have been implemented indirectly by the RA, by involving the Migration Directorate at the MoI as national authority with competencies in the field concerned. The decision for funding of each project is formalized in a contract between the responsible authority and the the Migration Directorate The implementation of projects under AP 2009 is forthcoming. The process of ex-ante evaluation of project proposals in executing mode is on-going. The projects funded under AP 2008 are listed below: Project RF/2008/P1/A1, A2 (Action 1 and Action 2 under AP 2008) „Additional equipment for 2 selected premises of the Temporary Accommodation Centre for Third-Country Nationals in Busmantsi, necessary to provide appropriate conditions for specialized consultative work with vulnerable persons and specialised interpretation services connected with the consultative work for assisting vulnerable persons”; Contract No І-10609/31.03.2010 г. between RA and Migration Directorate Project RF/2008/P1/A4 Implementation of compulsory administrative measures against nationals of third countries with which the cooperation in the field of return is especially difficult; (Action 4 under AP 2008); Contract № I-11547/12.04.2010 between RA and Migration Directorate Project RF/2008/P1/A5 - “Elaboration of comprehensive assessment (analysis) of the situation in the Republic of Bulgaria, other member states and countries of origin in relation with the migration processes, as a precondition for the development of Integrated Return Management Strategy”; Contract No DES 3/30.04.2010 between RA and Migration Directorate Project RF/2008/P2/A6 “Establishing network for cooperation with the reception centers in the countries of origin through interaction with NGOs and other MS”, Contract No DES 2/30.04.2010 between RA and Migration Directorate Project RF/2008/P2/A7 “Joint programme with MS for implementation of best practices regarding particular states or regions of origin and/or former stay”; Contract No DES-4/14.05.2010. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 17 Project RF/2008/P3/A9 “Creation of new and more effective methods of work with representatives of diplomatic missions in Bulgaria while exchanging information regarding return”, Contract No DES 1/30.04.2010 between RA and Migration Directorate IV.1 Share of the overall EU contribution to the programmes granted in the “executing body” method in 2008 and 2009 For each programme year (2008 and 2009), enter the share of the overall EU contribution to the programme (excluding the EU contribution for technical assistance) which was granted in the “executing body” method (in percentage, no decimal). - Programme 2008: 34 % of the EU contribution to the programme (excluding the EU contribution for technical assistance) - Programme 2009: N/A, not started yet IV.2 Calls for expression of interest or for proposals or similar selection method For each programme year (2008 and 2009), please provide the number of calls for expression of interest or for proposals or similar organised for the implementation of the RF annual programmes in the “executing body” method - Programme 2008: 0 (number of calls for expression of interest or for proposals or similar selection method) - Programme 2009: 0 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 18 IV.3 Proposals received, selected and funded after calls for expression of interest, call for proposals or similar selection method in the “executing body method” Number of … Programme 2008 Programme 2009 TOTAL 2008-2009 Proposals received Projects selected Projects funded 0 0 0 0 0 0 0 0 0 Have all projects selected for funding after calls for expression of interest, call for proposals, or similar been funded? Yes/No: N/A - If No, explain why: N/A First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 19 IV.4 Projects funded in the “executing body” method without a call for expression of interest or for proposals or similar Projects funded in the “executing body” method without a call for expression of interest or for proposals or similar selection method Number IV.5 Programme 2008 Programme 2009 TOTAL 2008-2009 6 0 6 Total number of projects funded in the “executing body” method in the programmes 2008 and 2009 Number of … Projects funded after calls for expression of interest, calls for proposals, or similar selection method(see table IV.3) Projects funded without such calls (see table IV.4) TOTAL Projects funded in the “executing body” method Programme 2008 Programme 2009 TOTAL 2008-2009 6 0 6 0 0 0 6 0 6 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 20 Part V SUMMARY DESCRIPTION OF THE PROJECTS FUNDED IN THE “AWARDING BODY” METHOD AND IN THE “EXECUTING BODY” METHOD 2008 - 2009 1. Summary description of the projects funded under Priority 1 in the annual programmes 2008 and 2009 In the “awarding body” method: No projects funded in the “awarding body” method under Priority 1 in the AP 2008. The implementation of AP 2009 has not been started yet. In the “executing body” method: - Project RF/2008/P1/A1, A2, Contract No І-10609/31.03.2010: Within the framework of the project 2 premises at the Temporary Accommodation Centre for Third Country Nationals at the Migration Directorate have been equipped for information and consultation activities with vulnerable persons. The project envisaged also provision of specialized interpretation services from/to rare foreign languages during consultative work with the vulnerable persons. Due to lack of bids no subcontractor for translation and interpretation has been hired. - Project RF/2008/P1/A4, Contract No I-11547/12.04.2010: The project aims at return of third country nationals, who do not or no longer fulfill the conditions for stay in Bulgaria and return decisions for them have been issued. The project focused on the countries with which the cooperation in the field of return is especially difficult. 17 persons have been returned to their country of origin within the scope of the project, 3 of them have been escorted and 14 returned voluntarily. The project expenditures comprise Specific expenses for target groups (flight and ferry tickets, visas, photos, cash incentives etc) and daily allowances and accommodation for escort officials. - Project funded RF/2008/P1/A5, Contract No DЕS-3/30.04.2010 aimed at preparation for the development of Integrated Return Plan under the AP 2009. The achieved project results are: an analysis on the migration processes and legislation in Austria and Sweden elaborated by ICMPD as a subcontractor, study visit of experts of the Migration Directorate and the Border Police in Austria which have developed an assessment of the same aspects in Bulgaria. 