Additions & Improvements to GMRT & NCRA Electrical & Civil system For 2010-2011 R V Swami Group-Coordinator GMRT/NCRA Review of last year 2009-10 Power Line RFI Mitigation. For Improvement of MSB transformer centres ( 31 locations) around Central Square are surveyed jointly by MSEB & GMRT , report is submitted to EE Manchar Agreed for replacement of items as detailed below. DO Sets : 13 sets (GMRT) HT Pin & Disc Insulators : 12 no.s ( MSEB) HT /LT Bushings Improvement: 15 no.s(MSEB) LT Distribution Box replacement : 16 no.s (MSEB/GMRT) Xmer Center grounding system : 5 locations.(GMRT) Power Line RFI Mitigation. 25 Sq .mm Copper multi-strand cable was removed from live 400KV Line with help of TRANSCOM OFFICIALS (10th Feb 10) FEEDERWISE POWER SHUTDOWN /TRIPPING IN TOTAL HOURS for last one year Name of Feeder No. of interruption 33kv Incoming feeder- 83 11KV East Feeder Period in hrs. 18hrs 54 min - 48 38 hrs 39 min 11KV West Feeder - 42 43hrs 52 min 11KV South Feeder - 55 101 hrs14 min 11KV Indoor VCB Panel of 33KV GMRT Substation Routine checks and Preventive maintenance were done. MSEB testing Executive engineer & his team are happy with performance & upkeep of 11KV VCB Panels. Special thanks to Electrical team for following Achievements 400 KV line hanging copper wire removal On 23rd Feb 2010 at 17.40 hrs 33KV substation Breakdown maintenance attended in minimum time with help of MSEB testing engineer & our staff who worked continuously 8 – 10 hours & released system at 3:30 hrs early morning of 24th Feb 2010. On 12th March 33KV line breakdown at 17:40 hrs located fault at 22:00 hours and restored the power at 23:45hrs same day. Electrical Works completed Generator Synchronizing Panel , 2 times enquiry was floated . It is in process of finalizing the vender - 15 lacs Engine electronic governor procurement is in process. - 6.5 lacs Servo Lab (Jog )shed Copper mesh Shielding, Steel support structure fabrication for copper mesh shielding & false ceiling, Power supply through AC line filters. work is completed. Total amount spent for above work : 8 lacs Pending is Power Cable, OF cable laying & Air conditioner installation. Lean roof & W/C room Estimated Amount : 6 lacs Completed GMRT Civil Works in last year 2009-10 Visitor center Architect is finalised Centre Sq. Fencing strengthening work phase –II completed - 18 lacs Lab Building painting - 2.3 lacs Toilet block for canteen - 16.4 lacs & Lean Roof (F E Lab) Antenna Tower painting (pending ) - 10 lacs Balcony grill for New type III C & IV - 1.5lacs Quarters Achievements NCRA • 15 meter Dish AC unit installation work completed - 1.0 lacs • East Campus building repainting completed – 1.5 lacs • WBM Approach Road to Pune University through Parks and Garden is in progress - 4 lacs • Modification of Kitchen platform for Type III, IV, V quarters work in=s in progress. - 6.6 lacs • Area mapping and preparation of Building drawings - 7.2 lacs NCRA Campus • 3TR Cassette type A C unit is procured -1.0 lacs & installed in NCRA Server room as a stand by unit. In East campus UPS mains Power Cable fault located, Straight through joint made by our electrical team & power restored for UPS room . Additions & Improvements to GMRT Electrical & Civil system For 2010-11 R V Swami Group-Coordinator GMRT/NCRA Visitor Centre & Auditorium Building at GMRT Observatory Proposal for New building on North – East side of Canteen. It will be multipurpose building, primarily for visitor Centre & auditorium and also have office & lab space . Entire Building will be Shielded, air conditioned, More inputs & Ideas are invited from selected Architects Estimated Cost – 150 Lkhs Proposed Civil works Centre Sq. Fencing strengthening - 20 lacs work phase –III Lab Building common area repainting - 05 lacs Approach Roads for Y array - 07 lacs Antenna DG rooms Antenna Tower painting - 10 lacs OFC cable laying in C Sq. - 17 lacs Bituminous Road phase I ( 2 Km) - 21 lacs Visitor Center Building - 150 lacs Total for proposed Civil works - 230 lacs New Electrical Requirement 1) LED type Aviation lights with time switch6.5 lacs. 2)Replacement of Power D B of antenna shielded cages with MCCB and MCB's – 5.0 lacs 3) 20KVA, 415 V, 3 phase to 3 phase output. stabilizers for antenna split ac's - 21 lacs. Improvement of Antenna lightning & equipment grounding system - 7.0 lacs Total Estimated amount for new req. 39.5 lacs 3 TR Voltas make Slim Line A C Units for Antenna Shielded Cage Remaining Central Square antennas (5 no.s) - 10 units Purchasing is in process - 8.00 lacs . On Line UPS for antenna base Sample units of different makes being tested for RFI • Planned this year remaining 14 no.s • Estimated cost – 9 lacs Power Line RFI Mitigation. for this years plan • 11KV Transformer Centres around the Central Square - 6 lacs Diesel Gen Sets with AMF Panels for Y array Antennas Tested for actual Antenna load at three different antenna sites with 35KVA DG set . Required Number of D G Sets = 10No.s Estimated Amount = 40 Lakhs Total for GMRT Electrical Works Slim Line A C Units for 8 lacs Antenna Shielded Cage Generator Synchronizing Panel including electronic governor for engine 21 lacs On Line UPS for antenna base 9 lacs Power Line RFI Mitigation 6 lacs Diesel Gen Sets Y array Antennas 40 lacs New requirements of electrical system – 39 lacs Total for GMRT Electrical Works 123 lacs Total Estimates for GMRT For Civil works 230 lacs Total for Electrical Works Slim Line A C Units for 8 lacs Antenna Shielded Cage Generator Synchronizing Panel including electronic governor for engine 21 lacs On Line UPS for antenna base 9 lacs Power Line RFI Mitigation 6 lacs Diesel Gen Sets Y array Antennas 40 lacs New requirements of electrical system – 39 lacs Total for GMRT Electrical Works 123 lacs Total of GMRT Civil & Electrical - 353 lacs NCRA Civil & Electrical Works • Refurbishing of Office Building & Guest House Projected Cost - 67 lacs • External wall Repainting of All NCRA buildings - 7 lacs • East Campus gate - 12 lacs • Packaged A C units for NCRA Server & computer room - 9 lacs • UPS for New Computer Server Room -6 lacs • Total estimated cost for NCRA - 101 lacs Thanks & Best Wishes for future plans to Civil & Electrical team . GMRT : Civil- Shri. K Raja, Shri S D Patil, Shri. Kambale Electrical - Shri. B S Patil, Shri. Shri. A A Dewane ,P S Gaikwad, Shri. G G Thorat, Shri. J L Ghangale, Shri. H V Kedari, Shri. T M Patil, Shri. Shakthi, Shri. R B Thorat & Shri. A R Kotwal. NCRA: Civil – Shri. Jadhav, Shri. Shelar. Electrical – Shri. Karekar, Shri. Tonde, Shri. Mehatre, Shri. Harjinder THANK YOU