PRODML Roadmap 2006-2010 Energistics 2nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford PRODML: The Most Viable Way to Enable Production Interoperability The Opportunity: Production application domain highly fragmented “Doing nothing” implies point to point integration: costly, slow, very high maintenance Opportunity to fix this! The Objective: Make integration cheaper, faster, simpler Enable dynamic creation “value loops” with new workflows and applications added “on the fly” Supply chain models “standards” vs “consolidated” – many vendors, public standards G&G/Reservoir – few vendors, de facto standards Production – industry standards approach PRODML Scada Slide #2 <PRODML/> Producing Asset Scope The Production Domain 2006 Initial Scope Gas Treating Facilities Gathering Separation & Distribution Oil Treating Facilities Injection Gas Export Facilities Oil Export Facilities Gas & Oil Contract Deliverability (Water, Steam, CO2) Water Handling •From bottom of the well to initial separation •Decisions we can effect in a day Reservoir Management: Slide #3 PRODML: Provides “Glue” in Key Area of Asset Management Business Processes High Frequency Low Frequency After Chevron, ExxonMobil 30 Sensor Data SCADA Systems Reservoir Models 2008 (OPC-UA Option) OPC Domain Application A Application B Geoscience Data De facto Standards Domain Application D Application E 2006 PRODML 2007-9 Many Production Applications Initial Scope 2010 PRODML Domain Maintenance Systems Drilling Systems Maintenance Domain WITSML Domain THE PROBLEM The Solution: Production: PRODML Solutions – Multiple Component Standards Medium Open Frequency Cycles Lack of existing standards Slide #4 PRODML – Material Progress 2006-7 A common language for production data has been created Commercial application has commenced, eg: Production Reporting (Statoil) Waterflood management (Chevron) DTS data management (Weatherford) First Commercial Applications (Schlumberger) R&D Proofs of Concept have been substantial: Gas Lift Optimisation Downhole sensors 5,000 well dataset transfers Network Model changes moving between applications Slide #5 PRODML Focus: Production Optimization Roadmap in place: 3 more years to industry standard High Frequency Business Processes Low Frequency 30 PRODML Focus Timeline: Timeline: Daily Weekly Field Surveillance Development Production and Management Planning Reporting Timeline: Field Optimisation Year Year Year Year Year Year Year 20062006 2007 2008 2008 20092009 2010 2006 2007 2009 2010 2009 2006 2010 2006 2007 2007 2008 2008 2009 2010 2006 2007 2007 2009 2010 2008 2010 20072008 2008 2009 2010 2010 2006 2009 (i) (ii) (i) (ii) (ii) (ii)(i) (i)(i)(ii) (ii)(ii) (i) (ii)(ii) (i) (i) (ii) (ii) (i) (i) (i) (i) (ii) ReservoirUse (i) (ii) (i) (ii) Use ReservoirWater SmartShared well Water Reservoir Well Welltest Monthly Integrate with Use Integrate Use Smart well Shared CasesSmart Production Dev Gas ModelDTShandling Daily with Reporting ESP SRP Use Smart well FluidsReservoir Well Welltest Integration Use Use Shared Shared Integration Monthly Production control opt.Fluids handling opt. with completions validation facilities Cases Cases network network ops. regulatory Cases Planning Cases optimizcapacity completion validation with facilities CaseswellLift capacity network network voidage with regulatory forecast downhole opt. maintenance based well Monitoring reporting NOJVs wells wells model with model with process reporting Cases Dev Planning Use offtake Gas forecast G/L & Downhole Daily Reporting ESP SRP ationdifferent & optimiztransfer &simulation maintenance model with model with and process reporting allocation change Opt. surveillance CasesoptimizLift change flowing downhole well different sensors reportingsimulation NOJVs wells wells ation monitoring referencing propagation detail level After Chevron, ExxonMobil Opt. propagation surveillance PTQ, ation allocation detail levelDTS Use Case Examples: [Timescales approximate] Gas Lift Optimisation (changes in well status or lift gas available) during 1 day Smart well control optimisation (offtake control from production data) weekly ProductionReservoir Operational mgt. (transient testing, voidage etc) monthly Development Planning (production data integrated with reservoir Slide #6 simulation) year Opportunity: Complete by 2010 Way ahead clear 2008-2010 after year 2 review completed: Extend Language for more processes & assets Evolve Multiple protocols, giving easier deployment & flexibility Professional support services from Energistics Grow Community: 7 Energy, 12 Svc. Co. ++ Multi-year commitment now required for successful completion Slide #7