2. Summary description of the projects funded under Priority 2 in the annual programmes 2008 and 2009 In the “awarding body” method No projects funded under Priority 2. The implementation of AP 2009 has not started yet. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 21 In the “executing body” method: There are two projects funded under Priority 2: 1. Project RF/2008/P2/A6; Contract No DES - 2/30.04.2010 between the RA and the Migration Directorate at MoI: The project encompasses a study on the existing reception centers in countries of origin and an assessment on the possibilities for interaction of the Migration Directorate with these centers, initially envisaged to be elaborated by a subcontractor. Due to unsuccessful tender procedures the study has been elaborated by experts of the Migration Directorate with the assistance by 2 external experts from the Immigration service of Federal state of Berlin. In addition a working visit to Germany has been conducted so that the officials of the Migration Directorate become acquainted with expertise regarding return procedures and reception centers. Project results have been presented during a seminar in Bulgaria with the participation of NGOs and international organizations. 2. Project RF/2008/P2/A7; Contract No DES - 4/14.05.2010 between the RA and the Migration Directorate at MoI, (Action 7 under AP 2008), aims at preparation for development of a joint programme with MS for implementation of “best practices” and improvement of the cooperation with MS and elaboration of cooperation programme for implementation of the best practices. 3. Summary description of the projects funded under Priority 3 in the annual programmes 2008 and 2009 In the “awarding body” method Two grants awarded under Priority 3: - BG/RF2008/A8/GR1 - 01 - Grant agreement No DES- 09/08.06.2010 “Information campaign for third-country nationals according to the humanitarian principles and in respect of their dignity”. The activities under the project aim at development and distribution of 1000 posters, 30 000 brochures and 30 billboards; elaboration and distribution of a 30 sec. video-clip and a 15 min documentary. The project is implemented and results have been achieved. - BG/RF2008/A8/GR1-02 Grant agreement No DES-10/10.06.2010 “Information and advice for third-country nationals while encouraging them for voluntary return”, including dissemination of 22 000 pieces of information materials, 1 broadcast of an elaborated video-clip. The project aims encouraging the voluntary return and reintegration in the countries of origin/return; better quality of services rendered to third-country nationals voluntarily returned and facilitated reintegration in the countries of origin/return; better cooperation between institutions dealing with migration, international organizations and NGOs. The project results have been successfully achieved. In the “executing body” method. One project has been funded under Priority 3: -Project RF/2008/P3/A9; Contract No DES - 1/30.04.2010 between the RA and the Migration Directorate at MoI (Action 9 under AP 2008) aims at creation of new and more effective methods of work with representatives of diplomatic missions in Bulgaria while exchanging information regarding return”. Within the scope of the project 4 workshops have been carried on with the active participation of experts of the Migration Directorate at the MoI and representatives of the diplomatic missions of Vietnam, China, Russia, Israel, Armenia, Morocco, Lebanon, Syria and Iraq in Bulgaria, of the Consular Affairs Directorate at the Ministry of Foreign Affairs in Bulgaria, UNHCR and NGOs. The above mentioned countries are among the countries with greatest migration flow to the EU through Bulgaria. The aims of the meetings was to encourage the cooperation in detection of the First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 22 immigrants identity, the issuance of travel documents for returnees, better coordination in solving difficult cases and finally maximum effectiveness of the return process as a whole. 4. Summary description of the projects funded under Priority 4 in the annual programmes 2008 and 2009 In the “awarding body” method N/A In the “executing body” method N/A 5. Summary description of the projects funded in the “awarding body” method without a call for proposals, in the annual programmes 2008 and 2009 No projects funded so far in the awarding body method without call for proposals. 6. Summary description of the projects funded in the “executing body” method without a call for expression of interest, a call for proposals or similar selection method, in the annual programmes 2008 and 2009 Project RF/2008/P1/A1, A2 „Additional equipment for 2 selected premises of the Temporary Accommodation Centre for Third Country Nationals, necessary to provide appropriate conditions for specialized consultative work with vulnerable persons and specialized interpretation services connected with the consultative work for assisting vulnerable persons”; Contract No І10609/31.03.2010 between RA and Migration Directorate – as per p. 1 Project RF/2008/P1/A4 “Implementation of compulsory administrative measures against nationals of third countries with which the cooperation in the field of return is especially difficult; Contract № I-11547/12.04.2010 between RA and Migration Directorate – as per p.1 Project RF/2008/P1/A5 - “Elaboration of comprehensive assessment (analysis) of the situation in the Republic of Bulgaria, other member states and countries of origin in relation with the migration processes, as a precondition for the development of Integrated Return Management Strategy”; Contract No DES -3/30.04.2010 between RA and Migration Directorate – as per p. 1 Project RF/2008/P2/A6 “Establishing network for cooperation with the reception centers in the countries of origin through interaction with NGOs and other MS”, Contract No DES -2/30.04.2010 between RA and Migration Directorate as per p.2 Project RF/2008/P2/A7 “Joint programme with MS for implementation of best practices regarding particular states or regions of origin and/or former stay”, Contract No DES - 4/14.05.2010 between RA and Migration Directorate – a per p.2 Project RF/2008/P3/A9 “Creation of new and more effective methods of work with representatives of