PPT - Energistics

advertisement
PRODML Roadmap
2006-2010
Energistics
2nd Annual Standards Summit
2 November 07
Laurence Ormerod, Weatherford
PRODML: The Most Viable Way to
Enable Production Interoperability

The Opportunity:
 Production
application domain highly fragmented
 “Doing nothing” implies point to point integration: costly,
slow, very high maintenance  Opportunity to fix this!

The Objective:
 Make
integration cheaper, faster, simpler
 Enable dynamic creation “value loops” with new
workflows and applications added “on the fly”

Supply chain models “standards” vs “consolidated”
– many vendors, public standards
 G&G/Reservoir – few vendors, de facto standards
 Production – industry standards approach PRODML
 Scada
Slide #2
<PRODML/>
Producing Asset Scope
The Production Domain
2006 Initial
Scope
Gas
Treating
Facilities
Gathering
Separation &
Distribution
Oil
Treating
Facilities
Injection
Gas
Export
Facilities
Oil
Export
Facilities
Gas & Oil
Contract
Deliverability
(Water, Steam, CO2)
Water
Handling
•From bottom of the well to initial separation
•Decisions we can effect in a day
Reservoir Management:
Slide #3
PRODML: Provides “Glue” in Key Area of
Asset Management
Business Processes
High Frequency
Low Frequency
After Chevron, ExxonMobil
30
Sensor
Data
SCADA
Systems
Reservoir
Models
2008
(OPC-UA Option)
OPC Domain
Application
A
Application
B
Geoscience
Data
De facto Standards Domain
Application
D
Application
E
2006 PRODML
2007-9
Many Production Applications
Initial Scope
2010
PRODML Domain
Maintenance
Systems
Drilling
Systems
Maintenance Domain
WITSML Domain
THE PROBLEM
The Solution:
Production:
PRODML Solutions
–
Multiple Component
Standards
Medium Open
Frequency
Cycles
Lack of existing standards
Slide #4
PRODML – Material Progress 2006-7


A common language for production data has
been created
Commercial application has commenced, eg:
 Production
Reporting (Statoil)
 Waterflood management (Chevron)
 DTS data management (Weatherford)
 First Commercial Applications (Schlumberger)

R&D Proofs of Concept have been substantial:
 Gas
Lift Optimisation
 Downhole sensors
 5,000 well dataset transfers
 Network Model changes moving between applications
Slide #5
PRODML Focus: Production Optimization
Roadmap in place: 3 more years to industry standard
High Frequency
Business Processes
Low Frequency
30
PRODML Focus
Timeline:
Timeline:
Daily
Weekly
Field
Surveillance
Development
Production
and
Management
Planning
Reporting
Timeline:
Field
Optimisation
Year
Year
Year
Year
Year
Year
Year
20062006
2007 2008
2008
20092009
2010
2006
2007
2009
2010
2009
2006
2010
2006 2007
2007
2008 2008
2009
2010
2006
2007 2007
2009
2010
2008
2010
20072008
2008
2009 2010
2010
2006
2009
(i)
(ii)
(i)
(ii)
(ii)
(ii)(i)
(i)(i)(ii)
(ii)(ii)
(i)
(ii)(ii)
(i) (i)
(ii) (ii)
(i)
(i) (i)
(i)
(ii)
ReservoirUse
(i)
(ii)
(i)
(ii)
Use
ReservoirWater SmartShared
well Water Reservoir
Well
Welltest Monthly
Integrate with
Use
Integrate
Use Smart well Shared
CasesSmart
Production
Dev
Gas
ModelDTShandling
Daily with
Reporting
ESP
SRP
Use
Smart
well
FluidsReservoir
Well
Welltest
Integration
Use
Use
Shared
Shared
Integration
Monthly
Production
control
opt.Fluids
handling opt.
with
completions
validation
facilities
Cases
Cases
network
network
ops.
regulatory
Cases
Planning
Cases
optimizcapacity
completion
validation
with
facilities
CaseswellLift capacity
network
network
voidage
with
regulatory
forecast
downhole
opt.
maintenance
based
well
Monitoring
reporting
NOJVs
wells
wells
model
with
model
with
process
reporting
Cases
Dev
Planning
Use offtake
Gas forecast
G/L
&
Downhole
Daily
Reporting
ESP
SRP
ationdifferent
&
optimiztransfer &simulation
maintenance
model
with
model
with
and
process
reporting
allocation
change
Opt.
surveillance
CasesoptimizLift change
flowing downhole
well different
sensors
reportingsimulation
NOJVs
wells wells
ation monitoring
referencing
propagation
detail level
After Chevron, ExxonMobil
Opt. propagation
surveillance
PTQ,
ation
allocation
detail
levelDTS
Use Case
Examples:
[Timescales
approximate]
Gas Lift
Optimisation
(changes in well
status or lift gas
available)
during 1 day
Smart well
control
optimisation
(offtake control
from production
data) weekly
ProductionReservoir
Operational
mgt. (transient
testing, voidage
etc) monthly
Development
Planning
(production
data integrated
with reservoir
Slide #6
simulation) year
Opportunity: Complete by 2010

Way ahead clear 2008-2010 after year 2
review completed:
 Extend
Language for more processes & assets
 Evolve
Multiple protocols, giving easier
deployment & flexibility
 Professional
support services from Energistics

Grow Community: 7 Energy, 12 Svc. Co. ++

Multi-year commitment now required for
successful completion
Slide #7
Download