diplomatic missions in Bulgaria while exchanging information regarding return”, Contract No DES -1/30.04.2010 between RA and Migration Directorate –as per p. 3 First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 23 7. Explain any significant change to the distribution of the projects funded in the “awarding body” method, by Priority and by Specific Priority, in the annual programmes 2008 and 2009 Only 1 action in the AP2008 is funded in the “awarding body” method: Action 8 (“Information campaigns for third-country nationals while observing the humanitarian principles and respecting their human dignity”), Priority 3 (Assistance for specific innovative national/international instruments for the return management), Specific priority 3.1. The budget distributed for this action is 20% of the total budget of the AP. The remaining 8 actions in the AP2008 are funded in “the executing body” method due to the fact that the only possible beneficiary is the Migration Directorate at the Ministry of Interior which is the competent national body in the field of migration control. “The executing body” method is predominant in AP2008 and it was expressly chosen in the process of programming because of the nature of the actions to be funded: strengthening the administrative capacity of the Migration Directorate, enhancement of the cooperation between the Migration Directorate and the respective services in other Member States as well as third-country agencies for facilitation of return to the countries of origin, and support for forced return of illegally staying third-country nationals. The funds envisaged in AP2009 however were allocated for measures other than strengthening the administrative capacity and the international cooperation with other MSs and countries of origin which were partially met by the Actions in the first AP. A considerable portion of the funds in AP2009 are intended for projects in the field of voluntary return, incl. reintegration measures, which were planned to be implemented under the “awarding body” method. Thus, actions funded in the “awarding body” method in AP2009 are 4: 2 under Priority 1, one under Priority 3, and one under Priority 4; 53% of the total amount of funds envisaged for the implementation of AP2009 is allocated for actions funded in the “awarding body” method. 8. Explain any significant change to the distribution of the projects funded in the “executing body” method, by Priority and by Specific Priority, in the annual programmes 2008 and 2009 See above 9. Highlight any significant change (other than the distribution referred to under points 7 and 8) to the projects funded in the “awarding body” and “executing body” method in the annual programmes 2008 and 2009 In the “awarding body” method N/A In the “executing body” method First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 24 The projects have been implemented within short project duration as initially planned. The necessary legislative changes related to the establishment of an adequate Control and Management System caused serious delay in the implementation of the AP 2008. This obstacle called for immediate action having in mind the end of the eligibility period. Therefore the RA, while observing the programme consistency, has taken the decision to implement the projects in short time in order to set up the preconditions for continuation of the actions under the AP 2009. The project content remained in line with the objectives and results of the AP 2008. The shorter project duration determined the limited allocations which have been absorbed. Nevertheless the most important results have been achieved and they will contribute to the achievement of the objectives of the AP 2009. 10. Important projects funded in the annual programmes 2008 and 2009 2008 annual programme Project № DEC-3/30.04.2010, named “Elaboration of comprehensive assessment (analysis) of the situation in the Republic of Bulgaria, other member states and countries of origin in relation with the migration processes, as a precondition for the development of Integrated Return Management Strategy”. The implementation of the project resulted in: Report on the results from an analysis of main migration flows, forecasts, trends and legislation in the area of migration in Austria and Sweden in particular the historical background of migration, legal and institutional framework, statistics, integration policy, return policy, illegal migration. The report was elaborated by the International Centre for Migration Policy Development as a subcontractor. The study has served as a basis for the implementation of the second phase of the project, namely elaboration of similar analysis in Bulgaria by experts of the Migration Directorate, and 2 outside experts from 2 NGOs, hired temporarily and specifically for the project. Both analyses represent an important precondition for the development of an Integrated Management Strategy and Integrated Return Plans. Project № BG/RF2008/A8/GR1 - 01 and BG/RF2008/A8/GR1 - 02 - grant agreements with the IOM and a private company under Action 8 of the AP 2008 “Information campaigns for thirdcountry nationals while observing the humanitarian principles and respecting their human dignity”. The elaborated video-clip, information materials (flyers, billboards, brochures) promoting the voluntary return and reintegration in the countries of origin/return; better quality of services rendered to third-country nationals voluntarily returned and facilitated reintegration in the countries of origin/return; better cooperation between institutions dealing with migration, international organizations and NGOs. 2009 annual programme - The implementation of the programme has not started yet. 11. Description of one “success story”, among all the projects funded in the annual programmes 2008 and 2009 As a “success story” could be considered the implementation of the grants aiming at information campaigns for third-country nationals and promoting the voluntary return to their country of origin. The implementation of the Action in a very short time led to the achievement of the following important results: elaborated and distributed 2 video-clips, one documentary, 53 000 information materials (flyers, billboards, brochures) promoting the voluntary return and reintegration of the First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 25 returnees in their countries of origin/return and cooperation between institutions dealing with migration, international organizations and NGOs. Increased interest was shown by those who are in procedure for giving a status of refugee by the State Agency for Refugees or those who received refusal by the State Agency for Refugees. (All these persons are charged with coercive administrative measure.) 12. Description of one “failure”, among all the projects funded in the annual programmes 2008 and 2009 As a “failure” should be considered the project funded with a Contract DEC - 4/14.05.2010 under Action 7 of AP 2008 - “Joint programme with MS for implementation of best practices regarding particular states or regions of origin and/or former stay”. The implementation of the project started in the middle of May 2010, the time for the implementation of the project was 2 months and none of the Member State invited responded to the invitation for cooperation. The following expected results were not achieved: - improvements of the cooperation with the MS institution dealing with migration; support to Migration Directorate - MoI while applying best practices regarding particular countries and regions of origin; - Improvement of the administrative capacity of the beneficiary in terms of practical implementation of the return procedures. The MS were contacted by e-mail were in details were described the activity, the expected results and the deadlines for implementation. It is supposed that the short period for implementation of the activity is the main reason for the projects failure. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 26 Part VI TECHNICAL ASSISTANCE INFORMATION AND PUBLICITY 1. Technical assistance Technical assistance was spent for: - Training of RA experts: 12 experts of the RA passed a training on “Activities and functions of the RA acting as an authority awarding grants in the course of the utilization of EU funds” held on 11-12 March 2010. The training was organized by the International Centre for Migration Policy Development. The lecturers from Poland, Slovakia and Belgium presented their experience in the “awarding body” method under SOLID funds. The follow up activities of the training envisaged consultation of the RA staff during preparation and publication of the call for proposals under AP 2008. - Hiring the external independent expert for participation in the selection committee for evaluation of applications submitted after the call for proposals; - Expenses related to arrangements of information days, SOLID committee meetings, and translation of the Manual of Procedures of the RA from Bulgarian into English, software services. 2. Information and Publicity - Information and publicity activities by the Responsible Authority Information and publicity activities by the Responsible Authority Following Articles 33 of the RF Implementing Rules, on 08.10.2009 RA organized and held information day for representatives of institutions and organizations (interested parties (partners)), including potential beneficiaries of RF. The meeting was attended by representatives of British Embassy in Sofia, the Ministry of Foreign Affairs, Bulgarian State Agency for Refugees with the Council of Ministers, International Organization for Migration, the UNHCR representation in Bulgaria, Assistance Centre for Torture Survivors, Caritas Bulgaria, Bulgarian Red Cross, International centre for development of migration policy, European Institute Sofia, etc. The RA presentation was focused on the Multiannual programme (Priorities, Objectives), the AP 2008 and AP 2009 (Priorities, Actions, budget), as well as the process and deadlines related to programming cycle for AP 2010. RA opened section (http://www.mvr.bg/EUFond_za_vrashtane/default.htm) for Return fund on the MoI website on 06.02.2009. Since May 2010 the RA has a separate web site (http://www.dmp.mvr.bg ). A special section for the RF is designed for publishing the information according to Article 33 (2) of the RF Implementing rules. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 27 - Information and publicity activities by the final beneficiaries Within the framework of the projects funded under “executing body” and “awarding body” method the Migration Directorate and the beneficiaries adhere to the requirements according to Article 34 of the RF Implementing rules. The Migration Directorate takes necessary measures to inform the public about the assistance obtained from the Fund. During workshops and seminars special materials have been printed with the EU logo in order those taking part in the project to be informed of the RF funding. Such measures are financed within the scope of each project and do not affect the TA. The grant beneficiaries also inform the public about the assistance co-financed by the RF. According to the grant agreements (Art.6 - Visual identification), the grant beneficiaries are obliged to inform the public that the project is co-financed by the RF. The steps undertaken must be in accordance with the applicable rules for information and publicity, stipulated in Commission Decision 458/2008/EO dated 05.03.2008 and Annex 10 to it. Any publication initiated by the grant beneficiaries under any form and content in any media must contain the following information: “This document is issued with the financial support, co-financed by the European Return Fund. The whole responsibility for the document content is born by <the name of the Beneficiary> and at any circumstances it should be accepted as an official statement of the European Commission and the Responsible Authority.” First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 28 Part VII ASSESSMENT OF IMPLEMENTATION OF THE ANNUAL PROGRAMMES 2008 AND 2009 VII.1. Assessment of the implementation of the 2008 Annual Programme 1. Has the 2008 programme been implemented as originally planned and broadly in line with the programme schedule? The 2008 programme has not been implemented as originally planned regarding the programmed schedule. The reasons could be summarized as follows: Legislative changes necessary for setting up an adequate Management and Control System; Change of the initially designed system at the end of 2009; Improvement of the organisational structure of the RA as well as recruitment of additional staff Delay in preparation of project fishes under AP 2008 by the beneficiaries due to quite new rules on eligibility; 2. Have you encountered problems on implementation of the 2008 annual programme? If so, what measures did you take? A problem during the implementation of the AP 2008 was the eligibility of the part of the equipment under Action 1 (2 access ramps) and the equipment under Action 3 (two specialized vehicles and one ambulance). The RA has taken the decision not to fund a project for delivery of the equipment due to short time of the project duration and taking into account the provisions on eligibility of costs for purchase of equipment based on depreciation costs corresponding to the rate of actual use and the duration of use for the project. 3. Has a revision of the 2008 programme by the Commission been necessary? If so, what were the main changes? N/A 4. Have you implemented the 2008 programme (the case being, the revised programme) fully? (= all or nearly all actions set out in the programme approved by the Commission, or in the revised programme approved by the Commission, could be implemented by the end of this programme) As of 30.06.2010 a total 6 out of 9 programmed actions were successfully implemented. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 29 The tender procedures for hiring a subcontractor for translation and interpretation services have been not successful due to lack of offers submitted which led to partially achievement of project objectives of the projects funded under Action 2 and Action 4. Action 3, which envisages purchase of 2 specialized vehicles for transportation of detained persons, 1 specialized vehicle with mobile platform for disabled persons and 1 ambulance, was not funded by the RA due to the short time of project implementation and the possible low degree of eligibility of costs based on depreciation of purchased assets. A project under Action 7 was funded by the RA but failed to be implemented due to late start of project implementation. 5. Have the expected quantitative and qualitative results of the 2008 programme - as set out in the programme / revised programme approved by the Commission - been achieved at the end of this programme? Action 1 – partly achieved; the aim to equip the two premises with (overhead-) projector, screen, flip-charts and information boards is completed. The purchase and installation of 2 access ramps for overcoming the levels’ difference is not completed. The programmed reconstruction of two premises at Temporary Accommodation Centre for Third-Country Nationals has not started. Action 2 – not achieved- the small tender procedure failed due to lack of bids submitted. Action 3- not achieved - not implemented. Action 4 - the expected results are partially achieved: 17 third-country nationals returned to their country of origin compared to 62 as per project fiche. Action 5: Fully achieved. Action 6 – Fully achieved. Action 7 - not achieved; the action was not implemented; Action 8- Fully achieved Action 9 -Partially achieved 6. In the light of the implementation of the 2008 programme, do you consider that the distribution of funding between the actions was appropriate? Were the actions set out in the programme you submitted to the Commission appropriate? The distribution of funding was appropriate but due to the late start of the implementation of AP 2008 as a whole, the maximum budgeted amount was not absorbed. As of the appropriateness of the programmed actions, the purchase of 2 specialized vehicles for transportation of detained persons, 1 specialized vehicle with mobile platform for disabled persons and 1 sanitary vehicle with medical equipment /ambulance/ for the implementation of the imposed compulsory measures should be considered as not appropriate because it was not programmed as a multiannual project and the money spent for its purchase could not be recovered by depreciation costs during the project lifetime. VII.2. 1. Assessment of the implementation of the 2009 Annual Programme Has the 2009 programme been implemented as originally planned and broadly in line with the programme schedule? First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 30 N/A 2. Have you encountered problems on implementation of the 2009 annual programme? If so, what measures did you take? N/A 3. Has a revision of the 2009 programme by the Commission been necessary? If so, what were the main changes? N/A 4. Have you implemented the 2009 programme (the case being, the revised programme) fully? (= all or nearly all actions set out in the programme approved by the Commission, or in the revised programme approved by the Commission, could be implemented by the end of this programme) N/A 5. Have the expected quantitative and qualitative results of the 2009 programme - as set out in the programme / revised programme approved by the Commission - been achieved at the end of this programme? N/A 6. In the light of the implementation of the 2009 programme, do you consider that the distribution of funding between the actions was appropriate? Were the actions set out in the programme you submitted to the Commission appropriate? N/A VII.3. 1. The Management and Control System for the Fund and the implementation of the Annual Programmes 2008 and 2009 Has the Management and Control System of the Return Fund which you designed in 2008, been efficient for the implementation of the annual programmes so far? The implementation of the actions envisaged under Annual Programme 2008 started after the changes in the Management and Control System of the Return Fund, described in point 2, were made. 2. Please list any changes you have made in the Management and Control System of the Return Fund which you designed in 2008, bearing in mind the experiences gained/ lessons learned during the implementation of the First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 31 annual programmes 2008 and 2009 and/or any comments from the Commission and/or audits The latest amendments to the Ministry of Interior Act (MoIA) have been adopted by Parliament in the fall of 2009 and entered into force as of December 25, 2009. The current version of MoIA is promulgated in the State Gazette, Vol. No. 93 of November 23rd, 2009. Following the said changes in the MoI Act the Government duly amended the Implementing Rules to the Ministry of Interior Act (IR-MoIA). The amendments to IR-MoIA have been approved by Council of Ministers Decree No. 2 of January 13th, 2010, which is promulgated in the State Gazette, Vol. No. 5 of January 19th, 2010. Both the MoI Act and the IR-MoIA are Internetaccessible: http://www.mvr.bg The abovementioned amendments have an effect to the Management and Control Systems of RF, as follow: 1. The former Certifying Authority – Financing Controlling Directorate was transformed. The Specialized Administrative Directorate “Planning & Management of the Budget” (SAD-PMB) at the Ministry of Interior has been designated as Certifying Authority for RF and EBF. The personnel entrusted with CA tasks were reappointed from Financing Controlling Directorate to the Planning & Management of the Budget Directorate. In its CA capacity the SAD-PMB of MoI is in charge of the certification aspects of the sound financial management of the implementation of the annual programmes under the two Funds. The SAD-PMB conducts all CA tasks as they are formulated in the Basic Acts (BAs) of the two Funds, and as further elaborated in the detailed Implementing Rules (IRs) to the two Basic acts. The SADPMB conducts all the tasks under Art. 29 of the BA for the RF. The CA-tasks stipulated in Article 150e, paragraph 10, Point “a” to Point “f’ of the latest version of IR-MoIA as functions of PMB Directorate. 2. The Procurement Directorate, which had been designated as Delegated Authority in charge of tender procedures under RF, was transformed. The CoM Decree No 205 of August 14th, 2009 for designation of the authorities for RF was amended by Council of Ministers Decree No 2 of January 13th, 2010 and no delegated authority is envisaged in the MCS for RF and EBF henceforth. In its RA capacity for the RF and EBF the IPD of MoI is in charge of the day-to-day management of the implementation of the annual programmes under the two Funds. The IP Directorate conducts all RA-related tasks as the latter are formulated in the Basic Acts of the two Funds, and as further elaborated in the detailed Implementing Rules to the two Basic acts. The IPD conducts all the tasks included in Art. 27 of the BA for the RF (Decision of European Parliament & Council /DEPC/, No 575 of 2007). In view of its RA-designation (with CoM Decree No 205 of August 14th, 2009), with the latest amendments to MoI Act, namely Art.16. Para 4, the IPD has been granted the statute of Legal (Juridical) Person. Being RA for the 2 Funds the IPD is responsible for the managing and implementing (including procurement) the MAPs under the 2 Funds in accordance with the principle of sound financial management. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 32 Part VIII OVERALL ASSESSMENT OF THE RESPONSIBLE AUTHORITY ON THE IMPLEMENTATION OF THE PROGRAMMES 2008 AND 2009 VIII.1. What is your overall assessment of the implementation of the Return Fund in your Member State from 2008 to 2009? The assessment includes only projects under AP 2008, in particular 8 projects at the total amount of 374236,50 EUR, of which 28677,40 EUR European financing and 93559,12 national contribution. The evaluated projects are separated in two groups depending on the method of implementation “Awarding body method” - 2 projects totaling 159913 EUR and “Executing body method” - 6 projects totaling 214323,50 EUR. The two projects funded in “Awarding body method” are focused on information campaigns for third-country nationals while observing the humanitarian principles and respecting their human dignity. The projects in the “Executing body method” are aimed at return of third-country nationals with imposed compulsory administrative measures to their country of origin; improvement of the consultative work with vulnerable persons, establishment of network with other MS and preparation for development of integrated return plans, contacting with diplomatic and consular missions of countries with which the cooperation is especially difficult. The projects are implemented by Migration Directorate- MoI, which is the institution dealing with illegally staying third-country nationals, imposing compulsory administrative measures and escorting the third - country nationals to the their country of origin. Relevance: The financial aid corresponds to the sector needs and is supported by proper legislation in line with the EU legislation in the area of migration and asylum. Development of sector strategy in the area of Bulgaria migration policy is envisaged. The project fiches structure is evaluated as completely satisfactory regarding the compliance with MP and APs, the priorities set, objectives, results, indicators, internal logic of the activities, eligibility of expenses. The beneficiary has to improve its knowledge on the RF eligibility rules. There are satisfactory indicators for measuring of the achieved results which are envisaged while developing the project fiches. As a whole, the indicators are measurable and time framed and can be used for progress measuring. The late start of the implementation and their short duration do not provide possibility for adequate measuring at the end of the eligibility period. Efficiency: The implementation of the projects funded is largely efficient. The expenditures made follow the principle of sound financial management, value -for- money and efficiency of costs when applying the criterion “lowest price” while choosing a subcontractor or purchasing of means for the project implementation. The expenditures made are market oriented. The invested resources match the results achieved. Effectiveness: The evaluation for projects effectiveness is satisfactory. The results achieved contribute partly to the achievement of the objectives set. The short duration of the projects under AP 2008 (between 1 to 3 months) does not guarantee completely achievement of the objectives. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 33 Regarding the projects, implemented jointly by the RA and Migration Directorate, efforts will be made for fully achievement of the objectives even after projects completion as well as in the framework of similar projects under AP 2009 and AP 2010. In particular, the latter concerns the project for work with vulnerable persons. In the framework of the project, equipment is delivered for the purpose of consultations of vulnerable persons. The equipment is used for the purposes stipulated in the project, but concrete results can be tracked after a definite period of time. The objectives set in the project for return of third-country nationals to their country of origin are partially achieved. A total of 17 out of 62 third-country nationals as per project are returned to their country of origin due to the short duration of the project (3 months), but the financing of the objective shall continue under AP 2009. Meanwhile, the project under Action 5 of AP 2008 shows full achievement of the objectives and is a precondition for successful implementation of the project under AP 2009. The commitment of the beneficiaries in RF funds absorption and the achievement of goals will guarantee effectiveness. Impact: The implementation of the projects funded under RF is expected to impact positively on Bulgaria migration policy and the target groups, but the impact can be measured on later stage. As of 30.06.2010 the impact is “adequate”. Sustainability: The results following the RF financial aid are expected to be positive due to the support provided at high political level. There is political will and commitment from the Migration Directorate high level officials in application of the EC migration policy. VIII. 2 Taking into account the overall implementation of the Return Fund in your Member State from 2008 to 2009, what is your preliminary assessment in relation to the following aspects of the Return Fund on the following aspects? 1. Relevance of the programme's priorities and actions to the national situation Please describe how relevant the programme's objectives are overall to the problems and needs identified in the field of return management. Has there been an evolution which required a reshaping of the intervention? The projects funded under AP 2008 follow strictly the RF objectives and the RF multiannual programme of Bulgaria. The Republic of Bulgaria considers as priority the implementation of programmes in the field of joint return with other EU countries under the financial support of the RF and in the context of solidarity and shared responsibility. The Republic of Bulgaria shares the fair and effective implementation of common standards in the field of the Community migration policy and will work in future in order to improve the management of return in all its aspects, based on the principle of integrated return management. The AP 2008 included preparatory activities for the development of integrated return plans which shall analyze the situation in Member States, in cooperation with UN High Commissioner for Refugees (UNCHR) and International Organization for Migration (IOM). Within AP 2008 information campaigns were conducted to promote voluntary return of persons who are not obliged to leave the territory, focusing on humanitarian principles and return of individuals while respecting their dignity. Considering the latter, the Republic of Bulgaria considers that the main objectives of the RF are entirely relevant to the needs of the sector in the country and the actions under the RF are in support of the target groups. It is not necessary that the multiannual strategy of Bulgaria be changed. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 34 The priorities and objectives under the Return Fund interact with national policies. The Member States make their efforts in order to ensure the link between the common European migration policy and the domestic strategies. We can make a conclusion that the priorities and the types of actions at European level are reflected at national level. 2. Effectiveness of the programme Please highlight the key results of the programme overall and the extent to which the desired results and objectives (as set out in the multiannual programme strategy) been attained. Are the effects resulting from the intervention consistent with its objectives? The projects implemented under the AP 2008 have contributed to the achievement of concrete results and objectives set out in the Multiannual programme, in particular: • optimization of the measures for voluntary return of persons -The project funded under Action 4 of the AP 2008 has contributed to effective implementation of procedures for return of third country nationals illegally staying on the territory of Republic of Bulgaria which are subject to return. The target group of the project was third country nationals with imposed compulsory administrative measures staying in the Temporary accommodation centre in Sofia. An emphasis during project implementation was put on the encouragement of voluntary return. The project objective was partially achieved – 17 third country nationals returned to the country of origin, 3 of them were subject of forcible return and 14 returned voluntarily. The planned number of 62 returnees was not achieved due to short project duration. • Optimization of the performed activities with vulnerable groups in compliance with their specific needs – 2 of the premises of the Temporary accommodation centre in Sofia were equipped with ERF funds. The project aimed at optimization of consultative work with vulnerable persons. The objective is partly achieved within the 3 month project duration. The activities will go on after project end. • reduction of the time for stay in Temporary Accommodation Centre for Third Country Nationals through more dynamic cooperation with the diplomatic services, other MS and NGOs -Within the framework of a project funded under the ERF four meetings with representatives of the diplomatic missions were carried out. The evaluation of project results could be assessed on a later stage. • expanding the cooperation with international and national NGOs in the process of achieving an effective and sustainable return -Within a project with beneficiary the IOM an information champagne for voluntary return was conducted. The IOM has effectively promoted the opportunities of voluntary return jointly with the Migration Directorate at the MoI. • elaboration of programs for integrated return management of the return - The analysis of main migration flows, trends and legislation in the area of return policy in Austria and Sweden and Bulgaria are an important precondition for the development of an Integrated Return Management Strategy under the AP 2009. 3. Efficiency of the programme Please estimate the cost of the management of the Return Fund so far and whether in your opinion the programme's objectives are being developed in accordance with the original planning and at a reasonable cost. The efficiency of the projects under AP 2008 is estimated as “satisfactory”. The late start of the AP 2008 implementation due to the necessity of development of adequate systems for management and control led to absorption of 25% of the funds allocated for the implementation of the actions under the programme. The projects co-financed by the RF, lasted 1 to 3 months. The short time of First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 35 and 2009 implementation reasoned the decision of the RA to not finance the action 3 amounting to 195000 EUR (appr.25% of the programmed AP budget), based on the impossibility for absorption of the funds allocated through depreciation. In accordance with the principle of effectiveness of the expenditure and value-for-money principle, the implementation of the projects under AP 2008 corresponds to the results achieved. The results from the implementation of the projects funded led partially to the achievement of the project objectives. The commitment of the parties in the programme implementation shall guarantee results sustainability. 4. Complementarity Please indicate any issues you have had with establishing the complementarity and/or synergies with other programmes and/or EC financial instruments such as the other Funds of the General Programme, the Thematic Programme on Asylum and Migration and/or the Structural Funds. The measures envisaged in the AP 2008 avoid duplication with other EC financial instruments in the field of illegal migration in the Republic of Bulgaria and supplement the following projects: Transition Facility project BG/07/IB/JH/10: “Effective implementation of the EU acquis in the field of migration policy and further strengthening the Migration Directorate’s institutional capacity”. Several training seminars are envisaged under the project on the practical aspects of the execution of return procedures- completed; Schengen Facility Objective 5, Measure 1: “Building and renovation activities for modernization of the police premises in the border area” for the Temporary Accommodation Centre for Third Country Nationals in Lyubimetz, Haskovo District- on-going; Schengen Facility, Measure/Action 2 - Delivery of 4 automobiles and 5 minibuses (8 + 1 type) for the needs of Migration Directorate is envisaged – completed. 5. Added value Please indicate how you perceive the programme's added value in comparison with existing national programmes/policies at national, regional and local level, and in relation to the national budget in the area of intervention of the Return Fund. The two grant agreements signed under Action 8 of AP “Information campaign for third-country nationals according to the humanitarian principles and in respect of their dignity” introduced innovative methods for encouraging the voluntary return compared to the existing ones at national level. The information campaigns added value in the terms of publicity and increased possibility for influencing third-country nationals in Bulgaria to take the decision to return to their country of origin. The measures, envisaged for implementation of the Multiannual programme will ensure the further development of the migration policy, especially in the field of legal migration in the Republic of Bulgaria, supplementing the projects mentioned in the Report. The co-financing under the Return fund improves the cooperation between the member-states in the field of integrated return management and could support the implementation of similar First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 36 procedures against third country nationals staying at the territory of the EU. The application of common standards on return in different MS will facilitate the third country nationals in their efforts to return voluntarily to their countries of origin. The EC financing gives the opportunity to the MS to join their efforts in the implementation of these standards. Otherwise, under the RF project the MS could cooperate regarding the implementation of enforced returns. The integrated return plans require involvement of more than one member states, which means that the responsibilities and the financial resources will be shared. VIII.3. Any suggestions / recommendations for improvements in the regulatory framework (basic act and implementing rules) and the Commission guidance documents which would help you to streamline and improve the annual programming exercise in general? Options for improvements in the regulatory framework with the purpose of facilitating the annual programming process can be found in the application of a more flexible approach in the allocations of funds for the annual programmes. Currently, in the period August-September the European Commission determines the allocations for the next year. On the one hand, this delays the drafting of the relevant Annual Programme which has to be sent by 1st November, and on the other hand, the differences between the annual allocations and the Estimates for the period 20092013 under SOLID 2007/25 for the multiannual programme lead to some difficulties in programming actions in the long run. This problem is especially important as far as External Borders Fund is concerned where funds are considerable and a large number of projects are multiannual. VIII.4. Any suggestions / recommendations for improvements in the regulatory framework (basic act and implementing rules) and the Commission guidance documents which would help you to streamline and improve the implementation of the actions / projects and the control mechanisms on the actions/ projects? Considering the specific legislation in the area of public procurement (namely that the funds are considered as public funds), the RA recommendаtions are oriented to the simplification of the Implementing rules and the eligibility rules - they might be more general and allowing flexible implementation. The Manual on eligibility rules should contain more examples (practical cases) related to the eligibility of expenditures based on Member States experience in the implementation of the SOLID funds. VIII. 5. Any suggestions / recommendations for improvements in terms of the guidance and support by the Commission to the Member States on the implementation of the programming exercise and the management and control system? The control over the implementation of Fund is opportunity and challenge. To translate project proposals into implemented action is a key challenge. First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 37 Effort has been made to develop appropriate implementation procedures, to define risks and problems. Important issue is the strengthening of the administrative capacity of all stakeholders involved in the management and implementation of the Fund. The EC support consists of clear procedures, rules and flexible approaches for management of the Fund. End of the report First Evaluation report on Implementation of actions co financed by the European Return Fund under AP 2008 and 2009 38